Search NASA⌕ Search

SEARCH · Search NASA

Results for “finance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Marketing Remote Sensing Data for North Pacific Fisheries Development and Management

Fish poaching, drug trafficking, ocean dumping, and other illegal activities are important problems on the high seas and in national economic zones. The primary thrust of the EOCAP II project, "Marketing Remote Sensing Data for North Pacific Fisheries Development and Management", was to use space-based sensors to improve the effectiveness of marine monitoring, control, and surveillance (MCS). Our initial objectives were to concentrate on the development of MCS tools using Advanced Very High Resolution Radiometry (AVHRR) and Synthetic Aperture Radar (SAR) data. Although we have successfully completed development of an initial version of our SAR-based monitoring tool (OmniVision), project activity has resulted in a much broader application of space-based assets to marine applications. Based in part on work commenced within EOCAP II, a new company, Ocean and Coastal Environmental Sensing, Inc. (OCENS), has been launched and the development of several new software products outside of the MCS arena initiated. One of those products, SeaStation, is near completion with a Fall, 1995 release date. Equity investment in OCENS now totals $70,000-with an additional amount being sought in the first round of financing. One of the pre-eminent objectives of EOCAP II is to make contributions to the US economy and job growth through the expansion of commercial uses of remotely sensed data. OCENS and the software products it is introducing into marine and coastal zone markets responds to this primary object*e. EOCAP II funding leveraged the market and technical know-how of OCENS founders into smart products that benefit marine and coastal zone users. Although technical difficulties and geopolitical shifts damaged the commercial feasibility of initial project objectives, the flexibility of the EOCAP II program now permits long-term business success. This in no small part stems from the fact that the EOCAP program recognizes the realities of small and start-up businesses and does not attempt to force these conditions to fit the apparent needs of big government. Instead, EOCAP works with those who know their market best in order to produce successful products and expanding businesses.

Source record↗

Commercializing Defense Technologies and Helping Defense Firms Succeed in Commercial Markets: A Report on the Objectives, Activities, and Accomplishments of the TAP-IN Program

Technology Access for Product Innovation (TAP-IN), the largest technology deployment project funded by TRP, was competitively selected through a national solicitation for proposals. TAP-IN was created to help companies access and apply defense technologies and help defense-dependent companies enter new commercial markets. Defense technologies included technologies developed by DoD, DOE, NASA, and their contractors. TAP-IN was structured to provide region-based technology access services that were able to draw on technology resources nationwide. TAP-IN provided expert assistance in all stages of the commercialization process from concept through prototype design to capital sourcing and marketing strategy. TAP-IN helped companies locate new technology, identify business partners, secure financing, develop ideas for new products, identify new markets, license technology, solve technical problems, and develop company-specific applications of federal technology. TAP-IN leveraged NASA's existing commercial technology network to create an integrated national network of organizations that assisted companies in every state. In addition to NASA's six regional technology transfer centers (RTTCs), TAP-IN included business and technology development organizations in every state, the Industrial Designers Society of America, and the Federal Laboratory Consortium (FLC).

Source record↗

Technology Assessment of High Capacity Data Storage Systems: Can We Avoid a Data Survivability Crisis?

This technology assessment of long-term high capacity data storage systems identifies an emerging crisis of severe proportions related to preserving important historical data in science, healthcare, manufacturing, finance and other fields. For the last 50 years, the information revolution, which has engulfed all major institutions of modem society, centered itself on data-their collection, storage, retrieval, transmission, analysis and presentation. The transformation of long term historical data records into information concepts, according to Drucker, is the next stage in this revolution towards building the new information based scientific and business foundations. For this to occur, data survivability, reliability and evolvability of long term storage media and systems pose formidable technological challenges. Unlike the Y2K problem, where the clock is ticking and a crisis is set to go off at a specific time, large capacity data storage repositories face a crisis similar to the social security system in that the seriousness of the problem emerges after a decade or two. The essence of the storage crisis is as follows: since it could take a decade to migrate a peta-byte of data to a new media for preservation, and the life expectancy of the storage media itself is only a decade, then it may not be possible to complete the transfer before an irrecoverable data loss occurs. Over the last two decades, a number of anecdotal crises have occurred where vital scientific and business data were lost or would have been lost if not for major expenditures of resources and funds to save this data, much like what is happening today to solve the Y2K problem. A pr-ime example was the joint NASA/NSF/NOAA effort to rescue eight years worth of TOVS/AVHRR data from an obsolete system, which otherwise would have not resulted in the valuable 20-year long satellite record of global warming. Current storage systems solutions to long-term data survivability rest on scalable architectures having parallel paths for data migration.

