Search NASA⌕ Search

SEARCH · Search NASA

Results for “automatic gain control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

168 records · Page 10

A Heritage BioSensor for Lunar Biology Experiments

Introduction: Automated biological experiments on small spacecraft missions have gained prominence over the past decade due to their simplicity, accessibility, and small mass, volume, and power needs. Most recently, the BioSensor microfluidic CubeSat payload aboard BioSentinel used an automated microfluidic cell culture system to study the effects of environmental stressors like deep space radiation and microgravity on yeast growth and metabolism. BioSentinel’s successor, the Lunar Explorer Instrument for space biology Applications (LEIA), will study the effects of lunar gravity and radiation using an improved version of the BioSensor microfluidic platform. The BioSensor payload has great adaptability to host a diverse range of biological experiments with single- and multi-celled organisms in both crewed and uncrewed missions, making it a compelling candidate for future space biology studies in a lunar surface environment. BioSensor Instrumentation on BioSentinel: The first spaceflight mission with the BioSensor, BioSentinel’s biology experiments occurred at three locations -- deep space, ISS and ground. The payload contained 18 microfluidic cards, each featuring 16 growth wells (a total of 288 growth wells). Each well was loaded before launch with desiccated yeast. In space, liquid culture medium (nutrients) was automatically introduced to batches of wells at a time to initiate a series of biology experiments. Temperature was maintained by thin film heaters on both sides of each card. Each well was equipped with three LEDs emitting at 570 nm, 630 nm, and 850 nm, paired with photodetectors to measure cell concentration and the alamarBlue (metabolic indicator dye) color transition from blue to pink. Phenotypic parameters like cell viability, metabolic rate, and generation time can be derived from these measurements. The sequence and timing of fluid fills, optical measurements, and thermal control were stored onboard, but could be updated asynchronously via ground communication. LEIA: LEIA is slated for launch no earlier than 2026 on a CLPS lander. BioSentinel’s BioSensor has been modified for use in LEIA. These improvements include: (a) storage for multiple culture medium types, (b) additional LED color (465 nm) for a new biological assay for antioxidant (carotenoid) production, (c) housing modifications for later biology load before launch, (d) improved isolation between electronic and fluidic components, and (e) improved humidity control for prolonged organism viability in case of post-load launch delay. Future Prospects: The consistent and successful demonstration of complex fluidics platforms alongside reliable instrument operations in a space environment is poised to create strong momentum for BioSensor-based biological experiment payloads. Planned future developments with the BioSensor include extending compatibility to a broader range of organisms and assays. Preliminary work has already demonstrated successful growth of Arabidopsis seedlings in fluidic cards. With a few modifications to the optical assembly, the setup could easily measure photosynthetic traits in plants and cyanobacteria. The addition of fluorescence measurements and generation of novel luminescent assays will elevate BioSensor’s functionality further. Beyond the BioSensor’s potential uses on free-flyer missions, ISS and Gateway, and CLPS landers, deploying the BioSensor to the lunar surface or in an artificial habitat on crewed missions could enable pioneering research on both how life responds to lunar conditions and future bioproduction capabilities making the BioSensor an indispensable tool for future space biology research.

Chinmayee Govinda Raj↗

Nonlinear filtering and limiting in high order methods for ideal and non-ideal MHD

The various filtering mechanisms and base scheme options of the newly developed adaptive numerical dissipation control in spatially high order filter schemes for the ideal and non-ideal magnetohydrodynamics (MHD) equations are investigated. These filter schemes are applicable to complex unsteady MHD high-speed shock/shear/turbulence problems. They also provide a natural and efficient way for the minimization of Div(B) numerical error. The type of spatial base scheme to be used in conjunction with our filter idea is very general. For example, spectral, compact and non-compact spatially central finite difference schemes are possible candidates. The adaptive numerical dissipation mechanism consists of automatic detection of different flow features as distinct sensors to signal the appropriate type and amount of numerical dissipation/filter where needed and to leave the rest of the region free from numerical dissipation contamination. The numerical dissipation considered consists of high order linear dissipation for the suppression of high frequency oscillation and the nonlinear dissipative portion of high-resolution shock-capturing methods for discontinuity capturing. The applicable nonlinear dissipative portion of high-resolution shock-capturing methods is also very general. The objective of this paper is to investigate the performance of using compact and non-compact central base schemes in conjunction with three commonly used types of nonlinear numerical dissipation for both the ideal and non-ideal MHD. This extended abstract shows the performance of three nonlinear filters in conjunction with a sixth-order non-compact spatial central base scheme. In the final paper, the high order compact spatial central base scheme will be illustrated and compared with the non-compact base scheme. The reason for the investigation of the high order compact spatial central base scheme over the non-compact base scheme is to evaluate if additional accuracy can be gained in regions of fine scale turbulence that are away from shocks/shears.

