Search NASA⌕ Search

SEARCH · Search NASA

Results for “interrupt”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A Hybrid Approach to Estimating the Economic Value of Enhanced Power System Resilience

The costs that power interruptions impose on customers and society have emerged as essential considerations for decision making about power system reliability and resilience. There is well-established literature on the direct costs of localized and relatively short-duration power interruptions. However, far less is known about the costs of widespread and long-duration (WLD) power interruptions, especially the indirect costs and related economy-wide impacts of these events. As a result, utility planning activities generally incorporate these costs incompletely or not at all. This report proposes a new approach to estimating WLD power interruption costs to support utility resilience planning studies. Specifically, the paper describes a hybrid method that integrates: (1) empirical surveys of region- and sector-specific inherent and adaptive customer behaviors during and after power interruptions, and (2) computable general equilibrium (CGE) modeling, which estimates the direct and indirect impacts of WLD power interruptions. The report provides both a rationale for the proposed hybrid approach and a roadmap outlining how it could be implemented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration program for Omega receiver prototype microcomputer data processing

The JOLT (TM) commercial microcomputer, based on the MOS Technology 6502 processor chip, for use in Omega navigation system is evaluated. A computer program was prepared in hand-assembled code to demonstrate receiver operation. The processor provides binary processing with interrupts enabled, a carriage return is given to initialize the teleprinter, and a jump is performed to enter the program loop to wait for an interrupt. The program loop operates continuously testing the interrupt flag. The interrupt routine reads the receiver status word and determines whether the current time-slot is the A slot. If so, the interrupt flag, which is also the data index pointer, is reset to zero. The status word is stored in the status buffer. If the time-slot is not A, the interrupt flag/pointer is incremented by one to index the phase and status to the proper buffer words for later use by the print routine.

Lilley, R. W.↗

Low latency counter event indication

A hybrid counter array device for counting events with interrupt indication includes a first counter portion comprising N counter devices, each for counting signals representing event occurrences and providing a first count value representing lower order bits. An overflow bit device associated with each respective counter device is additionally set in response to an overflow condition. The hybrid counter array includes a second counter portion comprising a memory array device having N addressable memory locations in correspondence with the N counter devices, each addressable memory location for storing a second count value representing higher order bits. An operatively coupled control device monitors each associated overflow bit device and initiates incrementing a second count value stored at a corresponding memory location in response to a respective overflow bit being set. The incremented second count value is compared to an interrupt threshold value stored in a threshold register, and, when the second counter value is equal to the interrupt threshold value, a corresponding "interrupt arm" bit is set to enable a fast interrupt indication. On a subsequent roll-over of the lower bits of that counter, the interrupt will be fired.

Gara, Alan G↗

Severe weather, utility spending, and the long-term reliability of the U.S. power system

There has been a limited amount of peer-reviewed literature on long-term trends in electricity reliability including the underlying factors that impact reliability across the United States. In this analysis, we considered up to 16 years of data from 203 U S. utilities—representing about 70% of electricity sales. Annual frequency of interruptions for an average customer—at the regional and U.S. national-level—has generally decreased over this timeframe. But we do not find that there is a statistically significant trend in the annual duration of interruptions for an average customer. We find that more explicit measures of severe weather are correlated with reliability. We are able to explain 7% and 16% of past variation in the reliability metrics system average interruption duration and frequency indices, respectively, is due to severe weather—a significant improvement over earlier studies. We find that current year spending by utilities is correlated with worse reliability and that cumulative spending over the preceding three years is correlated with better reliability. Finally, we demonstrate that using a statistical instrument to represent the annual frequency of interruptions for an average customer can greatly improve analysis of trends in the annual duration of interruptions for an average customer.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

Adoption of residential solar photovoltaic+energy storage systems (PVESS) is driven by both bill savings opportunities and customer demand for backup power. Prior work by this team (Gorman et al., 2022; Gorman et al., 2023) explored PVESS backup power capabilities during long-duration power interruptions (e.g., due to severe weather events), when customers are assumed to be able to anticipate the event and charge their batteries in advance. In many cases, however, power interruptions are unpredictable (and often relatively short); for those types of events, a customer will typically set its battery to maintain some minimum capacity in reserve in case of an interruption, which reduces the capacity available for managing utility bills. This study evaluates this operational tradeoff to help customers and installers configure backup reserve settings, and to inform decision-making more generally about the customer value of backup power services compared to utility bill savings. This study utilizes Berkeley Lab’s PRESTO tool to produce stochastic simulations of (predominantly short-duration) power interruption events, and builds on an earlier case-study demonstrating PVESS backup performance during short-duration interruptions (Baik et al., 2023).

