At least 181 records · Page 10

Performance of MODIS Thermal Emissive Bands On-orbit Calibration Algorithms

Two nearly identical copies of the Moderate Resolution Imaging Spectroradiometer (MODIS) are currently operated on-board the Terra and Aqua spacecrafts, launched in December 1999 and May 2002, respectively. Together, they have produced an unprecedented amount of science data products, which are widely used for the studies of changes in the Earth's system of land, oceans, and atmosphere. MODIS is a cross-track scanning radiometer, which uses a two-sided scan mirror and collects data continuously over a wide scan angle range (+/-55 degree relative to the instrument nadir) each scan of 1.47 seconds. It has 36 spectral bands with wavelengths ranging from visible (VIS) to long-wave infrared (LWIR). MODIS bands 1-19 and 26 are the reflective solar bands (RSB) and bands 20-25 and 27-36 are the thermal emissive bands (TEB). MODIS was developed and designed with improvements made over its heritage sensors (such as AVHRR and Landsat) and, in particular, with more stringent calibration requirements. Because of this, MODIS was built with a set of state-of-art on-board calibrators (OBC), which include a solar diffuser (SD), a solar diffuser stability monitor (SDSM), a blackbody (BB), a spectroradiometric calibration assembly (SRCA), and a space view (SV) port. With the exception of view angle differences, MODIS OBC measurements and the Earth View (EV) observations are made via the same optical path. MODIS TEB have a total of 160 individual TEB detectors (10 per band), which are located on two cold focal plane assemblies (CFPA). For nominal on-orbit operation, the CFPA temperature is controlled at 83K via a passive radiative cooler. For the TEB, the calibration requirements at specified typical scene radiances are less than or equal to 1% with an exception for the fire detection (low gain) band. MODIS TEB on-orbit calibration is performed on a scan-by-scan basis using a quadratic calibration algorithm, and data collected from sensor responses to the onboard BB and SV. The BB serves as the thermal calibration source and the SV provides measurements for the sensor's background and offsets. MODIS on-board BB is a v-grooved plate with its temperature measured using 12 platinum resistive thermistors (PRT) uniformly embedded in the BB substrate. All the BB thermistors were characterized pre-launch with reference to the NIST temperature standards. Unlike typical BB operations in many heritage sensors, which have no temperature control capability, the MODIS on-board BB can be operated at any temperatures between instrument ambient (about 270K) and 315K and can also be varied continuously within this range. This feature has significantly enhanced the MODIS' capability of tracking and updating the TEB nonlinear calibration coefficients over its entire mission. Following a brief description of MODIS TEB on-orbit calibration methodologies and its onboard BB operational activities, this paper provides a comprehensive performance assessment of MODIS TEB quadratic calibration algorithm. It examines the scan-by-scan, orbit-by-orbit, daily, and seasonal variations of detector responses and associated impact due changes in the CFPA and instrument temperatures. Specifically, this paper will analyze the contribution by each individual thermal emissive source term (BB, scan cavity, and scan mirror), the impact on the Level 1 B data product quality due to pre-launch and on-orbit calibration uncertainties. A comparison of Terra and Aqua TEB on-orbit performance, lessons learned, and suggestions for future improvements will also be made.

Xiong, Xiaoxiong↗

Evaluation of Anomaly Detection Capability for Ground-Based Pre-Launch Shuttle Operations

