Search NASA⌕ Search

SEARCH · Search NASA

Results for “demand scenarios”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Optimal economic dispatch policy for prosumer with energy storage considering self-consumption demand

This paper analyzed the effects of self-consumption demand on the joint economic dispatch of prosumers (energy consumers who are also producers), particularly for prosumers with both energy storage and distributed energy sources (DERs). Studies in the existing literature on the economic dispatch scheduling policy of energy storage, mostly from the perspective of electricity merchants, do not address the impacts of self-consumption demand. However, due to the intermittent and high levels of uncertainty regarding DERs generation and the dynamic demand of the prosumer, production and consumption are not always simultaneous; there are two possible scenarios in each period depending on whether DERs generation can meet prosumers' self-consumption or not. Incorporating the self-consumption demand will pose modeling challenges since these two scenarios cannot occur simultaneously in each period, and different scenarios require different decisions for prosumers. Further, this paper analyzed the two scenarios separately to find the optimal storage scheduling strategy, and the results were combined to get the optimal global solution. We focused on prosumers' economic decision-making while considering self-consumption demand and the physical constraints of a battery based on dynamic programming. Our study showed that the feasible state of charge (SOC) range of storage can be segmented into several sub-ranges by SOC reference points under the above two scenarios. As a result, a prosumer's optimal scheduling can be uniquely and conveniently selected based on the sub-ranges within which the current SOC falls. The results, therefore, provided multistage decision-making guidance for prosumers with energy storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multi-technology building system retrofits for utility incentive programs: Savings, costs and baseline considerations

Utility incentive programs are an important channel to support the deployment of energy efficiency in buildings. To date, these programs have largely been limited to single-component strategies. However, many utilities are now motivated to identify and develop multi-component system retrofits to achieve deeper energy savings, which are essential to achieving broader energy and greenhouse gas reduction goals in the buildings sector. In this paper we present the energy savings, demand reductions, and cost-effectiveness of 16 systems retrofit packages in six utility regions in the United States. These results are being used by these utilities to inform and develop incentive programs for systems retrofits. Our analysis shows that packages with proven lighting and HVAC measures can provide 5–22% whole building annual energy savings, and 13–22% annual energy costs savings, using utility incentive program baselines (code and existing building). The packages are reasonably cost effective for replace-on-burnout but generally not for a retrofit scenario prior to end of equipment life. Demand response can increase both the energy savings and energy cost savings, further improving the cost effectiveness of these packages. We analyzed the impact of using existing building vs. code baselines for calculating savings, showing that the choice of baseline in developing utility incentive programs has a substantial impact on the attributable energy savings to a program, with significant implications for the overall viability of a program (generally savings against existing building condition are higher and improve project and program cost-effectiveness).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improved Air-Conditioning Demand Response of Connected Communities over Individually Optimized Buildings

Connected communities potentially offer much greater demand response capabilities over singular building energy management systems (BEMS) through an increase of connectivity. The potential increase in benefits from this next step in connectivity is still under investigation, especially when applied to existing buildings. This work utilizes EnergyPlus simulation results on eight different commercial prototype buildings to estimate the potential savings on peak demand and energy costs using a mixed-integer linear programming model. This model is used in two cases: a fully connected community and eight separate buildings with BEMS. The connected community is optimized using all zones as variables, while the individual buildings are optimized separately and then aggregated. These optimization problems are run for a range of individual zone flexibility values. The results indicate that a connected community offered 60.0% and 24.8% more peak demand savings for low and high flexibility scenarios, relative to individually optimized buildings. Energy cost optimization results show only marginally better savings of 2.9% and 6.1% for low and high flexibility, respectively.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF↗

Electric Vehicle Charging Demand in the Chicago Metropolitan Area through 2030

This report outlines the collaborative efforts between Argonne National Laboratory and Exelon in advancing the Agent-Based Transportation Energy Analysis Model (ATEAM). Aligning with ComEd’s beneficial electrification plan, this study developed eight scenarios to access the temporal and spatial distribution of charging load and demand stemming from the widespread adoption of battery electric vehicles (BEV) adoption, augmented public charging infrastructure deployment, and increased multi-unit dwelling (MUD) charging availability. Enhancements to the ATEAM model encompassed the simulation of multiple days of travel behavior, estimation of total public charging infrastructure needs, user interface refinements, and output tracking at both vehicle and charging station levels. The total electricity consumption for residential and public charging to support over 800,000 BEVs in Chicago in 2029 is projected at approximately 10.2 GWh. Enhanced MUD home charging accessibility (70%) amplifies the home charging load in the study area by 1.5% compared to the baseline scenario (10%). The widespread adoption of BEVs reduces peak charging loads, owing to their inclusion across households with diverse income levels, thus fostering a more dispersed charging activity pattern. However, widespread BEV adoption increases the peak home charging load in areas with lower median household incomes, reflecting a higher BEV concentration in these locales and, subsequently, heightened peak charging demands. In the Widespread BEV adoption scenario, fewer census tracts exhibit elevated peak loads for combined home and public charging, indicating a more even distribution of charging demand across the study area. Predominantly, peak loads for combined charging—both home and public— occur between 2 p.m. and 10 p.m. across all scenarios, encompassing the majority of census tracts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Role and Value of Interregional Transmission in a Decarbonized U.S. Electricity System

