Direct broadcast satellite communications
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The design of a low-cost FM-microwave satellite-ground-station receiver is described. It is capable of accepting 12 contiguous color-television equivalent-bandwidth channels in the 11.72-12.2-GHz band using a wide-band FM format and frequency division multiplexing (FDM) of the channels. Each channel has 36 MHz of usable bandwidth with a 4-MHz guard band and provides a CATV compatible output. The overall system specifications are first discussed. Then consideration is given to the design, fabrication, and evaluation of the different subsystems in the receiver.
A new satellite multi-access scheme for packet-switching computer communications combines a dynamic allocation technique with conventional time-division multiplexing to minimize delays and maximize traffic thruput. The scheme is designed to give the shortest delays to short-duration interactive or priority traffic, at the expense of longer delays for large data transfers. Simulation results show markedly improved delay-thruput characteristics over conventional time-division multiplexing for a wide range of traffic mixes, with especially significant performance gains as the traffic imbalance among the nodes increases.
Explore the source record for details and available documents.
The means by which the data collected by the Voyager 1 mission to Jupiter were returned to earth are presented. Radio links between the earth and the spacecraft are used for the transmission of both imaging and nonimaging telemetry from the spacecraft and commands from the earth and for radiometric observations of the spacecraft and its environment. Features which have lead to vast improvements in the capability of the Voyager telecommunications system over that of previous space probes include the use of X-band rather than S-band telemetry, a dual power X-band traveling wave tube amplifier, a 3.7 m spacecraft antenna and a single channel telemetry system with concatenated coding. Communications equipment at the three ground complexes of the Deep Space Network for telemetry reception includes 64 m steerable antennas, cryogenic maser preamplifiers and a phase-lock loop receiver. Voyager 1 has met or exceeded all of its telecommunications requirements, providing a 98% data return and a total of 2 x 10 to the 11th data bits during the Jupiter encounter.
An experimental investigation of the performance of 1.22 m and 1.83 m diameter paraboloid antennas with an f/D ratio of 0.38 and using a feed developed by Kumar is reported. It is found that sidelobes below 30 dB can be obtained only if the paraboloids are relatively free of surface errors. A theoretical analysis of clam shell distortion shows that this is a limiting factor in achieving low sidelobe levels with many commercially available low cost paraboloids. The use of absorbing pads and small reflecting plates for sidelobe reduction is also considered.
The preliminary time/frequency dissemination experiments were made using the BSE. In order to establish the technique of the doppler shift canceling, the phase control servo including the satellite link and the precompensating frequency control using the measured values or using the orbital data of the satellite are tested. The amount of the residual doppler shift at the control station can be reduced to the order of 1 part in 10 to the 12th power or less by use of the first and the second methods. The method using the orbit data is expected to give a control capability of a few parts in 10 to 11th power. Thus, the maximum value of the doppler shift at the farther most place of the country is estimated to be + or - 2 x 10 to the -10 power without any correction. The experiment of the international time comparison via the NTS 1 was made for about one year since October 1978. The data of time difference between UTC(USNO) and UTC(RRL) are in good agreement with those via the portable clock of the USNO. By applying the correction for ionospheric delay the standard deviation of the data can be reduced to about one-half.
The consumed primary power is reduced and the efficiency of traveling wave tubes is raised through the use of depressed collectors which passively convert potential energy into electric energy. Efficiency was kept with constant within a 3 dB range while the output power varied by 10 dB. Aspects to be considered in transferring this technology to UHF klystrons are the electron energy spectrum of the klystron and the magnitude of the injection angle required.
Statistical analyses of carrier to interference power ratios (C/Is) were performed in assessing 17.5 GHz feeder links using (1) fixed power and power control, and (2) orthogonal linear and orthogonal circular polarizations. The analysis methods and attenuation/depolarization data base were based on CCIR findings to the greatest possible extent. Feeder links using adaptive power control were found to neither cause or suffer significant C/I degradation relative to that for fixed power feeder links having similar or less stringent availability objectives. The C/Is for sharing between orthogonal linearly polarized feeder links were found to be significantly higher than those for circular polarization only in links to nominally colocated satellites from nominally colocated Earth stations in high attenuation environments.
