Search NASA⌕ Search

SEARCH · Search NASA

Results for “critical infrastructures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

POWOW: A Modular, High Power Spacecraft Concept

A robust space infrastructure encompasses a broad range of mission needs along with an imperative to reduce costs of satellites meeting those needs. A critical commodity for science, commercial and civil satellites is power at an affordable cost. The POWOW (POwer WithOut Wires) spacecraft concept was created to provide, at one end of the scale, multi-megawatts of power yet also be composed of modules that can meet spacecraft needs in the kilowatt range. With support from the NASA-sponsored Space Solar Power Exploratory Research and Technology Program, the POWOW spacecraft concept was designed to meet Mars mission needs - while at the same time having elements applicable to a range of other missions. At Mars, the vehicle would reside in an aerosynchronous orbit and beam power to a variety of locations on the surface. It is the purpose of this paper to present the latest concept design results. The Space Power Institute along with four companies: Able Engineering, Inc., Entech, Inc., Primex Aerospace Co., and TECSTAR have produced a modular, power-rich electrically propelled spacecraft design that meets these requirements. In addition, it also meets a range of civil and commercial needs. The spacecraft design is based on multijunction Ill-V solar cells, the new Stretched Lens Aurora (SLA) module, a lightweight array design based on a multiplicity of 8 kW end-of-life subarrays and electric thrusters. The solar cells have excellent radiation resistance and efficiencies above 30%. The SLA has a concentration ratio up to 15x while maintaining an operating temperature of 80 C. The design of the 8 kW array building block will be presented and its applicability to commercial and government missions will be discussed. Electric propulsion options include Hall, MPD and ion thrusters of various power levels and trade studies have been conducted to define the most advantageous options. The present baseline spacecraft design providing 900 kW using technologies expected to be available in 2003 will be described. Areal power densities of nearly 400 W/meters squared at 80 C operating temperatures and wing level specific powers of over 400 W/kg are projected. Details of trip times and payloads to Mars will be presented as well as trade studies of various electric propulsion options. Trip times compare favorably with chemical propulsion options. Because the design is modular, learning curve methodology can be applied to determine expected cost reductions. These results will also be included. This paper has not been presented at a previous meeting.

Brandhorst, Henry W., Jr.↗

Beyond Control Centers

For NASA's Resource Prospector (RP) Lunar Rover Mission, we are moving away from a control center concept, to a fully distributed operation utilizing control nodes, with decision support from anywhere via mobile devices. This operations concept will utilize distributed information systems, notifications, mobile data access, and optimized mobile data display for off-console decision support. We see this concept of operations as a step in the evolution of mission operations from a central control center concept to a mission operations anywhere concept. The RP example is part of a trend, in which mission expertise for design, development and operations is distributed across countries and across the globe. Future spacecraft operations will be most cost efficient and flexible by following this distributed expertise, enabling operations from anywhere. For the RP mission we arrived at the decision to utilize a fully distributed operations team, where everyone operates from their home institution, based on evaluating the following factors: the requirement for physical proximity for near-real time command and control decisions; the cost of distributed control nodes vs. a centralized control center; the impact on training and mission preparation of flying the team to a central location. Physical proximity for operational decisions is seldom required, though certain categories of decisions, such as launch abort, or close coordination for mission or safety-critical near-real-time command and control decisions may benefit from co-location. The cost of facilities and operational infrastructure has not been found to be a driving factor for location in our studies. Mission training and preparation benefit from having all operators train and operate from home institutions.