Halem, M.↗

Study of the Application of Separation Control by Unsteady Excitation to Civil Transport Aircraft

This study provides a preliminary assessment of the potential benefits of applying unsteady separation control to transport aircraft. Estimates are given for some of the costs associated with a specific application to high-lift systems. High-leverage areas for future research were identified during the course of the study. The study was conducted in three phases. Phase 1 consisted of a coarse screening of potential applications within the aerodynamics discipline. Potential benefits were identified and in some cases quantified in a preliminary way. Phase 2 concentrated on the application to the wing high-lift system, deemed to have the greatest potential benefit for commercial transports. A team of experts, including other disciplines (i.e. hydraulic, mechanical, and electrical systems, structures, configurations, manufacturing, and finance), assessed the feasibility, benefits, and costs to arrive at estimates of net benefits. In both phases of the study, areas of concern and areas for future research were identified. In phase 3 of this study, the high-leverage areas for future research were prioritized as a guide for future efforts aimed at the application of active flow control to commercial transport aircraft.

McLean, J. D.↗

The Conference Proceedings of the 1998 Air Transport Research Group (ATRG) of the WCTR Society

Contents include the following: Airport choice in a multiple airport region: an empirical analysis for the San Francisco bay area. Liberalization of the westeuropian aviation: choice of a new hub airport for an airline. Austin Bergstrom airport traffic control tower establishment of a major activity level tower. A study to optimize the environmental capacity of Amsterdam airport schiphol.Airport performance in stakeholder involvement and communication strategies: a comparison of major Australian and North American air carrier and general aviation airports. Airport planning and location.Location of international airport and regional development. A simulation technique for analysis of Brasilian airport passanger terminal building.Multimodal airport access in Japan. Planning surface access provision at major airports Airline economics and the inclusion of environmental costs on airport hub pricing: a theoretical analysis. Airport financing and user charge systems in the USA. Optimal demand for operating lease of aircraft. Aircraft leasing industry and social welfare.The development of performance indicators for airports: a management perspective. Study about operational effect of the "security check-in" implantation in Brasilian international airports.Austin Bergstrom west loop cable system.and Optimal resource allocation model for airport passanger terminals.

Oum, Tae Hoon↗

Solar Energy Economics Revisited: The Promise and Challenge of Orbiting Reflectors for World Energy Supply

A system of orbiting, large-area, low mass density reflector satellites which provide nearly continuous solar energy to a world-distributed set of conversion sites is examined under the criteria for any potential new energy system: technical feasibility, significant and renewable energy impact, economic feasibility and social/political acceptability. Although many technical issues need further study, reasonable advances in space technology appear sufficient to implement the system. The enhanced insolation is shown to greatly improve the economic competitiveness of solar-electric generation to circa 1995 fossil/nuclear alternatives. The system is shown to have the potential for supplying a significant fraction of future domestic and world energy needs. Finally, the environmental and social issues, including a means for financing such a large shift to a world solar energy dependence, is addressed.

Billman, Kenneth W.↗

NASA Historical Data Book: NASA Space Applications, Aeronautics and Space Research and Technology, Tracking and Data Acquisition/Support Operations, Commercial Programs and - Volume 6

This sixth volume of the NASA Historical Data Book is a continuation of those earlier efforts. This fundamental reference tool presents information, much of it statistical, documenting the development of several critical areas of NASA responsibility for the period between 1979 and 1988. This volume includes detailed information on the space applications effort, the development and operation of aeronautics and space research and technology programs, tracking and data acquisition/space operations, commercial programs, facilities and installations, personnel, and finances and procurement during this era. Special thanks are owed to the student research assistants who gathered and input much of the tabular material-a particularly tedious undertaking. There are numerous people at NASA associated with historical study, technical information, and the mechanics of publishing who helped in myriad ways in the preparation of this historical data book.

Rumerman, Judy A.↗

International Space Station ECLSS Operations Status - Increment OA

This paper describes Environmental Control and Life Support Systems (ECLSS) operations to date for preflight planning, international partner coordination and mission plan execution of the International Space Station (ISS). The focus is on the activities involved with the STS-88(2A) Space Shuttle Endeavor flight, the first delivery of the US segment of the ISS, which consists of the Pressurized Mating Adapter (PMA)/and Node 1 elements, and the delivery of the first Russian segment of the ISS, the FGB, a US-financed and Russian- built module.

Lamczyk, Philip C.↗

2nd Generation RLV Risk Definition Program

The 2nd Generation RLV Risk Reduction Mid-Term Report summarizes the status of Kelly Space & Technology's activities during the first two and one half months of the program. This report was presented to the cognoscente Contracting Officer's Technical Representative (COTR) and selected Marshall Space Flight Center staff members on 26 September 2000. The report has been approved and is distributed on CD-ROM (as a PowerPoint file) in accordance with the terms of the subject contract, and contains information and data addressing the following: (1) Launch services demand and requirements; (2) Architecture, alternatives, and requirements; (3) Costs, pricing, and business cases analysis; (4) Commercial financing requirements, plans, and strategy; (5) System engineering processes and derived requirements; and (6) RLV system trade studies and design analysis.

