Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The Future of Building Science Education with the U.S. Department of Energy Solar Decathlon: Preprint

Experience the future of Building Science Education with the U.S. Department of Energy Solar Decathlon, from community-focused designs to real-life innovative zero energy buildings constructed by students. In this paper, we will introduce the Solar Decathlon programs and a reimagined Building Science Education curriculum that is transforming education to inspire future building design professionals and bring sustainable, equitable design and construction strategies to the real world. The Solar Decathlon is a collegiate-level building design competition that challenges students in 10 Contests, from embodied environmental impact to affordability and resilience. We will cover the structure of the competition and its two Challenges - the Build Challenge and the Design Challenge - as well as additional programs that impact all aspects of the buildings industry. These programs include the Solar Decathlon Building Science Education course, a free online video series that provides students and working professionals with building science fundamentals; the Design Partners Program, which connects innovative student design teams and local building owners seeking low-risk, low-cost opportunities to incorporate sustainable design alternatives into their building portfolio; and Solar Decathlon Pro, a program piloted in 2021 that brings Solar Decathlon resources to design professionals. The Solar Decathlon's effective approach to bringing real-world solutions to building science empowers future professionals to do impactful work.

buildings↗

1.2.4.404 - Data-Driven Approach for Hydropower Plant Controller Prototyping Using Remote Hardware in the Loop (DR-HIL)

Real-time prototyping of hydropower plant controls is important for reducing the cost and the risk of field deployment. This project will 1) collect design and operational data from actual hydro plants and 2) use a physics-informed machine learning approach for real-time emulation of hydropower plants, including hydro turbine and hydrodynamics. The data-driven models will be interfaced with digital real-time simulation at NREL’s Flatirons campus for hardware-in-the-loop (HIL) testing of the governor hardware device or controller-HIL (CHIL). The proposed approach will also establish the connectivity based remote CHIL testing capability using real-time data streams from an actual hydro plant. This integrated hydro-plant emulation with CHIL will be used to prototype hydro-governor controls and eventually provide an opportunity to test hydropower integrated with various technologies (e.g. conventional and renewable generation, energy conversion, etc.) as HIL.

controls prototyping↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The National Laboratory of the Rockies Strengthens U.S. Critical Minerals Supply Chains

The National Laboratory of the Rockies (NLR) is working to overcome bottlenecks and secure the U.S. critical mineral supply chain - delivering lower-cost, lower-risk pathways from unconventional and secondary feedstocks to validated products. NLR achieves this through cross-sector partnerships to advance U.S. critical minerals across the mining, processing, manufacturing, usage, and end-of-life stages.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Efficacy and safety of warfarin in patients with non-valvular atrial fibrillation and CKD G3–G5D

ABSTRACT Background Observational data comparing warfarin with no treatment for patients with non-valvular atrial fibrillation (NVAF) and severely reduced glomerular filtration rate (GFR) are conflicting and randomized controlled trials (RCTs) are lacking. Most studies do not provide information on warfarin treatment quality, making them difficult to compare. Methods This national cohort study investigates the risk of ischaemic stroke and major bleeding during warfarin treatment compared with no oral anticoagulants in patients with NVAF, GFR category 3–5 (G3–G5) or on dialysis (G5D), with kidney transplant recipients excluded, between 2009 and 2018. Data extracted from high-quality Swedish national healthcare registries, including the Swedish Renal Registry, AuriculA—the Swedish national quality registry for atrial fibrillation and anticoagulation—and the Stroke Registry. Results At enrolment of 12 106 patients, 21.4% were G3, 43.5% were G4, 11.6% were G5 and 23.6% were G5D. The mean time in the therapeutic range was 70%. Warfarin compared with no treatment showed a lower risk for ischaemic stroke for G3 {hazard ratio [HR] 0.37 [95% confidence interval (CI) 0.18–0.76]}, G4 [0.53 (0.38–0.74)] and G5D [0.49 (0.30–0.79)] and an increased risk of major bleeding in G4 [HR 1.22 (1.02–1.46)], G5 [1.52 (1.15–2.01)] and G5D [1.23 (1.00–1.51)]. All-cause mortality was more than halved on warfarin compared with no treatment in all GFR categories. Conclusions Warfarin treatment is associated with a lower risk of ischaemic stroke for patients with NVAF and G3, G4 and G5D at the cost of a higher risk of major bleeding for G4–G5D. Existing observational data are conflicting, stressing the need for RCTs on warfarin compared with no treatment in G4–G5D. Awaiting RCTs, it seems reasonable to treat selected patients on dialysis and NVAF with warfarin.

