Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Contingency Power Study for Short Haul Civil Tiltrotor

AlliedSignal Engines (AE) defined a number of concepts that significantly increased the horsepower of a turboshaft engine to accommodate the loss of an engine and enable the safe landing of a twin-engined, 40-passenger, short haul civil tiltrotor. From these concepts, "Water/Methanol Injection," a "Better Power Turbine Than Required," and a "Secondary Combustor For Interturbine Reheat" were chosen, based on system safety and economics, for more detailed examination. Engine performance, mission, and cost analysis of these systems indicated contingency power levels of 26 to 70 percent greater than normal rated takeoff could be attained for short durations, thus enabling direct operating cost savings between 2 and 6 percent.

Eisenberg, Joseph D.↗

A Comment on the Suspected Solar Neutrino-Solar Activity Connection

Recently, it has been proposed that there exists a highly statistically significant (at greater than or equal to 98% level of confidence) relationship between Ar-37 production rate (viz., solar neutrinos) and the Ap geomagnetic index (viz., solar particles), based on the (chi)-square goodness-of-fit test and correlation analysis, for the interval 1970-1990. While a relationship between the two parameters, indeed, seems to be discernible, the strength of the relationship has been overstated. Instead of being significant at the afore-mentioned level of confidence, the relationship is found to be significant at only greater than or equal to 95% level of confidence, based on Yates' modification to the (chi)-square test for 2 x 2 contingency tables. Likewise, while correlation analysis yields a value of r = 0.2691, it is important to note that such a value suggests that only about 7% of the variance can be 'explained' by the inferred correlation and that the remaining 93% of the variance must be attributed to other sources.

Wilson, Robert M.↗

A comment on the suspected solar neutrino -- solar activity connection

Recently, it has been proposed that there exists a highly statistically significant (at greater than or equal to 98% level of confidence) relationship between Ar-37 production rate (namely, solar neutrinos) and the Ap geomagnetic index (namely, solar particles), based on the chi-square goodness-of-fit test and correlation analysis, for the interval 1970-1990. While a relationship between the two parameters, indeed, seems to be discernible, the strength of the relationship has been overstated. Instead of being significant at the afore-mentioned level of confidence, the relationship is found to be significant at only greater than or equal to 95% level of confidence, based on Yates' modification to the chi-square test for 2 x 2 contingency tables. Likewise, while correlation analysis yields a value of r = 0.2691, it is important to note that such a value suggests that only about 7% of the variance can be 'explained' by the inferred correlation and that the remaining 93% of the variance must be attributed to other sources.

Wilson, Robert M.↗

Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Step 1: Human System Integration (HSI) FY05 Pilot-Technology Interface Requirements for Contingency Management

This document involves definition of technology interface requirements for Contingency Management. This was performed through a review of Contingency Management-related, HSI requirements documents, standards, and recommended practices. Technology concepts in use by the Contingency Management Work Package were considered. Beginning with HSI high-level functional requirements for Contingency Management, and Contingency Management technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of system failures and associated contingency procedures, and (2) the control capability needed by the pilot to obtain system status and procedure information. Fundamentally, these requirements provide the candidate Contingency Management technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Contingency Management operations and functions should interface with the pilot to provide the necessary Contingency Management functionality to the UA-pilot system. Requirements and guidelines for Contingency Management are partitioned into four categories: (1) Health and Status and (2) Contingency Management. Each requirement is stated and is supported with a rationale and associated reference(s).

Source record↗

On Determining the Rise, Size, and Duration Classes of a Sunspot Cycle

The behavior of ascent duration, maximum amplitude, and period for cycles 1 to 21 suggests that they are not mutually independent. Analysis of the resultant three-dimensional contingency table for cycles divided according to rise time (ascent duration), size (maximum amplitude), and duration (period) yields a chi-square statistic (= 18.59) that is larger than the test statistic (= 9.49 for 4 degrees-of-freedom at the 5-percent level of significance), thereby, inferring that the null hypothesis (mutual independence) can be rejected. Analysis of individual 2 by 2 contingency tables (based on Fisher's exact test) for these parameters shows that, while ascent duration is strongly related to maximum amplitude in the negative sense (inverse correlation) - the Waldmeier effect, it also is related (marginally) to period, but in the positive sense (direct correlation). No significant (or marginally significant) correlation is found between period and maximum amplitude. Using cycle 22 as a test case, we show that by the 12th month following conventional onset, cycle 22 appeared highly likely to be a fast-rising, larger-than-average-size cycle. Because of the inferred correlation between ascent duration and period, it also seems likely that it will have a period shorter than average length.

