Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy infrastructure siting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Improving Stability of an Optical Fiber pH Sensor with a Calcined Polyethylenimine-Coating at High Pressures and Temperatures

With an increased interest in subsurface gas storage technology for various energy applications, monitoring wellbore structural stability and subsurface geochemistry has become more pressing, and pH is a key parameter to measure. As high pressure and elevated temperatures in subsurface conditions are comparatively harsh relative to that expected for most standard pH sensor designs, any pH monitoring hardware must be designed for extended exposure to high pressures and temperatures. We previously reported that an optical fiber pH sensor functionalized with a calcined polyethylenimine coating had shown some promise as a high temperature and pressure pH sensor but with some drifting when operating for longer than 8 hours. In this paper, we investigated the coating composition and potential cause of the drifting and improved the stability of the prepared coating to minimize sensor drift under simulated wellbore conditions. Scanning electron microscopy (SEM) had previously shown moderate cracking at high pressures over short tests. By applying X-ray photoelectron spectroscopy (XPS) to characterize the sensor coating before and after one week of testing in an H2/CH4 gas blend at 80°C and 900 psi, a compositional change in the coating was observable, which may indicate susceptibility to alteration by subsurface gas storage conditions. Non-reducing (CH4, N2) environments were also tested, and confirmed that both temperature and pressure were also contributing to the drift.

energy infrastructure↗

Terrestrial Energy Storage SPS Systems

Terrestrial energy storage systems for the SSP system were evaluated that could maintain the 1.2 GW power level during periods of brief outages from the solar powered satellite (SPS). Short-term outages of ten minutes and long-term outages up to four hours have been identified as "typical" cases where the ground-based energy storage system would be required to supply power to the grid. These brief interruptions in transmission could result from performing maintenance on the solar power satellite or from safety considerations necessitating the power beam be turned off. For example, one situation would be to allow for the safe passage of airplanes through the space occupied by the beam. Under these conditions, the energy storage system needs to be capable of storing 200 MW-hrs and 4.8 GW-hrs, respectively. The types of energy storage systems to be considered include compressed air energy storage, inertial energy storage, electrochemical energy storage, superconducting magnetic energy storage, and pumped hydro energy storage. For each of these technologies, the state-of-the-art in terms of energy and power densities were identified as well as the potential for scaling to the size systems required by the SSP system. Other issues addressed included the performance, life expectancy, cost, and necessary infrastructure and site locations for the various storage technologies.

Brandhorst, Henry W., Jr.↗

Electrically Heated Testing of the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) Experiment Using a Depleted Uranium Core

The Kilopower project aims to develop and demonstrate scalable fission-based power technology for systems capable of delivering 1 to 10 kW of electric power with a specific power ranging from 2.5 to 6.5 W/kg. This technology could enable high-power science missions or could be used to provide surface power for manned missions to the Moon or Mars. NASA has partnered with the U.S. Department of Energy's National Nuclear Security Administration, Los Alamos National Laboratory, Nevada National Security Site (NNSS), and Y−12 National Security Complex to develop and test a prototypic reactor and power system using existing facilities and infrastructure. This technology demonstration, referred to as the "Kilowatt Reactor Using Stirling TechnologY (KRUSTY)," will undergo nuclear ground testing by the end of calendar year (CY) 2017 at the NNSS. The 1-kWe variation of the Kilopower system was chosen for the KRUSTY demonstration. The concept for the 1-kWe flight system consists of a 4 kWt highly enriched uranium-molybdenum reactor operating at 800 degC coupled to sodium heat pipes. The heat pipes deliver heat to the hot ends of eight 125-W Stirling convertors producing a net electrical output of 1 kW. Waste heat is rejected using titanium-water heat pipes coupled to carbon composite radiator panels. The KRUSTY test, based on this design, uses a prototypic highly enriched uranium-molybdenum core coupled to prototypic sodium heat pipes. The heat pipes transfer heat to two Advanced Stirling Convertors (ASC−E2s) and six thermal simulators, which simulate the thermal draw of full-scale power conversion units. Thermal simulators and Stirling engines are gas cooled. The most recent project milestone was the completion of nonnuclear system-level testing using an electrically heated depleted uranium (DU) (nonfissioning) reactor core simulator at the NASA Glenn Research Center. System-level testing has validated performance predictions and has demonstrated system-level operation and control in a test configuration that replicates the one to be used at the Device Assembly Facility (DAF) at the NNSS. Fabrication, assembly, and testing of the DU core has allowed for higher fidelity system-level testing at Glenn, and has validated the fabrication methods to be used on the highly enriched uranium core that will supply heat for the DAF KRUSTY demonstration.

