Search NASA⌕ Search

SEARCH · Search NASA

Results for “assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Effect of polarity of electric current on friction behavior of two gallium-lubricated tantalum slipring assemblies

Computer-processed data from low-speed (10 rpm) slipring experiments with two similar (but of opposite polarity) gallium-lubricated tantalum slipring assemblies (hemisphere against disk) carrying 50 amperes dc in vacuum (10 to the minus 9th power torr) showed that the slipring assembly with the anodic hemisphere had significantly lower peak-to-peak values and standard deviations of coefficient-of-friction samples (a measure of smoothness of operation) than the slipring assembly with the cathodic hemisphere. Similar data from an experiment with the same slipring assemblies running currentless showed more random differences in the frictional behavior between the two assemblies.

Przybyszewski, J.↗

Anti-buckling fatigue test assembly

An antibuckling fatigue test assembly is described for holding a metal specimen which is subjected to compression and to rapid cyclical heating and cooling while permitting visual observation. In an illustrative embodiment of this invention, the anti-buckling fatigue test apparatus includes first and second guide members between which the metal specimen is disposed and held, a heating assembly comprising a suitable heating source such as a quartz lamp and a reflecting assembly directing the heat onto the specimen, and a cooling assembly for directing a suitable cooling fluid such as air onto the specimen. The guide members each have a passage to permit the heat to be directed onto the specimen. An opening is provided in the reflecting assembly to permit visual inspection of that region of the specimen adjacent to the opening onto which the heat is directed.

Eichenbrenner, F. F.↗

Shaft seal assembly for high speed and high pressure applications

A seal assembly is provided for reducing the escape of fluids from between a housing and a shaft rotably mounted in the housing. The seal assembly comprises a pair of seal rings resiliently connected to each other and disposed in side-by-side relationship. In each seal ring, both the internal bore surface and the radial face which faces away from the other seal ring are provided with a plurality of equi-spaced recesses. The seal faces referred to are located adjacent a seating surface of the housing. Under normal operating conditions, the seal assembly is stationary with respect to the housing, and the recesses generate life, keep the assembly spaced from the rotating shaft and allow slip therebetween. The seal assembly can seize on the shaft, and slip will then occur between the radial faces and the housing.

Hadt, W. F.↗

Meta assembler enhancements and generalized linkage editor

A meta Assembler for NASA was developed. The initial development of the Meta Assembler for the SUMC was performed. The capabilities included assembly for both main and micro level programs. A period of checkout and utilization to verify the performance of the Meta Assembler was undertaken. Additional enhancements were made to the Meta Assembler which expanded the target computer family to include architectures represented by the PDP-11, MODCOMP 2, and Raytheon 706 computers.

Source record↗

Structural assembly in space

A cost algorithm for predicting assembly costs for large space structures is given. Assembly scenarios are summarized which describe the erection, deployment, and fabrication tasks for five large space structures. The major activities that impact total costs for structure assembly from launch through deployment and assembly to scientific instrument installation and checkout are described. Individual cost elements such as assembly fixtures, handrails, or remote minipulators are also presented.

Stokes, J. W.↗

Development of assembly and joint concepts for erectable space structures

The technology associated with the on-orbit assembly of tetrahedral truss platforms erected of graphite epoxy tapered columns is examined. Associated with the assembly process is the design and fabrication of nine member node joints. Two such joints demonstrating somewhat different technology were designed and fabricated. Two methods of automatic assembly using the node designs were investigated, and the time of assembly of tetrahedral truss structures up to 1 square km in size was estimated. The effect of column and node joint packaging on the Space Shuttle cargo bay is examined. A brief discussion is included of operating cost considerations and the selection of energy sources. Consideration was given to the design assembly machines from 5 m to 20 m. The smaller machines, mounted on the Space Shuttle, are deployable and restowable. They provide a means of demonstrating the capabilities of the concept and of erecting small specialized platforms on relatively short notice.

