A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously*; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details. * “Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems”, K.A. Polzin, et. al., International Electric Propulsion Conference IEPC 2022, IEPC-2022-155

Nuclear Electric Propulsion↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

BEEAM (Building Electrical Efficiency Analysis Model) [SWR-20-107]

Modern high-performance buildings exhibit an increasing number of building loads that use direct current (DC) electricity internally, rather than alternating current (AC), due to the advent of low-cost computing and advanced power electronics. Powering DC devices from the AC grid requires AC/DC power conversion, which introduces energy losses and reduces efficiency. As DC loads proliferate, the cumulative wasted energy associated with hundreds of millions of AC/DC converters has become one of the broadest energy savings opportunities in buildings. DC power distribution systems have been proposed as an elegant and transformative solution to the problem of DC devices. In a DC distribution system, the building's wires carry DC electricity, rather than AC; and a few centralized, highly efficient AC/DC converters replace the many smaller, less efficient converters that serve individual DC loads. Unfortunately, the trade-offs associated with DC distribution systems are not well understood. Reported energy savings associated with DC power distribution differ widely and have not been well validated. The Building Electrical Efficiency Analysis Model (BEEAM) is a Modelica library that simulates the efficiency of building electrical distribution systems using harmonic power flow. BEEAM can model a wide variety of building distribution topologies, including three-phase AC, single-phase AC, unipolar DC, bipolar DC, and hybrid networks under both balanced and unbalanced load conditions. BEEAM accurately models power electronic converter losses, provides granular estimates of losses throughout the distribution system, and properly models efficiency at part load conditions. Users can package BEEAM within a functional mockup unit (FMU), enabling co-simulation with other modeling platform, such as EnergyPlus. In summary, BEEAM provides a tool suite for fair and accurate comparison of the efficiency of building electrical distribution systems, including AC, DC, and hybrid systems.

Frank, Stephen↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mining Smart Meter Data to Enhance Distribution Grid Observability for Behind-the-Meter Load Control: Significantly improving system situational awareness and providing valuable insights

Distributed Energy Resources (DERs) are playing an increasingly important role in power systems. In 2023, five categories of DERs-distributed solar, electric vehicles (EVs), energy storage, residential smart thermostats, and small-scale combined heat and power-are expected to contribute about 104 GW to the U.S. summer peak (see GTM, 2018). With the increasing integration of DERs in power distribution systems, distributed load control is imperative to smooth the fluctuations that they introduce. However, a main challenge is that distribution systems lack systematic situational awareness because of their limited sensors. Furthermore, most customer-level behind-the-meter (BTM) DERs, such as rooftop photovoltaics (PVs), are being integrated into distribution systems, which complicates the system monitoring and control. Furthermore, enhanced electric grid monitoring is needed to promote renewable integration while ensuring reliability, but current approaches rely on expensive sensors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Independent Orbiter Assessment (IOA): Assessment of the orbital maneuvering subsystem, volume 2

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Orbital Maneuvering System (OMS) hardware and electrical power distribution and control (EPD and C), generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed Post 51-L NASA FMEA/CIL baseline. This report documents the results of that comparison for the Orbiter OMS hardware and EPD and C systems. Volume 2 continues the presentation of IOA worksheets and contains the critical items list and the NASA FMEA to IOA worksheet cross reference and recommendations.

Haufler, W. A.↗

Independent Orbiter Assessment (IOA): Assessment of the reaction control system, volume 1

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the aft and forward Reaction Control System (RCS) hardware, and Electrical Power Distribution and Control (EPD and C), generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed Post 51-L NASA FMEA/CIL baseline. This report documents the results of that comparison for the Orbiter RCS hardware and EPD and C systems. The IOA product for the RCS analysis consisted of 208 hardware and 2064 EPD and C failure mode worksheets that resulted in 141 hardware and 449 EPD and C potential critical items (PCIs) being identified. A comparison was made of the IOA product to the NASA FMEA/CIL baseline. After comparison and discussions with the NASA subsystem manager, 96 hardware issues, 83 of which concern CIL items or PCIs, and 280 EPD and C issues, 158 of which concern CIL items or PCIs, and 280 EPD and C issues, 158 of which concern CIL items or PCIs, remain unresolved. Volume 1 contains the subsystem description, assessment results, and some of the IOA worksheets.

