At least 181 records · Page 10

A Case Study about Energy and Cost Impacts for Different Community Scenarios Using a Community-Scale Building Energy Modeling Tool

The United States building sector consumed approximately 75% of electricity in 2019. By implementing renewable energy technologies and control strategies into buildings, future buildings will serve as energy generators as well as consumers. To accommodate this transition, communications among buildings and between buildings and the grid could provide more possibilities to optimize the energy performance of buildings. This paper develops a community-scale building energy model tool and conducts a case study adopting behind-the-meter distributed energy resources, sharing energy in different buildings, and using different electricity tariff structures. Three scenarios are studied: (1) electricity only supplied by the grid, (2) photovoltaic (PV) panels installed on and available to some but not all buildings, and (3) a connected community. To consider the impacts of locations and energy tariffs, this paper selects four cities and three electricity tariffs to evaluate the energy and cost performances of these three scenarios. The results show that the PV panels in Scenario 2 reduce 25% to 33% of the community-level electricity consumption and 20% to 30% of the community-level electricity cost compared with Scenario 1 in all studied locations and energy tariffs. By considering power management in the connected community (Scenario 3), the electricity consumption and cost can be further reduced by 6% to 7% and 5% to 11%, respectively, compared with Scenario 2.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Engineering Microgrids Amid the Evolving Electrical Distribution System

Non-wires alternatives and microgrid technologies are maturing and present great opportunities for electric utilities to increase the benefits they offer to their customers. They have the potential to decrease the cost of resolving traditional electrical system loading issues, contribute to carbon emissions reductions, and improve the electrical distribution system’s resilience to extreme weather events. The authors of this manuscript present a review of the research on microgrids and their practical applications. This is leveraged with the past work of the authors of this manuscript and other authors to develop specific objectives for microgrids, practical criteria for engineers to consider when deploying microgrids, stochastic methods to optimize microgrid designs, and black start requirements. This guidance is then used for the design of actual networked microgrids being deployed with adaptive boundaries.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC)

Increasing vehicle electrification will require extensive use of extreme fast charging (XFC), especially for larger vehicles. Uncoordinated XFC can create grid challenges, particularly at the distribution level. Two strategies can support widespread XFC: gold-plate the grid (i.e., upgrade all systems to enable worst-case, fully coincident loads) or use integrated planning to codesign a smart system based on advanced controls that leverage load flexibility and distributed energy resources. With the right design and control, XFC can simultaneously support both mobility and grid operations. Fully realizing the potential of XFC, however, will require unprecedented coordination among the charging infrastructure, grid, and vehicles. GEMINI-XFC combines high-fidelity grid and transport modeling at an unprecedented level of resolution and codesigns a smart system based on advanced controls that leverage load flexibility and distributed energy resources to optimize the integration of extreme fast charging (XFC) across a full regional scale with individual customer resolution.

ADVANCED PROPULSION SYSTEMS↗

Collaborative Distribution System Restoration Planning and Real-Time Dispatch Considering Behind-the-Meter DERs

Modern distribution systems are becoming more resilient against power outages thanks to the flexible generation capacity provided by the increasing integration of distributed energy resources (DERs). Compared to utility-scale DERs, which can be directly controlled by system operators, small-scale, behind-the-meter DERs are much more difficult to coordinate despite being the vast majority. Two major obstacles to the implementation of DERs for service restoration are the coordination of behind-the-meter DERs and the management of uncertainty. In this paper, a novel distribution system restoration strategy is proposed to overcome these two obstacles. The flexibility of be-hind-the-meter DERs is quantified and integrated into the restoration planning models within a hierarchical structure. The model predictive control technique is employed to enable adaptive restoration planning solution adjustments to accommodate fault scenarios and forecast errors. Besides, real-time power dispatch models are proposed to maintain power balance using available DER capability. Comprehensive integration of adaptive restoration planning schemes and real-time dispatch results are achieved through a collaborative restoration framework. Finally, the effectiveness of the proposed restoration strategy is verified through a modified IEEE 123-bus system and a real-world utility system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Providencia Island White Papers: Overview of Technical Requirements for Interconnection