This chapter will provide a thorough end-to-end description of the process for evaluation of three different data-driven algorithms for anomaly detection to select the best candidate for deployment as part of a suite of IVHM (Integrated Vehicle Health Management) technologies. These algorithms were deemed to be sufficiently mature enough to be considered viable candidates for deployment in support of the maiden launch of Ares I-X, the successor to the Space Shuttle for NASA's Constellation program. Data-driven algorithms are just one of three different types being deployed. The other two types of algorithms being deployed include a "nile-based" expert system, and a "model-based" system. Within these two categories, the deployable candidates have already been selected based upon qualitative factors such as flight heritage. For the rule-based system, SHINE (Spacecraft High-speed Inference Engine) has been selected for deployment, which is a component of BEAM (Beacon-based Exception Analysis for Multimissions), a patented technology developed at NASA's JPL (Jet Propulsion Laboratory) and serves to aid in the management and identification of operational modes. For the "model-based" system, a commercially available package developed by QSI (Qualtech Systems, Inc.), TEAMS (Testability Engineering and Maintenance System) has been selected for deployment to aid in diagnosis. In the context of this particular deployment, distinctions among the use of the terms "data-driven," "rule-based," and "model-based," can be found in. Although there are three different categories of algorithms that have been selected for deployment, our main focus in this chapter will be on the evaluation of three candidates for data-driven anomaly detection. These algorithms will be evaluated upon their capability for robustly detecting incipient faults or failures in the ground-based phase of pre-launch space shuttle operations, rather than based oil heritage as performed in previous studies. Robust detection will allow for the achievement of pre-specified minimum false alarm and/or missed detection rates in the selection of alert thresholds. All algorithms will also be optimized with respect to an aggregation of these same criteria. Our study relies upon the use of Shuttle data to act as was a proxy for and in preparation for application to Ares I-X data, which uses a very similar hardware platform for the subsystems that are being targeted (TVC - Thrust Vector Control subsystem for the SRB (Solid Rocket Booster)).

Martin, Rodney Alexander↗

Life Cycle Cost Growth Study for the Discovery and New Frontiers Program Office

The D&NF Program Office LCC Management Study provides a detailed look at the drivers underlying cost overruns and schedule delays for five D&NF missions. While none of the findings are new, the study underlines the importance of continued emphasis on sound project management techniques: a clean project management structure with a clear definition of roles and responsibilities across the various partners in a project, an understanding of institutional standards and procedures and any differences among the partners, and the critical need for a comprehensive IMS that can be used easily and routinely to identify potential threats to the critical path. The study also highlights the continuing need for realistic estimates of the total LCC. Sufficient time and resources must be allocated early in a project to ensure that the appropriate trade studies and analyses are performed across all aspects of a mission: spacecraft, ground system, operations concept, and fault management, to ensure that proposed and confirmed costs truly reflect the resource requirements over the entire mission life cycle. These studies need to include a realistic review of the assumptions underlying the use of new technologies, the integration of heritage and new hardware and software into the total mission environment, and any development and test savings based on heritage technology and lessons learned. Finally, the LCC Management Study stresses the need to listen to, carefully consider, and take positive action regarding the issues raised during reviews by the expert review teams.

Barley, Bryan↗

Continuing Evolution of Mars Sample Return

This paper addresses the continued evolution of the Groundbreaking MSR concept over the last year. One of the tenets of the low-cost approach is to use substantial heritage from an earlier mission, Mars Science Laboratory (MSL). Recently, the MSL project developed and switched to a revolutionary landing approach, coined 'sky-crane' where the MSL, which is a rover, is lowered gently to the Martian surface from a hovering vehicle. MSR has adopted this approach, again continuing to capitalize on the heritage for a significant portion of the new lander. In parallel, a MSR Technology Board was formed to reexamine MSR technology needs and participate in a continuing refinement of architectural trades. While the focused technology program continues to be definitized through the remainder of this year, the current assessment of what technology development is required, is discussed in this paper. In addition, the results of new trade studies and considerations will be discussed.

Mars Sample Return (MSR)↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

Seal Analysis for the Ares-I Upper Stage Fuel Tank Manhole Cover

Techniques for studying the performance of Naflex pressure-assisted seals in the Ares-I Upper Stage liquid hydrogen tank manhole cover seal joint are explored. To assess the feasibility of using the identical seal design for the Upper Stage as was used for the Space Shuttle External Tank manhole covers, a preliminary seal deflection analysis using the ABAQUS commercial finite element software is employed. The ABAQUS analyses are performed using three-dimensional symmetric wedge finite element models. This analysis technique is validated by first modeling a heritage External Tank liquid hydrogen tank manhole cover joint and correlating the results to heritage test data. Once the technique is validated, the Upper Stage configuration is modeled. The Upper Stage analyses are performed at 1.4 times the expected pressure to comply with the Constellation Program factor of safety requirement on joint separation. Results from the analyses performed with the External Tank and Upper Stage models demonstrate the effects of several modeling assumptions on the seal deflection. The analyses for Upper Stage show that the integrity of the seal is successfully maintained.