14 SOLAR ENERGY↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

This study explores tradeoffs between the use of home solar+storage systems for backup power versus day-to-day utility bill savings. The study focuses specifically on the “reserve setting” available with most home battery storage systems, which allow the customer to maintain some minimum level of storage in reserve in case of an unforeseen power interruption. The more capacity that is held in reserve, the greater the customer’s ability to ride-through possible power interruptions, but less capacity is then available to manage utility bills on a day-to-day basis. This study evaluates this operational tradeoff across a diverse set of locations and residential electricity tariff structures, relying on Berkeley Lab’s PRESTO model to stochastically simulate power interruption events, and exploring a range of sensitivities, including variations in customer value of lost load (VoLL), interruption frequency, and other key drivers. The results show that, in most circumstances, the opportunity cost of holding storage capacity in reserve, in terms of foregone bill saving, tends to outweigh any gains in reliability value associated with mitigated power interruptions. This finding is robust across tariff structures and across most of the sensitivities considered, including those related to rate level, customer load level, and storage sizing. There are a limited set of circumstances where raising the reserve setting improves the overall customer value (comprised of bill savings plus reliability value). Specifically, that exception occurs when all of the following conditions apply: (a) the customer resides in a location with exceptionally poor reliability, (b) the customer has exceptionally high VoLL; (c) the customer is on a net billing rate or on a TOU rate that allows grid discharging but not grid charging; and (d), depending on the location, the price arbitrage differential on that rate is relatively small. In all other circumstances analyzed, total customer value declines with reserve level.

14 SOLAR ENERGY↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Increasing available FIFO space to prevent messaging queue deadlocks in a DMA environment

Embodiments of the invention may be used to manage message queues in a parallel computing environment to prevent message queue deadlock. A direct memory access controller of a compute node may determine when a messaging queue is full. In response, the DMA may generate an interrupt. An interrupt handler may stop the DMA and swap all descriptors from the full messaging queue into a larger queue (or enlarge the original queue). The interrupt handler then restarts the DMA. Alternatively, the interrupt handler stops the DMA, allocates a memory block to hold queue data, and then moves descriptors from the full messaging queue into the allocated memory block. The interrupt handler then restarts the DMA. During a normal messaging advance cycle, a messaging manager attempts to inject the descriptors in the memory block into other messaging queues until the descriptors have all been processed.

97 MATHEMATICS AND COMPUTING↗

Microelectromechanical safe arm device

Microelectromechanical (MEM) apparatus and methods for operating, for preventing unintentional detonation of energetic components comprising pyrotechnic and explosive materials, such as air bag deployment systems, munitions and pyrotechnics. The MEM apparatus comprises an interrupting member that can be moved to block (interrupt) or complete (uninterrupt) an explosive train that is part of an energetic component. One or more latching members are provided that engage and prevent the movement of the interrupting member, until the one or more latching members are disengaged from the interrupting member. The MEM apparatus can be utilized as a safe and arm device (SAD) and electronic safe and arm device (ESAD) in preventing unintentional detonations. Methods for operating the MEM apparatus include independently applying drive signals to the actuators coupled to the latching members, and an actuator coupled to the interrupting member.

42 ENGINEERING↗

Preventing messaging queue deadlocks in a DMA environment

Embodiments of the invention may be used to manage message queues in a parallel computing environment to prevent message queue deadlock. A direct memory access controller of a compute node may determine when a messaging queue is full. In response, the DMA may generate and interrupt. An interrupt handler may stop the DMA and swap all descriptors from the full messaging queue into a larger queue (or enlarge the original queue). The interrupt handler then restarts the DMA. Alternatively, the interrupt handler stops the DMA, allocates a memory block to hold queue data, and then moves descriptors from the full messaging queue into the allocated memory block. The interrupt handler then restarts the DMA. During a normal messaging advance cycle, a messaging manager attempts to inject the descriptors in the memory block into other messaging queues until the descriptors have all been processed.

97 MATHEMATICS AND COMPUTING↗

Recent trends in power system reliability and implications for evaluating future investments in resiliency

Here, this study examines the relationship between annual changes in electricity reliability reported by a large cross-section of U.S. electricity distribution utilities over a period of 13 years and a broad set of potential explanatory variables, including weather and utility characteristics. We find statistically significant correlations between the average number of power interruptions experienced annually and above average wind speeds, precipitation, lightning strikes, and a measure of population density: customers per line mile. We also find significant relationships between the average number of minutes of power interruptions experienced and above average wind speeds, precipitation, cooling degree-days, and one strategy used to mitigate the impacts of severe weather: the amount of underground transmission and distribution line miles. Perhaps most importantly, we find a significant time trend of increasing annual average number of minutes of power interruptions over time—especially when interruptions associated with extreme weather are included. Lastly, the research method described in this analysis can provide a basis for future efforts to project long-term trends in reliability and the associated benefits of strategies to improve grid resiliency to severe weather—both in the U.S. and abroad.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The power reliability event simulator tool (PRESTO): A novel approach to distribution system reliability analysis and applications

