Results for “concurrent programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Mechanical and Microstructural Effects of Thermal Aging on Cast Duplex Stainless Steels by Experiment and Finite Element Method

Cast duplex stainless steel piping in light water nuclear reactors expe- rience thermal aging embrittlement during operational service. Interest in extending the operational life to 80 years requires an increased understanding of the microstructural evolution and corresponding changes in mechanical behavior. We analyze the evolution of the microstructure during thermal aging of cast CF-3 and CF-8 stainless steels using electron microscopy and atom probe tomography. The evolution of the mechanical properties is measured concurrently by mechanical methods such as tensile tests, Charpy V-notch tests, and instrumented nanoinden- tation. A microstructure-based finite element method model is developed and uti- lized in conjunction with the characterization results in order to correlate the local stress-strain effects in the microstructure with the bulk measurements. This work is supported by the DOE Nuclear Energy University Programs (NEUP), contract number DE-NE0000724.

36 MATERIALS SCIENCE↗

Applications of GIS and remote sensing in public participation and stakeholder engagement for watershed management

The use of Geographic Information Systems (GIS) and remote sensing technologies for the development of water quality management programs and for post-implementation assessments has increased dramatically in the past decade. This increase in adoption has been made more accessible through the interfaces of many popular software tools used in the regulation and assessment of water quality. Customized applications of these tools will increase, as ease of access and affordability of directly monitored and remotely sensed datasets improve over time. Concurrently, there is a need for inclusive participatory engagement with stakeholders to achieve solutions to current watershed management challenges. This paper explores the potential of these GIS and remote sensing datasets, tools, models, and immersive engagement technologies from other domains, for improving public participation and stakeholder engagement throughout the watershed planning process. To do so, an initial review is presented about the use of GIS and remote sensing in watershed management and its role in impairment identification, model development, and planning and implementation. Then, ways in which GIS and remote sensing can be integrated with stakeholder engagement through (1) leveraging GIS and remote sensing datasets, and (2) stakeholder engagement approaches including outreach and education, modeler-led development, and stakeholder-led involvement and feedback, are discussed. Finally, future perspectives on the potential for transforming public participation and stakeholder engagement in the watershed management process through applications of GIS and remote sensing are presented.

54 ENVIRONMENTAL SCIENCES↗

ALDWP Operational Highlights 2021

The Weapons Pit production manufacturing team completed pit build 21-1 assembly operations on December 23, 2020. This build utilized all essential flow sheet steps and included the second -01 long tube cut off extension and welding activity. This is the best build produced in the MC4597-01 pit program to date. Final out-of-line operations, non-destructive evaluation, and radiography was completed during the week of January 4. Depending on the results from high energy radiography, this pit will be considered to be a candidate for CERT-02 and shipment to Lawrence Livermore National Laboratory in support of pit certification. It is notable that this build was completed while concurrently making Plutonium (Pu) metal, producing additional castings, machining Pu parts for Build 22, completing disassembly of two pits, supporting Nightshade B Pu target characterization, and precision machining of Jasper certification base plates.

42 ENGINEERING↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Allosteric inhibition of SHP2 phosphatase inhibits cancers driven by receptor tyrosine kinases

The non-receptor protein tyrosine phosphatase SHP2, encoded by PTPN11, has an important role in signal transduction downstream of growth factor receptor signalling and was the first reported oncogenic tyrosine phosphatase1. Activating mutations of SHP2 have been associated with developmental pathologies such as Noonan syndrome and are found in multiple cancer types, including leukaemia, lung and breast cancer and neuroblastoma1, 2, 3, 4, 5. SHP2 is ubiquitously expressed and regulates cell survival and proliferation primarily through activation of the RAS–ERK signalling pathway2, 3. It is also a key mediator of the programmed cell death 1 (PD-1) and B- and T-lymphocyte attenuator (BTLA) immune checkpoint pathways6, 7. Reduction of SHP2 activity suppresses tumour cell growth and is a potential target of cancer therapy8, 9. Here we report the discovery of a highly potent (IC50 = 0.071 μM), selective and orally bioavailable small-molecule SHP2 inhibitor, SHP099, that stabilizes SHP2 in an auto-inhibited conformation. SHP099 concurrently binds to the interface of the N-terminal SH2, C-terminal SH2, and protein tyrosine phosphatase domains, thus inhibiting SHP2 activity through an allosteric mechanism. SHP099 suppresses RAS–ERK signalling to inhibit the proliferation of receptor-tyrosine-kinase-driven human cancer cells in vitro and is efficacious in mouse tumour xenograft models. Together, these data demonstrate that pharmacological inhibition of SHP2 is a valid therapeutic approach for the treatment of cancers.