Phillips, Dawn R.↗

Seal Analysis for the Ares-I Upper Stage Fuel Tank Manhole Covers

Naflex seals have long history of use in launch vehicle components, including Saturn stages and Space Shuttle External Tank. Ares-I Upper Stage tank pressures are higher than ET pressures, requiring performance verification of heritage seal design in new manhole cover configurations. Heritage external tank analyses are reviewed for potential application to Upper Stage.

Phillips, Dawn R.↗

Testing for the J-2X Upper Stage Engine

NASA selected the J-2X Upper Stage Engine in 2006 to power the upper stages of the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Based on the proven Saturn J-2 engine, this new engine will provide 294,000 pounds of thrust and a specific impulse of 448 seconds, making it the most efficient gas generator cycle engine in history. The engine's guiding philosophy emerged from the Exploration Systems Architecture Study (ESAS) in 2005. Goals established then called for vehicles and components based, where feasible, on proven hardware from the Space Shuttle, commercial, and other programs, to perform the mission and provide an order of magnitude greater safety. Since that time, the team has made unprecedented progress. Ahead of the other elements of the Constellation Program architecture, the team has progressed through System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of February 2010, more than 100,000 development engine parts have been ordered and more than 18,000 delivered. Approximately 1,300 of more than 1,600 engine drawings were released for manufacturing. A major factor in the J-2X development approach to this point is testing operations of heritage J-2 engine hardware and new J-2X components to understand heritage performance, validate computer modeling of development components, mitigate risk early in development, and inform design trades. This testing has been performed both by NASA and its J-2X prime contractor, Pratt & Whitney Rocketdyne (PWR). This body of work increases the likelihood of success as the team prepares for testing the J-2X powerpack and first development engine in calendar 2011. This paper will provide highlights of J-2X testing operations, engine test facilities, development hardware, and plans.

Buzzell, James C.↗

From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

In 2006, NASA selected an evolved variant of the proven Saturn/Apollo J-2 upper stage engine to power the Ares I crew launch vehicle upper stage and the Ares V cargo launch vehicle Earth departure stage (EDS) for the Constellation Program. Any design changes needed by the new engine would be based where possible on proven hardware from the Space Shuttle, commercial launchers, and other programs. In addition to the thrust and efficiency requirements needed for the Constellation reference missions, it would be an order of magnitude safer than past engines. It required the J-2X government/industry team to develop the highest performance engine of its type in history and develop it for use in two vehicles for two different missions. In the attempt to achieve these goals in the past five years, the Upper Stage Engine team has made significant progress, successfully passing System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of spring 2010, more than 100,000 experimental and development engine parts have been completed or are in various stages of manufacture. Approximately 1,300 of more than 1,600 engine drawings have been released for manufacturing. This progress has been due to a combination of factors: the heritage hardware starting point, advanced computer analysis, and early heritage and development component testing to understand performance, validate computer modeling, and inform design trades. This work will increase the odds of success as engine team prepares for powerpack and development engine hot fire testing in calendar 2011. This paper will provide an overview of the engine development program and progress to date.