The growing interest in onsite solar photovoltaic and energy storage systems is partially motivated by customer concerns regarding grid reliability. However, accurately assessing the effectiveness of PVESS in mitigating these interruptions requires a comprehensive understanding of location-specific outage patterns and the ability to simulate realistic scenarios. To address the gap, we introduce the Power Reliability Event Simulation TOol (PRESTO), the first publicly available tool that simulates location-specific power interruptions at the county level. PRESTO allows for a more realistic assessment of system reliability by considering the unpredictability and location-specific patterns of power interruptions. We applied PRESTO in a case study of a single-family home across three U.S. counties, examining the performance of a solar photovoltaic system with 10kWh of battery storage during short-duration power interruptions. Our findings show that this system reliably met 93% of energy demand for essential non-heating and cooling loads, fully serving these loads in 84% of events, despite the constraints of daily time-of-use bill management which limits the battery's state-of-charge reserve. However, when heating and cooling loads were included, system performance decreased significantly, with only 70% of demand met and full service in 43% of events. These results highlight the challenges of using solar photovoltaic and energy storage systems for short-duration outages, emphasizing the need to consider factors like battery size and grid charging strategies to improve reliability. Our study demonstrates the practical applications of PRESTO, providing valuable insights into potential mitigation strategies including grid charging and optimizing battery size.

14 SOLAR ENERGY↗

Impact of High-Dose Chemotherapy on the Ability to Deliver Subsequent Local-Regional Radiotherapy for Breast Cancer: Analysis of Cancer and Leukemia Group B Protocol 9082

Purpose: To report, from Cancer and Leukemia Group B Protocol 9082, the impact of high-dose cyclophosphamide, cisplatin, and BCNU (HD-CPB) vs. intermediate-dose CPB (ID-CPB) on the ability to start and complete the planned course of local-regional radiotherapy (RT) for women with breast cancer involving >=10 axillary nodes. Methods and Materials: From 1991 to 1998, 785 patients were randomized. The HD-CPB and ID-CPB arms were balanced regarding patient characteristics. The HD-CPB and ID-CPB arms were compared on the probability of RT initiation, interruption, modification, or incompleteness. The impact of clinical variables and interactions between variables were also assessed. Results: Radiotherapy was initiated in 82% (325 of 394) of HD-CPB vs. 92% (360 of 391) of ID-CPB patients (p = 0.001). On multivariate analyses, RT was less likely given to patients who were randomized to HD treatment (odds ratio [OR] = 0 .38, p < 0.001), older (p = 0.005), African American (p = 0.003), postmastectomy (p = 0.02), or estrogen receptor positive (p = 0.03). High-dose treatment had a higher rate of RT interruption (21% vs. 12%, p = 0.001, OR = 2.05), modification (29% vs. 14%, p = 0.001, OR = 2.46), and early termination of RT (9% vs. 2%, p = 0.0001, OR = 5.35), compared with ID. Conclusion: Treatment arm significantly related to initiation, interruption, modification, and early termination of RT. Patients randomized to HD-CPB were less likely to initiate RT, and of those who did, they were more likely to have RT interrupted, modified, and terminated earlier than those randomized to ID-CPB. The observed lower incidence of RT usage in African Americans vs. non-African Americans warrants further study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Oral Mucositis Prevention By Low-Level Laser Therapy in Head-and-Neck Cancer Patients Undergoing Concurrent Chemoradiotherapy: A Phase III Randomized Study