Briggs, Maxwell H.↗

Project Minerva: A low-cost manned Mars mission based on indigenous propellant production

Project Minerva is a low-cost manned Mars mission designed to deliver a crew of four to the Martian surface, using only two sets of two launches. Key concepts which make this mission realizable are the use of near-term technologies and in-situ propellant production, following the senario originally proposed by R. Zubrin of Martin Marietta. The first set of launches delivers two unmanned payloads into low earth orbit (LEO): one consists of an Earth Return Vehicle (ERV), a propellant production plant, and a set of robotic vehicles, and the second consists of the upper stage/trans-Mars injection (TMI) booster. In LEO, the two payloads are joined and inserted into a Mars transfer orbit. The landing on Mars is performed with the aid of multiple aerobraking maneuvers. On the Martian surface, the propellant production plant uses a Sabatier/electrolysis-type process to combine six tons of hydrogen brought from earth with carbon dioxide from the Martian atmosphere to produce 100 tons of liquid oxygen and methane, which are later used as the propellants for the rover expeditions and the manned return journey of the ERV. Once the in-situ propellant production is completed, approximately two years after the first set of launches, the manned portion of the mission leaves earth. This set of two launches is similar to that of the unmanned vehicles; the two payloads are the Manned Transfer Vehicle (MTV) and the upper stage/TMI booster. The MTV contains the manned rover and the habitat which houses the astronauts enroute to Mars and on the Martian surface. During the 180-day trip to Mars, artificial gravity is created by tethering the MTV to the TMI booster and inducing rotation. Upon arrival the MTV performs aerobraking maneuvers to land near the fully-fueled ERV, which will be used by the crew a year and a half later to return to earth. The mission entails moderate travel times with relatively low-energy conjunction-class trajectories and allows ample time for scientific exploration. This set of missions can be repeated every two years in order to continue exploration at a variety of sites and gradually establish the infrastructure for a permanent base on Mars.

Bruckner, Adam P.↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Energy Storage and the Law of Averages: How Storage Can Make Electricity More Affordable

The electric grid is planned, built, and operated to satisfy peak demand. But because peak demand only occurs for a few hours per year, customers end up paying full price for grid infrastructure that is only used for a small fraction of the year—an increasingly expensive proposition as peak demand continues to grow and more infrastructure is required to meet it. The emergence of cost-competitive energy storage technologies in recent years, however, offers the potential for a grid that is planned, built, and operated based on average demand. By strategically siting and operating energy storage throughout the electric grid, excess generation in low-demand periods can be captured and stored near customers, which then reduces the amount of electricity that needs to be generated and moved through the transmission and distribution systems during high-demand periods. This paper describes these potential benefits, supported by real-world examples of energy storage projects that have created cost savings, which points to the potential for profound and far-reaching reductions in the cost of electricity if energy storage technologies are deployed at scale throughout the electric grid. These examples will be of use to system planners and operators, utility regulators, decision makers, and stakeholders in those processes as they look for opportunities to reduce the cost of electricity in their respective systems and jurisdictions.

25 ENERGY STORAGE↗

Deliver Signal Phase and Timing (SPAT) for Energy Optimization of Vehicle Cohort Via Cloud-Computing and LTE Communications