Operations↗

Historical Domestic Flights from 2016-2020 with Estimations of Greenhouse Gas Emissions by Aircraft Type

Data and analyses are presented on the utilization of aircraft fuel in the U.S. and the greenhouse gas emissions that they create. Aggregated commercial passenger and freight aviation flight data from 2016-2020 is captured from the Bureau of Transportation Statistics website is used to augment flight data from the Sherlock data warehouse at NASA Ames is used to determine the miles flown by major aircraft models. The corresponding fuel burn is estimated using the International Civilian Aviation Organization fuel burn tables and carbon dioxide emissions are calculated using a fuel-burn multiplicative factor. One key conclusion of this analysis is that long haul flights (i.e. >2485 statute miles) create a disproportionately large amount of carbon dioxide emissions in the U.S while short flights (i.e. < 311 statute miles) contribute less than five percent of the U.S. aviation-related carbon dioxide emission. Although these short-haul flights may not have a large impact on overall carbon dioxide emissions, they will be a critical entry point for the adoption of future, larger fuel-efficient novel vehicles and the impact to future airport and infrastructure requirements. The final paper will present some estimates of the impact of advanced technologies on fuel burn and CO₂ emissions in various scenarios.

Susie Go↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, a fleet of unmanned ground vehicles (UGVs) was developed as a test and evaluation (T\&E) platform to reduce system integration gaps between simulation and live flight hardware. While simulation and hardware-in-the-loop bench testing provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure increase the risks to safety, property, and the project. Given ATTRACTOR’s goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, bridging these gaps was critical to successful project execution and feasibility assessment. In this paper we present the UGV fleet and its role in speeding up system integration, smoothing the transition from simulation to flight, and providing researchers an easy-to-use hardware test bed. An overview of the hardware and software on-board the vehicles is provided along with supporting infrastructure. The system integration process is documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted since the creation of the fleet. Finally, we discuss the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P. Vaughan↗

The Engineering Review Board

The NASA Engineering Review Board (ERB) is a permanent panel established to create an information infrastructure upgrade plan to support modernization efforts. The ERB looks at concepts and proposals from a system-wide perspective and identifies critical review milestones in the modernization plan. The background, role, and future directions of the ERB are described.

Hunter, Judy↗

Reliability and Maintainability Engineering - A Major Driver for Safety and Affordability

The United States National Aeronautics and Space Administration (NASA) is in the midst of an effort to design and build a safe and affordable heavy lift vehicle to go to the moon and beyond. To achieve that, NASA is seeking more innovative and efficient approaches to reduce cost while maintaining an acceptable level of safety and mission success. One area that has the potential to contribute significantly to achieving NASA safety and affordability goals is Reliability and Maintainability (R&M) engineering. Inadequate reliability or failure of critical safety items may directly jeopardize the safety of the user(s) and result in a loss of life. Inadequate reliability of equipment may directly jeopardize mission success. Systems designed to be more reliable (fewer failures) and maintainable (fewer resources needed) can lower the total life cycle cost. The Department of Defense (DOD) and industry experience has shown that optimized and adequate levels of R&M are critical for achieving a high level of safety and mission success, and low sustainment cost. Also, lessons learned from the Space Shuttle program clearly demonstrated the importance of R&M engineering in designing and operating safe and affordable launch systems. The Challenger and Columbia accidents are examples of the severe impact of design unreliability and process induced failures on system safety and mission success. These accidents demonstrated the criticality of reliability engineering in understanding component failure mechanisms and integrated system failures across the system elements interfaces. Experience from the shuttle program also shows that insufficient Reliability, Maintainability, and Supportability (RMS) engineering analyses upfront in the design phase can significantly increase the sustainment cost and, thereby, the total life cycle cost. Emphasis on RMS during the design phase is critical for identifying the design features and characteristics needed for time efficient processing, improved operational availability, and optimized maintenance and logistic support infrastructure. This paper discusses the role of R&M in a program acquisition phase and the potential impact of R&M on safety, mission success, operational availability, and affordability. This includes discussion of the R&M elements that need to be addressed and the R&M analyses that need to be performed in order to support a safe and affordable system design. The paper also provides some lessons learned from the Space Shuttle program on the impact of R&M on safety and affordability.