Purpose: Oral mucositis is a major complication of concurrent chemoradiotherapy (CRT) in head-and-neck cancer patients. Low-level laser (LLL) therapy is a promising preventive therapy. We aimed to evaluate the efficacy of LLL therapy to decrease severe oral mucositis and its effect on RT interruptions. Methods and Materials: In the present randomized, double-blind, Phase III study, patients received either gallium-aluminum-arsenide LLL therapy 2.5 J/cm{sup 2} or placebo laser, before each radiation fraction. Eligible patients had to have been diagnosed with squamous cell carcinoma or undifferentiated carcinoma of the oral cavity, pharynx, larynx, or metastases to the neck with an unknown primary site. They were treated with adjuvant or definitive CRT, consisting of conventional RT 60-70 Gy (range, 1.8-2.0 Gy/d, 5 times/wk) and concurrent cisplatin. The primary endpoints were the oral mucositis severity in Weeks 2, 4, and 6 and the number of RT interruptions because of mucositis. The secondary endpoints included patient-reported pain scores. To detect a decrease in the incidence of Grade 3 or 4 oral mucositis from 80% to 50%, we planned to enroll 74 patients. Results: A total of 75 patients were included, and 37 patients received preventive LLL therapy. The mean delivered radiation dose was greater in the patients treated with LLL (69.4 vs. 67.9 Gy, p = .03). During CRT, the number of patients diagnosed with Grade 3 or 4 oral mucositis treated with LLL vs. placebo was 4 vs. 5 (Week 2, p = 1.0), 4 vs. 12 (Week 4, p = .08), and 8 vs. 9 (Week 6, p = 1.0), respectively. More of the patients treated with placebo had RT interruptions because of mucositis (6 vs. 0, p = .02). No difference was detected between the treatment arms in the incidence of severe pain. Conclusions: LLL therapy was not effective in reducing severe oral mucositis, although a marginal benefit could not be excluded. It reduced RT interruptions in these head-and-neck cancer patients, which might translate into improved CRT efficacy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Backup power or bill savings? How electricity tariffs impact residential solar-plus-storage usage in the United States

Adoption of paired solar-plus-storage systems has accelerated in recent years, driven by both the demand for backup power and a desire to manage utility bills. Tradeoffs between those two uses can arise through the reserve setting on the battery storage system, which serves to maintain a minimum state of charge in case of a power interruption. Our paper applies an economic framework to evaluate this tradeoff in terms of changes in bill savings and customer reliability value across reserve levels, considering how those tradeoffs depend on the underlying electricity rate structure and levels. The analysis is based on a representative set of load profiles, solar profiles, tariff designs, and stochastic power interruption events across ten different regions in the United States. We find that the opportunity cost of holding storage capacity in reserve, in terms of foregone bill reductions, outweighs any gains in reliability value from mitigated power interruptions in the majority of customer situations. Higher storage reserve levels increase total customer value only in specific circumstances, such as for customers with inferior reliability (10x average interruptions), with a very high value of lost load ($50/kWh), and with tariff or interconnection rules that disallow grid charging. However, even this result is dampened when considering tariff designs with higher price differentials that increase the opportunity cost of holding storage in reserve (e.g. import/export or time-of-use rates). Allowing grid charging in tariffs essentially eliminates the necessity to hold any storage in reserve in all sensitivity cases explored.

Electric resilience↗

Probing the connections between superconductivity, stripe order, and structure in La₁.₉₀₅Ba₀.₀₉₅Cu 1-y Zn y O₄

The superconducting system La 2-x Ba x CuO₄ is known to show a minimum in the transition temperature T c at x=1/8 where maximal stripe order is pinned by the anisotropy within the CuO₂ planes that occurs in the low-temperature-tetragonal (LTT) crystal structure. For x=0.095, where T c reaches its maximum value of 32 K, there is a roughly coincident structural transition to a phase that is very close to LTT. Here, we present a neutron scattering study of the structural transition, and demonstrate how features of it correlate with anomalies in the magnetic susceptibility, electrical resistivity, thermal conductivity, and thermoelectric power. We also present measurements on a crystal with 1% Zn substituted for Cu, which reduces T c to 17 K, enhances the spin stripe order, but has much less effect on the structural transition. We make the case that the structural transition correlates with a reduction of the Josephson coupling between the CuO₂ layers, which interrupts the growth of the superconducting order. We also discuss evidence for two-dimensional superconducting fluctuations in the normal state, analyze the effective magnetic moment per Zn impurity, and consider the significance of the anomalous thermopower often reported in the stripe-ordered phase.

Wen, Jinsheng↗

Preliminary Assessment of a Propane-Air Backup System for the Anchorage, Alaska, Area

A propane-air backup system has been proposed as a method to supplement the natural gas supply in the Anchorage, Alaska, area. Companies in most industries require a back-up system for their primary energy source when there is a risk of energy interruption or when such a backup system offers a significant economic benefit. This is true especially for companies using natural gas that have loads greater than 2 million Btu per hour (Algas SDI, Inc. 2011). Many industrial processes operate continuously. An interruption in the fuel supply could halt mass production and result in major economic losses. In some cases—the glass industry, for example —fuel interruptions can be devastating, resulting not only in production losses but, potentially, in hundreds of thousands of dollars lost in capital investments. Most glass furnaces are fueled by natural gas and a disruption in natural gas service results in loss of glass production over several days. Mitigating this risk by using a back-up fuel system is imperative. Identifying a reliable and environmentally friendly energy source that will also offer the lowest possible manufacturing costs can increase a company’s competitiveness. Propane-air back-up systems allow companies to benefit from lower interruptible natural gas rates while relying on a propane-air system when needed.

Folga, Steve↗