Search NASA⌕ Search

SEARCH · Search NASA

Results for “engineering degree program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

ERHIC Conceptual Design

The conceptual design of the high luminosity electron-ion collider, eRHIC, is presented. The goal of eRHIC is to provide collisions of electrons (and possibly positrons) with ions and protons at the center-of-mass energy range from 25 to 140 GeV, and with luminosities exceeding 10{sup 33} cm{sup -2} s{sup -1}. A considerable part of the physics program is based on polarized electrons, protons and He3 ions with high degree of polarization. In eRHIC electron beam will be accelerated in an energy recovery linac. Major R&D items for eRHIC include the development of a high intensity polarized electron source, studies of various aspects of energy recovery technology for high power beams and the development of compact magnets for recirculating passes. In eRHIC scheme the beam-beam interaction has several specific features, which have to be thoroughly studied. In order to maximize the collider luminosity, several upgrades of the existing RHIC accelerator are required. Those upgrades may include the increase of intensity as well as transverse and longitudinal cooling of ion and proton beams.

43 PARTICLE ACCELERATORS↗

United States Automotive Materials Partnership LLC (USAMP) (Final Report Compilation)

The United States Automotive Materials Partnership LLC (USAMP) was formed in 1993 as a partnership between Chrysler Corporation, Ford Motor Company, and General Motors Corporation. Since then the U.S. Department of Energy (DOE) has supported its activities with funding and technical support. The mission of the USAMP is to conduct vehicle-oriented research and development in materials and materials processing to improve the competitiveness of the U.S. Auto Industry. Its specific goals are: (1) To conduct joint research to further the development of lightweight materials for improved automotive fuel economy; and (2) To work with the Federal government to explore opportunities for cooperative programs with the national laboratories, Federal agencies such as the DOE and universities. As a major component of the DOE's Office of FreedomCAR and Vehicle Technologies Program (FCVT) collaboration with the USAMP, the Automotive Lightweighting Materials (ALM) program focuses on the development and validation of advanced materials and manufacturing technologies to significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. The FCVT was announced in FY 2002 and implemented in FY 2003, as a successor of the Partnership for a New Generation of Vehicles (PNGV), largely addressed under the first Cooperative Agreement. This second USAMP Cooperative Agreement with the DOE has expanded a unique and valuable framework for collaboratively directing industry and government research efforts toward the development of technologies capable of solving important societal problems related to automobile transportation. USAMP efforts are conducted by the domestic automobile manufacturers, in collaboration with materials and manufacturing suppliers, national laboratories, universities, and other technology or trade organizations. These interactions provide a direct route for implementing newly developed materials and technologies, and have resulted in significant technical successes to date, as discussed in the individual project summary final reports. Over 70 materials-focused projects have been established by USAMP, in collaboration with participating suppliers, academic/non-profit organizations and national laboratories, and executed through its original three divisions: the Automotive Composites Consortium (ACC), the Automotive Metals Division (AMD), and Auto/Steel Partnership (A/SP). Two new divisions were formed by USAMP in 2006 to drive research emphasis on integration of structures incorporating dissimilar lightweighting materials, and on enabling technology for nondestructive evaluation of structures and joints. These new USAMP divisions are: Multi-Material Vehicle Research and Development Initiative (MMV), and the Non-Destructive Evaluation Steering Committee (NDE). In cooperation with USAMP and the FreedomCAR Materials Technical Team, a consensus process has been established to facilitate the development of projects to help move leveraged research to targeted development projects that eventually migrate to the original equipment manufacturers (OEMs) as application engineering projects. Research projects are assigned to one of three phases: concept feasibility, technical feasibility, and demonstration feasibility. Projects are guided through ongoing monitoring and USAMP offsite reviews, so as to meet the requirements of each phase before they are allowed to move on to the next phase. As progress is made on these projects, the benefits of lightweight construction and enabling technologies will be transferred to the supply base and implemented in production vehicles. The single greatest barrier to automotive use of lightweight materials is their high cost; therefore, priority is given to activities aimed at reducing costs through development of new materials, forming technologies, and manufacturing processes. The emphasis of the research projects reported in this document was largely on applied research and evaluation of mass savings opportunities through the aggressive application of lightweight materials, advanced computational methods, and the demonstration of production capable manufacturing processes intended for high-volume applications, all directed towards the FreedomCAR Program goals. Priority lightweighting materials include advanced high-strength steels (AHSS), aluminum, magnesium, titanium, and composites such as metal-matrix materials, and glass- and carbon-fiber-reinforced thermosets and thermoplastics. Besides developing valuable new design and material property information, several projects have extensively used computer-based product modeling and simulation technologies to optimize designs and materials usage while addressing the cost-performance issues. The purpose of this Summary Final Closeout Report is to document the successes, degree of progress, technology dissemination efforts, and lessons learned.