Safie, Fayssal M.↗

Detection, Localization, and Tracking of Unauthorized UAS and Jammers

Small unmanned aircraft systems (UASs) are expected to take major roles in future smart cities, for example, by delivering goods and merchandise, potentially serving as mobile hot spots for broadband wireless access, and maintaining surveillance and security. Although they can be used for the betterment of the society, they can also be used by malicious entities to conduct physical and cyber attacks to infrastructure, private/public property, and people. Even for legitimate use-cases of small UASs, air traffic management (ATM) for UASs becomes of critical importance for maintaining safe and collusion-free operation. Therefore, various ways to detect, track, and interdict potentially unauthorized drones carries critical importance for surveillance and ATM applications. In this paper, we will review techniques that rely on ambient radio frequency signals (emitted from UASs), radars, acoustic sensors, and computer vision techniques for detection of malicious UASs. We will present some early experimental and simulation results on radar-based range estimation of UASs, and receding horizon tracking of UASs. Subsequently, we will overview common techniques that are considered for interdiction of UASs.

surveillance↗

Designing a Software Architecture for the Precision Assembly of Space Structures

As NASA’s space exploration and science missions expand in complexity, longevity, anddistance beyond earth’s orbit, Orbital Servicing, Assembly and Manufacturing (OSAM)technologies and concepts have become a critical area of ongoing research and innovation.Artemis’ Moon-to-Mars goals of building sustainable elements on and around the Moon andMars that allow our robots and astronauts to explore and conduct more scientific researchwill demand in situ resource utilization, construction, and maintenance to succeed. In-spaceAssembly (ISA), as a sub-component of OSAM, focuses on the on-orbit building or fabricationof mission infrastructure and payloads. One such ISA application is highlighted by the recentNASA In-Space Assembled Telescope (iSAT) study, which stated that the next generation ofspace observatories will exceed the fairing size of existing or even planned launch vehicles andISA has emerged as a viable approach for observatory assembly. Research efforts at NASALangley Research Center have led to the design of a novel TriTruss structural concept for themodular construction of large complex persistent platforms. The TriTruss design and otherdeveloping OSAM technologies enable larger and persistent space missions that would notbe possible with single-launch-sized structures. For example, 20 meter or larger telescopesor orbital platform applications. However, the increased complexity will require autonomousoperations for the construction and maintenance of long-term infrastructure to achieve missionsuccess. NASA’s Precision Assembly of Space Structures (PASS) project is focused on thestructural and autonomy capabilities required to construct an iSAT in deep space. PASSresearch efforts will develop and validate critical technologies needed for effective efficienton-orbit assembly that can be confidently adopted for future systems. PASS will utilize theTriTruss modules to demonstrate the autonomous modular assembly of a 20m-class iSAT mirrorbackbone structure including simulated mirrors and wiring harness. In this paper, we addressthe software and hardware design considerations, technologies, and challenges of designing arobust robotics framework for assembling modular space structures in support of In SpaceAssembly missions in general as well as for PASS specifically.

Benjamin N Kelley↗

Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits and difficulties that a migration to cloud-based computing philosophies has uncovered when compared to the legacy Mission Control Center architecture. The team consists of system and software engineers with extensive experience with the MCC infrastructure and software currently used to support the International Space Station (ISS) and Space Shuttle program (SSP).

Martin, Keith↗

Methodologies and systems for heterogeneous concurrent computing

Heterogeneous concurrent computing is gaining increasing acceptance as an alternative or complementary paradigm to multiprocessor-based parallel processing as well as to conventional supercomputing. While algorithmic and programming aspects of heterogeneous concurrent computing are similar to their parallel processing counterparts, system issues, partitioning and scheduling, and performance aspects are significantly different. In this paper, we discuss critical design and implementation issues in heterogeneous concurrent computing, and describe techniques for enhancing its effectiveness. In particular, we highlight the system level infrastructures that are required, aspects of parallel algorithm development that most affect performance, system capabilities and limitations, and tools and methodologies for effective computing in heterogeneous networked environments. We also present recent developments and experiences in the context of the PVM system and comment on ongoing and future work.

