Search NASA⌕ Search

SEARCH · Search NASA

Results for “control room of the future”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

166 records · Page 10

Defending the Homeland: Growing Foreign Challenges to the U.S. Missile Defense Posture

The Office of the Secretary of Defense (OSD) for Policy requested that Lawrence Livermore National Laboratory conduct a Congressionally directed study on homeland missile defense, pursuant to Section 1692 of the fiscal year 2020 National Defense Authorization Act. In accordance with the statutory language, this study considers whether the security benefits obtained by deployment of homeland missile defenses of the United States are undermined or counterbalanced by adverse reactions of potential adversaries, and considers the effectiveness of homeland missile defense efforts of the United States to deter the development of ballistic missiles. Almost a half-century has elapsed since the United States and the Soviet Union signed the Anti-Ballistic Missile (ABM) Treaty, and almost two decades since the former withdrew. Since withdrawing, the United States has sought to develop and deploy a layered missile defense system to defend against regional threats to U.S. and allied interests abroad and to counter limited threats to the U.S. homeland. As such, missile defense supports key national defense policy objectives. Protecting the U.S. homeland, forces abroad, allies, and partners. Deterring attacks against the United States, its allies, and partners. Assuring allies an strengthening U.S. diplomatic activities in peacetime and crisis. We offer five key findings: 1. The primary benefit of the Ground-based Midcourse Defense (GMD) system is the protection it provides the U.S. homeland against a limited but evolving rogue-state missile threat. While this system has never been tested in combat, it appears thus far to have effectively paced North Korea’s development and deployment of intercontinental ballistic missiles (ICBMs). In the absence of such a defensive capability, the United States would likely have been more heavily exposed to North Korean actions, would have operated at a much higher-risk posture, and would have had less negotiating room with which to navigate coercive tactics and crises. Its allies would have been more concerned about U.S. willingness in time of crisis and war to run the risks of protecting them. The GMD system also serves as a hedge against Iranian breakout. 2. Potential adversaries continue to develop long-range ballistic missiles despite deployment of a U.S. homeland missile defense system. This includes both rogue states and major power rivals whose long-range missile programs predated the deployment of U.S. missile defenses. While North Korea has continued its long-range missile developments and achieved an intercontinental capability, Iran has not yet reached this threshold. The broader proliferation of long-range missiles anticipated in the late 1990s has not materialized. 3. While Russia has used the existence of a U.S. homeland missile defense system as a justification for its substantial and continuing weapon modernization program, neither Russian force modernization nor the limited U.S. homeland missile defense system has altered the strategic balance. Russia has long considered U.S. missile defenses—both theater and homeland—as directed against its strategic forces and as a capability that could rapidly advance, thereby eroding Russian confidence in its nuclear deterrent. Russia’s political and military actions appear excessive and negatively impact areas such as arms control, but they do not undermine the primary benefit of the U.S. system cited in Key Finding 1. 4. China’s expansion and diversification of nuclear and missile forces has been influenced by its concerns about U.S. homeland missile defense, but those concerns are only one of many factors in China’s force planning. Although China’s actions to preserve and expand its assured retaliation prospects have not fundamentally altered the strategic balance, its buildup and lack of transparency about its force modernization goals are troubling. Taken together, the aggregate pattern of China’s modernization activities over the past two decades strongly suggests a concerted effort to develop a modern military force commensurate with its intended geopolitical status. Whatever China’s legacy concerns over the survivability of its strategic nuclear forces, its ability to overwhelm the GMD system appears intact today and will be further strengthened in the years ahead as it continues its long-term modernization program. China’s political and military actions negatively affect U.S. security interests but do not undermine the primary benefit of the U.S. system cited in Key Finding 1. 5. The basic finding that benefits have not so far been undermined by adverse reactions is a function of circumstances that are increasingly in flux. The existing GMD-centered system is under increasing pressure from the pace and scope of North Korean missile deployments. The proposed “layered” system seeks to mitigate this impending capability gap in the near term and to complement future capabilities, such as the Next Generation Interceptor, when they come online. Given the pace of U.S. missile defense developments since 2000, it is possible that adversary advances in capability will outpace the U.S. system’s ability to adapt. Additionally, because this layered system is in principle more readily scaled, it will almost certainly be viewed skeptically by China and Russia. In a context of growing great-power security competition, the Department of Defense (DoD) should consider undertaking a broader net assessment of the U.S., Russian, and Chinese force balance.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Curation of Federally Owned Archeological Collections at NASA Langley Research Center

As a Federal agency, NASA has a moral and legal obligation to the public to manage the archeological heritage resources under its control. Archeological sites are unique, nonrenewable resources that must be preserved so that future generations may experience and interpret the material remains of the past. These sites are protected by a wide array of federal regulations. These regulations are intended to ensure that our nation's cultural heritage is preserved for the study and enjoyment of future generations. Once a site has been excavated, all that remains of it are the artifacts and associated records which, taken together, allow researchers to reconstruct the past. With the contextual information provided by associated records such as field notes, maps and photographs, archeological collections can provide important information about life in the past. An integral component of the federal archeology program is the curation of these databases so that qualified scholars will have access to them in years to come. Standards for the maintenance of archeological collections have been codified by various professional organizations and by the federal government. These guidelines focus on providing secure, climate-controlled archival storage conditions for the collections and an adequate study area in which researchers can examine the artifacts and documents. In the 1970's and early 1980's, a group of NASA employees formed the LRC Historical and Archeological Society (LRCHAS) in order to pursue studies of the colonial plantations that ha been displaced by Langley Research Center (LaRC). They collected data on family histories and land ownership as well as conducting archeological surveys and excavations at two important 17th-20th century plantation sites in LaRC, Cloverdale and Chesterville. The excavations produced a wealth of information in the form of artifacts, photographs, maps and other documents. Unfortunately, interest on the part of the LRCHAS membership waned before a report was written, and since 1982 the artifacts have moldered in a flimsy trailer with no climate controls, which had once served as a field laboratory but which threatened to become a tomb for the collection. A recent analysis of Langley's cultural resources by Gray & Pape, Inc. recommended that the collection be organized, cataloged, and placed in a proper curation facility in accordance with Federal regulations. The project for the LARSS program was to research curation standards, organize the collection, catalog it, and prepare it for transfer to a facility which could provide adequate long-term curation conditions for the artifacts and documents. The first phase was to organize the artifacts, which were lying about the lab in various stages of cleaning, analysis, and conservation. Once all of the artifacts from the various excavation units and levels had been regrouped, they were cleaned and/or repackaged in archivally-stable materials. A basic catalog was prepared which will provide interested parties with a rough idea of what we have and where it can be found. Another aspect of the project was to organize the records left by the LRCHAS. Bundles of papers, photographs, and field data found in every corner and drawer of the laboratory trailer were put into order and, where appropriate, copies were made on acid-free Permabond paper for long term storage. Finally, the entire collection and most of the lab equipment was transferred into a secure, climate controlled room which will serve as an archive and study space for qualified scholars interested in exploring LaRC's rich historical heritage.

Eastman, John Arnold↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