This issue brief provides an overview of key technical requirements for inverter-based resources - including distributed energy resources (DERs) - to support the reliable and safe operation of the Providencia Island electrical grid, and other island or isolated area mini-grid applications. With the planned increase in inverter-based resources and the introduction of energy storage, adopting Institute of Electrical and Electronics Engineers (IEEE) Std 1547-2018, including the more advanced performance capabilities for voltage and frequency ride-through, will simplify interconnection as well as help to maintain a safe, reliable grid on Providencia Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Forecasting Multi-Wave Epidemics Through Bayesian Inference

We present a simple, near-real-time Bayesian method to infer and forecast a multiwave outbreak, and demonstrate it on the COVID-19 pandemic. The approach uses timely epidemiological data that has been widely available for COVID-19. It provides short-term forecasts of the outbreak’s evolution, which can then be used for medical resource planning. The method postulates one- and multiwave infection models, which are convolved with the incubation-period distribution to yield competing disease models. The disease models’ parameters are estimated via Markov chain Monte Carlo sampling and information-theoretic criteria are used to select between them for use in forecasting. The method is demonstrated on two- and three-wave COVID-19 outbreaks in California, New Mexico and Florida, as observed during Summer-Winter 2020. We find that the method is robust to noise, provides useful forecasts (along with uncertainty bounds) and that it reliably detected when the initial single-wave COVID-19 outbreaks transformed into successive surges as containment efforts in these states failed by the end of Spring 2020.

59 BASIC BIOLOGICAL SCIENCES↗

Case Studies and Model Guidance for Establishing Solar Cybersecurity Working Groups

This tool outlines actions that states can take to establish state-level working groups, which can be a critical first step to establishing state cybersecurity programs and efforts to support cybersecurity in distributed energy resources. Specifically, these working groups can lead the development of cybersecurity task forces focused around distributed energy resources, formal recommendations for policy makers and regulators, and the creation of a response strategies and plans for cybersecurity impacts or incidents in solar photovoltaic systems.

14 SOLAR ENERGY↗

North Carolina Water Utility Builds Resilience with Distributed Energy Resources

As the frequency and duration of grid outages increase, backup power systems are becoming more important for ensuring that critical infrastructure continues to provide essential services. Most facilities rely on diesel generators, which may be ineffective during long outages owing to limited fuel supplies and high generator failure rates. Distributed energy resources such as solar, storage, and combined-heat-and-power systems, coupled with on-site biofuel production, offer an alternative source of on-site generation that can provide both cost savings and resilience (i.e., the ability to respond to catastrophic events with longer-term consequences). A mixed-integer linear program minimizes costs and maximizes resilience at a wastewater treatment plant in Wilmington, North Carolina. We find that the plant can reduce life-cycle energy costs by 3.1% through the installation of a hybrid combined-heat-and-power, photovoltaic, and storage system. When paired with existing diesel generators, this system can sustain full load for seven days while saving $664,000 over 25 years and reducing diesel fuel use by 48% compared with the diesel-only solution. This analysis informed a decision by the Cape Fear Public Utility Authority to allocate funds for the implementation of a combined-heat-and-power system at the wastewater treatment plant in fiscal year 2023. Finally, the benefits of deploying hybrid combined-heat-and-power technologies and the utilization of on-site biofuel production extend, on a national scale, to thousands of wastewater treatment facilities and other types of critical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Innovative Pathways to Net Zero Emissions: Subnational Strategies for Distributed Solar Deployment to Improve Grid Quality and Reduce Energy Costs in Argentina

Through Net Zero World, the National Renewable Energy Laboratory (NREL), the National Energy Secretariat of Argentina, La Pampa's Energy and Mining Secretariat, Pampetrol, and the Administracion Provincial de Energia de La Pampa (APELP) conducted an integrated analysis of the power system of the La Pampa province in Argentina. The study assessed the impact that solar and battery energy storage systems could have on the region grid's reliability and electricity costs, providing insights into long-term decarbonization strategies across Argentina. The analysis demonstrated that these systems are expected not only to help with decarbonization efforts but also to bolster grid resiliency, reduce line losses, and improve voltage regulation while lowering electricity costs. The paper offers a replicable framework for similar studies across other Argentine provinces, which could inform a national grid reliability plan and promote regional coordination. Such coordination will play a key role in supporting a nationwide clean energy transition as Argentina increases its share of renewable energy. By coordinating subnational energy plans with national strategies, Argentina can secure a resilient clean energy future, leveraging the substantial renewable resources available across its provinces.