Davis, Robert M.↗

Mining for Data

AbTech Corporation used an F-18 HARV (High Alpha Research Vehicle) simulation developed by NASA to create an interactive computer-based prototype of the MQ (Model Quest) SV (System Validator) tool. Dryden Flight Research Center provided support to develop, test, and rapidly reprogram the validation function. AbTech's ModelQuest Enterprises highly automated and outperforms other modeling techniques to quickly discover meaningful relationships, patterns, and trends in databases. Applications include technical and business professionals in finance, marketing, business, banking, retail, healthcare, and aerospace.

Source record↗

How I Love My 80 Percenters

Don't ever take your support staff for granted. By support staff, I mean the people in personnel, logistics, and finance; the ones who can make things happen with a phone call or a signature, or by the same token frustrate you to no end by their inaction; these are people you must depend on. I've spent a lot of time thinking about how to cultivate relationships with my support staff that work to the advantage of both of us. The most important thing that have learned working with people, any people--and I will tell you how I learned this in a minute--is there are some folks you just can't motivate, so forget it, don't try; others you certainly can with a little psychology and some effort; and the best of the bunch, what I call the 80 percenters, you don't need to motivate because they're already on the team and performing beautifully. The ones you can't change are rocks. Face up to it, and just kick them out of your way. I have a reputation with the people who don't want to perform or be part of the team. They don't come near me. If someone's a rock, I pick up on it right away, and I will walk around him or her to find someone better. The ones who can be motivated I take time to nurture. I consider them my projects. A lot of times these wannabes are people who want to help but don't know how. Listen, you can work with them. Lots of people in organizations have the mindset that all that matters are the regulations. God forbid if you ever work outside those regulations. They've got one foot on that regulation and they're holding it tight like a baby holds a blanket. What you're looking for is that first sign that their minds are opening. Usually you hear it in their vocabulary. What used to sound like "We can't do that ... the regulations won't allow it ... we have never done this before," well, suddenly that changes to "We have options ... let's take a look at the options ... let me research this and get back to you." The 80 percenters you want to nurture too, but they're already on the team. The 80 percenters know the regulation, but if there is a problem because of a regulation, they will still tell you, "Don't worry about it, I've got it under control." These people don't see themselves as guardians of the regulations. Instead, they see themselves as customer service representatives. Two 80 percenters on my team are Hettie Courtney at Goddard Space Flight Center and Debbie Randall at NASA Headquarters in Code B. Thank you, ladies, very much. You are the best.

Maturo, Anthony J.↗

Optimal Inflatable Space Towers with 3 - 100 km Height

Theory and computations are provided for building inflatable space towers up to one hundred kilometers in height. These towers can be used for tourism, scientific observation of space, observation of the Earth's surface, weather and upper atmosphere, and for radio, television, and communication transmissions. These towers can also be used to launch space ships and Earth satellites. These projects are not expensive and do not require rockets. They require thin strong films composed from artificial fibers and fabricated by current industry. The towers can be built using present technology. The towers can be used (for tourism, communication, etc.) during the construction process and provide self-financing for further construction. The tower design does not require work at high altitudes; all construction can be done at the Earth's surface. The transport system for a tower consists of a small engine (used only for friction compensation) located at the Earth's surface. The tower is separated into sections and has special protection mechanisms in case of damage. Problems involving security, control, repair, and stability of the proposed towers are addressed in other publications. The author is prepared to discuss these and other problems with serious organizations desiring to research and develop these projects.

Bolonkin, Alexander↗

NASA Scientific Data Purchase Project: From Collection to User

NASA's Scientific Data Purchase (SDP) project is currently a $70 million operation managed by the Earth Science Applications Directorate at Stennis Space Center. The SDP project was developed in 1997 to purchase scientific data from commercial sources for distribution to NASA Earth science researchers. Our current data holdings include 8TB of remote sensing imagery consisting of 18 products from 4 companies. Our anticipated data volume is 60 TB by 2004, and we will be receiving new data products from several additional companies. Our current system capacity is 24 TB, expandable to 89 TB. Operations include tasking of new data collections, archive ordering, shipment verification, data validation, distribution, metrics, finances, customer feedback, and technical support. The program has been included in the Stennis Space Center Commercial Remote Sensing ISO 9001 registration since its inception. Our operational system includes automatic quality control checks on data received (with MatLab analysis); internally developed, custom Web-based interfaces that tie into commercial-off-the-shelf software; and an integrated relational database that links and tracks all data through operations. We've distributed nearly 1500 datasets, and almost 18,000 data files have been downloaded from our public web site; on a 10-point scale, our customer satisfaction index is 8.32 at a 23% response level. More information about the SDP is available on our Web site.

