Search NASA⌕ Search

SEARCH · Search NASA

Results for “asset management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Demonstrating Distribution System Resiliency through Grid-Edge Microgrids, on a Multi-Site Networked Hardware-in-Loop Platform

With the increasing penetration of Distributed Energy Resources (DERs) at the grid-edge, power systems include more energy storage, remote switches, relays, voltage regulators, and other intelligent electronic devices (IED). Effective control of these grid-edge devices by using Advanced Distribution Management Systems (ADMS) can yield substantial improvements to the resiliency and power quality of distribution systems. In this paper, improvements to the resiliency of a distribution system are demonstrated using a multi-site evaluation environment consisting of a real-time Hardware-in-Loop (HIL) setup in which DERs and other IEDs are modeled; and an ADMS which monitors and is able to control the distribution system assets. The HIL model and the ADMS are located 2400 km away, with communication between the sites enabled by a data manager using Distributed Network Protocol 3 (DNP3), demonstrating the system's capabilities even over long distances. After a simulated transmission system failure in the HIL demonstration setup, DERs and other devices are operated to restore critical loads and node voltage profile (to within the 'nominal +/-5%' band) in the distribution system.

ADMS↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Survey of Cyber Risk Analysis Techniques for Use in the Nuclear Industry

Using traditional probabilistic risk analysis methods for severe accident safety risk management on non-digital systems, structures, and components at nuclear power plants is well-established. In contrast, cyber risk analysis of digital assets is still an immature field with unproven techniques due, in part, to the continuously changing threat environment and the challenge of digital assets failing in unexpected ways. As the nuclear fleet continues to adopt digital instrumentation and control systems, it is increasingly important to have effective and efficient cyber risk analysis techniques to support risk management decisions, such as risk elimination by system redesign or risk mitigation by implementation of prioritized security controls. To understand the state of the art in cyber risk analysis for future research, we surveyed 36 publications across ten application domains. We describe our survey methodology and rate each technique based upon scope, adoptability, and repeatability. In this work, we examine the unique constraints of the nuclear industry and outline the strengths and weaknesses of using the cyber risk analysis techniques in the industry, highlighting gaps with current techniques. We also discuss challenges and potential research directions for advancing the science for both existing and new advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Ten questions concerning reinforcement learning for building energy management

As buildings account for approximately 40% of global energy consumption and associated greenhouse gas emissions, their role in decarbonizing the power grid is crucial. The increased integration of variable energy sources, such as renewables, introduces uncertainties and unprecedented flexibilities, necessitating buildings to adapt their energy demand to enhance grid resiliency. Consequently, buildings must transition from passive energy consumers to active grid assets, providing demand flexibility and energy elasticity while maintaining occupant comfort and health. This fundamental shift demands advanced optimal control methods to manage escalating energy demand and avert power outages. Reinforcement learning (RL) emerges as a promising method to address these challenges. Here, in this paper, we explore ten questions related to the application of RL in buildings, specifically targeting flexible energy management. We consider the growing availability of data, advancements in machine learning algorithms, open-source tools, and the practical deployment aspects associated with software and hardware requirements. Our objective is to deliver a comprehensive introduction to RL, present an overview of existing research and accomplishments, underscore the challenges and opportunities, and propose potential future research directions to expedite the adoption of RL for building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Distribution System Voltage Regulation using State Estimation and DER Grid-Support Functions

Increasing solar energy penetrations may create challenges for distribution system operations because production variability can lead to large voltage deviations or protection system miscoordination. Instituting advanced management systems on distribution systems is one promising method for combating these challenges by intelligently controlling distribution assets to regulate voltage and ensure protection safety margins. While it is generally not the case today, greater deployment of power system sensors and interoperable distributed energy resources (DER)e.g., photovoltaic (PV) inverters, energy storage systems (ESS), electric vehicles (EVs)will enable situational awareness, control, and optimization of distribution systems. In this work, a control system was created which measures power system parameters to estimate the status of a feeder, forecasts the distribution state over a short-term horizon, and issues optimal set point commands to distribution-connected equipment to regulate voltage and protect the system. This two-year project integrated multiple research innovations into a management system designed to safely allow PV penetrations of 50% or greater. The integrated software was demonstrated through extensive real-time (RT) and power hardware-in-the-loop studies and a field demonstration on a live power system with a 684 kVA PV system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rapid Spaceborne Mapping of Wildfire Retardant Drops for Active Wildfire Management

