Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A Mars' Year of Topographic Mapping With The Mars Orbiter Laser Altimeter

Since the end of February 1999 the Mars Orbiter Laser Altimeter (MOLA) has been mapping the planet continuously except for a 2 month period around solar conjunction in June 2000. At the end of January 2001 the Mars Global Surveyor Spacecraft (MGS) had completed its prime Mission, one Mars year of observing the planet, and begun the Extended Mission of slightly more than 14 months. MOLA will had acquired over 530 million altimetric measurements by early 2001, and continued to work perfectly. During the Extended Mission the main objective for MOLA will be observations of the seasonal variations in the locations and altitudes of clouds, the changes in the elevations of the polar icecaps due to the deposition and sublimation Of CO2, as well as supporting NASA's search for suitable future landing sites.

Smith, David E.↗

Stability and targeting in Dawn's final orbit

The Dawn spacecraft conducted two extended missions at Ceres following the completion of the primary mission in June 2016. The final orbit of the second extended mission was designed to have a 35-km periapsis altitude for 10x higher resolution science. The mission ended in this orbit when the spacecraft ran out of attitude control propellant. In this paper, we describe the final orbit and discuss the challenges of flying this low at Ceres. We also include our stability analysis showing the spacecraft will remain in orbit for more than 20 years, as stipulated by the planetary protection requirements.

Kennedy, Brian↗

Viking 75 project: Viking lander system primary mission performance report

Viking Lander hardware performance during launch, interplanetary cruise, Mars orbit insertion, preseparation, separation through landing, and the primary landed mission, with primary emphasis on Lander engineering and science hardware operations, the as-flown mission are described with respect to Lander system performance and anomalies during the various mission phases. The extended mission and predicted Lander performance is discussed along with a summary of Viking goals, mission plans, and description of the Lander, and its subsystem definitions.

Cooley, C. G.↗

Emergency Response Fire-Imaging UAS Missions over the Southern California Wildfire Disaster

Objectives include: Demonstrate capabilities of UAS to overfly and collect sensor data on widespread fires throughout Western US. Demonstrate long-endurance mission capabilities (20-hours+). Image multiple fires (greater than 4 fires per mission), to showcase extendable mission configuration and ability to either linger over key fires or station over disparate regional fires. Demonstrate new UAV-compatible, autonomous sensor for improved thermal characterization of fires. Provide automated, on-board, terrain and geo-rectified sensor imagery over OTH satcom links to national fire personnel and Incident commanders. Deliver real-time imagery (within 10-minutes of acquisition). Demonstrate capabilities of OTS technologies (GoogleEarth) to serve and display mission-critical sensor data, coincident with other pertinent data elements to facilitate information processing (WX data, ground asset data, other satellite data, R/T video, flight track info, etc).

Cobleigh, Brent R.↗

NASA 2007 Western States Fire Missions (WSFM)

This viewgraph presentation describes the Western states Fire Missions (WSFM) that occurred in 2007. The objectives of this mission are: (1) Demonstrate capabilities of UAS to overfly and collect sensor data on widespread fires throughout Western US. (1) Demonstrate long-endurance mission capabilities (20-hours+). (2) Image multiple fires (greater than 4 fires per mission), to showcase extendable mission configuration and ability to either linger over key fires or station over disparate regional fires. (3) Demonstrate new UAV-compatible, autonomous sensor for improved thermal characterization of fires. (4) Provide automated, on-board, terrain and geo-rectified sensor imagery over OTH satcom links to national fire personnel and Incident commanders. (5) Deliver real-time imagery to (within 10-minutes of acquisition). (6) Demonstrate capabilities of OTS technologies (GoogleEarth) to serve and display mission-critical sensor data, coincident with other pertinent data elements to facilitate information processing (WX data, ground asset data, other satellite data, R/T video, flight track info, etc).