Sunderam, V. S.↗

Comparison Study of Machine Learning Techniques to Predict Flight Energy Consumption for Advanced Air Mobility

This paper addresses the need to predict the flight energy consumption of aerial vehicles in the presence of wind using machine learning techniques. The presented work is critical to achieving sustainable and efficient operations for Advanced Air Mobility (AAM) and to evaluating the readiness of the ground-supporting energy infrastructure, e.g., electric grid and AAM portals. The flight energy consumption is described using the "energy per meter" (EPM) metric. We present a comparison study of influential machine learning techniques in predicting EPM using real-world flight test data. We presented new results of using the Decision Tree, Random Forest, and linear regression techniques, along with our previous results using the Recurrent Neural Network and Feed Forward Neural Network techniques. The comparison results show that the Linear Regression method outperforms other methods on the basis of the Mean Squared Error and error variance.

Machine Learning↗

Relay Support for the Mars Science Laboratory and the Coming Decade of Mars Relay Network Evolution

Mars Relay Network is prepared to support MSL: a) ODY/MRO/MEX will all provide critical event comm support during EDL. b) New Electra/Electra-Lite capabilities on the MSL-MRO link will support >250 Mb/sol MSL data return. 2013 MAVEN orbiter will replenish on-orbit relay infrastructure as prior orbiters approach end-of-life. While NASA has withdrawn from the 2016 EMTGO and 2018 Joint Rover missions, analysis of the potential link shows a path to Gbit/sol relay capability 2012.

critical event telemetry↗

Structures and Materials Working Group report

The appropriateness of the selection of four issues (advanced materials development, analysis/design methods, tests of large flexible structures, and structural concepts) was evaluated. A cross-check of the issues and their relationship to the technology drivers is presented. Although all of the issues addressed numerous drivers, the advanced materials development issue impacts six out of the seven drivers and is considered to be the most crucial. The advanced materials technology development and the advanced design/analysis methods development were determined to be enabling technologies with the testing issues and development of structural concepts considered to be of great importance, although not enabling technologies. In addition, and of more general interest and criticality, the need for a Government/Industry commitment which does not now exist, was established. This commitment would call for the establishment of the required infrastructure to facilitate the development of the capabilities highlighted through the availability of resources and testbed facilities, including a national testbed in space to be in place in ten years.

Torczyner, Robert↗

Paving the Path for Human Space Exploration: The Challenges and Opportunities

Lauri Hansen, Director of Engineering at NASA Johnson Space Center will discuss the challenges of human space exploration. The future of human exploration begins with our current earth reliant missions in low earth orbit. These missions utilize the International Space Station to learn how to safely execute deep space missions. In addition to serving as an exploration test bed and enabling world class research, the International Space Station enables NASA to build international and commercial partnerships. NASA's next steps will be to enable the commercialization of low earth orbit while concentrating on developing the spacecraft and infrastructure necessary for deep space exploration and long duration missions. The Orion multi-purpose crew vehicle and the Space Launch System rocket are critical building blocks in this next phase of exploration. There are many challenges in designing spacecraft to perform these missions including safety, complex vehicle design, and mass challenges. Orion development is proceeding well, and includes a significant partnership with the European Space Agency (ESA) to develop and build the Service Module portion of the spacecraft. Together, NASA and ESA will provide the capability to take humans further than we have ever been before - 70,000 km past the moon. This will be the next big step in expanding the frontiers of human exploration, eventually leading to human footprints on Mars.

Hansen, Lauri↗

Playing with DIRT: Building the Framework for a Comprehensive In-Situ Soil Materials Testing Database