59 BASIC BIOLOGICAL SCIENCES↗

Custom Accessors: Enabling Scalable Data Ingestion, (Re-)Organization, and Analysis on Distributed Systems

The emerging class of high velocity and high volume data analytic workflows comprise interwoven data ingestion, organization, and processing stages, with ingestion and organization steps often contributing comparable or even higher computational costs than actual processing steps. Since complex workflows consist of a variety of phases that view and use data differently, being able to construct efficient, scalable, distributed data structures (arrays, vectors, sets, maps, and multi-maps) is essential and requires custom methods to extend and shrink containers, analyze and position data, and, maintain globallyconsistent meta-data. In this paper, we propose a novel datastructure access paradigm based on the concept of Accessors. At a high level, accessors are customizable callable objects that can modify the behavior of insert, read, update, and delete operations for distributed containers while preserving atomicity guarantees. Accessors provide a very clean and natural way to implement a variety of programming patterns, e.g., conditional insertion/deletion and cascading computations, which would be otherwise hard (or even impossible) to express in parallel and distributed settings without using locks. We demonstrate the practicality and usefulness of our approach with two representative use cases and study the performance of these applications on a distributed High-Performance Computing system. Our analysis highlights that our proposed abstraction allows for an effective overlapping and concurrent execution of different workflow steps (e.g., data ingestion and analysis), which in a conventional analytics pipeline would execute sequentially, contributing cumulatively to the overall latency.

Castellana, Vito G. [BATTELLE (PACIFIC NW LAB)] (O↗

Rock Melt Borehole Sealing System, Final Technical Report for SBIR Phase I Grant No. DE-SC0011888

Purpose of Research Deep borehole disposal is one option that has received attention in recent years as a possible strategy for long-term disposal of the tens of thousands of tons of spent nuclear fuel. The feasibility of the deep borehole option relies upon designing and constructing an effective seal within the borehole to ensure that the waste package does not communicate with the shallow subsurface biosphere through the borehole itself. Some of the uncertainty associated with the long-term suitability of the deep borehole option is related to (1) the degradation of traditional sealing materials over time and (2) the inability of traditional sealing methods to adequately seal a Disturbed Rock Zone surrounding the borehole. One possible system to address these concerns consists of encapsulating the waste in a melt generated from either the waste itself or a plug above the waste. This current project expanded on previous work to further advance the deep borehole disposal concept. Research Objectives & Findings The overarching objective of the study was to evaluate the feasibility of constructing a downhole heater that is capable of meeting the technical and logistical requirements to melt rock. This ultimate objective was accomplished by two primary approaches. The first approach was to define the heater requirements and conceptually design a system that is capable of melting rock. The second approach was to determine the feasibility of conducting an in situ, field-scale melting experiment to validate the suitability of the rock melt seal concept. The evaluation and conceptual design of the heater system resulted in the following primary findings: • Borehole wall temperatures capable of producing a partial melt are achievable under most expected thermal conductivities with a 12-kilowatt heater. • Commercially available components have been identified that meet the requirements of the heater system, including resistive elements that are capable of providing the required heat generation, container materials that can withstand the anticipated temperatures, and a system capable of providing power to the heater. Evaluating the feasibility of performing field-scale experiments resulted in the following major findings: • The Sanford Underground Research Facility (SURF) has been identified as a host site for field testing of prototype heaters. The technical and logistical requirements for performing the rock melt tests can be met by using or expanding the existing infrastructure at SURF with on-site personnel and contractors. • In situ hydraulic conductivity test using packers can test the effectiveness of the rock melt seal, while a mine back performed from a lower level can further evaluate the recrystallized melt. • Preliminary costing indicates that a field-scale melting experiment at SURF is feasible within a Phase II Small Business Innovation Research budget while allowing sufficient budget for refining the heater design, coordinating the test program, and interpreting the results. Application of Research The rock melt sealing concept has the potential to reduce uncertainty associated with the long-term storage of nuclear waste. Preliminary efforts of this study defined the requirements of a downhole heater system capable of melting rock and indicated that developing such a system is feasible using available technology. The next logical step is designing and manufacturing prototype heaters. Concurrent with prototype development is coordinating robust field-scale experiments that are capable of validating the design for marketing to potential users.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Commercial Electric Vehicle (EV) Development and Manufacturing Program (Final Report)