Welander, Frida (ORCID:0000000311117215)↗

Designing Cost‐Effective Carbon Payments to Induce Cellulosic Feedstock Production for Sustainable Aviation Fuel

Perennial bioenergy crops, such as miscanthus and switchgrass, and crop residues have the potential to scale up sustainable aviation fuel (SAF) production and mitigate carbon emissions. However, high establishment costs, delayed returns, and risk–return profiles that diverge from those of conventional crops can hinder incentives to adopt bioenergy crops. We develop an economic model that incorporates spatially varying joint yield and price distributions for the multiple crop choices a farmer faces and apply it to examine the incentives for risk-averse, present-biased, and credit-constrained farmers to produce cellulosic feedstocks under various biomass prices. We link this model to a biogeochemical model to quantify the spatially varying carbon mitigation benefits from these feedstocks in the rainfed region of the United States. We also analyze the cost-effectiveness of two carbon payment policies: annual and upfront. We find that risk-averse, present-biased, or credit-constrained farmers prefer to grow the lower-yielding but less risky switchgrass and harvest corn stover instead of the lower carbon, higher-yielding but riskier feedstock miscanthus, resulting in lower SAF production. Upfront carbon payments incentivize higher quantities of less carbon-intensive SAF production by risk-averse, credit-constrained, and present-biased farmers because they offset a part of the establishment costs of miscanthus. We also find that when farmers are credit-constrained, upfront payments are more cost-effective in terms of carbon mitigation per dollar spent. In contrast, annual payments are more cost-effective when farmers can access credit.

09 BIOMASS FUELS↗

Early Fault Detection in Nuclear Systems: A Digital Engineering Approach

Nuclear energy systems present unique challenges in terms of ensuring safety, reliability, and efficiency during their design and operation. Early fault detection is critical for mitigating risks and fostering system resilience. However, current methods often fall short at identifying faults during early stages, potentially leading to costly delays and safety risks. The present work proposes a comprehensive digital engineering approach that leverages digital twins, digital threads, model-based systems engineering, artificial intelligence, and immersive extended reality to support early fault detection in nuclear systems. Through a series of case studies, we highlight specific gaps in the fault detection mechanisms of traditional nuclear design and operation processes, then demonstrate a suite of solutions we are working to implement to address these shortcomings in similar projects. Our findings suggest that a digital engineering approach to design and operation can significantly improve fault detection, ultimately leading to reductions in risk.

42 - ENGINEERING↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stakeholder-Engaged Structured Decision Making for the Los Alamos Legacy Cleanup Mission - 20501

