Search NASA⌕ Search

SEARCH · Search NASA

Results for “boiling water reactor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Status Update on the High Precision Isotopic Measurements on High Burnup LWR Fuel in 2020

The US Department of Energy (DOE) Office of Nuclear Energy (NE) is currently investigating the feasibility of directly disposing dual-purpose (storage and transportation) canisters (DPCs) in a spent nuclear fuel (SNF) repository. Criticality during the repository performance period (10,000 years or more) is one of the major concerns related to direct disposal of DPCs, specifically as the system undergoes degradation in the repository environment and timeframe. Oak Ridge National Laboratory (ORNL) is developing an as-loaded criticality analysis methodology using full (actinides + fission products) burnup credit that exploits the inherent criticality margin associated with actual canister-specific loading configuration. Burnup credit criticality analysis requires validation of the depletion/decay codes used to generate the burned isotopic inventory of an assembly by comparing the code-predicted inventory with experimentally determined isotopic data. Currently, isotopic measurement data for boiling water reactors (BWR) SNF are limited, and additional measurements will be highly beneficial for BWR burnup credit analysis, which is essential to demonstrate disposability of BWR DPCs. Moreover, new pressurized water reactor (PWR) samples of isotopic measurements will expand the PWR sample population and consequently will greatly improve sample statistics. In turn, this will reduce uncertainty in the computational determination of the isotopic composition of commercial SNF and eliminate additional penalties currently used for lack of data. As part of the isotopic analysis task, eight diverse, high burnup (HBU) samples from several PWR rods are being dissolved and isotopically analyzed to provide high-quality measurement data for PWR SNF to reducing the uncertainties associated with PWR isotopic depletion validation. The isotopics of interest focus on nuclides important to burnup credit, shielding, and decay heat in PWR SNF. Additionally, eight high burnup BWR fuel samples from the Limerick nuclear power plant have been identified for measurement to support reducing uncertainties associated with BWR isotopic depletion validation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: High-Pressure Coolant Injection 1998-2020

This report presents an unreliability evaluation of the high-pressure coolant injection system (HPCI) at 25 U.S. commercial boiling water reactors. Demand, run hour, and failure data from 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Core Spray 1998-2020

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial boiling water reactors. Demand, run hour, and failure data from 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Isolation Condenser 1998-2020

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from calendar year 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

System Study: Isolation Condenser 1998-2022

This report presents an unreliability evaluation of the isolation condenser (ISO) system at three U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Core Spray 1998-2022

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant increasing trends were identified in both the HPCS system start-only unreliability and 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: High-Pressure Coolant Injection 1998-2022

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

99 GENERAL AND MISCELLANEOUS↗

Initial Site-Specific De-Inventory Report for La Crosse

This report addresses the tasks, equipment, and interfaces necessary for the complete de-inventory of the La Crosse Boiling Water Reactor (LACBWR) independent spent fuel storage installation (ISFSI) site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benchmark Calculation for the Quad Cities Unit 1 Cycles 1-3 Using the SCALE 6.3/Polaris–PARCS v3.4.2 Code Package

In this study, benchmark calculations were performed for the Quad Cities Unit 1 cycles 1–3 to validate the SCALE 6.3/Polaris–PARCS v3.4.2 code package with the ENDF/B-VII.1 AMPX 56-group library by comparing the simulated results with the measured data. The benchmark results will be used in evaluating uncertainties of the SCALE/Polaris–PARCS code package for boiling water reactor physics analysis for key nuclear parameters such as reactivity and assembly power peaking factors. This report details plant and fuel design specifications and input data for SCALE/Polaris, GenPMAXS, and PARCS; additionally, detailed information is provided for all the input and output files produced for the benchmark calculations. The benchmark results are summarized herein so that they can be used to evaluate uncertainties with other benchmark results for key nuclear parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benchmark Calculation for the Hatch Unit 1 Cycles 1-3 Using the SCALE 6.3/Polaris–PARCS v3.4.2 Code Package

This study was the performance of the benchmark calculation for the Hatch Unit 1 cycles 1–3, to validate the SCALE 6.3/Polaris–PARCS v3.4.2 with the ENDF/B-VII.1 AMPX 56-group library by comparing the simulated results with the measured data. The benchmark results will be used in evaluating uncertainties of the SCALE/Polaris–PARCS code package for boiling water reactor (BWR) physics analysis for key nuclear parameters such as reactivity and assembly power peaking factors. This report details plant and fuel design specifications and input data for SCALE/Polaris, GenPMAXS and PARCS, and additionally, detailed information is provided for all the input and output files produced for the benchmark calculations. The benchmark results were summarized such that they can be used in evaluating uncertainties for key nuclear parameters with other BWR benchmark results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benchmark Calculation for the Peach Bottom Unit 2 Cycles 1-3 Using the SCALE 6.3/Polaris–PARCS v3.4.2 Code Package