Aerial application of fire retardant is a critical tool for managing wildland fire spread. Retardant applications are carefully planned to maximize fire line effectiveness, improve firefighter safety, protect high-value resources and assets, and limit environmental impact. However, topography, wind, visibility, and aircraft orientation can lead to differences between planned drop locations and the actual placement of the retardant. Information on the precise placement and areal extent of the dropped retardant can provide wildland fire managers with key information to (1) adaptively manage event resources, (2) assess the effectiveness of retardant slowing or stopping fire spread, (3) document location in relation to ecologically sensitive areas; and perform or validate cost-accounting for drop services. This study uses Sentinel-2 satellite data and commonly used machine learning classifiers to test an automated approach for detecting and mapping retardant application. We show that a multiclass model (retardant, burned, unburned, and cloud artifact classes) outperforms a single-class retardant model and that image differencing (post-application minus pre-application) outperforms single-image models. Compared to the random forest and support vector machine, the gradient boosting model performed the best with an overall accuracy of 0.88 and an F1 Score of 0.76 for fire retardant, though results were comparable for all three models. Our approach maps the full areal extent of the dropped retardant within minutes of image availability, rather than linear representations currently mapped by aerial GPS surveys. The development of this capability allows for the rapid assessment of retardant effectiveness and documentation of placement in relation to sensitive environments.

54 ENVIRONMENTAL SCIENCES↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

W-8 Production Liaison brochure [Slides]

W-8 is part of the Weapon Systems (W) Engineering Division. W Division provides the system engineering and program management necessary to sustain the safety, reliability, and security of Los Alamos National Laboratory’s assets in the active United States nuclear stockpile: the B61, W76, W78, and W88.

42 ENGINEERING↗

FRMAC Laboratory Analysis Manual Volume 1, Revision 0

The Federal Radiological Monitoring and Assessment Center (FRMAC) is an operational center, available on request by the Department of Homeland Security (DHS) to respond to nuclear and radiological incidents as described in the National Response Framework (NRF). Under the Federal Interagency Operational Plan for Response and Recovery’s Nuclear/Radiological Annex, the U.S. Department of Energy (DOE) has the responsibility to maintain the operational readiness of the FRMAC during the emergency phase of an event. FRMAC is initially established and managed by the Nuclear Emergency Support Team (NEST) and serves as an interagency operations center with representatives from various federal, state, and local radiological response organizations. The purpose of the FRMAC is to assist state, local, tribal, and territorial governments (SLTT) in their mission to protect the health and well-being of their citizens with: • Verified radiation measurements. • Interpretations of radiation distributions based on Environmental Protection Agency (EPA), Food and Drug Administration (FDA), or local Protective Action Guidelines (PAGs). • Characterization of overall radiological conditions. Once a declaration to respond to a radiological emergency has been made, the National Nuclear Security Administration (NNSA) Headquarters will coordinate the response in consultation with the cognizant NNSA Regional Coordinating Office (RCO). Each of the eight RCOs maintain a 24-hour response capability for radiological emergencies that may occur in states served by its region. When a FRMAC is established, it operates under the parameters of the Incident Command System (ICS), as defined in the National Incident Management Systems (NIMS) construct. The Consequence Management Home Team (CMHT) will be activated immediately during normal business hours (Pacific Time Zone), and within two hours otherwise. The Consequence Management Response Team (CMRT) is prepared for deployment within six hours after activation. Along with the assets, FRMAC provides an operational framework for coordinating of all federal off-site radiological monitoring and assessment activities during a response to a radiological emergency to support the coordinating agency and SLTT governments. Potential radiological emergencies that fall within FRMAC vary widely in terms of the area affected, the nature of the contamination, and the scope of the government’s response. Detonation of a nuclear device, accidental release of radiation from a nuclear power plant, and a terrorist threat are just a few of the many possible scenarios FRMAC must be prepared to address. Through all this, supporting the state, local, and tribal organizations in the protection of the public remains the primary goal of the federal response.

54 ENVIRONMENTAL SCIENCES↗

Operationalizing Synchrophasors for Enhanced Grid Reliability and Asset Utilization

The report discusses the development of production-grade synchrophasor software applications. The objective is to improve system reliability and asset utilization for offline as well as real-time considerations, as per the Department of Energy (DOE) guidelines specified by Funding Opportunity Announcement (FOA) DE-FOA-0001492. On the one hand, we have developed grid management applications on how to transform synchrophasor-based monitoring into operator guidance, and commercial grade tools addressing industry needs such as NERC Reliability Standards (MOD 26, MOD 27 and MOD 33). On the other hand, with the wide industrial adoption in mind, the developed applications have been fully discussed with utility partners and installed in the utility partners site including 6 field tests. The Model Validation and Calibration software module has been integrated into GE’s PhasorAnalyticsTM. The first commercial contract has been signed even before the close date of this project. The Angle-based Grid Management (AGM), Fast Voltage Security Assessment (FastVSA), Enhanced Islanding Monitoring(EIM) and Enhanced Disturbance Management (EDM) have been integrated into GE’s Grid Stability Assessment line of applications in e-terra Suite of EMS product.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Introduction to Los Alamos National Laboratory [Slides]