Buoni, Greg↗

Emergency Response Fire-Imaging UAS Missions over the Southern California Wildfire Disaster

Objectives include: Demonstrate capabilities of UAS to overfly and collect sensor data on widespread fires throughout Western US. Demonstrate long-endurance mission capabilities (20-hours+). Image multiple fires (greater than 4 fires per mission), to showcase extendable mission configuration and ability to either linger over key fires or station over disparate regional fires. Demonstrate new UAV-compatible, autonomous sensor for improved thermal characterization of fires. Provide automated, on-board, terrain and geo-rectified sensor imagery over OTH satcom links to national fire personnel and Incident commanders. Deliver real-time imagery (within 10-minutes of acquisition). Demonstrate capabilities of OTS technologies (GoogleEarth) to serve and display mission-critical sensor data, coincident with other pertinent data elements to facilitate information processing (WX data, ground asset data, other satellite data, R/T video, flight track info, etc).

DelFrate, John H.↗

Large UAS Operations in the NAS - The NASA 2007 Western States Fire Missions (WSFM)

Objectives: Demonstrate capabilities of UAS to overfly and collect sensor data on wildfires throughout Western US. Demonstrate long-endurance mission capabilities (20+ hours). Image multiple fires (greater than 4 fires per mission), to showcase extendable mission configuration and ability to either linger over key fires or station over disparate regional fires. Deliver real-time imagery to (within 10-minutes of acquisition).

Buoni, Gregory P.↗

Autonomous Navigation Performance During The Hartley 2 Comet Flyby

On November 4, 2010, the EPOXI spacecraft performed a 700-km flyby of the comet Hartley 2 as follow-on to the successful 2005 Deep Impact prime mission. EPOXI, an extended mission for the Deep Impact Flyby spacecraft, returned a wealth of visual and infrared data from Hartley 2, marking the fifth time that high-resolution images of a cometary nucleus have been captured by a spacecraft. The highest resolution science return, captured at closest approach to the comet nucleus, was enabled by use of an onboard autonomous navigation system called AutoNav. AutoNav estimates the comet-relative spacecraft trajectory using optical measurements from the Medium Resolution Imager (MRI) and provides this relative position information to the Attitude Determination and Control System (ADCS) for maintaining instrument pointing on the comet. For the EPOXI mission, AutoNav was tasked to enable continuous tracking of a smaller, more active Hartley 2, as compared to Tempel 1, through the full encounter while traveling at a higher velocity. To meet the mission goal of capturing the comet in all MRI science images, position knowledge accuracies of +/- 3.5 km (3-?) cross track and +/- 0.3 seconds (3-?) time of flight were required. A flight-code-in-the-loop Monte Carlo simulation assessed AutoNav's statistical performance under the Hartley 2 flyby dynamics and determined optimal configuration. The AutoNav performance at Hartley 2 was successful, capturing the comet in all of the MRI images. The maximum residual between observed and predicted comet locations was 20 MRI pixels, primarily influenced by the center of brightness offset from the center of mass in the observations and attitude knowledge errors. This paper discusses the Monte Carlo-based analysis that led to the final AutoNav configuration and a comparison of the predicted performance with the flyby performance.

flyby↗

Ikhana UAS Overview

Ikhana demonstrates capabilities of UAS to overfly and collect sensor data on widespread fires throughout Western US and also demonstrate long-endurance mission capabilities (20-hours+). Ikhana images multiple fires (greater than 4 fires per mission), to showcase extendable mission configuration and ability to either linger over key fires or station over disparate regional fires. Ikhana also demonstrates new UAV-compatible, autonomous sensor for improved thermal characterization of fires. Also it provides automated, on-board, terrain and geo-rectified sensor imagery over the horizon SATCOM links to national fire personnel and Incident commanders.

UAS in the NAS↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Manned orbital systems concepts study. Book 3: Configurations for extended duration missions

Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.