In this study, benchmark calculations were performed for Peach Bottom Unit 2 cycles 1–3 to validate the SCALE 6.3/Polaris–PARCS v3.4.2 with the ENDF/B-VII.1 AMPX 56-group library by comparing the simulated results with the measured data. The benchmark results will be used to evaluate uncertainties of the SCALE/Polaris–PARCS code package for boiling water reactor physics analysis for key nuclear parameters such as reactivity and assembly power peaking factors. This report details plant and fuel design specifications and input data for SCALE/Polaris, GenPMAXS and PARCS. Additionally, detailed information is provided for all the input and output files produced for the benchmark calculations. The benchmark results were summarized such that they can be used to evaluate uncertainties with other benchmark results for key nuclear parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Subplane Decusping for BWRs in MPACT

Control blade cusping can introduce significant error in boiling water reactor (BWR) calculations with MPACT when blade tips fall partway within an axial method of characteristics (MOC) plane, requiring homogenization of controlled and uncontrolled regions. This work implements subplane decusping for BWRs in MPACT by enabling BWR-compatible subplane coarse mesh finite difference (CMFD) and extending the existing decusping framework to represent between-assembly control blades that insert from the bottom of the core. The method resolves axial heterogeneity on a refined subplane mesh in the low-order solve and uses the resulting subplane flux shape to form flux-volume homogenized transport cross sections for the partially rodded MOC plane. The capability is evaluated using a single physics General Electric (GE)-14 assembly and a multiphysics Peach Bottom Unit 2 Type 1 assembly (PB2T1A) with thermal hydraulic feedback. In both cases, coarse axial meshes with and without subplane decusping are compared against fine mesh reference solutions over the full range of blade withdrawal positions. Subplane decusping reduces maximum/average eigenvalue errors from 3,369/220 pcm to 303/36 pcm for GE-14 and from 6,689/585 pcm to 1,582/109 pcm for PB2T1A. Additionally, it reduces pin power root mean square errors from 5.2%/0.8% to 1.8%/0.2% for GE-14 and from 6.9%/0.6% to 2.3%/0.1% for PB2T1A. These results demonstrate an effective, practical correction for BWR blade cusping in VERA-MPACT.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Core Spray 1998-2024

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Full-core high-burnup BWR LOCA fuel performance analysis and FFRD susceptibility

The susceptibility of the boiling water reactor (BWR) Limerick Unit 1 to fuel fragmentation, relocation, and dispersal during a postulated large-break loss-of-coolant accident (LBLOCA) was calculated using a multiphysics framework. The simulations include full-core, rod-resolved neutronic, thermal hydraulic, and fuel performance models using the VERA, TRACE, and BISON codes. This work focused on the transient BISON simulations, which include both the normal operation and LBLOCA periods in the same simulations. Cladding integrity was assessed using two correlations that are included with BISON. make page break Several new BWR-specific features were recently added to BISON. This work represents the first time these features have been included in a core-scale set of simulations. This study hence evaluates the performance of these new models for an operating reactor with realistic operating conditions. Simulation results showed that cladding integrity was maintained (i.e., no rods burst). Finally, future work to improve BWR and PWR predictions using this framework is suggested.

BISON↗

Nuclide Inventory Benchmark for BWR Spent Nuclear Fuel: Challenges in Evaluation of Modeling Data Assumptions and Uncertainties

This work discusses challenges and approaches to uncertainty analyses associated with the development of a nuclide inventory benchmark for fuel irradiated in a boiling water reactor. The benchmark under consideration is being developed based on experimental data from the SFCOMPO international database. The focus herein is on how to address missing data in fuel design and operating conditions that are important for adequately simulating the time-dependent changes in fuel during irradiation in the reactor. The effects of modeling assumptions and uncertainties in modeling parameters on the calculated nuclide inventory were analyzed and quantified through computational models developed using capabilities in the SCALE code system. Particular attention was given to the impact of the power history and water coolant density on the calculated nuclide inventory, as well as to the effect of geometry modeling considerations not usually addressed in a nuclide inventory benchmark. These considerations include gap closure, channel bow, and channel corner radius, which do not usually apply to regular reactor operation but are relevant for assessing impacts of potential anomalous operating scenarios.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