The Weapon Systems Engineering Division (W) provides the system engineering and program management necessary to sustain the safety, reliability, and security of the Los Alamos National Laboratory’s assets in the active United States nuclear stockpile - the B61, W76, W78 and W88. The Division generates key certification data for Annual Assessment supporting the Laboratory Director's letter to the President on the health of those warheads. This role demands ongoing surveillance of the active stockpile and evaluation of the potential impact of any issues through design, engineering, fabrication, testing using state-of-the-art computational simulation tools and engineering test facilities. The Division works in close liaison with the several production facilities across the nuclear security complex as well as with the customers in the US Navy and Air Force.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Advanced Oxygen-Free Electrolyzer for Ultra-Low-Cost H 2 Storage for Fossil Plants (Final Technical Report)

DOE’s Office of Fossil Energy and Carbon Management has determined that long-duration energy storage solutions co-located with fossil energy assets offer significant benefits to the fossil industry, electric utilities, and customers. T2M Global has developed an Advanced O 2 -Free Electrolyzer System (AES) Technology for low-cost, long-duration H 2 energy storage for fossil plants. The MW-class AES Module conceptual design aims to upgrade stranded assets (dilute/waste syngas streams, excess electricity, and waste heat) at fossil plants to higher value H 2 for additional revenue and greater sustainability. The H 2 energy storage equips fossil plants with the load following capability needed for the lucrative grid-support services market created by Variable Renewable Energy resources.

08 HYDROGEN↗

Capturing Historic Reliability Performance Through Graph Databases: A Model Based System Engineering Approach

With the goal of improving the performance and reliability of high dependable technological systems such as nuclear power plants, advanced monitoring and health management systems are employed to inform system engineers on observed degradation processes and anomalous behaviors of assets and components. This information is captured in the form of large amount of data which can be heterogenous in nature (e.g., numeric, textual). Such large data availability poses challenges when system engineers are required to parse and analyze them in order to track historic reliability performance of assets and components. This paper tackles directly this challenge by providing means to organize data in the form of a graph: a knowledge graph. The presented approach distinguish itself from current knowledge graph-based methods by the fact that model-based system engineering (MBSE) models are used to “put data into context”. In particular, MBSE models are used as skeleton of a knowledge graph; numeric and textual data elements, once processed, are associated to MBSE model elements. Thus, a knowledge graph captures both system architecture (though MBSE models) and health/performance data. Such feature opens the door to new data analytics methods designed to identify causal relations between observed phenomena.

97 - MATHEMATICS AND COMPUTING↗

Distributed Energy Resource Cybersecurity Framework and Cyber Range Integration

Distributed energy resource (DER) systems feature complex, data-driven communications networks that require careful system coordination and constant vigilance to ensure that grid assets are secure. Because DERs are an important component of the decarbonization strategy, agencies need to secure energy data that could implicate issues of national security if compromised. To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's (NREL's) Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions that are used to generate a site-specific report and recommendations. This paper outlines a plan to integrate the DER-CF with another key asset-NREL's cyber range-to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF for federal facility energy managers and planners. This integration will result in a visualization environment to interpret and interact with compliance data. Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FRMAC Assessment Manual Volume 1 - Assessment Division Operations

In the event of a major radiological incident or accident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities and/or capabilities for responding to such incidents (Ref. FRMAC10). The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. For less severe radiological incidents, elements of the Department of Energy (DOE) Consequence Management (CM) program, such as the CM Response Team (CMRT) or CM Home Team (CMHT) may be activated to provide similar support activities to regional or local response assets. This manual describes the roles and responsibilities of the Assessment Division of the FRMAC during a response to a radiological incident. Every effort will be made in this manual in accordance with the Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center (FRMAC) – Emergency Phase (Ref. RSL07) to use terminology consistent with the National Incident Management System (NIMS) for Incident Command System (ICS) organizations, planning processes, and leadership positions (Ref. FEMA17). This manual also applies to smaller scale CM responses that may involve the CMRT or CMHT elements without the formation of a FRMAC. It details the concept of operations for the Assessment Division, including common tasks performed by the Division. This manual also describes the organizational structure of the Assessment Division and roles of the personnel within the Division.

61 RADIATION PROTECTION AND DOSIMETRY↗

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Power Management Solution for Growing Loads at Airport Rental Facilities

Growing electrical loads across airport facilities could expand beyond local grid capacities. Coordinating flexible loads with generation and storage assets can reduce coincident peaks, mitigate costly upgrades, and reduce electricity costs. This report outlines how The Athena Team has developed a suite of tools, resources, and solutions to leverage load flexibility with energy assets to harness this value potential.

24 POWER TRANSMISSION AND DISTRIBUTION↗