36 MATERIALS SCIENCE↗

Performance Refactoring of Instrumentation, Measurement, and Analysis Technologies for Petascale Computing. The PRIMA Project

The growing number of cores provided by today’s high-­end computing systems present substantial challenges to application developers in their pursuit of parallel efficiency. To find the most effective optimization strategy, application developers need insight into the runtime behavior of their code. The University of Oregon (UO) and the Juelich Supercomputing Centre of Forschungszentrum Juelich (FZJ) develop the performance analysis tools TAU and Scalasca, respectively, which allow high-­performance computing (HPC) users to collect and analyze relevant performance data – even at very large scales. TAU and Scalasca are considered among the most advanced parallel performance systems available, and are used extensively across HPC centers in the U.S., Germany, and around the world. The TAU and Scalasca groups share a heritage of parallel performance tool research and partnership throughout the past fifteen years. Indeed, the close interactions of the two groups resulted in a cross-­fertilization of tool ideas and technologies that pushed TAU and Scalasca to what they are today. It also produced two performance systems with an increasing degree of functional overlap. While each tool has its specific analysis focus, the tools were implementing measurement infrastructures that were substantially similar. Because each tool provides complementary performance analysis, sharing of measurement results is valuable to provide the user with more facets to understand performance behavior. However, each measurement system was producing performance data in different formats, requiring data interoperability tools to be created. A common measurement and instrumentation system was needed to more closely integrate TAU and Scalasca and to avoid the duplication of development and maintenance effort. The PRIMA (Performance Refactoring of Instrumentation, Measurement, and Analysis) project was proposed over three years ago as a joint international effort between UO and FZJ to accomplish these objectives: (1) refactor TAU and Scalasca performance system components for core code sharing and (2) integrate TAU and Scalasca functionality through data interfaces, formats, and utilities. As presented in this report, the project has completed these goals. In addition to shared technical advances, the groups have worked to engage with users through application performance engineering and tools training. In this regard, the project benefits from the close interactions the teams have with national laboratories in the United States and Germany. We have also sought to enhance our interactions through joint tutorials and outreach. UO has become a member of the Virtual Institute of High-­Productivity Supercomputing (VI-­HPS) established by the Helmholtz Association of German Research Centres as a center of excellence, focusing on HPC tools for diagnosing programming errors and optimizing performance. UO and FZJ have conducted several VI-­HPS training activities together within the past three years.

97 MATHEMATICS AND COMPUTING↗

Energy Technology Commercialization and Entrepreneurship: Insights From the U.S. Department of Energy's Office of Technology Transitions 2024 Energy Technology University Prize Faculty Track

The Energy Technology University Prize (EnergyTech UP) was established in 2022 with the goal of challenging student teams to develop impactful business plans for energy technologies of their choosing. EnergyTech UP is part of the The American Made Challenges program portfolio, funded by the U.S. Department of Energy. EnergyTech UP is specifically funded by the Department of Energy's Office of Technology Transfer (OTT) and is administrated by staff at the National Renewable Energy Laboratory (NREL). Since its inception, the annual prize has attracted applications from approximately 1,948 students across nearly every U.S. state and territory, awarding over $1 million in funds to student teams. In 2024, the prize expanded to include a Faculty Track, which invited faculty members from degree-granting institutions across the U.S. to design entrepreneurship-based curricula or educational activities. This new track aims to foster innovation in energy entrepreneurship education by leveraging the expertise of faculty to create robust, practical, and inclusive learning experiences. This report summarizes the themes, strategies and impacts identified in proposals from EnergyTech UP's inaugural Faculty Track. Our primary data for organizing insights are the Faculty Track applications themselves. This evaluation of 2024 EnergyTech UP Faculty Track applications aims to support future EnergyTech UP Faculty Track applicants as well as others who are interested in promoting, developing, and/or implementing educational activities that focus on energy commercialization and entrepreneurship at their institutions. By presenting insights from 2024 entries to the Faculty Track, we hope to contribute to a growing inventory of open-source curriculum development resources and provide materials to facilitate the growth of similar programs at a variety of collegiate institutions.