Long-term, sustainable planetary exploration will require the ability to "live off the land," relying on In-Situ Resource Utilization (ISRU) and In-Situ Construction as core capabilities. Reduction of both risk and launch mass for lunar construction will require evaluating and comparing regolith materials for use as feedstocks suitable for in-situ beneficiation and fabrication of building components. These material assessment capabilities will inform lunar infrastructure design decisions, with co-benefits for terrestrial construction using in-situ materials. Current planetary construction technology development relies on lunar mapping and orbital data, Apollo-era sample analyses, current simulant inventories, and tests conducted using analog site soils. Requirements for lunar infrastructure design decisions and construction systems will be determined based on specific environmental conditions, mission architectures, and the materials available within traverse range of lunar feedstock processing depots. Critical for success is the capability to identify, evaluate and make effective use of a wide range of materials as they are found in-situ on the lunar surface. This paper discusses the development of a digital repository for data on soil and regolith properties, beginning with their structural performance in both cementitious and non-cementitious building material formulations. The Database for In-situ Resource Testing (DIRT) compiles a catalog of raw materials, additives, and formulations, with notations pertaining to material sources and preparation techniques entered via a web-based user interface. Design of consistent data schemas for site-sourced materials evaluation will facilitate linkage with relevant terrestrial and planetary materials databases while enabling guided data input via templates for participation by broader groups of collaborators. Results of these analyses are compiled in a centralized repository to generate insights applicable for regolith resources and landing sites yet to be precisely defined. Collection of thorough records of material characteristics, applications and performance will support innovative construction solutions not only for space infrastructure but for sustainable, resilient design in the terrestrial built environment.

Sarah Joey Seitz↗

Severe Space Weather Events--Understanding Societal and Economic Impacts: A Workshop Report - Extended Summary

The effects of space weather on modern technological systems are well documented in both the technical literature and popular accounts. Most often cited perhaps is the collapse within 90 seconds of northeastern Canada's Hydro-Quebec power grid during the great geomagnetic storm of March 1989, which left millions of people without electricity for up to 9 hours. This event exemplifies the dramatic impact that severe space weather can have on a technology upon which modern society critically depends. Nearly two decades have passed since the March 1989 event. During that time, awareness of the risks of severe space weather has increased among the affected industries, mitigation strategies have been developed, new sources of data have become available, new models of the space environment have been created, and a national space weather infrastructure has evolved to provide data, alerts, and forecasts to an increasing number of users. Now, 20 years later and approaching a new interval of increased solar activity, how well equipped are we to manage the effects of space weather? Have recent technological developments made our critical technologies more or less vulnerable? How well do we understand the broader societal and economic impacts of severe space weather events? Are our institutions prepared to cope with the effects of a 'space weather Katrina,' a rare, but according to the historical record, not inconceivable eventuality? On May 22 and 23, 2008, a one-and-a-half-day workshop held in Washington, D.C., under the auspices of the National Research Council's (NRC's) Space Studies Board brought together representatives of industry, the federal government, and the social science community to explore these and related questions. The key themes, ideas, and insights that emerged during the presentations and discussions are summarized in 'Severe Space Weather Events--Understanding Societal and Economic Impacts: A Workshop Report' (The National Academies Press, Washington, D.C., 2008), which was prepared by the Committee on the Societal and Economic Impacts of Severe Space Weather Events: A Workshop. The present document is an expanded summary of that report.

Source record↗

International Space Station as a Base Camp for Exploration Beyond Low Earth Orbit

The idea for using the International Space Station (ISS) as platform for exploration has matured in the past year and the concept continues to gain momentum. ISS provides a robust infrastructure which can be used to test systems and capabilities needed for missions to the Moon, Mars, asteroids and other potential destinations. International cooperation is a critical enabler and ISS has already demonstrated successful management of a large multi-national technical endeavor. Systems and resources needed for expeditions can be aggregated and thoroughly tested at ISS before departure thus providing wide operational flexibility and the best assurance of mission success. A small part of ISS called an Exploration Platform (ISS-EP) can be placed at Earth-Moon Libration point 1 (EML1) providing immediate benefits and flexibility for future exploration missions. We will show how ISS and the ISS-EP can be used to reduce risk and improve the operational flexibility for missions beyond low earth orbit. Life support systems and other technology developed for ISS can be evolved and adapted to the ISS-EP and other exploration spacecraft. New technology, such as electric propulsion and advanced life support systems can be tested and proven at ISS as part of an incremental development program. Commercial companies who are introducing transportation and other services will benefit with opportunities to contribute to the mission since ISS will serve as a focal point for the commercialization of low earth orbit services. Finally, we will show how use of ISS provides immediate benefits to the scientific community because its capabilities are available today and certain critical aspects of exploration missions can be simulated.

Raftery, Michael↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