Predictive Signal Phase and Timing (SPAT) message set is one fundamental building block for vehicle-to-infrastructure (V2I) applications such as Eco-Approach and Departure (EAD) at traffic signal controlled urban intersections. Among the two complementary communication methods namely short-range sidelink (PC5) and long-range cellular radio link (Uu), this paper documents the work with long-range link: the complete data chain includes connecting to the traffic signals via existing backhaul communication network, collecting the raw signal phase state data, predicting the signal state changes and delivering the SPAT data via a geofenced service to requests over HTTP protocols. An Application Programming Interface (API) library is developed to support various cellular data transmission reduction and latency improvement techniques. An emulation-based algorithm is applied to predict the traffic signal state changes to provide adequate prediction horizon (e.g., at minimum 2 minutes) for the cohort energy optimization. In fact, the same connectivity and SPAT delivery methodology has been applied to traffic signalized intersections nationwide in the United States upon public agency approvals for access to their firewalled traffic control network and signal control systems or directly to individual controllers. This methodology proves its effectiveness and potential for rapid growth of such SPAT deliveries at mass production scale without needing infrastructure hardware retrofit or excessive communication means. To support the energy optimization of light and heavy-duty vehicle cohorts of mixed automation and propulsion systems (EV, ICE and hybrid), the connection and SPAT deliveries at two sites were completed, including public roads in Washtenaw County, Michigan and closed track test sites at American Center for Mobility (ACM) in Ypsilanti, Michigan. However, only closed test track results at ACM will be presented in this paper. A neuroevolution based optimizer is developed and implemented to control the speed of a vehicle cohort with different propulsion systems and automation levels. Closed track tests showed significant energy savings of the cohort operation.

99 GENERAL AND MISCELLANEOUS↗

CO2 Streams Captured From Industrial Processes and Corrosion of Steel Pipelines

Based on the knowledge accumulated in the last decade related to Carbon Capture and Storage (CCS) processes and the identified gaps in knowledge, our study identifies and quantifies the key issues that impact the corrosion of materials, specifically relating to the integrity of structures for the CO2 transport pipelines and provides a better understanding of the materials’ compatibility with CO2 steams with impurities. This will help to understand the corrosion risks associated with CO2 transport and injection and leverage existing infrastructure or rebuild new pipeline networks to transport CO2 with impurities for EOR or geological storage.

CO2 corrosion↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Plan for a Data Base Approach to Evaluating LWR Plant Integration with Hydrogen and Industrial Facilities

The purpose of this report is to provide an outline and scope of a database tool that could be used to identify the most beneficial locations to site a hydrogen, chemical facility or other industrial facility that would be powered by nuclear energy. This energy may be in the form of electricity produced by the plant, heat in the form of steam or both. In addition, this siting tool should consider factors such as economics, geography, industries, residences, geological hydrogen storage, and key infrastructure. The infrastructure to be considered could include pipelines or other storage and transportation facilities to carry the created products from the production facility to the end user. Also considered should be infrastructure that could deliver needed chemicals or gasses to allow the production of desired products such as ammonia or biofuels. This data base tool should allow a screening study of all U.S. nuclear plants to identify opportunities and barriers to creating hydrogen hubs around nuclear power plants. For this effort, it has been decided that the Siting Tool for Advanced Nuclear Development (STAND) would be used to conduct this screening study which is a follow-on research project to this present effort. Currently, plans are being developed to modify the STAND tool to provide the capability necessary to perform screening of each US commercial nuclear plant to identify the best locations to site hydrogen or chemical production facilities. Many features of the current STAND tool will be employed to meet this objective, but additional infrastructure data (such as the location of pipelines) may need to be added to allow these locations to be fully vetted. In addition, new analysis capabilities may need to be added so economic considerations can be understood

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advancing Federal Infrastructure Through Innovation: Customer Damage Function Calculator

Provides an overview of the National Renewable Energy Laboratory (NREL) Customer Damage Function (CDF) Calculator web tool, developed with funding and support from the Federal Energy Management Program (FEMP). The CDF Calculator is a screening tool that provides justification to site and/or headquarters leadership for resilience investments. It generates monetary values to justify investments in resilience solutions to prevent or lessen the impact of a grid outage at a facility.

CDF calculator↗

Decarbonization in Climate Resilience Planning

Recent executive orders such as E.O. 14008 require federal agencies to address climate change by enhancing resilience and reducing emissions through decarbonization. Traditionally, federal agencies require their sites to develop preparedness plans, such as continuity of operations plans and/or more comprehensive resilience plans. When climate change is included in these plans, the focus tends to be on climate adaptation solutions such as hardening infrastructure and not on climate mitigation through decarbonization. However, with the ambitious emission reductions targets set out by the federal government, it is essential to provide resources and tools to support energy and water managers in achieving decarbonization goals. To achieve this, there is a need for decarbonization to be incorporated into existing resilience planning processes. We discuss a method of incorporating a decarbonization analysis into an existing resilience planning process to create a holistic framework that considers climate adaptation, climate mitigation, and risk reduction priorities when developing and prioritizing solutions for federal sites. Site managers and decision makers must be aware of potential opportunities and trade-offs in meeting energy and water performance goals, emission reductions goals, and climate adaptation goals when developing technological, operational, or institutional resilience solutions. By combining these processes, energy and water managers can minimize the additional level of effort to ensure that their sites are not only able to withstand climate-related energy and water disruptions, but also contribute to climate mitigation. A holistic approach can help federal agencies serve as a model for incorporating decarbonization strategies into site-level resilience planning for the rest of the nation.

