Search NASA⌕ Search

SEARCH · Search NASA

Results for “engine starts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Google Dataset Search and CMR

Searching for earth science data from scratch has, traditionally, been a non-trivial process. Using commercial search engines a starting point, it has not been trivial to locate information and services related to a science users needs. The advent of Google Dataset Search has improved that process. CMR has leveraged the schema.org dataset feature to provide semantic markup on our collection landing pages that are used by Google Dataset Search to provide results that map directly to a scientist's needs and provide an intuitive gateway in to the NASA Earthdata environment.

Discovery↗

NASA Space Launch System Completes Key Hotfire Test And Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. As directed by the White House in 2019, the agency team is striving to return humans to the Moon and land the first woman and the first person of color on the lunar surface. NASA and its commercial partners made significant progress in the second half of 2020 and the first half of 2021 on the agency’s Space Launch System (SLS), one of the key parts of the Artemis program. The team is preparing for a 2021 launch of Artemis I, the first integrated launch of the Block 1 variant of SLS with the Orion crew capsule. Hardware for the Artemis II launch, which will be the first to launch crew on SLS and Orion, is progressing through assembly, and hardware for Artemis III has started manufacturing. Artemis IV manufacturing has also started, and engines for Artemis V are in development/manufacturing. This paper will discuss the progress made in the last year and the items currently in work on for future SLS flights and variants.

Bruce R Askins↗

HWO TMPO Status

Habitable Worlds Observatory (HWO) Technology Maturation Project Office (TMPO) Status

HAB↗

Foil Bearing Starting Considerations and Requirements for Rotorcraft Engine Applications

Foil gas bearings under development for rotorcraft-sized, hot core engine applications have been susceptible to damage from the slow acceleration and rates typically encountered during the pre-ignition stage in conventional engines. Recent laboratory failures have been assumed to be directly linked to operating foil bearings below their lift-off speed while following conventional startup procedures for the engines. In each instance, the continuous sliding contact between the foils and shaft was believed to thermally overload the bearing and cause the engines to fail. These failures highlight the need to characterize required acceleration rates and minimum operating speeds for these applications. In this report, startup experiments were conducted with a large, rotorcraft engine sized foil bearing under moderate load and acceleration rates to identify the proper start procedures needed to avoid bearing failure. The results showed that a bearing under a 39.4 kPa static load can withstand a modest acceleration rate of 500 rpm/s and excessive loitering below the bearing lift-off speed provided an adequate solid lubricant is present.

Radil, Kevin C.↗

Free-jet Testing of a REST Scramjet at Off-Design Conditions

Scramjet flowpaths employing elliptical combustors have the potential to improve structural efficiency and performance relative to those using planar geometries. NASA Langley has developed a scramjet flowpath integrated into a lifting body vehicle, while transitioning from a rectangular capture area to both an elliptical throat and combustor. This Rectangular-to-Elliptical Shape Transition (REST) scramjet, has a design point of Mach 7.1, and is intended to operate with fixed-geometry between Mach 4.5 and 8.0. This paper describes initial free-jet testing of the heat-sink REST scramjet engine model at conditions simulating Mach 5.3 flight. Combustion of gaseous hydrogen fuel at equivalence ratios between 0.5 and 1.5 generated robust performance after ignition with a silane-hydrogen pilot. Facility model interactions were experienced for fuel equivalence ratios above 1.1, yet despite this, the flowpath was not unstarted by fuel addition at the Mach 5.3 test condition. Combustion tests at reduced stagnation enthalpy indicated that the engine self-started following termination of the fuel injection. Engine data is presented for the largest fuel equivalence ratio tested without facility interaction. These results indicate that this class of three-dimensional scramjet engine operates successfully at off-design conditions.

Smart, Michael K.↗

Component Testing of the J-2X Augmented Spark Igniter (ASI)

