SEARCH · Search NASA
Results for “demand forecasts”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Time-Varying Value of Energy Efficiency in Michigan
Quantifying the time-varying value of energy efficiency is necessary to properly account for all of its benefits and costs and to identify and implement efficiency resources that contribute to a low-cost, reliable electric system. Historically, most quantification of the benefits of efficiency has focused largely on the economic value of annual energy reduction. Due to the lack of statistically representative metered end-use load shape data in Michigan (i.e., the hourly or seasonal timing of electricity savings), the ability to confidently characterize the time-varying value of energy efficiency savings in the state, especially for weather-sensitive measures such as central air conditioning, is limited. Still, electric utilities in Michigan can take advantage of opportunities to incorporate the time-varying value of efficiency into their planning. For example, end-use load research and hourly valuation of efficiency savings can be used for a variety of electricity planning functions, including load forecasting, demand-side management and evaluation, capacity planning, long-term resource planning, renewable energy integration, assessing potential grid modernization investments, establishing rates and pricing, and customer service (KEMA 2012). In addition, accurately calculating the time-varying value of efficiency may help energy efficiency program administrators prioritize existing offerings, set incentive or rebate levels that reflect the full value of efficiency, and design new programs.
GridAPPS-D™ at Three: Milestones on the Road to Advanced Distribution Functionality
Since the project’s inception in 2016, the GridAPPS-D team at PNNL has worked closely with its partners in industry and academia—as well as its advisory board of leading utilities—to develop the platform and the supporting resources. Here are some of the milestones, highlights, and achievements during the first three years of the project that set the stage to mature the platform and establish a robust GridAPPS-D ecosystem to realize and share the benefits more broadly among utilities.
Technology requirements for post-1985 communications satellites
The technical and functional requirements for commercial communication satellites are discussed. The need for providing quality service at an acceptable cost is emphasized. Specialized services are postulated in a needs model which forecasts future demands. This needs model is based upon 322 separately identified needs for long distance communication. It is shown that the 1985 demand for satellite communication service for a domestic region such as the United States, and surrounding sea and air lanes, may require on the order of 100,000 MHz of bandwith. This level of demand can be met by means of the presently allocated bandwidths and developing some key technologies. Suggested improvements include: (1) improving antennas so that high speed switching will be possible; (2) development of solid state transponders for 12 GHz and possibly higher frequencies; (3) development of switched or steered beam antennas with 10 db or higher gain for aircraft; and (4) continued development of improved video channel compression techniques and hardware.
Rural land mobile radio market assessment and satellite and terrestrial system concepts
Market potential exists; the nature of the market in terms of service needs, usage characteristics, service requirements, and forecasting the demand to the year 2000; alternative system cncepts that show promise in addressing the identified needs, in a cost effective manner; and advanced technology requirements associated with these concepts are considered.
The Conference Proceedings of the 1997 Air Transport Research Group (ATRG) of the WCTR Society
Topics discussed include the following: Airline Demand and Forecasting, Quality of Service, Competition and Productivity, and Consumer Choice on Air Travel.
Information Requirements for Supervisory Air Traffic Controllers in Support of a Wake Vortex Departure System
Closely Space Parallel Runway (CSPR) configurations are capacity limited for departures due to the requirement to apply wake vortex separation standards from traffic departing on the adjacent parallel runway. To mitigate the effects of this constraint, a concept focusing on wind dependent departure operations has been developed, known as the Wake Turbulence Mitigation for Departures (WTMD). This concept takes advantage of the fact that crosswinds of sufficient velocity blow wakes generated by aircraft departing from the downwind runway away from the upwind runway. Consequently, under certain conditions, wake separations on the upwind runway would not be required based on wakes generated by aircraft on the downwind runway, as is currently the case. It follows that information requirements, and sources for this information, would need to be determined for airport traffic control tower (ATCT) supervisory personnel who would be charged with decisions regarding use of the procedure. To determine the information requirements, data were collected from ATCT supervisors and controller-in-charge qualified individuals at Lambert-St. Louis International Airport (STL) and George Bush Houston Intercontinental Airport (IAH). STL and IAH were chosen as data collection sites based on the implementation of a WTMD prototype system, operating in shadow mode, at these locations. The 17 total subjects (STL: 5, IAH: 12) represented a broad-base of air traffic experience. Results indicated that the following information was required to support the conduct of WTMD operations: current and forecast weather information, current and forecast traffic demand and traffic flow restrictions, and WTMD System status information and alerting. Subjects further indicated that the requisite information is currently available in the tower cab with the exception of the WTMD status and alerting. Subjects were given a demonstration of a display supporting the prototype systems and unanimously stated that the WTMD status information they felt important was represented. Overwhelmingly, subjects felt that approving, monitoring and terminating the WTMD procedure could be integrated into their supervisory workload.