Decarbonizing the U.S. energy system entails a significant expansion of wind and solar power and electrification of end-use applications. Achieving both is more efficient and less costly when interregional transmission capacity is expanded, but the fractured nature of grid planning in the United States is often a barrier to such expansion. Here, we explore the role of interregional transmission under a variety of decarbonization scenarios, using a capacity-expansion model to generate co-optimized portfolios of generation, storage, and transmission that meet decarbonization targets and electrification-driven demand. We explore portfolio and cost differences across 92 scenarios, from scenarios with limited transmission expansion to those that include a meshed high-voltage direct current (HVDC) network. In the core decarbonization scenarios, wind capacity expands by ~10x and solar by ~20x compared to 2020, hundreds of gigawatts of battery storage are deployed, and interregional transmission expands by 3-6x. Transmission expansion occurs nationwide but is concentrated between the central "wind belt" and eastern load centers. The HVDC scenarios result in hundreds of billions of dollars of savings in total system cost, demonstrating the economic benefits of interregional transmission in support of rapid decarbonization.

capacity expansion↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

Demand Capacity Balancing at Vertiports for Urban Air Mobility

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

GCAM-USA electricity demand results for National Climate Assessment 5

Overview This dataset includes GCAM-USA v 5.3 outputs for the percent change in electricity demand in the U.S. from 2020 to 2050 and from 2020 to 2100 for the thermodynamic global warming scenario "RCP8.5_hotter" and the SSP5 socioeconomic scenario. These results were produced as part of the Integrated Multisector, Multiscale Modeling (IM3) project. Detailed Information The electricity demand is calculated based on the IM3 GCAM-USA simulations. For the purpose of reproducibility, we provide the following data: 1. Raw data: the annual electricity demand for CONUS simulated by IM3 GCAM-USA for the scenario RCP8.5 Hotter - SSP5. 2. R scripts: process raw data, calculate percent change of electricity demand from 2020 to 2050 and from 2020 to 2100, and plot the data over CONUS. 3. Results: figures provided for NCA-5 and the corresponding data table from the R scripts.

Climate Change↗

The Peaking Potential of Long-Duration Energy Storage in the United States Power System

In this work, we investigated the peaking potential for storage with durations of 4 h up to durations of 168 h (1 week). The peaking potential for a given storage duration is the amount of storage that can be added to a power system before that storage can no longer serve the peak net demand period at full rated capacity. We found that for the United States, 168 h of storage would be sufficient to serve about 27 % of peak demand, or about 215 GW in the current system. However, more than one-half of this amount could be served by storage with 12 h or less of capacity. As deployment of wind and solar grows, the peaking potential increases significantly, and under decarbonization scenarios, approximately one-half of the peak demand could be served by storage of up to 168 h; but again, the majority of this storage could be with durations of up to 12 h. The potential is also driven by the mix of wind and solar, and by storage efficiency, with the deployment of solar having the largest impact for both storage peaking potential and the mix of durations.

capacity expansion↗

The Lithuania 100% Renewable Energy Study - Interim Results: Electricity System Scenarios for 2030 [Slides]

Lithuania's Energy Vision aims to achieve self-sufficiency in electricity generation by 2035 and transition to 100% renewable energy as soon as possible while maintaining affordability, reliability, and energy security. The Lithuania Energy Agency (LEA) is partnering with the National Renewable Energy Laboratory (NREL) to conduct the Lithuania 100% Renewable Energy Study (Lithuania 100) to provide evidence-based analysis for development of Lithuania's National Energy Independence Strategy. The Lithuania 100 Study leverages unique tools and capabilities of NREL to provide rigorous technical analysis of clean energy policies to achieve 100% renewable energy, and assess impacts on electricity grid operations, hydrogen system development, electricity distribution networks, air quality, and human health outcomes. The study is supported by a stakeholder committee chaired by the Ministry of Energy of Lithuania and implemented by four technical working groups. This report provides highlights of key interim results from modeling of Lithuania's near-term electricity grid through the year 2030. Results show that Lithuania has sufficient renewable energy potential, flexible generation capacity, and interconnection with neighboring European Union countries to reliably meet projected 2030 electricity demand with 100% renewable energy. A range of scenarios were modeled, each of which achieves at least 100% renewable energy in electricity, on average over the year, by 2030. Potential demands for hydrogen across industrial and transportation sectors were also evaluated, as well as the cost of hydrogen produced in Lithuania by 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simulation-based analysis of different curb space type allocations on curb performance