14 SOLAR ENERGY↗

Long-Term Planning for the Tamil Nadu Power System

Increased deployment of wind and solar raises new questions for power system planners regarding the future mix of generation technologies, optimal siting of generation capacity, trade-offs between generation and transmission investments, and system flexibility needs. The National Renewable Energy Laboratory (NREL) is working with Tamil Nadu Generation and Distribution Company (TANGEDCO) to answer the following questions: How much—and what type—of generation and transmission investments are needed to serve future demand at least cost? How can variable resources such as wind and solar be considered in the planning process? What are the key drivers (e.g., policies, technology costs, fuel constraints) for investments?

Children's Investment Fund Foundation↗

Southcentral/Upper-West Combined Heat and Power Technical Assistance Partnership

This Final Technical Report describes the successful completion of all project tasks under award DE-EE0008272, plus three additional deliverables, all completed within the original budget. Our objective was to position CHP as a key driver of American competitiveness, the strategic use of domestic energy resources, and enhanced energy resilience. This vision was pursued through sustained collaboration with a broad range of public and private stakeholders, including manufacturers, commercial and institutional facilities, state and federal agencies, and associations of end-users, among others.

03 NATURAL GAS↗

Cybersecurity Standards for Distributed Energy Resources: Gaps and Harmonization Strategy

This report examines cybersecurity standards for Distributed Energy Resources (DERs) in light of their rapid growth and increasing integration into energy systems. It identifies critical gaps in existing frameworks, including inadequate coverage of DER-specific challenges, complexities in implementing comprehensive standards, integration issues with legacy systems, adoption hurdles for newer standards, and a lack of harmonization across regulatory landscapes. The analysis highlights vulnerabilities such as data integrity risks, unauthorized device control, and denial-of-service attacks across various DER technologies like solar PV, wind turbines, energy storage systems, and hydrogen fuel cells. The report proposes a harmonization strategy to address these deficiencies by developing unified cybersecurity requirements, certification programs, and training resources while fostering collaboration among stakeholders such as government agencies, industry groups, DER operators, manufacturers, and research institutions. A phased roadmap is outlined to refine and implement these measures through pilot testing and widespread adoption. Ultimately, the report underscores the urgent need for coordinated efforts to enhance DER cybersecurity and ensure the reliable operation of future energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Workshop Report: Rural Electric Cooperative Distributed Energy Resource Business Model Development Workshops

The United States' energy future is being shaped by decades of technology innovation, rapidly changing consumer requirements, and governmental focus on securing reliable, low-cost energy sources. With expanded electrification and increased emphasis on grid reliability coupled with the heightened complexity and risks associated with transmission infrastructure, the use of distributed energy resources (DERs) is more commonly being considered a safe, efficient, and cost-effective way to maintain grid resilience and reliability. Amidst improvements in performance, decreasing costs, and unprecedented federal policy support for DERs, electric cooperatives are considering new opportunities to use these assets to ensure secure and reliable operations for millions of customers. In light of these developments, a series of workshops were held to collaborate on the development of business models for DERs in rural electric cooperative ecosystems. The first workshop was held July 11, 2024, at the Tri-State Generation and Transmission Association Inc. headquarters in Westminster, Colorado (hereafter referred to as the "Tri-State Workshop"). The second workshop was hosted by PNGC Power on Oct. 9, 2024, in Portland, Oregon (hereafter referred to as the "PNGC Power Workshop"). These workshops convened representatives from G&Ts, distribution cooperatives,2 the energy industry, the financial community, the U.S. government, national and regional organizations, and national laboratories to share perspectives on the unique needs, challenges, and opportunities that they face as DERs are further integrated into the grid. The workshops were designed to address the following objectives: (1) develop the enabling attributes of electric cooperative DER business models, (2) explore pathways for generating community benefits from these assets, and (3) identify technical challenges and market risks for DERs in rural electric cooperative service territories. This report outlines key findings and major themes identified by workshop participants that federal agencies, G&Ts, distribution cooperatives, and other entities can consider to advance electric cooperative DER business models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