Kynard, Mike↗

Turbopump Seal Testing at Marshall Space Flight Center

The new ARES space flight program has presented many challenges to aerospace engineers and designers. One of the areas for consideration are the seals in the turbopumps that supply cryogenic propellants to the combustion chamber in the upper stage. Heritage face seals that worked in the past might not be sufficient in the newer turbopumps with increased speeds, pressures across the seals, and loads. New seal materials, engineering designs, and analysis techniques have been developed since the early use of these heritage seals, however, rub conditions and surface degradation at the sliding contact cannot be reliably predicted. Testing is required to determine the safe operating limits and verify seal wear life over the operating range. Rocketdyne in Canoga Park California entered into a task agreement with MSFC to design, fabricate, build, test, disassemble, and inspect hardware after tests of carbon materials and wear resistant coatings. The purpose of testing would be to determine the safe operating limits, empirically iterate the design, and select the best combination of materials for face seals and mating rings. This paper summarizes the many hours and efforts of individuals and teams to get the program operating successfully and presents the test results that were obtained.

Gibson, Howard G.↗

Advanced Development Program for a 625 lbf thrust engine for Ares First Stage Roll Control System

NASA's new Ares Launch Vehicle will require twelve thrusters to provide roll control of the vehicle during the first stage firing. All twelve roll control thrusters will be located at the inter-stage segment that separates the solid rocket booster first stage from the second stage. NASA selected a mono propellant hydrazine solution and as a result awarded Aerojet-General a contract in 2007 for an advanced development program for an MR-80- series 625 Ibf vacuum thrust monopropellant hydrazine thruster. This thruster has heritage dating back to the 1976 Viking Landers and most recently for the 2011 Mars Science Laboratory. Prior to the Ares application, the MR-80-series thrusters had been equipped with throttle valves and not typically operated in pulse mode. The primary objective of the advanced development program was to increase the technology readiness level and retire major technical risks for the future flight qualification test program. Aerojet built on their heritage MR-80 rocket engine designs to achieve the design and performance requirements. Significant improvements to cost and lead-time were achieved by applying Design for Manufacturing and Assembly (DFMA) principles. AerojetGeneral has completed Preliminary and Critical Design Reviews, followed by two successful rocket engine development test programs. The test programs included qualification random vibration and firing lite that significantly exceed the flight qualification requirements. This paper discusses the advanced development program and the demonstrated capability of the MR-80C engine. Y;

Dawson, Matt↗

Fabrication of Lanthanum Telluride 14-1-11 Zintl High-Temperature Thermoelectric Couple

The development of more efficient thermoelectric couple technology capable of operating with high-grade heat sources up to 1,275 K is key to improving the performance of radioisotope thermoelectric generators. Lanthanum telluride La3-xTe4 and 14-1-11 Zintls (Yb14MnSb11) have been identified as very promising materials. The fabrication of advanced high-temperature thermoelectric couples requires the joining of several dissimilar materials, typically including a number of diffusion bonding and brazing steps, to achieve a device capable of operating at elevated temperatures across a large temperature differential (up to 900 K). A thermoelectric couple typically comprises a heat collector/ exchanger, metallic interconnects on both hot and cold sides, n-type and ptype conductivity thermoelectric elements, and cold-side hardware to connect to the cold-side heat rejection and provide electrical connections. Differences in the physical, mechanical, and chemical properties of the materials that make up the thermoelectric couple, especially differences in the coefficients of thermal expansion (CTE), result in undesirable interfacial stresses that can lead to mechanical failure of the device. The problem is further complicated by the fact that the thermoelectric materials under consideration have large CTE values, are brittle, and cracks can propagate through them with minimal resistance. The inherent challenge of bonding brittle, high-thermal-expansion thermoelectric materials to a hot shoe material that is thick enough to carry the requisite electrical current was overcome. A critical advantage over prior art is that this device was constructed using all diffusion bonds and a minimum number of assembly steps. The fabrication process and the materials used are described in the following steps: (1) Applying a thin refractory metal foil to both sides of lanthanum telluride. To fabricate the n-type leg of the advanced thermoelectric couple, the pre-synthesized lanthanum telluride coupon was diffusion bonded to the metal foil using a thin adhesion layer. (2) Repeating a similar process for the 14-1-11 Zintl p-type leg of the advanced thermoelectric couple. (3) Bonding thick CTE-matched metal plates on the metallized lanthanum telluride and Yb14MnSb11 to form the hot and cold sides of the thermoelectric couple. The calculated conversion efficiency of such an advanced couple would be about 10.5 percent, about 35 percent better than heritage radioisotope thermoelectric technology that relies on Si-Ge alloys. In addition, unlike Si-Ge alloys, these materials can be combined with many other thermoelectric materials optimized for operation at lower temperatures to achieve conversion efficiency in excess of 15 percent (a factor of 2 increase over heritage technology).