adoption readiness level↗

Prioritizing ICS Beachhead Systems for Cyber Vulnerability Testing

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS Prioritization Process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS Prioritization Process was premised largely upon the impact which could result to an industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. The worldwide compromise of the SolarWinds Orion platform, first reported in December 2020, through malicious interference with the digital patching cycle was a watershed event in cyber supply chain security. The SolarWinds compromised demonstrated the strategic importance of certain types of ubiquitous software, and the ability to generate widespread cybersecurity effects. To address this challenge and as a part of the Department of Energy’s response to the SolarWinds compromise, DOE’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER) directed the National Laboratories to evolve the CyTRICS Prioritization Process methodology to encompass additional factors related to the strategic importance of digital components. CESER directed CyTRICS researchers to identify, characterize, and append strategic factors to the CyTRICS Prioritization Process to provide additional weight to these characteristics. National Laboratory expert researchers identified functionality, distribution, and platform characteristics for digital components in ICS and OT that they assessed would be likely targeted in strategic initial-access cyber attack. CyTRICS has termed these factors “ICS Beachhead Systems,” leveraging a definition first advanced by Schneider Electric, which is intended as a blanket term to encompass digital components, products, and systems in OT. This paper describes the ICS Beachhead Systems identified and the rationale for inclusion. As a next step in the research and refinement process, the National Laboratories will validate this initial set of characteristics against digital components evaluated by the CyTRICS program and current implementation of the CyTRICS Prioritization Process. After validation, CyTRICS researchers will then develop a scoring methodology to generate a quantitative score to assess the degree to which a digital component is characterized as an ICS Beachhead System. Finally, the National Laboratories will append this scoring to the existing CyTRICS Prioritization Process algorithm.

97 MATHEMATICS AND COMPUTING↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

42 ENGINEERING↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Friction Experiment Data Analysis

The Spent Fuel Waste Disposition (SFWD) program under the U.S. Department of Energy (DOE) is planning a seismic shake table test of full-scale dry storage systems of spent nuclear fuel (SNF) to close the gap related to the seismic loads on the fuel assemblies in dry storage systems. This test will allow for quantifying the strains and accelerations on surrogate fuel assembly during representative earthquakes. A concrete layer will be installed on the shake table before the test to simulate conditions representative of an ISFSI pad. In the shake table tests with the vertical cask, the cask will be free-standing because this is representative of all, except two, ISFSIs in the U.S. with vertical dry storage casks. The static and dynamic friction coefficients between the steel bottom of the cask and the concrete layer on the shake table are important parameters that will affect cask behavior during the test. These parameters must be known for the pre- and post-test modelling, data analysis, and model validation. The friction experiment was performed at the Engineering Department of the University of New Mexico (UNM) to determine the friction coefficients between a steel plate with the same finish as the bottom of the vertical cask manufactured for the test and different concrete surfaces. In this experiment the steel plate was fixed and the concrete sample was pulled over the plate with a constant displacement rate using an MTS machine. This allowed for collecting continuous horizontal force data over the length of the steel plate. Four displacement rates and three vertical loads were used. The tests were performed with four concrete blocks with different degrees of the surface roughness - light sandblast, light to medium sandblast, medium bush hammer, and heavy sandblast. The total number of tests was 48. The data were used to calculate static and dynamic friction coefficients.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report - Inspection Limit Confirmation for Upper Head Penetration Nozzle Cracking