In support of the development of the J-2X engine, 201 low pressure, liquid oxygen / liquid hydrogen (LOX/LH2) J-2X Augmented Spark Igniter (ASI) subsystem ignition tests were conducted at Marshall Space Flight Center (MSFC). The main objective of these tests was to start the ASI within the anticipated J-2X engine start box, as well as outside of it, to check for ignition margin. The setup for the J-2X ASI component testing simulated, as much as possible, the tank-head start-up configuration of the ASI within the J-2X Engine. The ignition tests were divided into 124 vacuum start tests to simulate altitude start on a flight engine, and 77 sea-level start tests to simulate the first set of ground tests for the J-2X Engine at Stennis Space Center (SSC). Other ignition parameters that were varied included propellant tank pressures, oxidizer temperature entering the ASI oxidizer feedline, oxidizer valve timing, spark igniter condition (new versus damaged), and oxidizer and fuel feedline orifice sizes. Propellant blowdowns using venturis sized to simulate the ASI resistance allowed calculation of transient propellant mass flow rates as well as global mixture ratio for all ignition tests. Global mixture ratio within the ASI at the time of ignition varied from 0.2 to 1.2. Detailed electronics data obtained from an instrumented ignition lead allowed characterization of the breakdown voltage, sustaining voltage and energy contained in each spark as the ASI propellants ignited. Results indicated that ignition always occurred within the first five sparks when both propellants were present in the ASI chamber.

Osborne, Robin J.↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Advanced transportation system studies technical area 3: Alternate propulsion system concepts. SSME upper stage use

The main objective was to determine viable methods for starting the Space Shuttle Main Engine (SSME) in an altitude environment and restarting it in an orbit environment with minimum changes in utilization of the engine system or hardware. The study concluded that the use of the SSME in an upper stage is feasible with minimal changes to the engine systems. The altitude start case requires only a change in the valve sequencing during start and reorificing of the ASI lines. Inlet pressures can be moderately low at 40 psia for the LOX and 32 psia for the H2. The orbital restart case adds the need to recirculate propellant and thermal control paint (to keep the turbomachinery inlets cold to minimize the tank pressures needed), and the need to heat two small components (to maintain acceptable mixture ratios during the early part of the start). These actions allow start anytime after approximately 120 minutes. Earlier starts (approximately one hour) are also possible but would require additional component heating for mixture ratio control during the early portion of the start sequence.

Strangeland, Eric↗

Engine Operating Conditions that Cause Thermal-Fatigue Cracks in Turbojet-Engine Buckets

Five engine tests were conducted to definitely establish the failure mechanism of leading-edge cracking and to determine which conditions of engine operation cause the failures. Five groups of S-616 and M-252 buckets from master lots were run consecutively in the same J47-25 engine. The tests included a steady-state run at full-power conditions, rapid cycling between idle and rated speed, and three different start-stop tests. The first start-stop test consisted of cycles of start and stop with 5 minutes of idle speed before each stop; the second included cycles of start and stop but with 15 minutes of rated speed before each stop; the third consisted of cycles of gradual starts and normal stops with 5 minutes at idle speed before each stop. The test results demonstrated that the primary cause of leading-edge cracking was thermal fatigue produced by repeated engine starts. The leading edge of the bucket experiences plastic flow in compression during starts and consequently is subjected to a tensile stress when the remainder of the bucket becomes heated and expands. Crack initiation was accelerated when rated-speed operation was added to each normal start-stop cycle. This acceleration of crack formation was attributed to localized creep damage and perhaps to embrittlement resulting from overaging. It was demonstrated that leading-edge cracking can be prevented simply by starting the engine gradually.

Johnston, James R.↗

The start-up of a gas turbine engine using compressed air tangentially fed onto the blades of the basic turbine

The use of compressed air was suggested to increase the reliability and motor lifetime of a gas turbine engine. Experiments were carried out and the results are shown in the form of the variation in circumferential force as a function of the entry angle of the working jet onto the turbine blade. The described start-up method is recommended for use with massive rotors.

Slobodyanyuk, L. K.↗

Mach 4 free-jet tunnel starting experiments for a hypersonic research engine model causing high blockage

Tests of a full scale hypersonic research engine (HRE) were conducted in the hypersonic tunnel facility at Mach numbers of 5, 6, and 7. Since the HRE would cause a rather high blockage (48.83 percent of the nozzle area), subscale tests were conducted in various available small wind tunnels prior to the full scale tests to study the effects of model blockage on tunnel starting. The results of the Mach 4 subscale tests which utilized a model system at 0.0952 scale which simulated the HRE in the test section of the tunnel are presented. A satisfactory tunnel starting could not be achieved by varying the free jet length or diffuser size nor by inserting the model into the test stream after tunnel starting. However, the installation of a shroud around the HRE model allowed the tunnel to start with the model preset in the tunnel at a tunnel stagnation pressure to atmospheric exit pressure ratio of 13.4. The simulation of the discharge of instrumentation cooling water and the addition of test hardware at the aft end of the HRE model did not have a significant effect on the tunnel starting.

