Search NASA⌕ Search

SEARCH · Search NASA

Results for “line loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Development and Testing of a Drogue Parachute System for X-37 ALTV/B-52H Separation

Multiple scenarios were identified in which the X-37 approach and landing test vehicle (ALTV) catastrophically recontacts the B-52H carrier aircraft after separation. The most cost-effective recontact risk mitigation is the prelaunch deployment of a drogue parachute that is released after the X-37 ALTV has safely cleared the B-52H. After release, a fully-inflated drogue parachute takes 30 min to reach ground and results in a large footprint that excessively restricts the days available for flight. To reduce the footprint, a passive collapse mechanism consisting of an elastic reefing line attached to the parachute skirt was developed. At flight loads the elastic is stretched, allowing full parachute inflation. After release, drag loads drop dramatically and the elastic line contracts, reducing the frontal drag area. A 50 percent drag reduction results in an approximately 75 percent ground footprint reduction. Eleven individual parachute designs were evaluated at flight load dynamic pressures in the High Velocity Airflow System (HIVAS) at the Naval Air Warfare Center (NAWC), China Lake, California. Various options for the elastic reefing system were also evaluated at HIVAS. Two best parachute designs were selected from HIVAS to be carried forward to flight test. Detailed HIVAS test results are presented in this report.

Whitmore, Stephen A.↗

Development and Testing of a Drogue Parachute System for X-37 ALTV/B-52H Separation

Multiple scenarios were identified in which the X-37 approach and landing test vehicle (ALTV) catastrophically recontacts the B-52H carrier aircraft after separation. The most cost-effective recontact risk mitigation is the prelaunch deployment of a drogue parachute that is released after the X-37 ALTV has safely cleared the B-52H. After release, a fully-inflated drogue parachute takes 30 min to reach ground and results in a large footprint that excessively restricts the days available for flight. To reduce the footprint, a passive collapse mechanism consisting of an elastic reefing line attached to the parachute skirt was developed. At flight loads the elastic is stretched, allowing full parachute inflation. After release, drag loads drop dramatically and the elastic line contracts, reducing the frontal drag area. A 50-percent drag reduction results in an approximately 75-percent ground footprint reduction. Eleven individual parachute designs were evaluated at flight load dynamic pressures in the High Velocity Airflow System (HIVAS) at the Naval Air Warfare Center (NAWC), China Lake, California. Various options for the elastic reefing system were also evaluated at HIVAS. Two best parachute designs were selected from HIVAS to be carried forward to flight test. Detailed HIVAS test results are presented in this report.

Whitmore, Stephen A.↗

Phase protection system for ac power lines

The system described provides protection for phase sensitive loads from being or remaining connected to ac power lines whenever a phase reversal occurs. It comprises a solid state phase detection circuit, a dc power relay circuit, an ac-to-dc converter for energizing the relay circuit, and a bistable four terminal transducer coupled between the phase detection circuit and the power relay circuit, for controlling both circuits.

Wong, W. J.↗

Tunable Reduced Size Planar Folded Slot Antenna Utilizing Varactor Diodes

A tunable folded slot antenna that utilizes varactor diodes is presented. The antenna is fabricated on Rogers 6006 Duriod with a dielectric constant and thickness of 6.15 and 635 m, respectively. A copper cladding layer of 17 m defines the antenna on the top side (no ground on backside). The antenna is fed with a CPW 50 (Omega) feed line, has a center frequency of 3 GHz, and incorporates Micrometrics microwave hyper-abrupt 500MHV varactors to tune the resonant frequency. The varactors have a capacitance range of 2.52 pF at 0 V to 0.4 pF at 20 V; they are placed across the radiating slot of the antenna. The tunable 10 dB bandwidth of the 3 GHz antenna is 150 MHz. The varactors also reduce the size of the antenna by 30% by capacitively loading the resonating slot line. At the center frequency, 3 GHz, the antenna has a measured return loss of 44 dB and a gain of 1.6 dBi. Full-wave electromagnetic simulations using HFSS are presented that validate the measured data. Index Terms capacitive loading, Duriod, folded slot antenna, varactor.

Scardelletti, Maximilian C.↗

Shunt regulation electric power system

A regulated electric power system having load and return bus lines is described. A plurality of solar cells interconnected in a power supplying relationship and having a power shunt tap point electrically spaced from the bus lines is provided. A power dissipator is connected to the shunt tap point and provides for a controllable dissipation of excess energy supplied by the solar cells. A dissipation driver is coupled to the power dissipator and controls its conductance and dissipation and is also connected to the solar cells in a power taping relationship to derive operating power therefrom. An error signal generator is coupled to the load bus and to a reference signal generator to provide an error output signal which is representative of the difference between the electric parameters existing at the load bus and the reference signal generator. An error amplifier is coupled to the error signal generator and the dissipation driver to provide the driver with controlling signals.