Technical parameters such as satellite antenna characteristics, Earth station requirements, bandwidths, channelization, and allowable carrier-to-interference ratios are discussed. An overview of the downlink plan is given, including a histogram of the transmitter power requirements. The plan includes satellite orbit positions, spacecraft transmitted powers, antennas beam sizes, channel assignments, and polarizations.
The paper presents the results of recent studies by the Feeder Link Sub-Working Group of the FCC Advisory Committee for the 1983 Regional Administrative Radio Conference (RARC). These studies conclude that specification of a few key parameters will make feeder link planning relatively straightforward. Feeder links can be located anywhere within a country if satellite orbit locations are separated by 10 deg for adjacent service areas and key parameter values presented in the paper are adopted. Colocated satellites serving a common service area need special attention to attain sufficient isolation between a desired channel and its adjacent cross-polarized channels and alternate co-polarized channels. In addition to presenting planning conclusions by the Advisory Committee, the paper presents and analyzes actions of the International Radio Consultative Committee's Conference Planning Meeting (CPM) concerning feeder links. The CPM reached conclusions similar to, and compatible with, those of the Advisory Committee.
Technical parameters such as satellite antenna characteristics, earth station requirements, bandwidths, channelization, and allowable carrier-to-interference ratios are discussed. An overview of the downlink plan is given, including a histogram of the transmitter power requirements. The plan includes satellite orbit positions, spacecraft transmitted powers, antennas beam sizes, channel assignments, and polarizations.
Design and planning guidelines being followed to define feeder link parameters for the U.S. ITU Region 2 DBS system are outlined. The carrier/noise (C/N) ratio determines the signal quality acceptable to the consumer and sets the standards which the link must meet. A 10 dB margin is required to meet a 99 percent availability criterion for the times of heaviest rainfall attenuation. The receiver gain is limited by the bandwidth, system noise temperature, and the antenna size. Three mechanisms have been identified for ensuring receiver discrimination between desired and interfering signals. Test points must be selected to examine the effectiveness of the chosen feeder link configuration in maintaining signal reception and channel separation, of the antennas installed, and of the orbital positions of the satellites.
Two search techniques are considered for solving satellite synthesis problems. Neither is likely to find a globally optimal solution. In order to determine which method performs better and what factors affect their performance, we design an experiment and solve the same problem under a variety of starting solution configuration-algorithm combinations. Since there is no randomization in the experiment, we present results of practical, rather than statistical, significance. Our implementation of a cyclic coordinate search procedure clearly finds better synthesis solutions than our implementation of a gradient search procedure does with our objective of maximizing the minimum C/I ratio computed at test points on the perimeters of the intended service areas. The length of the available orbital arc and the configuration of the starting solution are shown to affect the quality of the solutions found.
A passive, unswitched scheme is introduced for directly interconnecting N stations, each of which has C transmitters and receivers. Implementations using fiber optics with spatial multiplexing and optionally wavelength multiplexing are discussed. This scheme utilizes the same resources as standard topologies with C parallel buses but outperforms them in two respects: (1) the aggregate throughput is proportional to C squared rather than to C; and (2) the power of each transmitter need reach only N/C, instead of N, receivers.
Two search techniques are considered for solving satellite synthesis problems. Neither is likely to find a globally optimal solution. In order to determine which method performs better and what factors affect their performance, an experiment is designed and the same problem is solved under a variety of starting solution configuration-algorithm combinations. Since there is no randomization in the experiment, results of practical, rather than statistical, significance are presented. Implementation of a cyclic coordinate search procedure clearly finds better synthesis solutions than implementation of a gradient search procedure does with the objective of maximizing the minimum C/I ratio computed at test points on the perimeters of the intended service areas. The length of the available orbital arc and the configuration of the starting solution are shown to affect the quality of the solutions found.