Source record↗

Mars manned fusion spaceship

Fusion Propulsion has an enormous potential for space exploration in the near future. In the twenty-first century, a usable and efficient fusion rocket will be developed and in use. Because of the great distance between other planets and Earth, efficient use of time, fuel, and payload is essential. A nuclear spaceship would provide greater fuel efficiency, less travel time, and a larger payload. Extended missions would give more time for research, experiments, and data acquisition. With the extended mission time, a need for an artificial environment exists. The topics of magnetic fusion propulsion, living modules, artificial gravity, mass distribution, space connection, and orbital transfer to Mars are discussed. The propulsion system is a magnetic fusion reactor based on a tandem mirror design. This allows a faster, shorter trip time and a large thrust to weight ratio. The fuel proposed is a mixture of deuterium and helium-3. Helium-3 can be obtained from lunar mining. There will be minimal external radiation from the reactor resulting in a safe, efficient propulsion system.

Hedrick, James↗

Orbit Control Operations for the Cassini-Huygens Mission

The Cassini-Huygens spacecraft was launched in 1997 as an international and collaborative mission to study Saturn and its many moons. After a seven-year cruise, Cassini began orbiting Saturn for a four- year tour. This tour consists of 157 planned maneuvers, and their back-up locations, designed to target 52 encounters, mostly of Saturn's largest moon Titan. One of the mission's first activities was to release the Huygens probe to Titan in December 2004. Currently in its last year of the prime mission, Cassini-Huygens continues to obtain valuable data on Saturn, Titan, and Saturn's other satellites. Return of this information is in large part due to a healthy spacecraft and successful navigation. A two-year extended mission, beginning July 2008, will offer the opportunity to continue science activities. With a demanding navigation schedule that compares with the prime tour, the Cassini Navigation team relies on operations procedures developed during the prime mission to carry-out the extended mission objectives. Current processes for orbit control operations evolved from the primary navigational requirement of staying close to predetermined targeting conditions according to Cassini science sequence planning. The reference trajectory is comprised of flyby conditions to be accomplished at minimal propellant cost. Control of the planned reference trajectory orbit, and any trajectory updates, is achieved with the execution of Orbit Trim Maneuvers (OTMs). The procedures for designing, processing, and analyzing OTMs during Cassini operations is presented. First, a brief overview of the Cassini-Huygens Mission is given, followed by a general description of navigation. Orbit control and maneuver execution methods are defined, along with an outline of the orbit control staffing and operations philosophy. Finally, an example schedule of orbit control operations is shown.

navigation↗

Lunar Reconnaissance Orbiter Orbit Determination Accuracy Analysis

LRO definitive and predictive accuracy requirements were easily met in the nominal mission orbit, using the LP150Q lunar gravity model. center dot Accuracy of the LP150Q model is poorer in the extended mission elliptical orbit. center dot Later lunar gravity models, in particular GSFC-GRAIL-270, improve OD accuracy in the extended mission. center dot Implementation of a constrained plane when the orbit is within 45 degrees of the Earth-Moon line improves cross-track accuracy. center dot Prediction accuracy is still challenged during full-Sun periods due to coarse spacecraft area modeling - Implementation of a multi-plate area model with definitive attitude input can eliminate prediction violations. - The FDF is evaluating using analytic and predicted attitude modeling to improve full-Sun prediction accuracy. center dot Comparison of FDF ephemeris file to high-precision ephemeris files provides gross confirmation that overlap compares properly assess orbit accuracy.

Gravitation↗

Ensuring Cassini's End-of-Mission Propellant Margins

The Cassini spacecraft is in its final years. On September 15, 2017, Cassini will plunge deep into Saturn's atmosphere never to reemerge; thus concluding its second extended mission and 13 years in orbit around the ringed planet. As of October 2014, the spacecraft is four years in to its seven-year, second extended mission, the Cassini Solstice Mission (CSM). With three years left and only 2.5% of its loaded bipropellant and 37% of its loaded monopropellant remaining, the Cassini project actively manages the predicted end-of-mission propellant margins to maintain a high confidence in the spacecraft's ability to complete the CSM as designed.