Wright, W. H.↗

Testing and Analytical Modeling for Purging Process of a Cryogenic Line

The purging operations for cryogenic main propulsion systems of upper stage are usually carried out for the following cases: 1) Purging of the Fill/Drain line after completion of propellant loading. This operation allows the removal of residual propellant mass; and 2) Purging of the Feed/Drain line if the mission is scrubbed. The lines would be purged by connections to a ground high-pressure gas storage source. The flowrate of purge gas should be regulated such that the pressure in the line will not exceed the required maximum allowable value. Exceeding the maximum allowable pressure may lead to structural damage in the line. To gain confidence in analytical models of the purge process, a test series was conducted. The test article, a 20-cm incline line, was filled with liquid hydrogen and then purged with gaseous helium (GHe). The influences of GHe flowrates and initial temperatures were evaluated. The Generalized Fluid System Simulation Program, an in-house general-purpose computer program for flow network analysis, was utilized to model and simulate the testing. The test procedures, modeling descriptions, and the results will be presented in the final paper.

Hedayat, A.↗

Testing and Analytical Modeling for Purging Process of a Cryogenic Line

The purging operations for cryogenic main propulsion systems of upper stage are usually carried out for the following cases: 1) Purging of the Fill/Drain line after completion of propellant loading. This operation allows the removal of residual propellant mass; and 2) Purging of the Feed/Drain line if the mission is scrubbed. The lines would be purged by connections to a ground high-pressure gas storage source. The flow-rate of purge gas should be regulated such that the pressure in the line will not exceed the required maximum allowable value. Exceeding the maximum allowable pressure may lead to structural damage in the line. To gain confidence in analytical models of the purge process, a test series was conducted. The test article, a 20-cm incline line, was filled with liquid hydrogen and then purged with gaseous helium (GHe). The influences of GHe flow-rates and initial temperatures were evaluated. The Generalized Fluid System Simulation Program, an in-house general-purpose computer program for flow network analysis, was utilized to model and simulate the testing. The test procedures, modeling descriptions, and the results will be presented in the final paper.

Hedayat, A.↗

Structural Analysis of Pressurized Small Diameter Lines in a Random Vibration Environment

The pressurization and propellant feed lines for the Ares 1 Upper Stage Reaction and Roll Control Systems (ReCS and RoCS) were required to be in a high g-load random vibration flight environment. The lines connected the system components and were filled with both liquid hydrazine and gaseous helium. They are considered small and varied between one fourth to one inch in diameter. The random vibration of the lines was considered to be base excitation through the mating components and mounting hardware. It was found that reducing the amount of support structure for the lines added flexibility to the system and improved the line stresses from random vibration, but caused higher stresses from the static g-loads. The locations and number of brackets were optimized by analyzing the mode shapes of the lines causing high stresses. The use of brackets that only constrain motion in the direction of concern further reduced the stresses in the lines. Finite element analysis was used to perform the analysis. The lines were pre-stressed by temperature and internal pressure with fluid and insulation included as non-structural mass. Base excitation was added to the model using Power Spectral Density (PSD) data for the expected flight loads. The random vibration and static g-load cases were combined to obtain the total stress in the lines. This approach advances the state of the art in line analysis by using FEA to predict the stresses in the lines and to optimize the entire system based on the expected flight environment. Adding flexibility to lines has been used in piping system for temperature loads, but in flight environments flexibility has been limited for the static stresses. Adding flexibility to the system in a flight environment by reducing brackets has the benefit of reducing stresses and weight

Davis, Mark↗

Fatigue damage of notched boron/epoxy laminates under constant-amplitude loading

Fatigue damage in (0, plus or minus 45) and (0, plus or minus 45, 90) boron/epoxy laminates was studied with X-ray radiography and scanning electron microscopy. In addition, limited tests for residual strength and stiffness were performed. Initially, fatigue damage in both (0, plus or minus 45) and (0, plus or minus 45, 90) laminates occurred as intralaminar cracks around the edge of the hole. Then, whenever further damage developed, intralaminar cracks in the plus or minus 45-deg plies began to propagate from the edge of the hole. Finally, in both types of laminates, primarily plus or minus 45-deg fibers broke (prior to two-piece failure) where intralaminar cracks in the plus or minus 45-deg plies had occurred. In the (0, plus or minus 45) laminates, the 45-deg plies developed intralaminar and transthickness cracks along lines parallel to the loading axis and tangent to the hole in the test specimen. This damage, which was most pronounced under compressive loads, had little effect on either strength or stiffness. In contrast, in the (0, plus or minus 45, 90) laminates, the plus or minus 45-deg plies developed intralaminar cracks transverse to the loading axis.