Ravi, Vilupanur A.↗

Observed Differences in Spectral Microphysical Retrievals from MODIS

The microphysical structure of clouds is of fundamental importance for understanding a variety of cloud radiation and physical processes. With the advent of MODIS (Moderate Resolution Imaging Spectroradiometer) on the NASA EOS Terra and Aqua platforms, simultaneous global/daily 1km retrievals of cloud effective particle size are available using the heritage 3.7 an band from AVHRR as well as the 1.6 and 2.1 m shortwave IR bands. The MODIS cloud product (MOD06/MYD06 for MODIS Terra and Aqua, respectively) provides separate effective radii results using each of these spectral bands. It has been found that significant differences can occur between the three size retrievals, mainly for liquid water marine boundary layer clouds and especially in broken (low cloud fraction) regimes. In particular, for such regimes, effective radii derived from the MODIS 2.1 lim band can be substantially larger than retrievals from the Heritage 3.7 lam band. In this paper, we present global and regional results of the differences, including correlations, view angle dependencies, and algorithm sensitivities for the existing MODIS Collection 5 product.

Platnick, Steven E.↗

NASA Glenn Research Center Electrochemistry Branch Battery Overview

This presentation covers an overview of NASA Glenn s history and heritage in the development of electrochemical systems for aerospace applications. Specific areas of focus are Li-ion batteries and their development for future Exploration missions. Current component development efforts for high energy and ultra high energy Li-ion batteries are addressed. Electrochemical systems are critical to the success of Exploration, Science and Space Operations missions. NASA Glenn has a long, successful heritage with batteries and fuel cells for aerospace applications. GRC Battery capabilities and expertise span basic research through flight hardware development and implementation. There is a great deal of synergy between energy storage system needs for aerospace and terrestrial applications.

Manzo, Michelle A.↗

Past and Present Large Solid Rocket Motor Test Capabilities

A study was performed to identify the current and historical trends in the capability of solid rocket motor testing in the United States. The study focused on test positions capable of testing solid rocket motors of at least 10,000 lbf thrust. Top-level information was collected for two distinct data points plus/minus a few years: 2000 (Y2K) and 2010 (Present). Data was combined from many sources, but primarily focused on data from the Chemical Propulsion Information Analysis Center s Rocket Propulsion Test Facilities Database, and heritage Chemical Propulsion Information Agency/M8 Solid Rocket Motor Static Test Facilities Manual. Data for the Rocket Propulsion Test Facilities Database and heritage M8 Solid Rocket Motor Static Test Facilities Manual is provided to the Chemical Propulsion Information Analysis Center directly from the test facilities. Information for each test cell for each time period was compiled and plotted to produce a graphical display of the changes for the nation, NASA, Department of Defense, and commercial organizations during the past ten years. Major groups of plots include test facility by geographic location, test cells by status/utilization, and test cells by maximum thrust capability. The results are discussed.