Jacquemin, G. G.↗

SADE: A space experiment to demonstrate structural assembly

The Structural Assembly and Demonstration Experiment (SADE) demonstrates that the Shuttle is a suitable base for space construction; this includes a test of the Shuttle's control system to determine its performance when a long attached truss or beam is extended from the bay. Examples of Shuttle-related systems that will receive special attention are the RMS, the lighting system, and the crew assembly capabilities. A second purpose is to determine the extent to which the assembly results from the Neutral Buoyancy Simulator can be used to forecast the results of space assembly is determined. Finally, the SADE truss design will be validated by measuring the performance of the deployment, the special connectors, and the assembly methods.

Harrison, J. K.↗

ACCESS (Assembly Concept for Construction of Erectable Space Structure) - A Shuttle flight experiment

ACCESS is a planned Shuttle flight experiment to assess the potential of an on-orbit construction concept designed for efficient manual assembly of a space truss. The experiment, which is scheduled for launch November 27, 1985, on the Space Transportation System (STS) flight 61-B, uses two astronauts secured in fixed foot restraints located in the Shuttle cargo bay to assemble a 45-foot long aluminum truss beam from 93 tubular struts and 33 nodal joints. Neutral buoyancy simulations of the flight experiment indicate the truss can be assembled in less than thirty minutes. Structural assembly, structural repair, flexible cable attachment and manual manipulation of the truss is also planned for the experiment using an astronaut secured in the Manipulator Foot Restraint attached to the Remote Manipulator System arm. Flight assembly data will be generated for correlation of the neutral buoyancy ground test data. This paper describes the ACCESS flight experiment and presents results of the neutral buoyancy development and training tests.

Heard, W. L., Jr.↗

Optimal use of human and machine resources for Space Station assembly operations

This paper investigates the issues involved in determining the best mix of human and machine resources for assembly of the Space Station. It presents the current Station assembly sequence, along with descriptions of the available assembly resources. A number of methodologies for optimizing the human/machine tradeoff problem have been developed, but the Space Station assembly offers some unique issues that have not yet been addressed. These include a strong constraint on available EVA time for early flights and a phased deployment of assembly resources over time. A methodology for incorporating the previously developed decision methods to the special case of the Space Station is presented. This methodology emphasizes an application of multiple qualitative and quantitative techniques, including simulation and decision analysis, for producing an objective, robust solution to the tradeoff problem.

Parrish, Joseph C.↗

Results of EVA/mobile transporter space station truss assembly tests

Underwater neutral buoyance tests were conducted to evaluate the use of a Mobile Transporter concept in conjunction with EVA astronauts to construct the Space Station Freedom truss structure. A three-bay orthogonal tetrahedral truss configuration with a 15 foot square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices (mobile foot restraints). The average unit assembly time (which included integrated installation of utility trays) was 27.6 s/strut, or 6 min/bay. The results of these tests indicate that EVA assembly of space station size structures can be significantly enhanced when using a Mobile Transporter equipped with astronaut positioning devices. Rapid assembly time can be expected and are dependent primarily on the rate of translation permissible for on-orbit operations. The concept used to demonstate integrated installation of utility trays requires minimal EVA handling and consequentially, as the results show, has little impact on overall assembly time.

Watson, Judith J.↗

Photovoltaic module on-orbit assembly for Space Station Freedom

One of the elements of the Space Station Freedom power system is the Photovoltaic (PV) module. These modules will be assembled on-orbit during the assembly phase of the program. These modules will be assembled either from the shuttle orbiter or from the Mobile Servicing Center (MSC). The different types of assembly operations that will be used to assemble PV Modules are described.