Navistar with the Department of Energy’s assistance undertook this effort to achieve the project objectives as listed in the next section. A wholly owned subsidiary of Navistar, Workhorse Sales Corporation was the original grant awardee and upon their discontinuation as a standalone business entity, Navistar assumed the role of principal investigator. The intent of the effort, as part of the American Recovery and Reinvestment Act (ARRA) was to produce zero emission vehicles that could meet the needs of the marketplace while reducing carbon emissions to zero. This effort was predicated upon the assumption that concurrent development activities in the lithium ion battery industry investigations would significantly increase their production volumes thus leading to substantial reductions in their manufacturing costs. As a result of this development effort much was learned about the overall system compatibility between the electric motor, battery pack, and charging capabilities. The original system was significantly revised and improved during the execution of this development effort. The overall approach that was chosen was to utilize a British zero emissions, class 2 truck that had been developed for their market, homologate it and modify it to meet the product requirements as specified in the grant details. All of these specific goals were achieved. During the course of marketing and selling the product valuable information was obtained as relates to customer expectations, price points, and product performance expectations, specifically those customer expectations about range requirements in urban delivery situations. While the grant requirements specified a range of 100 miles on a single charge, actual customer usage logs indicate a range of 40 miles or less is typical for their applications. The price point, primarily due to battery pack costs, was significantly higher than the mass market could bear. From Navistar’s and the overall industry’s perspective, valuable insights and lessons into this all-electric vehicle propulsion were gained during the performance of this effort and can be revisited when battery chemistry and technology advance to the point of more suitable economic viability. Additionally, another goal of the ARRA act and this specific grant was to manufacture the product in the, at that time, economically depressed Northwest Indiana area. Navistar chose a location in Wakarusa, Indiana which fulfilled this requirement. Navistar was and continues to be committed to alternative fuel and propulsion options as an industry leader in the medium and heavy duty truck industry.

33 ADVANCED PROPULSION SYSTEMS↗

BTMS Testing Section

Cell testing is an important part of understanding the performance and life capabilities of stateof- the art energy storage technologies, particularly with respect to the distinct technical and functional requirements posed by the BTMS program. The baseline requirements for BTMS are loosely defined as a 1MWh BTMS system supporting six 350kW DC fast charging stations with no load profile defined. In order to test energy storage components and systems against these requirements, test procedures must be created that begin to address fundamental questions concerning the balance between cell performance and lifetime to minimize BTMS station cost and maximize station life. System usage scenarios are concurrently being developed with testing of baseline cells intended to illustrate their capabilities relative to a broad set of initial system assumptions. The results from these early performance tests and aging procedures will produce both slow and accelerated cycle-life aging information through a mix of empirical observations and modeling.

