Search NASA⌕ Search

SEARCH · Search NASA

Results for “beam loading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Passive Microphonics Mitigation during LCLS-II Cryomodule Testing at Fermilab

The LCLS-II project calls for cryomodule production and testing at both Fermilab and JLab. Due to low beam loading and high cavity quality factor, the designed peak detuning specification is 10 Hz. Initial testing showed peak detuning up to 150 Hz with a complex and varying time-structure, showing both fast (1-2 second) and slow (1-2 hour) drifts in amplitude and spectrum. Extensive warm and cold testing showed Thermoacoustic Oscillations in the cryogenic valves were the primary source of the microphonics. This was mitigated by valve wipers and valve re-plumbing, resulting in a greatly improved cavity detuning environment. Additional modifications were made to the cavity mechanical supports and Fermilab test stand to improve detuning performance. These modifications and testing results will be presented.

43 PARTICLE ACCELERATORS↗

Status Update of a Harmonic Kicker Development for JLEIC

The Jefferson Lab Electron-Ion Collider (JLEIC) is an asymmetric high luminosity ring-ring collider proposed as the next major R&D facility for the nuclear physics community. Both of JLEIC?s electron and ion collider rings have high beam current with gaps serving the pur-poses of beam abort, ion clearing, etc. Those gaps will cause time-varying beam loading in the storage RF cavi-ties, and may result in modulation of cavity RF phase/voltage and cyclic shift of collision point, which could lead to significant luminosity loss. We studied a few approaches to mitigate the RF phase modulation and IP shift, such as correcting the RF phase/voltage modula-tion with traditional LLRF feedback, one-turn feedback (OTFB), or RF feedforward (FF); optimizing the bunch fill pattern to limit the RF phase/voltage modulation to a small fraction of the bunch trains in the collider ring; or matching the RF phase modulation in the two rings. The preliminary results are discussed in this paper.

Guo, Jiquan↗

High-Charge Injector for on-Axis Injection Into A High-Performance Storage Ring Light Source

Next-generation, high-performance storage ring light sources based on multibend achromat optics will require on-axis injection because of the extremely small dynamic aperture. Injectors will need to supply full-current bunch replacement in the ring with high single-bunch charge for swap-out. For upgrades of existing light sources, such as the Advanced Photon Source Upgrade (APS-U), it is economical to retain the existing injector infrastructure and make appropriate improvements. The challenges to these improvements include achieving high single-bunch charge in the presence of instabilities, beam loading, charge stability and reliability. In this paper, we discuss the rationale for the injector upgrades chosen for APS-U, as well as backup and potential alternate schemes. To date, we have achieved single-bunch charge from the injectors that doubles the original design value, and have a goal to achieve about three times the original design value.

43 PARTICLE ACCELERATORS↗

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of $3.5\cdot 10^{-6}$ is presented from thermal, structural and fatigue lifetime perspectives.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗

Longitudinal matching without $γ_t$ quads

The Yellow e-lens lattice requires a different working point (29.68/30.69 instead of 28.68/29.69) to provide the correct betatron phase advance between IP 8 and the e-lens. Since this raises $γ_t$ by about one unit, it needs to be ensured that longitudinal matching can still be achieved. In an earlier experiment, $γ_t$ had been lowered by $∆γ_t$ = 0.35 by means of the $γ_t$ quadrupoles. In the experiment reported here, longitudinal matching was achieved by lowering the 9 MHz RF cavity voltage, while $γ_t$ was raised by 0.5 units to more closely simulate the conditions with the higher integer tunes. During the experiment, the Yellow $γ_t$ quad design values were set to the park current (2A), and tunes were adjusted through RampEditor. The 9 MHz RF cavity voltage was reduced from 17 kV to the calculated matched value of 12 kV. Figure 1 shows the resulting beam profile evolution as measured by the wall current monitor (WCM). In an attempt to further fine-tune the matching, the voltage was set to 11.5 and 12.5 kV. However, shot-to-shot fluctuations were larger than the effect of these voltage variations. The Yellow Landau was off during this study, as set through the YellowStore tab in RFramps, as well as in the Landau tab. At the end of the study the Landau settings were restored in the Landau tab to the value as found at the start. The experiment was successful; matching was achieved with around 12 kV on the 9 MHz cavity. Had only one bunch in Yellow during the experiment, but 56 in Blue with the same 9 MHz RF voltage, though unmatched due to regular gamma-t quad settings. No problems due to beam loading at the low cavity voltage occured. This experiment, together with previous studies, indicates that longitudinal matching into the Yellow e-lens lattice can be achieved in spite of the higher horizontal tune.