The ASME Code Case N-729-1 defines alternative examination requirements for the Control Rod Drive Mechanism (CRDM) upper head penetration nozzle welds. The basis for these examination requirements was developed as part of an Industry program conducted by the Materials Reliability Program (MRP) through the Electric Power Research Institute (EPRI). The results of this program were published in MRP-95 Rev. 1 and document a set of finite element weld residual stress analyses conducted on a variety of upper head penetration nozzles. The inspection zone selected by the industry was based on the stress where it was assumed that primary water stress corrosion cracking (PWSCC) would not initiate. As explained in MRP-95 Rev. 1, it has been illustrated that PWSCC does not occur in the Alloy 600 tube when the stresses are below the yield strength of that tube. Typical yield strengths at operating conditions for Alloy 600 range from 35 ksi to 65 ksi. A stress less than 20-ksi tension was chosen as a conservative range where PWSCC would not initiate. Over the last several years, Engineering Mechanics Corporation of Columbus (Emc2) has conducted welding residual stress analyses on upper head penetration J-welds made from Alloy 182 weld metal for the U.S. Nuclear Regulatory Commission (NRC) staff. These efforts were performed as a confirmatory evaluation of the industry’s analyses conducted as part of their MRP-95 Rev. 1 effort. To this point, the analyses conducted by Emc2 have not been compared to the MRP-95 Rev. 1 results or the examination zones defined in the Code Case. Therefore, this report summarizes the past Emc2 CRDM welding analyses and investigates the regions where the welding stresses may be sufficiently high to promote stress corrosion cracking (SCC). In all, 90 welding residual stress analyses were conducted by Emc2 and the largest distance below the weld where the stress drops below 20 ksi was 5 inches for the uphill weld of the 53-degree nozzle case. For the largest distance above the weld where stress drops below 20 ksi, the worst case was 1.5 inches above the downhill side of the 25-degree nozzle case. The inspection zones described in both MRP-95 Rev. 1 and Code Case N-729-1 were set at 1.0 inch for nozzle angles greater than 30 degrees or 1.5 inches for nozzle angles less than 30 degrees, above the highest or below the lowest point on the weld. In all cases analyzed by Emc2 in this effort, there was only one case where the stress was above 20 ksi outside of this inspection zone. For that case, the stresses were very close to 20 ksi at the inspection zone limit and were considered acceptable.

36 MATERIALS SCIENCE↗

Autoignition of CRC diesel surrogates at low temperature combustion conditions: Rapid compression machine experiments and modeling

As federal programs require increasingly stringent engine emissions and fuel economy standards, these ambitions can only be met if next-generation combustion technology is developed focusing on high-efficiency and low-emissions engines. Recent research has indicated the need to operate engines at higher compression ratios and with low temperature combustion (LTC) to achieve the needed gains in engine efficiency and reductions in emissions. Because there is a lack of understanding of the chemistry of diesel fuel components and their mixtures at these LTC conditions, this limits the ability to develop predictive chemical kinetic models that can be used to optimize engine combustion. The current study aims to fill in gaps in fundamental combustion data on surrogate fuel mixtures relevant to diesel fuels. Specifically, four multicomponent diesel surrogates formulated by the Coordinating Research Council (CRC) to emulate an ultra-low-sulfur research-grade #2 certification diesel fuel (CFA), namely V0a (4 components), V0b (5 components), V1 (8 components), and V2 (9 components), have been investigated in a rapid compression machine (RCM) through determination of total and first-stage ignition delay times. Autoignition characteristics of lean to rich fuel/O 2 /N 2 mixtures, for the four CRC surrogates and CFA, have been measured using an RCM at LTC relevant pressures and temperatures, in the ranges of 10–20 bar and 650–1000 K, respectively. The equivalence ratios have been varied by independently changing the oxygen mole fraction and the fuel mole fraction in the test mixtures, thereby illustrating the individual effects of oxygen concentration and fuel loading on diesel autoignition. Autoignition results of these four CRC surrogates are compared among them and with those of CFA. Some degree of agreement in autoignition response between each CRC surrogate and CFA is observed, while discrepancies are also identified and discussed. In addition, a detailed chemical kinetic model for diesel surrogates has been developed and validated against these newly-acquired RCM data. We find that this model shows reasonable agreement with the overall ignition delay time results of the current RCM experiments. Chemical kinetic analyses of the developed model were further conducted to help identify the reactions controlling the autoignition processes and the consumption of fuel components in CRC surrogates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF– 24138

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of a Test Facility to Investigate Fundamental Na-CO 2 Interactions in Compact Heat Exchangers