Roderick, G. L.↗

Polar cap models of gamma-ray pulsars: Emision from single poles of nearly aligned rotators

We compare a new Monte Carlo simulation of polar cap models for gamma-ray pulsars with observations of sources detected above 10 MeV by the Compton Observatory (CGRO). We find that for models in which the inclination of the magnetic axis is comparable to the angular radius of the polar cap, the radiation from a single cap may exhibit a pusle with either a single broad peak as in PSR 1706-44 and PSR 1055-52, or a doubly peaked profile comparable to those observed from the Crab, Vela and Geminga pulsars. In general, double pulses are seen by observers whose line of sight penetrates into the cap interior and are due to enhanced emission near the rim. For cascades induced by culvature radiation, increased rim emission occurs even when electrons are accelerated over the entire cap, since electrons from the interior escape along magnetic field lines with less curvature and hence emit less radiation. However, we obtain better fits to the duty cycles of observed profiles if we make the empirical assumption that acceleration occurs only near the rim. In either case, the model energy spectra are consistent with most of the observed sources. The beaming factors expected from nearly aligned rotators, based on standard estimates for the cap radius, imply that their luminosities need not be as large as in the case of orthogonal rotators. However, small beam angles are also a difficutly with this model because they imply low detection probablities. In either case the polar cap radius is a critical factor, and in this context we point out that plasma loading of the field lines should make the caps larger than the usual estimates based on pure dipole fields.

Daugherty, Joseph K.↗

Lifting-surface theory for calculating the loading induced on a wing by a flap

A method is described for using lifting-surface theory to obtain the pressure distribution on a wing with a trailing-edge flap or control surface. The loading has a logarithmic singularity at the flap edges, which may be determined directly by the method of matched asymptotic expansions. Expressions are given for the singular flap loading for various flap hinge line and side edge geometries, both for steady and unsteady flap deflection. The regular part of the flap loading must be obtained by inverting the lifting-surface-theory integral equation relating the pressure and the downwash on the wing: procedures are described to accomplish this for a general wing and flap geometry. The method is applied to several example wings, and the results are compared with experimental data. Theory and test correlate well.

Johnson, W. A.↗

A use of regression analysis in acoustical diagnostics of gear drives

A study is presented of components of the vibration spectrum as the filtered first and second harmonics of the tooth frequency which permits information to be obtained on the physical characteristics of the vibration excitation process, and an approach to be made to comparison of models of the gearing. Regression analysis of two random processes has shown a strong dependence of the second harmonic on the first, and independence of the first from the second. The nature of change in the regression line, with change in loading moment, gives rise to the idea of a variable phase shift between the first and second harmonics.

Balitskiy, F. Y.↗

A practical concept for powered or tethered weight-lifting LTA vehicles

A concept for a multi-hull weightlifting airship is presented. The concept is based upon experience in the design and handling of gas-filled balloons for commercial purposes, it was first tested in April, 1972. In the flight test, two barrage balloons were joined side-by-side, with an intermediate frame, and launched in captive flight. The success of this flight test led to plans for a development program calling for a powered, piloted prototype, a follow-on 40 ton model, and a 400 ton transport model. All of these airships utilize a tetrehedric three-line tethering method for loading and unloading phases of flight, which bypasses many of the difficulties inherent in the handling of a conventional airship near the ground. Both initial and operating costs per ton of lift capability are significantly less for the subject design than for either helicopters or airships of conventional mono-hull design.

Balleyguier, M. A.↗

Shock-induced fine-grained recrystallization of olivine - Evidence against subsolidus reduction of Fe/2+/

Electron spin resonance (ESR) studies have been carried out on three single grains of terrestrial olivine (Fo90) shock loaded along the 010 line to peak pressures of 280, 330, and 440 kbar. The results indicate that neither metallic Fe similar to that observed in returned lunar soils nor paramagnetic Fe(3+) caused by oxidation of Fe(2+) has been produced in these shock experiments. Trace amounts of Mn (2+) have been detected in both shocked and unshocked olivine. The ESR signals of Mn(2+) show spectral features which are found to correlate with the degree of shock-induced recrystallization observed petrographically. The increasing mass fraction of recrystallized olivine correlates with increasing shock pressures. This phenomenon is modelled assuming it results from the progressive effect of the shock-induced transformation of the olivine to a yet unknown high-pressure phase and its subsequent reversion to the low-pressure olivine phase. The mass fraction of recrystallized material is predicted to be nearly linear with shock pressure.