More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction
Current Environmental Control and Life Support System (ECLSS) development and test activities are not generating data fast enough to provide statistically-supportable precise Orbital Replacement Unit (ORU) failure rate estimates for future missions. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches – namely regular resupply and rapid abort capabilities – will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of operations on board the International Space Station (ISS), a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass for future missions. A Bayesian failure rate estimation approach, such as the one currently implemented by the ISS Program, can help reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior failure rate estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, these subjective (and often inaccurate) prior estimates currently have a strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.
More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction
The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.
More Data Needed for Failure Rate Estimation, Validation, and Uncertainty Reduction
The currently planned schedule for advanced Environmental Control and Life Support System (ECLSS) development and test activities to support human exploration missions is unlikely to generate sufficient data to enable statistically-supportable, precise Orbital Replacement Unit (ORU) failure rate estimates to meet existing crew safety expectations. Accurate and precise failure rate estimates are critical for missions beyond Low Earth Orbit (LEO) because current risk mitigation approaches –namely regular resupply and rapid abort capabilities –will not be available. Safe operations will depend on mission planners’ ability to accurately forecast spares demand and efficiently provide the necessary resources. However, even after more than a decade of International Space Station (ISS) ECLSS operations, a significant amount of uncertainty remains in failure rate estimates. Uncertain or inaccurate failure rates result in increased risk and spares mass. A Bayesian estimation approach, such as the one currently implemented by the ISS Program, can reduce uncertainty by incorporating engineering judgement into failure rate estimates. However, experience on the ISS and with other complex systems shows that these prior failure rate estimates are often inaccurate. In addition, prior estimates are typically point values; some level of uncertainty must be added to convert these into probability distributions for Bayesian updating, and there are several potential methods for doing so. Due to the low rate of data collection, any inaccuracy in theseprior estimates currently hasa strong influence on the end result. This paper examines the challenges associated with failure rate estimation, validation, and uncertainty reduction in the context of ECLSS development for beyond-LEO missions. A variety of techniques for generating and updating Bayesian priors are discussed and evaluated using both real-world and simulated data. Potential solutions for improving failure rate estimation, including testing additional units, are analyzed and discussed, and a set of recommendations are provided for next-generation system development activities.
Forecasting the 2020 and 2030 demand for radioactive materials used in medicine.
Abstract not provided.
Integrated Predictive Systems for Solar Energy with Modeling, Post Processing and Machine Learning
Explore the source record for details and available documents.
Airport Traffic Management and Planning Framework
Initial results from the Athena project show that high-performance computing and high-fidelity traffic simulation can help guide airport traffic management decisions and understand operating bottlenecks.
Generative AI in Supply Chain Management: Applications, Challenges, and Future Directions
Supply chain management (SCM) is undergoing rapid transformation due to increasing global complexity, demand volatility, and operational disruptions. Generative Artificial Intelligence (GenAI) has emerged as a powerful paradigm capable of synthesizing data, simulating operational scenarios, and enabling adaptive decision-making across supply chain networks. This paper presents a survey of GenAI’s role in SCM, focusing on its applications in predictive analytics, autonomous logistics, and fraud detection. Unlike traditional AI systems that rely primarily on predictive analytics, GenAI models, including large language models, generative adversarial networks, and diffusion-based architectures, enable the creation of synthetic supply chain scenarios and autonomous optimization strategies. This survey provides (1) a taxonomy of GenAI techniques for supply chain applications, (2) a comparative analysis of generative AI approaches with traditional machine learning, reinforcement learning, and blockchain-based methods, and (3) a discussion of key challenges such as data privacy, interpretability, and integration with legacy enterprise systems. Furthermore, we outline open research problems and propose directions for future research toward autonomous, resilient, and sustainable AI-driven supply chains.
Day-Ahead Probabilistic Forecasting of Net-Load and Demand Response Potentials with High Penetration of Behind-the-Meter Solar-plus-Storage
The goal of this project is to develop advanced methods for day-ahead net-load forecasting, by leveraging the state-of-the-art machine learning techniques. The developed models produce both point and probabilistic forecasts for a variety of use cases, and are versatile to work with different types of data sets. The innovation lies in the novel design of the architectures, leveraging the most recent advances in machine learning that have not been explored in power systems, accompanied by techniques in the broader artificial intelligence fields such as fuzzy systems. This project has achieved the following accomplishments: (1) preprocessing of over 10 data sets covering varying geographical regions, time horizons, and system levels, which form a robust foundation for training and evaluating forecasting models across a wide range of realistic grid scenarios; (2) development of an interactive web app that enables exploratory analysis of load and generation data, and supports better understanding of data trends, anomalies, and correlations, facilitating model development and stakeholder engagement; (3) implementation of over 10 benchmark models for point and probabilistic forecasting, which include a mix of conventional machine learning methods and state-of-the-art deep learning approaches, providing a comprehensive baseline for performance comparison and validation of the proposed models; (4) development of a fuzzy system based gradient boosting model, tailored for small (less than 3 years) data sets, which achieves a mean absolute percentage error (MAPE) of 4% for point forecasting and a 20% improvement in average pinball loss for probabilistic forecasting; (5) development of a Transformer (a state-of-the-art deep learning architecture) based neural network model, tailored for large (3 years or more) data sets, which achieves a MAPE of 2% for point forecasting and a 20% improvement in average pinball loss for probabilistic forecasting; (6) development of a methodology for quantifying DR potential, and extensions of the previous models for multi-target forecasting of net load and DR potential, which achieve a MAPE of 10% for DR potential.