Nicholson, Lamar↗

Six-month space greenhouse experiments--a step to creation of future biological life support systems

SVET Space Greenhouse (SG)--the first automated facility for growing of higher plants in microgravity was designed in the eighty years to be used for the future BLSS. The first successful experiment with vegetables was carried out in 1990 on the MIR Space Station (SS). The experiments in SVET SG were resumed in 1995, when an American Gas Exchange Measurement System (GEMS) was added. A three-month wheat experiment was carried out as part of MIR-SHUTTLE'95 program. SVET-2 SG Bulgarian equipment of a new generation with optimised characteristics was developed (financed by NASA). The new SVET-GEMS equipment was launched on board the MIR SS and a successful six-month experiments for growing up of two crops of wheat were conducted in 1996 - 97 as part of MIR-NASA-3 program. The first of these "Greenhouse" experiments (123 days) with the goal to grow wheat through a complete life cycle is described. Nearly 300 heads developed but no seeds were produced. A second crop of wheat was planted and after 42 days the plants were frozen for biochemical investigations. The main environmental parameters during the six-month experiments in SVET (substrate moisture and lighting period) are given. The results and the contribution to BLSS are discussed.

long duration↗

Analysis of System-Wide Investment in the National Airspace System: A Portfolio Analytical Framework and an Example

In this paper, the authors review the FAA s current program investments and lay out a preliminary analytical framework to undertake projects that may address some of the noted deficiencies. By drawing upon the well developed theories from corporate finance, an analytical framework is offered that can be used for choosing FAA s investments taking into account risk, expected returns and inherent dependencies across NAS programs. The framework can be expanded into taking multiple assets and realistic values for parameters in drawing an efficient risk-return frontier for the entire FAA investment programs.

Bhadra, Dipasis↗

Cost Analysis for Large Civil Transport Rotorcraft

This paper presents cost analysis of purchase price and DOC+I (direct operating cost plus interest) that supports NASA s study of three advanced rotorcraft concepts that could enter commercial transport service within 10 to 15 years. The components of DOC+I are maintenance, flight crew, fuel, depreciation, insurance, and finance. The cost analysis aims at VTOL (vertical takeoff and landing) and CTOL (conventional takeoff and landing) aircraft suitable for regional transport service. The resulting spreadsheet-implemented cost models are semi-empirical and based on Department of Transportation and Army data from actual operations of such aircraft. This paper describes a rationale for selecting cost tech factors without which VTOL is more costly than CTOL by a factor of 10 for maintenance cost and a factor of two for purchase price. The three VTOL designs selected for cost comparisons meet the mission requirement to fly 1,200 nautical miles at 350 knots and 30,000 ft carrying 120 passengers. The lowest cost VTOL design is a large civil tilt rotor (LCTR) aircraft. With cost tech factors applied, the LCTR is reasonably competitive with the Boeing 737-700 when operated in economy regional service following the business model of the selected baseline operation, that of Southwest Airlines.

Coy, John J.↗

Productivity Analysis of Public and Private Airports: A Causal Investigation

Around the world, airports are being viewed as enterprises, rather than public services, which are expected to be managed efficiently and provide passengers with courteous customer services. Governments are, increasingly, turning to the private sectors for their efficiency in managing the operation, financing, and development, as well as providing security for airports. Operational and financial performance evaluation has become increasingly important to airport operators due to recent trends in airport privatization. Assessing performance allows the airport operators to plan for human resources and capital investment as efficiently as possible. Productivity measurements may be used as comparisons and guidelines in strategic planning, in the internal analysis of operational efficiency and effectiveness, and in assessing the competitive position of an airport in transportation industry. The primary purpose of this paper is to investigate the operational and financial efficiencies of 22 major airports in the United States and Europe. These airports are divided into three groups based on private ownership (7 British Airport Authority airports), public ownership (8 major United States airports), and a mix of private and public ownership (7 major European Union airports. The detail ownership structures of these airports are presented in Appendix A. Total factor productivity (TFP) model was utilized to measure airport performance in terms of financial and operational efficiencies and to develop a benchmarking tool to identify the areas of strength and weakness. A regression model was then employed to measure the relationship between TFP and ownership structure. Finally a Granger causality test was performed to determine whether ownership structure is a Granger cause of TFP. The results of the analysis presented in this paper demonstrate that there is not a significant relationship between airport TFP and ownership structure. Airport productivity and efficiency is, however dependent upon the level of competition, choice of the market, and regulatory control.

Vasigh, Bijan↗