Yee,H. C.↗

Discrete Deterministic and Stochastic Petri Nets

Petri nets augmented with timing specifications gained a wide acceptance in the area of performance and reliability evaluation of complex systems exhibiting concurrency, synchronization, and conflicts. The state space of time-extended Petri nets is mapped onto its basic underlying stochastic process, which can be shown to be Markovian under the assumption of exponentially distributed firing times. The integration of exponentially and non-exponentially distributed timing is still one of the major problems for the analysis and was first attacked for continuous time Petri nets at the cost of structural or analytical restrictions. We propose a discrete deterministic and stochastic Petri net (DDSPN) formalism with no imposed structural or analytical restrictions where transitions can fire either in zero time or according to arbitrary firing times that can be represented as the time to absorption in a finite absorbing discrete time Markov chain (DTMC). Exponentially distributed firing times are then approximated arbitrarily well by geometric distributions. Deterministic firing times are a special case of the geometric distribution. The underlying stochastic process of a DDSPN is then also a DTMC, from which the transient and stationary solution can be obtained by standard techniques. A comprehensive algorithm and some state space reduction techniques for the analysis of DDSPNs are presented comprising the automatic detection of conflicts and confusions, which removes a major obstacle for the analysis of discrete time models.

MATHEMATICAL MODELS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Robonaut 2 - IVA Experiments On-Board ISS and Development Towards EVA Capability

Robonaut 2 (R2) has completed its fixed base activities on-board the ISS and is scheduled to receive its climbing legs in early 2014. In its continuing line of firsts, the R2 torso finished up its on-orbit activities on its stanchion with the manipulation of space blanket materials and performed multiple tasks under teleoperation control by IVA astronauts. The successful completion of these two IVA experiments is a key step in Robonaut's progression towards an EVA capability. Integration with the legs and climbing inside the ISS will provide another important part of the experience that R2 will need prior to performing tasks on the outside of ISS. In support of these on-orbit activities, R2 has been traversing across handrails in simulated zero-g environments and working with EVA tools and equipment on the ground to determine manipulation strategies for an EVA Robonaut. R2 made significant advances in robotic manipulation of deformable materials in space while working with its softgoods task panel. This panel features quarter turn latches that secure a space blanket to the task panel structure. The space blanket covers two cloth cubes that are attached with Velcro to the structure. R2 was able to open and close the latches, pull back the blanket, and remove the cube underneath. R2 simulated cleaning up an EVA worksite as well, by replacing the cube and reattaching the blanket. In order to interact with the softgoods panel, R2 has both autonomously and with a human in the loop identified and localized these deformable objects. Using stereo color cameras, R2 identified characteristic elements on the softgoods panel then extracted the location and orientation of the object in its field of view using stereo disparity and kinematic transforms. R2 used both vision processing and supervisory control to successfully accomplish this important task. Teleoperation is a key capability for Robonaut's effectiveness as an EVA system. To build proficiency, crewmembers have attempted increasingly difficult tasks using R2 inside the Station. After donning motion capture equipment and a virtual reality visor, Expedition 34/35 flight engineer Tom Marshburn began operations with simple hand movements. Having gained confidence, Marshburn guided R2's arms in a leader-follower exercise with crewmate Chris Cassidy. He was also able to use the hand to grab a tumbling roll of tape, a task only demonstrable in microgravity. Later efforts saw Cassidy handle softgoods through shared control with ground operators, mimicking an activity previously achieved using only autonomy. Robotic climbing through the ISS on handrails requires both precision motion and compliant grasps in order to both position grippers on handrails/seat track and prevent large internal forces. R2 climbs using actively controlled compliance and torque limiting to meet both the precision and softness requirements. During a step, the attached leg is controlled to be strong and stiff in order to maintain precision trajectory tracking. The swing leg is controlled to be stiff but weak to minimize unintentional impact forces while maintaining precision. During a simulated dual limb grasp (as shown in Figure 1), the R2 controller maintains one limb rigid and one limb soft to prevent large internal forces from building up. R2's grippers also use a form of force control to limit grip force while not fully closed on either a handrail or seat track thus limiting unintentional forces on cables/objects that may be present in R2's translational path. The on-board torso R2 safety system relies on a single end-effector velocity limit to prevent potential impact forces from exceeding Station maximum load requirements. R2's mobile configuration required modifications to the velocity limiting safety function due to its large, dynamic inertia. R2's legs maneuver the robot's mass creating configuration dependent, joint-relative inertias. A single all-encompassing velocity limit to cover worst case inertia is prohibitively low. The upgraded R2 control and safety systems solve this problem using momentum limiting, momentum control, and kinetic energy minimization. Momentum and kinetic energy take the robot mass into account relieving low velocity restrictions on low inertia end-effectors while ensuring that the overall mass of R2 is limited from hazardous velocities. The momentum of R2's five safety nodes (each of the four end-effectors and the body) is monitored and compared to a single momentum limit. If any of the five nodes exceeds the safety limit, the motor power is removed and the robot comes to a stop. Momentum control/limiting also provides a simple, reliable method to integrate hand held tools into the safety system by providing the tool mass to the control system thus automatically reducing the allowable velocity of the end-effector with the tool. Work on the ground continues to build the skill set for an EVA Robonaut. Recent experiments (Figure 2) demonstrate how a teleoperator can use R2 to manipulate a tether hook, an important safety precaution on spacewalks. Another task displayed Robonaut's ability to pull back a protective jacket over a hose and search for damage, as well as inspect a quick-disconnect fitting for debris. Demonstrations such as these are indicative of EVA work done on ISS, specifically seen during a series of spacewalks over 2012 and 2013 where astronauts searched for an ammonia leak in one of the external cooling loops. Through experiments both on ISS and on the ground, R2 is evolving and providing the information needed to plan out the upgrades that will make an EVA Robonaut an effective tool. With the addition of legs, R2 will start climbing inside the space station and supply invaluable information on how the climbing strategies and task stabilization techniques must be refined. Ground R2 systems will continue to work with additional EVA tools and equipment in preparation for onboard IVA testing and future EVA applications.