43 PARTICLE ACCELERATORS↗

Longitudinal matching without $\gamma_t$ quads

The Yellow e-lens lattice requires a different working point (29.68/30.69 instead of 28.68/29.69) to provide the correct betatron phase advance between IP 8 and the e-lens. Since this raises $\gamma_t$ by about one unit, it needs to be ensured that longitudinal matching can still be achieved. In an earlier experiment, $\gamma_t$ had been lowered by$\Delta\gamma_t$ = 0.35 by means of the $\gamma_t$ quadrupoles. In the experiment reported here, longitudinal matching was achieved by lowering the 9 MHz RF cavity voltage, while $\gamma_t$ was raised by 0.5 units to more closely simulate the conditions with the higher integer tunes. During the experiment, the Yellow $\gamma_t$ quad design values were set to the park current (2A), and tunes were adjusted through RampEditor. The 9 MHz RF cavity voltage was reduced from 17 kV to the calculated matched value of 12 kV. Figure 1 shows the resulting beam profile evolution as measured by the wall current monitor (WCM). In an attempt to further fine-tune the matching, the voltage was set to 11.5 and 12.5 kV. However, shot-to-shot fluctuations were larger than the effect of these voltage variations. The Yellow Landau was off during this study, as set through the YellowStore tab in RFramps, as well as in the Landau tab. At the end of the study the Landau settings were restored in the Landau tab to the value as found at the start. The experiment was successful; matching was achieved with around 12 kV on the 9 MHz cavity. Had only one bunch in Yellow during the experiment, but 56 in Blue with the same 9 MHz RF voltage, though unmatched due to regular gamma-t quad settings. No problems due to beam loading at the low cavity voltage occurred. This experiment, together with previous studies , indicates that longitudinal matching into the Yellow e-lens lattice can be achieved in spite of the higher horizontal tune.

43 PARTICLE ACCELERATORS↗

A novel injection-locked amplitude-modulated magnetron at 1497 MHz

Thomas Jefferson National Accelerator Facility (JLab) uses low efficiency klystrons in the CEBAF machine. In the older portion they operate at 30% efficiency with a tube mean time between failure (MTBF) of five to six years. A highly efficient source (>55-60%) must provide a high degree of backwards compatibility, both in size and voltage requirements, to replace the klystron presently used at JLab, while providing energy savings. Muons, Inc. is developing a highly reliable, highly efficient RF source based upon a novel injection-locked amplitude modulated (AM) magnetron with a lower total cost of ownership, >80% efficiency, and MTBF of six to seven years. The design of the RF source is based upon a single injection-locked magnetron system at 8 kW capable of operating up to 13 kW, using the magnetron magnetic field to achieve the AM required for backwards compatibility to compensate for microphonics and beam loads. A novel injection-locked 1497 MHz 8 kW AM magnetron with a trim magnetic coil was designed and its operation numerically simulated during the Phase I project. The low-level RF system to control the trim field and magnetron anode voltage was designed and modeled for operation at the modulation frequencies of the microphonics. A plan for constructing a prototype magnetron and control system was developed.