Carson, G. T., Jr.↗

Computer-Aided Design Of Turbine Blades And Vanes

Quasi-three-dimensional method for determining aerothermodynamic configuration of turbine uses computer-interactive analysis and design and computer-interactive graphics. Design procedure executed rapidly so designer easily repeats it to arrive at best performance, size, structural integrity, and engine life. Sequence of events in aerothermodynamic analysis and design starts with engine-balance equations and ends with boundary-layer analysis and viscous-flow calculations. Analysis-and-design procedure interactive and iterative throughout.

Hsu, Wayne Q.↗

Engine System Loads Development for the Fastrac 60K Flight Engine

Early implementation of structural dynamics finite element analyses for calculation of design loads is considered common design practice for high volume manufacturing industries such as automotive and aeronautical industries. However, with the rarity of rocket engine development programs starts, these tools are relatively new to the design of rocket engines. In the new Fastrac engine program, the focus has been to reduce the cost to weight ratio; current structural dynamics analysis practices were tailored in order to meet both production and structural design goals. Perturbation of rocket engine design parameters resulted in a number of Fastrac load cycles necessary to characterize the impact due to mass and stiffness changes. Evolution of loads and load extraction methodologies, parametric considerations and a discussion of load path sensitivities are discussed.

Frady, Greg↗

Engine System Loads Analysis Compared to Hot-Fire Data

Early implementation of structural dynamics finite element analyses for calculation of design loads is considered common design practice for high volume manufacturing industries such as automotive and aeronautical industries. However with the rarity of rocket engine development programs starts, these tools are relatively new to the design of rocket engines. In the NASA MC-1 engine program, the focus was to reduce the cost-to-weight ratio. The techniques for structural dynamics analysis practices, were tailored in this program to meet both production and structural design goals. Perturbation of rocket engine design parameters resulted in a number of MC-1 load cycles necessary to characterize the impact due to mass and stiffness changes. Evolution of loads and load extraction methodologies, parametric considerations and a discussion of load path sensitivities are important during the design and integration of a new engine system. During the final stages of development, it is important to verify the results of an engine system model to determine the validity of the results. During the final stages of the MC-1 program, hot-fire test results were obtained and compared to the structural design loads calculated by the engine system model. These comparisons are presented in this paper.

Frady, Gregory P.↗

Advanced Gas Turbine (AGT): Power-train system development

Technical work on the design and effort leading to the testing of a 74.5 kW (100 hp) automotive gas turbine is described. The general effort was concentrated on building an engine for test starting in July. The buildup progressed with only routine problems and the engine was delivered to the test stand 9 July. In addition to the engine build effort, work continued in selected component areas. Ceramic turbine parts were built and tested. Burst tests of ceramic rotors show strengths are approaching that achieved in test bars; proof testing is required for acceptable strength ceramic vanes. Over 25 hours was accumulated on the combustor rig in three test modes: pilot nozzle only, start nozzle, and main nozzle operation. Satisfactory ignition was achieved for a wide range of starting speeds and the lean blowout limit was as low as 0.06 kg/b (0.14 lb/hr). Lean blowout was more a function of nozzle atomization than fuel/air ratio. A variety of cycle points were tested. Transition from start nozzle flow to main nozzle flow was done manually without difficulty. Regenerator parts were qualification tested without incident and the parts were assembled on schedule. Rig based performance matched first build requirements. Repeated failures in the harmonic drive gearbox during rig testing resulted in that concept being abandoned for an alternate scheme.

Helms, H. E.↗

Shuttle Centaur engine cooldown evaluation and effects of expanded inlets on start transient

As part of the integration of the RL10 engine into the Shuttle Centaur vehicle, a satisfactory method of conditioning the engine to operating temperatures had to be established. This procedure, known as cooldown, is different from the existing Atlas Centaur due to vehicle configuration and mission profile differenced. The program is described, and the results of a Shuttle Centaur cooldown program are reported. Mission peculiarities cause substantial variation in propellant inlet conditions between the substantiated Atlas Centaur and Shuttle Centaur with the Shuttle Centaur having much larger variation in conditions. A test program was conducted to demonstrate operation of the RL10 engine over the expanded inlet conditions. As a result of this program, the Shuttle Centaur requirements were proven satisfactory. Minor configuration changes incorporated as a result of this program provide substantial reduction in cooldown propellant consumption.

Source record↗