Prust, Chet D.↗

Wireless Pulse-Width Modulation Control of Power Converters Using Ultra-Wideband Technology for Distributed High-Voltage Systems

In this study, we present a new approach for wireless pulse-width modulation (PWM) control of a power converter, applicable to numerous power converters within a complex electrical distribution system. This method eliminates the need for multiple physical connections of gating/PWM signals among distributed converter modules. By using ultra-wideband-based communication, the PWM control signals can be wirelessly transmitted from a central controller to multiple converters simultaneously and seamlessly. System stability is thoroughly analyzed, and experimental results validate the efficacy of the wireless control scheme for a buck converter operating at a 50-kHz switching frequency. The minimum latency obtained from this setup is 5.38 ..mu..s. This control concept offers easier implementation of distributed control in high-voltage power systems, especially in multilevel architectures, even under harsh conditions with ambient noise.

ADVANCED PROPULSION SYSTEMS↗

Space Shuttle Upgrades Advanced Hydraulic Power System

Three Auxiliary Power Units (APU) on the Space Shuttle Orbiter each provide 145 hp shaft power to a hydraulic pump which outputs 3000 psi hydraulic fluid to 41 hydraulic actuators. A hydrazine fuel powered APU utilized throughout the Shuttle program has undergone many improvements, but concerns remain with flight safety, operational cost, critical failure modes, and hydrazine related hazards. The advanced hydraulic power system (AHPS), also known as the electric APU, is being evaluated as an upgrade to replace the hydrazine APU. The AHPS replaces the high-speed turbine and hydrazine fuel supply system with a battery power supply and electric motor/pump that converts 300 volt electrical power to 3000 psi hydraulic power. AHPS upgrade benefits include elimination of toxic hydrazine propellant to improve flight safety, reduction in hazardous ground processing operations, and improved reliability. Development of this upgrade provides many interesting challenges and includes development of four hardware elements that comprise the AHPS system: Battery - The battery provides a high voltage supply of power using lithium ion cells. This is a large battery that must provide 28 kilowatt hours of energy over 99 minutes of operation at 300 volts with a peak power of 130 kilowatts for three seconds. High Voltage Power Distribution and Control (PD&C) - The PD&C distributes electric power from the battery to the EHDU. This 300 volt system includes wiring and components necessary to distribute power and provide fault current protection. Electro-Hydraulic Drive Unit (EHDU) - The EHDU converts electric input power to hydraulic output power. The EHDU must provide over 90 kilowatts of stable, output hydraulic power at 3000 psi with high efficiency and rapid response time. Cooling System - The cooling system provides thermal control of the Orbiter hydraulic fluid and EHDU electronic components. Symposium presentation will provide an overview of the AHPS upgrade, descriptions of the four hardware elements, and a summary of development results to date.

Source record↗

Wireless Pulse-Width Modulation Control of Power Converters Using Ultra-Wideband Technology for Distributed High-Voltage Systems: Preprint

In this study, we present a new approach for wireless pulse-width modulation (PWM) control of a power converter, applicable to numerous power converters within a complex electrical distribution system. This method eliminates the need for multiple physical connections of gating/PWM signals among distributed converter modules. By using ultra-wideband-based communication, the PWM control signals can be wirelessly transmitted from a central controller to multiple converters simultaneously and seamlessly. System stability is thoroughly analyzed, and experimental results validate the efficacy of the wireless control scheme for a buck converter operating at a 50-kHz switching frequency. The minimum latency obtained from this setup is 5.38 mus. This control concept offers easier implementation of distributed control in high-voltage power systems, especially in multilevel architectures, even under harsh conditions with ambient noise.