43 PARTICLE ACCELERATORS↗

A novel injection-locked amplitude-modulated magnetron at 1497 MHz

Thomas Jefferson National Accelerator Facility (JLab) uses low efficiency klystrons in the CEBAF machine. In the older portion they operate at 30% efficiency with a tube mean time between failure (MTBF) of five to six years. A highly efficient source (>55-60%) must provide a high degree of backwards compatibility, both in size and voltage requirements, to replace the klystron presently used at JLab, while providing energy savings. Muons, Inc. is developing a highly reliable, highly efficient RF source based upon a novel injection-locked amplitude modulated (AM) magnetron with a lower total cost of ownership, >80% efficiency, and MTBF of six to seven years. The design of the RF source is based upon a single injection-locked magnetron system at 8 kW capable of operating up to 13 kW, using the magnetron magnetic field to achieve the AM required for backwards compatibility to compensate for microphonics and beam loads. A novel injection-locked 1497 MHz 8 kW AM magnetron with a trim magnetic coil was designed and its operation numerically simulated during the Phase I project. The low level RF system to control the trim field and magnetron anode voltage was designed and modeled for operation at the modulation frequencies of the microphonics. A plan for constructing a prototype magnetron and control system was developed.

42 ENGINEERING↗

Addendum to the Maximum Current of the Linac

The purpose of this technical note is to supplement the information provided in NSLS-II Technical Note 105: Maximum Current of the NSLS-II Linac. This is included in the Linac Commissioning SAD Addendum as Appendix B. Technical Note 105 made some assumptions which have been subjected to further analysis. This technical note will reexamine some of these assumptions. This technical note includes additional analysis of: 1. Updated PARMELA model of the linac 2. Updated beam loading model 3. Gun faults which lead to full discharge of the gun and high voltage deck 4. Consideration of the case where the gun can emit more charge than has been measured by manufacturer, but within cathode specifications. In all cases the linac ASE is not violated either of operation because not enough current is generated or recovery from the fault will take enough time that violating the ASE is not possible.

36 MATERIALS SCIENCE↗

Ion Channel Laser Based on Direct Laser Acceleration of a Shaped Beam Driver (Final Technical Report)

The main focus of our research was to understand the synergies between an electron bunch and a laser pulse when the two co-propagate through the plasma. We have clearly demonstrated using theoretical and computational modeling that the propagation distance of both the bunch and the laser pulse could be extended. The ability of the combined bunch/pulse system to extend the propagation distance and the size of the plasma bubble enables highly-efficient sources of relativistic electrons. As pointed out by the Plasma Decadal Study, such electron sources can be used for generating extremely bright x-rays for a variety of applications can serve as probes and diagnostics for other plasma experiments: high energy density (HED) sciences, inertial confinement fusion (ICF), and potentially Fusion Materials and Technology (FM&T). Development of advanced diagnostics of plasma-based accelerators is yet another key area identified by recent reports. Even broader security and medical applications of compact accelerator-based radiation sources, such as very high energy electron (VHEE) sources for FLASH radiobiology, have been identified by a recent multi-agency panel. A number of key technical issues were considered and successfully resolved during the course of the grant. Those include: beam loading effect of both the driver and witness bunches on the wake, laser channeling by the bunch, and the direct laser acceleration (DLA) of the driver bunch by the laser pulse. To demonstrate clear synergy, we were able to ascertain that the total energy gain of a witness bunch in the wake of the combined bunch/laser complex is large than the sum of the energy gains in the wake of the laser pulse alone, and the driver bunch alone. We have also demonstrated that not only the energy gain is improved, but the energy spread is not sacrificed. To carry out these simulations, we have to develop a range of in-house computational tools, including a fully-3D code WAND-PIC.

43 PARTICLE ACCELERATORS↗

Harmonic Slip-Stacking

Particle accelerators employ slip-stacking configurations to store two particle beams with disparate momenta within a single ring. Additionally, A novel slip-stacking configuration employing a harmonic RF cavity was proposed and studied. Anticipated benefits of the harmonic cavity include mitigating parametric resonances, minimizing emittance growth, and significantly expanding the stable longitudinal phase-space area. By surpassing the requirements of PIP-II operation, the harmonic RF cavity will support extending slip-stacking operation for subsequent beam power upgrades of Main Injector, including a proposed cycle rate improvement. Our ongoing research will verify the simulation of harmonic slip-stacking (HSS) operation under RF phase-errors, such as those causes by beam-loading effects.