One of the key objectives of the SFR R&D program is to develop and demonstrate innovative cost reduction and performance enhancing technologies for SFRs. The supercritical carbon dioxide (S-CO 2 ) Brayton cycle power converter system has been identified as one such innovation that could contribute to meeting this objective. One appealing feature of this system is the small footprint that the hardware requires, which is in part due to the use of Printed Circuit Heat Exchangers (PCHEs) as the secondary (Na-to-CO 2 ) heat exchanger as well as the recuperator and cooler modules. Although PCHEs have a high degree of structural integrity, the potential for leak(s) to develop between the sodium and CO2 coolant channels in the secondary heat exchanger cannot be ruled out, leading to discharge of high pressure CO 2 into the secondary coolant circuit. Due to the robustness of the PCHE design, catastrophic failure leading to gas jet blowdown into the secondary sodium loop is not deemed to be a likely scenario. Rather, small crack(s) (or micro-leaks) may develop in which CO 2 will bleed into the secondary system at a relatively low rate and chemically react with the sodium. The primary focus of the current work is to develop an experiment capability to investigate reaction characteristics under micro-leak conditions. This report summarizes the progress that was made towards meeting this objective this fiscal year. In particular, the facility scaling rationale was developed, and on that basis, the detailed facility design and operating procedures were completed. Based on the design work, fabrication drawings for the three primary system components (i.e., test vessel, dump tank, and separator/vapor trap) were generated and submitted to an outside vendor (i.e., Ability Engineering Technology in South Holland, IL) for fabrication. Fabrication of these components was also completed this year. Plans are to have the facility assembled by the midpoint of FY11 and to begin shakedown testing at that time.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

2024 Incubator Final Report: Active Hybrid Mooring

This Incubator project has defined and developed a representation of an active hybrid mooring (AHM) system in Simulink to assess whether the speed and accuracy of AHM is sufficient to warrant further investigation in a larger project. We first built a representative mooring system for the VolturnUS-S 15MW floating offshore wind turbine (FOWT) in 1,000-meter water depth to provide baseline loads and displacements needed in the AHM system, with the results showing off-the-shelf actuators would be practical. We then defined model configurations for the numerical and physical substructures, using standalone MoorDyn v2 with a novel input strategy and chained hydraulic actuators represented in Simulink Simscape, respectively. The remainder of the project has focused on verifying the existing models for speed and accuracy against OpenFAST simulations, increasing their complexity to enable six degree of freedom (6DOF) operation, and connecting the numerical and physical substructures into a single holistic model. The verification phase of the project has shown promising results, though further refinement is needed to resolve accuracy discrepancies and for robust performance across a wider range of metocean conditions. The numerical model we developed is computationally stable and operates faster than real time using a time step of 0.01 seconds or shorter, indicating the model is likely fast enough for our AHM design to operate successfully. Additionally, the Simscape model of a hydraulic actuator operates with less than 0.3% relative error when actuating mooring loads from an OpenFAST simulation of the VolturnUS-S 1,000-meter mooring system. The aforementined refinements will be performed in the next year as a Continuing Incubator, with key remaining tasks include programming the predictor-corrector loop to minimize movement error, testing against more complex nonlinear wave cases, and expanding to enable loads from connected shared mooring lines.

17 WIND ENERGY↗

The National Ignition Facility and the Path to Fusion Energy

The National Ignition Facility (NIF) is operational and conducting experiments at the Lawrence Livermore National Laboratory (LLNL). The NIF is the world's largest and most energetic laser experimental facility with 192 beams capable of delivering 1.8 megajoules of 500-terawatt ultraviolet laser energy, over 60 times more energy than any previous laser system. The NIF can create temperatures of more than 100 million degrees and pressures more than 100 billion times Earth's atmospheric pressure. These conditions, similar to those at the center of the sun, have never been created in the laboratory and will allow scientists to probe the physics of planetary interiors, supernovae, black holes, and other phenomena. The NIF's laser beams are designed to compress fusion targets to the conditions required for thermonuclear burn, liberating more energy than is required to initiate the fusion reactions. Experiments on the NIF are focusing on demonstrating fusion ignition and burn via inertial confinement fusion (ICF). The ignition program is conducted via the National Ignition Campaign (NIC) - a partnership among LLNL, Los Alamos National Laboratory, Sandia National Laboratories, University of Rochester Laboratory for Laser Energetics, and General Atomics. The NIC program has also established collaborations with the Atomic Weapons Establishment in the United Kingdom, Commissariat a Energie Atomique in France, Massachusetts Institute of Technology, Lawrence Berkeley National Laboratory, and many others. Ignition experiments have begun that form the basis of the overall NIF strategy for achieving ignition. Accomplishing this goal will demonstrate the feasibility of fusion as a source of limitless, clean energy for the future. This paper discusses the current status of the NIC, the experimental steps needed toward achieving ignition and the steps required to demonstrate and enable the delivery of fusion energy as a viable carbon-free energy source.