Elliott, Douglas B.↗

Is a Generator the Only Solution When the Grid Fails? Optimizing Systems for Resiliency and Carbon Reduction: Preprint

Traditionally, buildings are dependent on utility infrastructure, and when a grid failure happens, end users rely on the closest source of energy storage to sustain operation until power is restored. For buildings, that typically means using an electric generator. This electric generator either uses on-site energy storage such as fossil fuels in a tank or a gas connection which is, in turn, tied to gas wells—also a form of energy storage. Generators are popular for their ease of implementation and low capital costs; however, they have limited value outside of disruptions, and they are a source of scope 1 emissions, or direct greenhouse gas emissions from sources controlled by the building owner. In contrast, some power generation and storage systems, such as photovoltaic (PV) panels and battery energy storage systems (BESS), can serve the same purpose during grid disruptions while presenting advantages outside of power failure. This paper explores methods for storing and converting energy on-site to increase building resiliency, focusing on solutions that minimize scope 1 emissions. We analyze the cost and carbon impacts of energy efficiency measures, PV arrays, and BESS, with and without generators, in a simulation test case. We find significant benefits can be achieved both during and outside of power failure events when designing systems that integrate the on-demand capability of generators, the low carbon energy supplied by PV, and the storage capabilities of BESS. Specifically, adding even minimal BESS and PV can result in downsizing the generator, increasing generator efficiency and requiring less fuel.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

HIVE™ [SWR-19-36]

The HIVE™ platform is a mobility services simulation platform developed to provide insight on the energy, infrastructure, service, and economic outcomes of various mobility as a service (MaaS) options. The HIVE platform takes a set of spatiotemporal travel origin-destination pairs and simulates the operation of a predefined mobility service fleet, incorporating request pooling, and various operational and charging behaviors. Hive specializes at modeling fleets of automated electric vehicles (AEVs) and can be used to site and size direct current fast charge (DCFC) stations and measure grid impacts of large-scale AEV fleets serving real-world MaaS trip demand (similar to taxis, Uber, Lyft, etc.). Potential outcomes from a Hive simulation include level of service, total vehicle miles traveled (VMT), deadheading (zero passenger) miles, simultaneous and total energy loads, average occupancy, and more. Hive is developed to generalize to new regions and can be customized to handle many scenarios and operating conditions.

Rames, Clement↗

Guide to the Distributed Energy Resource Risk Management Framework

The emergence of distributed energy resources (DERs) has transformed the electric power sector and will likely have even more profound impacts on the future evolution of the United States energy sector as it modernizes and becomes more reliant upon complex informatics programming and systems to ensure that our power grid remains safe from malicious interference. To mitigate risks associated with the increased and diversified use of DERs, the Distributed Energy Resource Cybersecurity Framework (DER-CF) was developed in 2019. The National Renewable Energy Laboratory extended the scope of the DER-CF to include the RMF. To address the challenges faced by federal energy managers and energy system stakeholders in applying the RMF to DER systems, the Distributed Energy Resource Risk Manager (DER-RM) is a six-step process to proactively manage cybersecurity risk in a methodical manner. The DER-RM is independent of the DER-CF's existing assessment, allowing users to focus specifically on the RMF steps. The tools are targeted to different processes - DER-CF enables organizations to perform self-assessments to improve their cybersecurity posture, while DER-RM assists organizations in achieving compliance with specific requirements. This document provides an overview of the DER-RM. The RMF process outlined in this report serves as a guide to diagnose information and operational system threats, gather required materials to comply with industry standards, and document plans for achieving Authority to Operate. Using the DER-RM, federal agencies and other organizations can easily and intuitively follow the RMF process, manage the risks to their grid-edge infrastructure through the integration of their on-site DERs, and comply with appropriate requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