Habibeh, Mohammad↗

Baseband Digital Network Analyzer Upgrade for LLRF Controllers

Digital Network Analyzers (DNA) have been implemented in many Low-Level Radio Frequency (LLRF) systems, notably NSLS-II and CERN, to help tune feedback loops. DNA characterizes feedback loops by measuring the frequency-dependent magnitude and phase transfer functions. It enables the measurement of open loop gains, gain/phase margins, and loop delays to help fine-tune feedback loops. An FPGA-based DNA has been developed and integrated into the current Relativistic Heavy Ion Collider (RHIC) LLRF infrastructure. Its performance has been tested with an implementation of one-turn delay feedback (OTFB) on the bench to maximize gain and stability. The DNA has been used to characterize a RHIC 28 MHz cavity in a RHIC Accelerator Physics Experiment (APEX) to test transient beam loading compensation strategies.

43 PARTICLE ACCELERATORS↗

Recent Progress on Radiation Damage Studies at RaDIATE

Recent major accelerator facilities have been limited in beam power by production target and beam window survivability, where radiation damage to their constituent materials has been identified as the most cross-cutting challenge facing these high power target facilities. The RaDIATE collaboration, Radiation Damage In Accelerator Target Environments, was formed in 2012 to address this challenge by bringing together experts from the fields of nuclear materials and accelerator target facilities. The collaboration conducted high intensity proton beam irradiation of test specimens at the Brookhaven Linac Isotope Producer (BLIP) facility at BNL, where the specimens, including candidate materials for various beam intercepting device applications, were provided by participating accelerator facilities. Post-Irradiation Examination (PIE) of the irradiated specimens is being conducted at participating nuclear/fusion research institutions with appropriate ``hot-cell'' facilities, such as Pacific Northwest National Laboratory (PNNL).The recent collaboration work also includes efforts to provide the samples irradiated at BLIP to in-beam thermal shock test at CERN's HiRadMat facility. It will be the first examination to observe how the radiation-damaged material will behave when exposed to actual beam loading conditions. In this talk up-to-date status of these experiments, PIEs, and prospect for the works conducted by the RaDIATE collaboration are over-viewed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluation of a metal shear web selectively reinforced with filamentary composites for space shuttle application. Phase 2: summary report: Shear web component fabrication

The fabrication of two shear web test elements and three large scale shear web test components are reported. In addition, the fabrication of test fixtures for the elements and components is described. The center-loaded beam test fixtures were configured to have a test side and a dummy or permanent side. The test fixtures were fabricated from standard extruded aluminum sections and plates and were designed to be reuseable.

Laakso, J. H.↗

Solar array maximum power tracking with closed-loop control of a 30-centimeter ion thruster

A new solar array/ion thruster system control concept has been developed and demonstrated. An ion thruster beam load is used to automatically and continuously operate an unregulated solar array at its maximum power point independent of variations in solar array voltage and current. Preliminary tests were run which verified that this method of control can be implemented with a few, physically small, signal level components dissipating less than two watts.

Gruber, R. P.↗

Shape optimization of damping layers

Shape optimization of unconstrained and constrained damping layers is completed. The specific problem analyzed is a cantilever beam loaded at its tip by a harmonic force. Finite element modeling and mathematical programming techniques are used to obtain the solution. Performance measures are taken to be reduction of maximum diplacement and increase in fatigue lifetime. Results include the improvement, over the uniform treatment case, of these measures when the profile of the damping layer is optimized.

Lin, T.-C.↗

Significance of norms and completeness in variational based methods

By means of a simple structural problem, an important requirement often overlooked in practice on the basis functions used in Rayleigh-Ritz-Galerkin type methods is brought into focus. The problem of the static deformation of a uniformly loaded beam is solved variationally by expanding the beam displacement in a Fourier Cosine series. The potential energy functional is rendered stationary subject to the geometric boundary conditions. It is demonstrated that the variational approach does not converge to the true solution. The object is to resolve this paradox, and in so doing, indicate the practical implications of norms and completeness in an appropriate inner product space.

Storch, Joel A.↗