Sours, Thomas↗

Space Station assembly sequence planning - An engineering and operational challenge

This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

Kaidy, James T.↗

Opportunities for space station assembly operations during crew absence

Prior to Permanently Manned Capability (to be achieved approximately 21 months after the First Element Launch), the Space Station will be manned for less than 10 percent of its total staytime on orbit. The most intensive and critical Station assembly operations will occur during these early flights. Some robotic resources may be available to perform assembly operations while the Station crew is absent; however, the use of robotic devices for assembly operations during unmanned phases has not yet been adopted by the Space Station program. This paper studies the relevant aspects of teleoperated and autonomous assembly activities, and presents candidate assembly operations that could be performed during crew absence. From this analysis, the potential benefits of remote control of robotic resources can be weighed against any associated increase in cost and complexity that would accompany implementation of this capability.

Parrish, Joseph C.↗

Component count and preliminary assembly considerations for large space truss structures

Expressions for the number of truss components per truss division are presented along with expressions for the area and dimensions of mosaic hexagonal panel arrangements. The expressions were developed by substituting the number of truss components in specific truss divisions into associated polynomial equations and solving for the coefficients of the polynomials. To assist in automated or astronaut truss/panel assembly operations, a concept for assembling a tetrahedral truss with hexagonal panels is presented. The assembly concept minimizes the exchange of truss assembly devices and panel attachment devices, assuming that the number of exchanges is a driving assembly concern.

Kenner, W. Scott↗

The challenge of assembling a space station in orbit

Assembly of a space station in orbit is a challenging and complicated task. If mankind is to exploit the knowledge already gained from space flight and continue to advance the frontiers of space exploration, then space stations in orbit must be part of the overall space infrastructure. Space stations, like the Freedom, having relatively large mass which greatly exceeds the lifting capability of their transportation system, are candidates for on-orbit assembly. However, when a large wide-body booster is available, there are significant advantages to having a deployable space station assembled on Earth and transported into orbit intact or in a few large pieces. The United States will build the Space Station Freedom by the assembly method. Freedom's assembly is feasible, but a significant challenge, and it will absorb much of NASA's effort in the next 8 years. The Space Station Freedom is an international program which will be the centerpiece of the free world's space activities in the late 1990's. Scientific information and products from the Space Station Freedom and its use as a transportation depot will advance technology and facilitate the anticipated manned space exploration surge to the Moon and Mars early in the 21st century.

Brand, Vance D.↗

Interset: A natural language interface for teleoperated robotic assembly of the EASE space structure

A teleoperated robot was used to assemble the Experimental Assembly of Structures in Extra-vehicular activity (EASE) space structure under neutral buoyancy conditions, simulating a telerobot performing structural assembly in the zero gravity of space. This previous work used a manually controlled teleoperator as a test bed for system performance evaluations. From these results several Artificial Intelligence options were proposed. One of these was further developed into a real time assembly planner. The interface for this system is effective in assembling EASE structures using windowed graphics and a set of networked menus. As the problem space becomes more complex and hence the set of control options increases, a natural language interface may prove to be beneficial to supplement the menu based control strategy. This strategy can be beneficial in situations such as: describing the local environment, maintaining a data base of task event histories, modifying a plan or a heuristic dynamically, summarizing a task in English, or operating in a novel situation.

Boorsma, Daniel K.↗

Photovoltaic module on-orbit assembly for Space Station Freedom

One of the elements of the Space Station Freedom power system is the photovoltaic (PV) module. These modules will be assembled on-orbit during the assembly phase of the program. These modules will be assembled either from the Shuttle Orbiter or from the Mobile Servicing Center (MSC). The different types of assembly operations that will be used to assemble PV modules are described.

Sours, T.↗

Space Shuttle Main Engine component assembly, assignment, and scheduling expert system

The SSME's Component Assembly and Life Management Expert System (CALMES) assists the engine assembly and scheduling process, ensuring that these activities utilize available resources with the greatest possible efficiency. On the basis of parts inventories and a proposed flight schedule, CALMES (1) determined how components may be optimally assembled from the parts inventory, (2) assigns components to flights, (3) schedules component testing, and (4) schedules component assembly. A graph-theoretical optimal matching algorithm, based on a modified simplex method, is applied to the major functions required by the SSME component assembly and scheduling processes.

Dietz, W. E.↗