ADVANCED PROPULSION SYSTEMS↗

EMTP based stability analysis of space station electric power system in a test bed environment

The Space Station Freedom Electric Power System (EPS) will convert solar energy into electric energy and distribute the same using an 'all dc', Power Management and Distribution (PMAD) System. Power conditioning devices (dc to dc converters) are needed to interconnect parts of this system operating at different nominal voltage levels. Operation of such devices could generate under damped oscillations (instability) under certain conditions. Criteria for instability are examined and verified for a single device. Suggested extension of the criteria to a system operation is examined by using the EMTP model of the PMAD DC test bed. Wherever possible, data from the test bed is compared with the modeling results.

Dravid, Narayan V.↗

EMTP based stability analysis of Space Station Electric Power System in a test bed environment

The Space Station Freedom Electric Power System (EPS) will convert solar energy into electric energy and distribute the same using an 'all dc', Power Management and Distribution (PMAD) System. Power conditioning devices (dc to dc converters) are needed to interconnect parts of this system operating at different nominal voltage levels. Operation of such devices could generate under damped oscillations (instability) under certain conditions. Criteria for instability are examined and verified for a single device. Suggested extension of the criteria to a system operation is examined by using the EMTP model of the PMAD dc test bed. Wherever possible, data from the test bed is compared with the modeling results.

Dravid, Narayan V.↗

Technology That's Ready and Able to Inspect Those Cables

Attempting to locate a malfunctioning wire in a complex bundle of wires or in a cable that is concealed behind a wall is as difficult as trying to find a needle in a haystack. The result of such an effort can also be costly, time-consuming, and frustrating, whether it is the tedious process of examining cable connections for the Space Shuttle or troubleshooting a cable television hookup. Furthermore, other maintenance restrictions can compound the effort required to locate and repair a particular wiring problem. For example, on the Space Shuttle, once a repair is completed, all systems that have a wire passing through any of the connectors that were disconnected during troubleshooting are affected and, therefore, must undergo retesting, an arduous task that is completely unrelated to the original problem. In an effort to streamline wire inspection and maintenance, two contractors supporting NASA's Kennedy Space Center invented the Standing Wave Reflectometer (SWR) in 1999. In doing so, they leveraged technology that was first developed to detect problems that could lead to aircraft accidents, such as the one that resulted in the catastrophic failure of TWA flight 800 in 1996. The SWR performs a non-intrusive inspection that verifies the condition of electrical power and signal-distribution systems inside the Space Shuttle orbiters. Such testing reduces processing delays and ensures safe operation of these systems.

Source record↗

Computer program analyzes and monitors electrical power systems (POSIMO)

Requirements to monitor and/or simulate electric power distribution, power balance, and charge budget are discussed. Computer program to analyze power system and generate set of characteristic power system data is described. Application to status indicators to denote different exclusive conditions is presented.

Jaeger, K.↗

Informative Background on the Interoperability Requirements in IEEE Std 1547-2018

The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sensors with Intelligent Measurement Platform and Low-cost Equipment (SIMPLE) for Monitoring and Control of Medium Voltage Distribution Systems with High Penetration of Intermittent Distributed Energy Resources

The primary focus of the SIMPLE project was to develop, commission, test and introduce intelligent voltage and current sensor platform with enhanced characteristics (accuracy, bandwidth and harmonic range) and high measurement granularity for medium voltage distribution system monitoring, protection and control. The enhancements incorporated existing (commercially available) sensors and made them suitable for applications such as voltage regulation, frequency support, fault detection and location, distribution system state estimation, power quality measurements and electrical distribution network topology processing. The development of the intelligent sensor platform was driven by the need for high-fidelity monitoring and control of medium voltage distribution feeder to enable higher penetration of renewable resources and microgrid operation.

14 SOLAR ENERGY↗