42 ENGINEERING↗

Decision Analyses Related to Groundwater Remediation - 17051

Traditional decision analyses of groundwater remediation scenarios frequently fail because the probability of adverse, unanticipated events occurring is often high. This is driven by many factors including that (1) the models developed to represent the flow and transport in contaminated aquifers are typically simpler than reality and do not account for all the important governing processes, (2) probability distributions are assigned to critical performance parameters (such as model inputs or characteristics of the engineered remediation systems) even though some of these parameters might be unknown or not be very well constrained. However, there is a novel decision analysis methodology and a computational tool based on Bayesian Information-Gap Decision Theory (BIG-DT) that are designed to mitigate the shortcomings of the models and probabilistic decision analyses by leveraging a non-probabilistic decision theory -- information-gap decision theory. The new decision analysis methodology considers possible models that have not been explicitly enumerated and does not require us to commit to a particular probability distribution for model and remediation-design parameters. Both the set of possible models and the set of possible probability distributions grow as the degree of uncertainty increases. The fundamental question that BIG-DT asks is 'How large can these sets be before a particular decision results in an undesirable outcome?'. The decision that allows these sets to be the largest is considered to be the best option. In this way, BIG-DT enables robust decision-support for groundwater remediation problems. Here, we apply BIG-DT to a representative groundwater remediation scenario where different options for hydraulic containment and pump and treat are being considered. BIG-DT requires many model runs and high-performance computing resources are needed when complex models are used. We demonstrate the BIG-DT analyses on a series of synthetic problems that are designed to be consistent with real-world problems such as Los Alamos National Laboratory (LANL) contamination sites. We also discuss a general framework for how the BIG-DT analyses will be carried out at the chromium groundwater contamination site at LANL. BIG-DT is implemented in Julia (a high-level, high-performance dynamic programming language for technical computing) and is part of the MADS framework (http://mads.lanl.gov and http://madsjulia.github.io/Mads.jl). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Landrush: Rethinking In-Situ Analysis for GPGPU Workflows

In-situ analysis on the output data of scientific simulations has been made necessary by ever-growing output data volumes and increasing costs of data movement as supercomputing is moving towards exascale. With hardware accelerators like GPUs becoming increasingly common in high end machines, new opportunities arise to co-locate scientific simulations and online analysis performed on the scientific data generated by the simulations. However, the asynchronous nature of GPGPU programming models and the limited context-switching capabilities on the GPU pose challenges to co-locating the scientific simulation and analysis on the same GPU. This paper dives deeper into these challenges to understand how best to co-locate analysis with scientific simulations on the GPUs in HPC clusters. Specifically, our 'Landrush' approach to GPU sharing proposes a solution that utilizes idle cycles on the GPU to provide an improved time-to-answer, that is, the total time to run the scientific simulation and analysis of the generated data. Landrush is demonstrated with experimental results obtained from leadership high-end applications on ORNL's Titan supercomputer, which show that (i) GPU-based scientific simulations have varying degrees of idle cycles to afford useful analysis task co-location, and (ii) the inability to context switch on the GPU at instruction granularity can be overcome by careful control of the analysis kernel launches and software-controlled early completion of analysis kernel executions. Results show that Landrush is superior in terms of time-to-answer compared to serially running simulations followed by analysis or by relying on the GPU driver and hardwired thread dispatcher to run analysis concurrently on a single GPU.

Computer Science↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Hanford Seismic Report for Fiscal Year 2008

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During fiscal year 2008, the Hanford Seismic Network recorded 1431 triggers on the seismometer system, which included 112 seismic events in the southeast Washington area and an additional 422 regional and teleseismic events. There were 74 events determined to be local earthquakes relevant to the Hanford Site. The highest-magnitude event (3.7 Mc) occurred on May 18, 2008, and was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, 13 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 45 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 16 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 54 earthquakes were located in swarm areas and 20 earthquakes were classified as random events. The May 18 earthquake was the highest magnitude event recorded since 1975 in the vicinity of the Hanford Site (between 46 degrees and 47 degrees north latitude and 119 degrees and 120 degrees west longitude). The event was not reported as being felt on the Hanford Site or causing any damage and was communicated to the Pacific Northwest National Laboratory Operations Center per HSAP communi¬cations procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and 400 Area were triggered by the May 18 event. The maximum acceleration recorded at the SMA stations (0.17% at the 300 Area) was 12 times smaller than the reportable action level (2% g) for Hanford Site facilities.

47 OTHER INSTRUMENTATION↗