25 ENERGY STORAGE↗

Value of Integrated Risk and Issue Management - 17516

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

99 GENERAL AND MISCELLANEOUS↗

Value of Integrated Risk and Issue Management - 17589

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA closure at the Connecticut Yankee atomic power company Haddam neck plant - 15655

From 1968 through 1996 Connecticut Yankee Atomic Power Company (CYAPCO) operated the Haddam Neck Plant (HNP) at 362 Injun Hollow Road, East Hampton, Connecticut. In 1980 CYAPCO applied to be a permitted generator and storage facility for hazardous waste and was issued a Resource Conservation and Recovery Act (RCRA) Part A Treatment, Storage, and Disposal Facility Permit. During the operational period, the HNP produced more than 110 billion kilowatt-hours of energy. In 1996, CYAPCO decided to close and decommission the HNP. Decommissioning activities began in 1998 and were successfully completed in 2007 in accordance with Nuclear Regulatory Commission (NRC) regulations and the CYAPCO License Termination Plan. As part of the closure process for the HNP, closure of the RCRA permit under the RCRA Corrective Action Program (CAP) was required. From 2002 through 2007, under the RCRA CAP, CYAPCO completed investigations and remediation work to address environmental impacts resulting from chemical usage at the HNP. The RCRA CAP was conducted under the regulatory authority of the United States Environmental Protection Agency (USEPA) and the Connecticut Department of Energy and Environmental Protection (CTDEEP). In the fall of 2014, the RCRA closure process was completed, and CYAPCO, with concurrence from USEPA, was issued a Letter of Completion from the CTDEEP signifying completion of the RCRA closure process. The paper discusses the RCRA closure process completed at the HNP, including the investigation, remediation, groundwater monitoring, and closure activities completed to achieve closure of the HNP under the RCRA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards the next generation 23% efficient n-type cells with low cost manufacturing

Suniva, Inc., in collaboration with the University Center for Excellence in Photovoltaics (UCEP) at the Georgia Institute of Technology (GIT) proposed this comprehensive three year program to enable the development of an advanced high performance product that will help the US regain its competitive edge in PV. This project was designed to overcome cost and efficiency barriers through advances in PV science, technology innovation, low-cost manufacturing and full production of ~22.5% efficient n-type Si cells in Norcross, GA. At the heart of the project is the desire to complement the technology being developed concurrently under the Solarmat and ARPAe initiatives to develop a differentiated product superior in both performance and cost effectiveness to the competing alternatives available on the market, and push towards achieving SunShot objectives while ensuring a sustainable business model based on US manufacturing. A significant reduction of the costs in modules produced today will need to combine reductions in wafer costs, cell processing costs as well as module fabrication costs while delivering a product that is not only more efficient under test conditions but also increases the energy yield in outdoor operations. This project will result in a differentiated high performance product and technology that is consistent with sustaining PV manufacturing in the US for a longer term and further highlights the need for continued support for developing the next generation concepts that can keep US manufacturing thriving to support the growing demand for PV in the US and consistent with the US government’s mandates for energy independence.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Load Balancing Scientific Applications

The largest supercomputers have millions of independent processors, and concurrency levels are rapidly increasing. For ideal efficiency, developers of the simulations that run on these machines must ensure that computational work is evenly balanced among processors. Assigning work evenly is challenging because many large modern parallel codes simulate behavior of physical systems that evolve over time, and their workloads change over time. Furthermore, the cost of imbalanced load increases with scale because most large-scale scientific simulations today use a Single Program Multiple Data (SPMD) parallel programming model, and an increasing number of processors will wait for the slowest one at the synchronization points. To address load imbalance, many large-scale parallel applications use dynamic load balance algorithms to redistribute work evenly. The research objective of this dissertation is to develop methods to decide when and how to load balance the application, and to balance it effectively and affordably. We measure and evaluate the computational load of the application, and develop strategies to decide when and how to correct the imbalance. Depending on the simulation, a fast, local load balance algorithm may be suitable, or a more sophisticated and expensive algorithm may be required. We developed a model for comparison of load balance algorithms for a specific state of the simulation that enables the selection of a balancing algorithm that will minimize overall runtime.