Curbspace is a limited resource in urban areas. Delivery, ridehailing and passenger vehicles must compete for spaces at the curb. Cities are increasingly adjusting curb rules and allocating curb spaces for uses other than short-term paid parking, yet they lack the tools or data needed to make informed decisions. In this research, we analyze and quantify the impacts of different curb use allocations on curb performance through simulation, covering various mixes of curbspace uses (bus stops, paid parking, passenger pick-up/drop-off zones, and commercial vehicle loading zones), parking rules, and driver rule compliance. Three metrics (including two new ones) are developed to evaluate the performance of the curb, covering productivity and accessibility of passengers and goods, and CO 2 emissions. The metrics are calculated for each scenario across a wide range of input parameters (traffic volume, parking demand rate, vehicle dwell time, and street design speed) and compared to each other and to a baseline scenario. This work can inform policy decisions by providing municipalities a tool to analyze various curb management strategies and choose the ones that produce results more in line with their policy goals.

99 GENERAL AND MISCELLANEOUS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Space Station EVA System Evolution Study

Evaluation of Space Station Freedom support of manned exploration is in progress to identify SSF EVA system evolution requirements and capabilities. The output from these studies will provide data to support the preliminary design process to ensure that Space Station EVA system requirements for future missions (including the Transportation Node) are adequately considered and reflected. The study considers SSF support of future missions and the EVA system baseline to determine adequacy of EVA requirements and capabilities, and to identify additional requirements, capabilities, and necessary technology upgrades. EVA demands levied by formal requirements and indicated by evolution mission scenarios are high for the out-years of Space Station Freedom. An EVA system designed to meet the baseline requirements can easily evolve to meet evolution demands with few exceptions. Results to date indicate that upgrades or modifications to the EVA system may be necessary to meet all forseeable hangar induced EVA environments. Work continues to quantity the EVA capability in this regard. Evolution mission scenarios with EVA in and around unshielded nuclear propulsion engines are inconsistent with anthropomorphic EVA capabilities.

Rouen, Michael N.↗

U.S. Distribution Transformer Demand Phase III - Key Drivers and Managing Demand [Slides]

This presentation demonstrates a significant analysis, on forecasting the demand for distribution transformers. The analysis is conducted for the United States, estimating the initial in-service capacity of these assets, and forecasting demand for these assets through 2050 with several sensitivities conducted. It examines not only demand for these assets, but importantly, how utility planning practices can impact the demand for theses assets in time. Under load growth scenarios, whether utilities practice like-for-like replacement strategies as failures occur, or whether they practice proactive up-sizing, anticipating electric load growth, can have major impacts on future demand. It also examines several other growth factors, such as the increasing demand for step-up transformers, which share many of the same characteristics as distribution transformers, and the demand for specific transformers for large project growth from data centers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Active control of electron cyclotron emission radiometer channel frequencies for improved electron temperature measurements

As advanced scenarios are developed for tokamak operations, the demand for flexibility of the electron cyclotron emission (ECE) channels’ locations has increased. The tunable feature of yttrium iron garnet (YIG) filters provides this spatial flexibility. Here, we present a method of performing ECE measurements on fixed flux surfaces instead of fixed frequencies. This is achieved by adjusting YIG filters utilized in the intermediate frequency section to frequencies associated with flux surfaces in regions of interest during the discharge. Here, the key components are the application of tunable YIG filters and a control program that calculates the filter settings using flux information from real-time reconstruction equilibria (EFIT). This fast procedure facilitates T e measurements in regions of interest to investigate plasma dynamic behaviors.

47 OTHER INSTRUMENTATION↗

NASA TLA workload analysis support. Volume 2: Metering and spacing studies validation data

Four sets of graphic reports--one for each of the metering and spacing scenarios--are presented. The complete data file from which the reports were generated is also given. The data was used to validate the detail task of both the pilot and copilot for four metering and spacing scenarios. The output presents two measures of demand workload and a report showing task length and task interaction.

Sundstrom, J. L.↗

Cargo Logistics Airlift Systems Study (CLASS). Volume 5: Summary

Findings and conclusions derived during the study of freighter aircraft requirements to the year 2008 are summarized. These results represent the stepping off point for the much needed coordinated planning efforts by government agencies, the airlines, the users, and the aircraft manufacturers. The methodology utilized in the investigations is shown. The analysis of the current system encompassed evaluations of the past and current cargo markets and on sight surveys of airport and cargo terminals. The findings that resulted provided the basis for formulating the case study procedures, developing the future scenario, and developing the future cargo market demand.

Burby, R. J.↗