Sturm, Erick J., II↗

Effect of Reduced Temperature Storage on Nutrient & Quality Stability in Space Food

The processed and prepackaged spaceflight food system is a critical human support system for manned space flights. As missions extend longer and farther from Earth over the next 20 years, strategies to stabilize the nutritional and sensory quality of food must be identified. For a mission to Mars, the space foods themselves must maintain quality for up to 5 years to align with cargo prepositioning scenarios. Optimizing the food system to achieve a 5‐year shelf life mitigates the risk of an inadequate food system during extended missions. Because previous attempts to determine a singular pathway to a 5‐year shelf life for food were unsuccessful, this investigation combines several approaches, based on science, technological advancement, and past empirical evidence, to determine their potential to extend the shelf life of the prepackaged food system for long duration missions. This study may identify food processing, packaging, and storage technologies that will be required for exploration missions and the extent that they must be implemented to achieve a 5‐year shelf life for the entire food system.

Cooper, M. R.↗

Progress on LISA Colloid Microthruster Technology Development

Colloid microthrusters have been operated successfully in flight, providing drag-free and precision control for spacecraft that can be used for future applications such as gravity wave and exoplanet observatories. The Space Technology 7 Disturbance Reduction System (ST7- DRS) technology demonstration payload included eight Busek Colloid Micro-Newton Thrusters (CMNTs) as part of the Laser Interferometer Space Antenna (LISA) Pathfinder mission that launched in December of 2015. The CMNTs provided full attitude and precision drag-free control of the spacecraft with <10 nm/√Hz stability along the most sensitive axis during commissioning, nominal, and extended mission phases through April of 2017. Performance requirements (≤0.1 μN/√Hz) were met and models were validated based on on- orbit measurements of test mass motion and actuation during the 60-day nominal and 30-day extended missions. In 2018, the European Space Agency (ESA) selected LISA to be the agency’s next “large-class” mission, currently in Phase A, with a launch scheduled for 2034 and a 12.5-year duration, including the transfer (1.5 years), commissioning (1 year), nominal (4 or 6 years), and extended (6 or 4 years) phases of the mission, which sets the lifetime and consumables requirement. NASA is considering a significant contribution of hardware to the ESA-led mission, potentially including colloid microthrusters. In preparation, NASA is developing five technologies to TRL 5 and 6, including the colloid microthrusters, to be ready for infusion into LISA by the mission adoption review (MAR), currently scheduled for 2024. While ST7-DRS effectively brought the CMNTs to TRL 7, additional lower-TRL flow control components must be developed for full redundancy, reducing the system-level TRL back to 4. Key to the future of the colloid microthruster technology will be to use lessons learned and keep as much of the heritage from the ST7 design as possible while updating the system to support redundancy and lifetime requirements of a flagship-class mission. This paper describes the technology plan and progress to reach TRL 6 by the MAR, focusing on near- term plans to reach TRL 5 by the end of March 2022 for the LISA Colloid Microthrusters (CMTs). Work includes requirements development and sizing studies, breadboard and brassboard hardware developments at Busek, including relevant lifetime and environment testing, and lifetime modeling, verification and validation efforts at JPL, UCLA, and UCI.

Gamero-Castaño, Manuel↗

Lunar Reconnaissance Orbiter Orbit Determination Accuracy Analysis

Results from operational OD produced by the NASA Goddard Flight Dynamics Facility for the LRO nominal and extended mission are presented. During the LRO nominal mission, when LRO flew in a low circular orbit, orbit determination requirements were met nearly 100% of the time. When the extended mission began, LRO returned to a more elliptical frozen orbit where gravity and other modeling errors caused numerous violations of mission accuracy requirements. Prediction accuracy is particularly challenged during periods when LRO is in full-Sun. A series of improvements to LRO orbit determination are presented, including implementation of new lunar gravity models, improved spacecraft solar radiation pressure modeling using a dynamic multi-plate area model, a shorter orbit determination arc length, and a constrained plane method for estimation. The analysis presented in this paper shows that updated lunar gravity models improved accuracy in the frozen orbit, and a multiplate dynamic area model improves prediction accuracy during full-Sun orbit periods. Implementation of a 36-hour tracking data arc and plane constraints during edge-on orbit geometry also provide benefits. A comparison of the operational solutions to precision orbit determination solutions shows agreement on a 100- to 250-meter level in definitive accuracy.

Gravitation↗