Diftler, Myron↗

Exploration of Near-Term Potential Routes and Procedures for Urban Air Mobility

Urban air mobility is gaining interest as the need for On Demand Mobility in today's congested traffic is becoming high in metropolitan areas. Urban Air Mobility (UAM) is envisioned as a concept to transport passengers and cargo safely and efficiently using innovative aircraft in the urban areas. It is expected to improve mobility for the general public, decongest road traffic, reduce transport time and reduce the strain on existing public transport networks. There exist several challenges to Urban Air Mobility (UAM) such as integration of procedures with airspace and the airport, noise levels that are acceptable to the general public, public safety, public acceptance, vehicle certification, and more. Most of the research in the United States and European skies (DLR - German Aerospace Center) related to urban areas has focused on small UAS (Unmanned Aircraft Systems) flights (NASA's UTM (UAS Traffic Management) research) and their integration with the airspace and building safe operations in densely populated areas. Previous studies on UAM have focused on fast time simulations of the routes that are separated via a separation service and network of routes. Similarly, research in Europe has focused on the approach profile for these innovative aircraft, vertiports and battery life among others. UAM as a part of the On-Demand Mobility effort has provided some guidelines for operations as shown below: Does not require additional ATC (Air Traffic Control) infrastructure; Does not impose additional workload on ATC; Does not restrict operations of traditional airspace users; Will meet appropriate safety thresholds and requirements; Will prioritize operational scalability; Will allow flexibility where possible and structure where necessary. This paper explores potential routes and procedures in a Human-In-The-Loop (HITL) experiment that could be applied in the near-term to allow integration of UAM flights into the airspace as well as a large airport. The airspace that was explored was Dallas Fort Worth (DFW) airspace managed by the DFW East Tower in South Flow only. In addition, Dallas Love Field (DAL) and Addison (ADS) airspace were also part of the testbed. The initial set of routes investigated in this study were published helicopter routes in the DFW area. Figure 1 shows class B airspace in DFW area and the origin/destination city pairs where UAM flights flew along with helicopter routes shown in blue. The research focused on exploring procedures for integrating UAM flights into Class Bravo and Class Delta airspace. Three different communication procedures, evaluated with three different levels of UAM traffic, are shown in Table 1. The current day routes were evaluated with current day communication procedures were explored as the first condition. The current day routes were also evaluated in the second condition with reduced communications, which was assumed due to the presence of a Letter Of Agreement (LOA). The purpose of the LOA was to reduce the verbiage associated with pilots getting clearance to Class B airspace from the controllers, pre-assigning beacons codes to the UAM flights, separate routes by assigning altitudes and speeds to flights going in any one direction. Flights were expected to automatically change frequency when exiting Class B airspace, thus transition points for entry and exit points were also specified in the LOA.

Urban Air Mobility↗