The Los Alamos National Laboratory (LANL) environmental legacy cleanup program requires decisions to be made for environmental remediation, decommissioning and disposal or management of radioactive waste. This legacy cleanup program was established to address groundwater contamination, material disposal areas (MDAs) that have been used to dispose of radioactive and other waste material, and 'aggregate areas' that might produce radioactive or other chemical waste as a result of remediation activities. The LANL site is regulated for environmental concerns under the Resource Conservation and Recovery Act (RCRA). However, some parts of LANL, such as material disposal area G (MDA G), have disposed of radioactive waste under DOE Order 435.1, and are subject to other regulations. For example, decommissioning the remote-handled TRU material stored in 33 shafts at MDA G falls under EPA's 40 CFR 191. Collectively, the regulations are all aimed in the same direction of finding the best solution, either through constructs such as 'as low as reasonably achievable' (ALARA), considering balancing factors as opposed to only cost and human health risk, and, under EPA regulations such as RCRA and NEPA, evaluating impact from all chemicals and both human health and ecological endpoints. Despite the basic goals and objectives of the regulations or their guidance, the main challenge is in their implementation. Arguably perhaps, but really in principle, all of these (and similar) regulations are asking for a decision analysis to be performed. Implementation challenges encountered have included lack of understanding of decision analysis in the industry, lack of effective stakeholder engagement in the decision analysis process, and lack of appreciation of the need to separate value judgments from science, the latter leading to developing conservative, or protective, science-based models. Conservative models lead to poor solutions, lack of effective stakeholder engagement leads to long drawn out protracted approaches to finding a solution (which also might never be found with this approach), and lack of understanding of decision analysis and Bayesian statistics causes poor models to be built, which creates unfortunate situations of 'garbage in, garbage out' becoming the basis for decision making. Stakeholder-engaged structured decision making (SDM) is an approach to solving problems that relies on the theory of decision science to involve stakeholders in the decision-making process. This approach incorporates stakeholder values using a scientifically rigorous methodology that separates value judgments from science in a way that helps avoid the pitfalls of biased, protective, or conservative modeling. This approach has its foundation in Keeney's 1992 treatise on value-focused thinking [1]. Keeney advocated a paradigm shift in decision making based on the idea that the standard way of thinking about decisions is backwards. The standard approach of focusing first on identifying alternatives rather than on articulating values results in a reactive approach with the emphasis on mechanics and fixed choices instead of the core values that have meaning to stakeholders. This paradigm shift effectively engages all stakeholders in the decision-making process while using a values focused thinking approach that can lead to the identification of decision opportunities and the creation of better alternatives. The intent is to be proactive and generate solutions that are related directly to values and objectives as identified by stakeholders. There are, perhaps, two overarching reasons why SDM can be used to benefit LANL's environmental legacy cleanup. Some of LANL's remaining waste management and environmental management problems are challenging and complex (for example, the Cr and RDX plumes, and MDAs) and while the traditional approach has, arguably, worked well for relatively simple risk-based problems, it cannot, or should not, be applied to more complex problems if the most effective and efficient solutions are desired. The second reason is cost. This has perhaps become more critical since publication of the Government Accountability Office (GAO) reports that DoE's environmental liability is considered a high-risk concern for the nation [2]. The focus of SDM is on structuring solutions to decision risk problems by first addressing stakeholder and decision maker values and subsequently developing decision objectives and ways to measure those objectives, preference weighting across objectives, identifying decision alternatives that best achieve those values, and characterizing uncertainty in predictions of the measures. Because a complete decision model is created using SDM, it can be evaluated to find the main elements of the model that drive, or predict, the best solution. This approach creates complete decision models that are transparent, traceable, reproducible and technically defensible. The science behind SDM, or decision analysis, is well founded, yet it is not unusual to see ad hoc approaches to decision making implemented under various environmental regulations that are pertinent to the LANL site, including NEPA, RCRA and DOE Order 435.1. Such ad hoc approaches are often not transparent or traceable, and lack reproducibility and technical defensibility. The LANL legacy cleanup program has embarked on using SDM to address the complex problems that remain. Stakeholder meetings have been held, and a prototype version of the stakeholder value system has been developed. Further meetings are expected in the future to address specific project needs. This is a long-term endeavor considering the complex environmental problems faced by DOE EM in Los Alamos (EM-LA), and careful planning, consideration of stakeholder value systems, and engagement with stakeholders throughout the SDM process is expected to lead to a successful endpoint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Case for Reduced Precious Metal Catalysts in Proton Exchange Membrane Electrolyzers

Proton exchange membrane (PEM) water electrolyzers are a key technology in decarbonizing hydrogen production. Though the market for PEM electrolyzer systems is growing, there are concerns that the cost and availability of precious metal catalysts utilized in today’s commercial systems can limit deployment. Herein, we show that while the availability of Ir should not impede deployment in the near term, the inelasticity of the Ir commodity price is cause for immediate concern. Here we emphasize that diversifying catalyst materials, even with other precious metals, can reduce system costs and mitigate supply chain risk. Furthermore, we analyze the trade-offs between catalyst capital cost and catalyst activity for a range of operating conditions (i.e., capacity factor, electricity price). The framework presented herein is a first step toward establishing performance targets (i.e., activity, stability, material cost) for reduced precious metal and non-precious metal catalysts as a function of PEM electrolyzer operating conditions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power

Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This paper focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including nine alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power Plant

This presentation is prepared for the DOE LWRS RISA Pathway Stakeholder Engagement Meeting on October 13-14, 2021. Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This presentation focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including eight alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

Cost Efficient-by-Design Microreactors: Trade-offs between cost, technical, and regulatory factors

This research evaluates a cost reduction investigation through adoption of a functional containment approach on the microreactor system and structure. Trade-offs between microreactor system designs, fuels and reactor module sizes are evaluated based on performance-based and risk-informed design procedures. Cost savings are evaluated against trade-offs in the reliability of passive heat removal systems, reactivity control, and radioactive material containment. Results can inform the Microreactor Program and reactor designs on “sweet spots” for microreactors that are cost-efficient while meeting required safety limits.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PF-4 Seismic Performance Reassessment Project (P-SPRaP), Interim Risk Methodology and Deliverables [Slides]

Background: Interim Risk was added to P-SPRaP (SPR Phase 2) to produce intermediate results which build confidence, exercise methodology, develop early insights, and (most importantly) mitigate LANL pit production program risk. Status: SPR Phase 2 is actively underway, has P-SPRaP project team priority focus, and is targeting completion in FY21 (September 2021). Deliverable: Presentation of interim risk results (loss of confinement for screened in failure modes), list of potential criticisms of Interim Risk approach / methodology that intervenors could raise, cost and schedule for completion of Final Risk.

58 GEOSCIENCES↗

CO 2 Pipeline risk assessment and comparison for the midcontinent United States

For this work, a comprehensive quantitative risk assessment for the construction and operation of CO 2 transportation networks considered for the Midcontinent United States was conducted. The results showed risks associated with CO 2 pipelines were significantly less than those of other pipeline types. The assessment used four conceptual pipelines of different lengths to discuss risks operators may see. The assessment evaluated the risk associated with construction and operation using data from the US Occupational Safety Health Administration to determine the risk of injury or death for pipeline workers and data from the US Pipeline and Hazardous Materials Safety Administration for CO 2 , natural gas distribution, natural gas transmission/gathering, and non-CO 2 hazardous liquid pipelines to develop quantitative likelihood and severity values leading to risk values. The data for the assessment covered incidents from 2010 to 2017 for CO 2 pipelines. The average risk for construction and 30 years of operation for four CO 2 pipeline configurations ranging between 79 and 1,546 miles in length was found. The construction and operational risk averaged between $\$1,400,521$ (approximately $\$0.02$/tonne of CO 2 ) for the shorter pipeline (79 miles) and $\$27,481,939$ (approximately $\$0.10$/tonne of CO 2 ) for a longer pipeline (1,546 miles). The largest risks of fatality for CO 2 pipelines comes from vehicle transport. The largest operational risk to the pipeline was due to leakage. Public pipeline opposition is also a significant risk; it was not quantified but is addressed.

03 NATURAL GAS↗

Book Chapter: Small Modular Reactors

Small Modular Reactors (SMRs) have been a very promising development in nuclear power over the last two decades. SMRs are defined as nuclear reactors with a power output of less than 300 MWe. This is in comparison to gigawatt-size reactors, which can have electrical output of 1000–1500 MWe or more. This chapter will consist of two major sections. The first will be a detailed summary of the small modular reactor designs being proposed around the world. This section will focus on those that are the furthest along in their development, but will also include some information about the wide variety of proposed designs that require significant research and development. The second part will be a discussion of the remaining challenges to the adoption of SMRs as a major energy source. SMRs are not a new concept, but they do represent a new vision for an older concept. These reactors have the potential to become a major source of energy in the near future. The development of small, modular designs can help promote the adoption of nuclear energy by reducing upfront costs, reducing the financial risk associated with nuclear power, and the barriers to entry. However, the adoption of SMRs is not without challenges. Regulatory and licensing changes to address the unique benefits and concerns associated with SMRs will continue to be a challenge as regulators adapt to the unique features emerging from the design process. The development of new instrumentation and control systems is an ongoing issue. And economics is possibly the most significant challenge, with high construction costs, cheap natural gas, and government subsidies, combining to result in significant financial risk associated with adopting nuclear generation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