Ahrens, T. J.↗

Shock-induced deformation features in terrestrial peridot and lunar dunite

Single crystals of terrestrial olivine were experimentally shock-loaded along the 010 line to peak pressures 280, 330, and 440 kbar, and the resulting deformation features were compared to those in olivine from lunar dunite 72415. Recovered fragments were examined to determine the orientation of the planar fractures. With increasing pressure the percentage of pinacoids and prisms decreases, whereas the percentage of bipyramids increases. The complexity of the distribution of bipyramids also increases with increasing pressure. Other shock-induced deformation features, including varying degrees of recrystallization, are found to depend on pressure, as observed by others. Lunar dunite 72415 was examined and found to contain olivine with well-developed shock-deformation features. The relative proportion of pinacoid, prism, and bipyramid planar fractures measured for olivine from 72415 indicates that this rock appears to have undergone shock pressure in the range 330-440 kbar. If this dunite was brought to the surface of the moon as a result of excavation of an Imbrium event-sized impact crater, the shock-pressure range experienced by the sample and the results of cratering calculations suggest that it could have originated no deeper than 50-150 km.

Snee, L. W.↗

Dual-Anode Nickel/Hydrogen Cell

Use of two hydrogen anodes in nickel/hydrogen cell reduces ohmic and concentration polarizations contributing to internal resistance, yielding cell with improved discharging performance compared to single-anode cell. Dual-anode concept incorporated into nickel/hydrogen cells of individual pressure-vessel type (for use aboard spacecraft) and common pressure-vessel type, for use on Earth to store electrical energy from photovoltaic sources, "uninterruptible" power supplies of computer and telephone systems, electric vehicles, and load leveling on power lines. Also applicable to silver/hydrogen and other metal/gas batteries.

Gahn, Randall F.↗

A comparative evaluation of in-plane shear test methods for laminated graphite-epoxy composites

The objectives were to evaluate popular shear test methods for various forms of graphite-epoxy composite materials and to determine the shear response of graphite-epoxy composites with various forms of fiber architecture. Numerical and full-field experimental stress analyses were performed on four shear test configurations for unidirectional and bidirectional graphite-epoxy laminates to assess the uniformity and purity of the shear stress (strain) fields produced in the specimen test section and to determine the material in-plane shear modulus and shear response. The test methods were the 10 deg off-axis, the +/- 45 deg tension, the Iosipescu V-notch, and a compact U-notch specimen. Specimens were prepared from AS4/3501-6 graphite-epoxy panels, instrumented with conventional strain gage rosettes and with a cross-line moire grating, and loaded in a convenient testing machine. The shear responses obtained for each test method and the two methods of specimen instrumentation were compared. In a second phase of the program the shear responses obtained from Iosipescu V-notch beam specimens were determined for woven fabric geometries of different weave and fiber architectures. Again the responses of specimens obtained from strain gage rosettes and moire interferometry were compared. Additional experiments were performed on a bidirectional cruciform specimen which was also instrumented with strain gages and a moire grating.

Morton, John↗

STS-51 pad abort. OV103-engine 2033 (ME-2) fuel flowmeter sensor open circuit

The STS-51 initial launch attempt of Discovery (OV-103) was terminated on KSC launch pad 39B on 12 Aug. 1993 at 9:12 AM E.S.T. due to a sensor redundancy failure in the liquid hydrogen system of ME-2 (Engine 2033). The event description and time line are summarized. Propellant loading was initiated on 12 Aug. 1993 at 12:00 AM EST. All space shuttle main engine (SSME) chill parameters and Launch Commit Criteria (LCC) were nominal. At engine start plus 1.34 seconds a Failure Identification (FID) was posted against Engine 2033 for exceeding the 1800 spin intra-channel (A1-A2) Fuel Flowrate sensor channel qualification limit. The engine was shut down at 1.50 seconds followed by Engines 2032 and 2030. All shut down sequences were nominal and the mission was safely aborted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 111-101, Fuel Flowrate Intra-Channel Test Channel A disqualification. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to an open circuit in a Fuel Flowrate Sensor. This type of failure has occurred eight previous times in ground testing. The sensor had performed acceptably on three previous flights of the engine and SSME flight history shows 684 combined fuel flow rate sensor channel flights without failure. The disqualification of an Engine 2 (SSME No. 2033) Fuel Flowrate sensor channel was a result of an instrumentation failure and not engine performance. All other engine operations were nominal. This disqualification resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