Kowalski, Robert R.↗

Ares I-X Flight Test Development Challenges and Success Factors

The NASA Constellation Program's Ares I-X rocket launched successfully on October 28, 2009 collecting valuable data and providing risk reduction for the Ares I project. The Ares I-X mission was formulated and implemented in less than four years commencing with the Exploration Systems Architecture Study in 2005. The test configuration was founded upon assets and processes from other rocket programs including Space Shuttle, Atlas, and Peacekeeper. For example, the test vehicle's propulsion element was a Shuttle Solid Rocket Motor. The Ares I-X rocket comprised a motor assembly, mass and outer mold line simulators of the Ares I Upper Stage, Orion Spacecraft and Launch Abort System, a roll control system, avionics, and other miscellaneous components. The vehicle was 327 feet tall and weighed approximately 1,800,000 pounds. During flight the rocket reached a maximum speed of Mach 4.8 and an altitude of 150,000 feet. The vehicle demonstrated staging at 130,000 feet, tested parachutes for recovery of the motor, and utilized approximately 900 sensors for data collection. Developing a new launch system and preparing for a safe flight presented many challenges. Specific challenges included designing a system to withstand the environments, manufacturing large structures, and re-qualifying heritage hardware. These and other challenges, if not mitigated, may have resulted in test cancellation. Ares I-X succeeded because the mission was founded on carefully derived objectives, led by decisive and flexible management, implemented by an exceptionally talented and dedicated workforce, and supported by a thorough independent review team. Other major success factors include the use of proven heritage hardware, a robust System Integration Laboratory, multi-NASA center and contractor team, concurrent operations, efficient vehicle assembly, effective risk management, and decentralized element development with a centralized control board. Ares I-X was a technically complex test that required creative thinking, risk taking, and a passion to succeed.

Askins, Bruce↗

Environmental Assurance Program for the Phoenix Mars Mission

The Phoenix Mars mission involves delivering a stationary science lander on to the surface of Mars in the polar region within the latitude band 65 deg N to 72 deg N. Its primary objective is to perform in-situ and remote sensing investigations that will characterize the chemistry of the materials at the local surface, subsurface, and atmosphere. The Phoenix spacecraft was launched on August 4, 2007 and will arrive at Mars in May 2008. The lander includes a suite of seven (7) science instruments. This mission is baselined for up to 90 sols (Martian days) of digging, sampling, and analysis. Operating at the Mars polar region creates a challenging environment for the Phoenix landed subsystems and instruments with Mars surface temperature extremes between -120 deg C to 25 deg C and diurnal thermal cycling in excess of 145 deg C. Some engineering and science hardware inside the lander were qualification tested up to 80 deg C to account for self heating. Furthermore, many of the hardware for this mission were inherited from earlier missions: the lander from the Mars Surveyor Program 2001 (MSP'01) and instruments from the MSP'01 and the Mars Polar Lander. Ensuring all the hardware was properly qualified and flight acceptance tested to meet the environments for this mission required defining and implementing an environmental assurance program that included a detailed heritage review coupled with tailored flight acceptance testing. A heritage review process with defined acceptance success criteria was developed and is presented in this paper together with the lessons learned in its implementation. This paper also provides a detailed description of the environmental assurance program of the Phoenix Mars mission. This program includes assembly/subsystem and system level testing in the areas of dynamics, thermal, and electromagnetic compatibility, as well as venting/pressure, dust, radiation, and meteoroid analyses to meet the challenging environment of this mission.

thermal testing↗

Experiment in Onboard Synthetic Aperture Radar Data Processing

Single event upsets (SEUs) are a threat to any computing system running on hardware that has not been physically radiation hardened. In addition to mandating the use of performance-limited, hardened heritage equipment, prior techniques for dealing with the SEU problem often involved hardware-based error detection and correction (EDAC). With limited computing resources, software- based EDAC, or any more elaborate recovery methods, were often not feasible. Synthetic aperture radars (SARs), when operated in the space environment, are interesting due to their relevance to NASAs objectives, but problematic in the sense of producing prodigious amounts of raw data. Prior implementations of the SAR data processing algorithm have been too slow, too computationally intensive, and require too much application memory for onboard execution to be a realistic option when using the type of heritage processing technology described above. This standard C-language implementation of SAR data processing is distributed over many cores of a Tilera Multicore Processor, and employs novel Radiation Hardening by Software (RHBS) techniques designed to protect the component processes (one per core) and their shared application memory from the sort of SEUs expected in the space environment. The source code includes calls to Tilera APIs, and a specialized Tilera compiler is required to produce a Tilera executable. The compiled application reads input data describing the position and orientation of a radar platform, as well as its radar-burst data, over time and writes out processed data in a form that is useful for analysis of the radar observations.