Wilson, Robert M.↗

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Scale and the representation of human agency in the modeling of agroecosystems

Human agency is an essential determinant of the dynamics of agroecosystems. However, the manner in which agency is represented within different approaches to agroecosystem modeling is largely contingent on the scales of analysis and the conceptualization of the system of interest. While appropriate at times, narrow conceptualizations of agroecosystems can preclude consideration for how agency manifests at different scales, thereby marginalizing processes, feedbacks, and constraints that would otherwise affect model results. Modifications to the existing modeling toolkit may therefore enable more holistic representations of human agency. Model integration can assist with the development of multi-scale agroecosystem modeling frameworks that capture different aspects of agency. In addition, expanding the use of socioeconomic scenarios and stakeholder participation can assist in explicitly defining context-dependent elements of scale and agency. Finally, such approaches, however, should be accompanied by greater recognition of the meta agency of model users and the need for more critical evaluation of model selection and application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DeepGrid: Robust Deep Reinforcement Learning-based Contingency Management

Increasing uncertainty raised by the integration of renewable energy resources requires an enormous number of simulations to be carried out for the security assessment of the power grid. However, it is challenging to assess the steady-state and dynamic security indices for different system contingency events by doing an exhaustive analysis in real-time due to the computational and communication constraints. One promising solution is using data-driven techniques along with the system models to train an intelligent contingency management framework to better handle the contingencies in real-time. Nevertheless, implementing a data-driven technique to obtain the best remedial actions necessitates to account for the effect of the measurement noise on the performance of the contingency management. To tackle these challenges, we leverage a robust deep reinforcement learning (DRL) algorithm called Double Deep Q-Network (DDQN) to design a recommender system capable of prescribing optimal control actions with the help of the real-time digital simulator (RTDS). The use of RTDS system in combination with the advanced DRL algorithm allows to explore a wide variety of system contingencies in order to derive better remedial actions. The performance of the proposed algorithm is evaluated in IEEE 9-bus system under different loading conditions, and different network configurations in presence of noisy measurements.

Ghasemkhani, Amir↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evidence of Panmixia between Sympatric Life History Forms of Coastal Cutthroat Trout in Two Lower Columbia River Tributaries

Abstract Coastal cutthroat trout Oncorhynchus clarkii clarkii exhibit resident and migratory life history strategies that often occur sympatrically, but the relationship between these forms within a population is poorly characterized. Through use of passive integrated transponder technology, migratory and resident coastal cutthroat trout were identified in two lower Columbia River tributaries (Abernathy Creek and the Chinook River) separated by more than 80 km. Genetic data from 17 highly variable microsatellite loci were used to ascertain the genetic population structure of these life history forms within and between streams. No distinct genetic separation was observed between the life history forms within a stream, as assessed by four different statistical approaches: permutation tests based on the genetic differentiation index FST, principal components analysis of individuals, analysis of molecular variance, and contingency tests of allele frequency heterogeneity. Genetic differences were an order of magnitude higher between stream samples (FST > 0.03) than between life history forms within a stream (FST < 0.003). The contingency test detected allele frequency differences between migratory and resident life history forms in Abernathy Creek (P = 0.001), but this result was influenced more by age-class structure than by reproductive isolation between life history forms. Results are consistent with a single, randomly mating population in each stream producing both migratory and resident life history forms. These data suggest that individual life history strategy in coastal cutthroat trout is predominantly determined by phenotypic plasticity rather than genotype.

Johnson, Jeffrey R.↗

ER Line Phase II Project Risk Assessment Report

The purpose of this risk and opportunity assessment is to report the potential cost impacts from technical and programmatic risks (TPR) and opportunities. This analysis will determine the cost contingency for these TPR impacts. The approach taken to manage risk is consistent with risk and opportunity management guidance contained in DOE Order 413.3B, Project Management for the Acquisition of Capital Assets, the DOE Guide 413.3-7, Risk Management Guide and LANL’s Project Management Procedure AP-350-204 Risk and Opportunity Management.

Engineering(42)↗

RTO Technical Publications: A Quarterly Listing

A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

Source record↗

Contingency support using adaptive telemetry extractor and expert system technologies

The 'telemetry analysis logic for operations support' prototype system constitutes an expert system that is charged with contingency planning for the NASA Hubble Space Telescope (HST); this system has demonstrated the feasibility of using an adaptive telemetry extractor/reformatter that is integrated with an expert system. A test case generated by a simulator has demonstrated the reduction of the time required for analysis of a complex series of failures to a few minutes, from the hour usually required. The HST's telemetry extractor will be able to read real-time engineering telemetry streams and disk-based data. Telemetry format changes will be handled almost instantaneously.

Bryant, Thomas↗

Renewable Energy Contingencies in Power Systems: Concept and Case Study

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a co-optimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources.

Mohar Chattopadhyay↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 7, 2013 UTC, and completed its mission on April 17, 2014 UTC with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The mission objectives, much of which can be attributed to careful LADEE mission was a resounding success, achieving all planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission, the Lunar Orbit Insertion (LOI). highly critical phase of the mission.

failure analysis↗