97 MATHEMATICS AND COMPUTING↗

Spatiotemporal development of expanding bacterial colonies driven by emergent mechanical constraints and nutrient gradients

Abstract Bacterial colonies growing on solid surfaces can exhibit robust expansion kinetics, with constant radial growth and saturating vertical expansion, suggesting a common developmental program. Here, we study this process forEscherichia colicells using a combination of modeling and experiments. We show that linear radial colony expansion is set by the verticalization of interior cells due to mechanical constraints rather than radial nutrient gradients as commonly assumed. In contrast, vertical expansion slows down from an initial linear regime even while radial expansion continues linearly. This vertical slowdown is due to limitation of cell growth caused by vertical nutrient gradients, exacerbated by concurrent oxygen depletion. Starvation in the colony interior results in a distinct death zone which sets in as vertical expansion slows down, with the death zone increasing in size along with the expanding colony. Thus, our study reveals complex heterogeneity within simple monoclonal bacterial colonies, especially along the vertical dimension. The intricate dynamics of such emergent behavior can be understood quantitatively from an interplay of mechanical constraints and nutrient gradients arising from obligatory metabolic processes.

Science & Technology - Other Topics↗

Validation of Photovoltaic Modeling Tool HelioScope Against Measured Data

HelioScope is a cloud-based solar design software developed by Folsom Labs to model arrays based on physical design. Folsom Labs received a grant from the Department of Energy for the National Renewable Energy Laboratory to validate the performance of HelioScope's simulation engine against measured PV system performance. This study builds upon previous validation work by NREL of multiple other PV modeling tools, using the same fixed-tilt systems with available system specifications. HelioScope designs were set up using the same system specifications and concurrent weather data as were used in previous studies. The predicted performance results from the simulations were compared with measured data and to performance predictions by other PV modeling tools.

14 SOLAR ENERGY↗

Hanford site asbestos management lessons learned - 15183

The U.S. Department of Energy (DOE) is responsible for the environmental cleanup of the Hanford Site central plateau. As part of this responsibility, DOE contractors conduct deactivation, decommissioning, decontamination, and demolition (D4) of retired/inactive facilities, including very large chemical processing facilities. To date, DOE contractors have demolished hundreds of facilities, reducing baseline site maintenance costs and reducing the environmental threats and hazards that the degrading buildings present. Many of these Hanford facilities include asbestos-containing materials (as well as other hazardous components), which must be managed in compliance with applicable regulations and standards. In most cases, the facilities are demolished as Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) removal or remedial actions. In an effort to streamline cleanup operations and to utilize site cleanup funding more efficiently, while still being protective of personnel and the environment, agreements were reached between the US Environmental Protection Agency (EPA) Hanford Project Office, the Washington Department of Ecology (Ecology), the Benton Clean Air Agency (BCAA) and the US Department of Energy Richland Operations Office (DOE-RL) on approaches to be utilized for demolition. One of these approaches would involve leaving cement asbestos board siding (e.g. transite), an EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP) Category II non-friable asbestos-containing material, in place during demolition using heavy equipment, employing a set of controls that would maintain protection of personnel and the environment. This agreement was documented in a number of formal communications, including Notices of Intent issued as required by the asbestos NESHAP regulation, letters between the various agencies, CERCLA work plans, and the approved contractor baselines. A large number of buildings were demolished with transite siding in place, using the agreed upon controls and approaches. Personnel breathing zone and work area perimeter monitoring verified that the controls employed were protective in that there were no exceedances of permissible exposure limits during or after the demolition operations. EPA later reconsidered their previous concurrence with demolishing transite materials in place and issued a joint letter with Ecology revoking concurrence on any of the aforementioned CERCLA decision documents and associated work plans. DOE and their contractors took action to comply with the approach to demolition preferred by EPA for future demolitions, and initiated a series of actions to modify asbestos management practices in their operations accordingly. This paper will discuss both the actions taken to address EPA concerns with sites where transite materials were left in place for demolition and actions taken to ensure that the central plateau D4 program complies with the 40 CFR 61 Subpart M, National Emission Standard for Asbestos, (Asbestos NESHAP) methods for asbestos management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