Enduse Global Emissions Mitigation Scenarios (EGEMS): A New Generation of Energy Efficiency Policy Planning Models
This paper presents efforts to date and prospective goals towards development of a modelling and analysis framework which is comprehensive enough to address the global climate crisis, and detailed enough to provide policymakers with concrete targets and achievable outcomes. In terms of energy efficiency policy, this requires coverage of the entire world, with emphasis on countries and regions with large and/or rapidly growing energy-related emissions, and analysis at the 'technology' level-building end use, transport mode or industrial process. These elements have not been fully addressed by existing modelling efforts, which usually take either a top-down approach, or concentrate on a few fully industrialized countries where energy demand is well-understood. Inclusion of details such as appliance ownership rates, use patterns and efficiency levels throughout the world allows for a deeper understanding of the demand for energy today and, more importantly, over the coming decades. This is a necessary next step for energy analysts and policy makers in assessment of mitigation potentials. The modelling system developed at LBNL over the past 3 years takes advantage of experience in end use demand and in forecasting markets for energy-consuming equipment, in combination with known technology-based efficiency opportunities and policy types. A particular emphasis has been placed on modelling energy growth in developing countries. Experiences to date include analyses covering individual countries (China and India), end uses (refrigerators and air conditioners) and policy types (standards and labelling). Each of these studies required a particular effort in data collection and model refinement--they share, however, a consistent approach and framework which allows comparison, and forms the foundation of a comprehensive analysis system leading to a roadmap to address the greenhouse gas mitigation targetslikely to be set in the coming years.
Value of long-term streamflow forecast to reservoir operations for water supply in snow-dominated catchments
In this study, we develop a forecast-based adaptive control framework for Oroville reservoir, California, to assess the value of seasonal and inter-annual forecasts for reservoir operation.We use an Ensemble Streamflow Prediction (ESP) approach to generate retrospective, one-year-long streamflow forecasts based on the Variable Infiltration Capacity hydrology model. The optimal sequence of daily release decisions from the reservoir is then determined by Model Predictive Control, a flexible and adaptive optimization scheme.We assess the forecast value by comparing system performance based on the ESP forecasts with that based on climatology and a perfect forecast. In addition, we evaluate system performance based on a synthetic forecast, which is designed to isolate the contribution of seasonal and inter-annual forecast skill to the overall value of the ESP forecasts.Using the same ESP forecasts, we generalize our results by evaluating forecast value as a function of forecast skill, reservoir features, and demand. Our results show that perfect forecasts are valuable when the water demand is high and the reservoir is sufficiently large to allow for annual carry-over. Conversely, ESP forecast value is highest when the reservoir can shift water on a seasonal basis.On average, for the system evaluated here, the overall ESP value is 35% less than the perfect forecast value. The inter-annual component of the ESP forecast contributes 20-60% of the total forecast value. Improvements in the seasonal component of the ESP forecast would increase the overall ESP forecast value between 15 and 20%.
Data-driven modeling to enhance municipal water demand estimates in response to dynamic climate conditions
Altered precipitation and temperature patterns from a changing climate will affect supply, demand, and overall municipal water system operations throughout the arid western U.S. While supply forecasts leverage hydrological models to connect climate influences with surface water availability, demand forecasts typically estimate water use independent of climate and other externalities. Stemming from an increased focus on seasonal water demand management, we use the Salt Lake City, Utah municipal water system as a test bed to assess model accuracy versus complexity trade-offs between simple climate-independent econometric-based models and complex climate-sensitive data-driven models to average to extreme wet and dry climate conditions—representative of a new climate normal. Here, the climate-independent model displayed low performance during extreme dry conditions with predictions exceeding 90% and 40% of the observed monthly and seasonal volumetric demands, respectively, which we attribute to insufficient model complexity. The climate-sensitive models displayed greater accuracy in all conditions, with an ordinary least squares model demonstrating a measurable reduction in prediction bias (3.4% vs. -27.3%) and RMSE (74.0 lpcd vs. 294 lpcd) compared to the climate-independent model. The climate-sensitive workflow increased model accuracy and characterized climate-demand interactions, demonstrating a novel tool to enhance water system management.