Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission sequencing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Orbit Determination Accuracy Analysis of the Magnetospheric Multiscale Mission During Perigee Raise

The Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF) will provide orbit determination and prediction support for the Magnetospheric Multiscale (MMS) mission during the mission's commissioning period. The spacecraft will launch into a highly elliptical Earth orbit in 2015. Starting approximately four days after launch, a series of five large perigee-raising maneuvers will be executed near apogee on a nearly every-other-orbit cadence. This perigee-raise operations concept requires a high-accuracy estimate of the orbital state within one orbit following the maneuver for performance evaluation and a high-accuracy orbit prediction to correctly plan and execute the next maneuver in the sequence. During early mission design, a linear covariance analysis method was used to study orbit determination and prediction accuracy for this perigee-raising campaign. This paper provides a higher fidelity Monte Carlo analysis using the operational COTS extended Kalman filter implementation that was performed to validate the linear covariance analysis estimates and to better characterize orbit determination performance for actively maneuvering spacecraft in a highly elliptical orbit. The study finds that the COTS extended Kalman filter tool converges on accurate definitive orbit solutions quickly, but prediction accuracy through orbits with very low altitude perigees is degraded by the unpredictability of atmospheric density variation.

Multiscale↗

Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity

NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.

Moon missions↗

Lessons Learned from Daily Uplink Operations during the Deep Impact Mission

The daily preparation of uplink products (commands and files) for Deep Impact was as problematic as the final encounter images were spectacular. The operations team was faced with many challenges during the six-month mission to comet Tempel One of the biggest difficulties was that the Deep Impact Flyby and Impactor vehicles necessitated a high volume of uplink products while also utilizing a new uplink file transfer capability. The Jet Propulsion Laboratory (JPL) Multi-Mission Ground Systems and Services (MGSS) Mission Planning and Sequence Team (MPST) had the responsibility of preparing the uplink products for use on the two spacecraft. These responsibilities included processing nearly 15,000 flight products, modeling the states of the spacecraft during all activities for subsystem review, and ensuring that the proper commands and files were uplinked to the spacecraft. To guarantee this transpired and the health and safety of the two spacecraft were not jeopardized several new ground scripts and procedures were developed while the Deep Impact Flyby and Impactor spacecraft were en route to their encounter with Tempel-1. These scripts underwent several adaptations throughout the entire mission up until three days before the separation of the Flyby and Impactor vehicles. The problems presented by Deep Impact's daily operations and the development of scripts and procedures to ease those challenges resulted in several valuable lessons learned. These lessons are now being integrated into the design of current and future MGSS missions at JPL.

uplink↗

Sequence System Building Blocks: Using a Component Architecture for Sequencing Software

Over the last few years software engineering has made significant strides in making more flexible architectures and designs possible. However, at the same time, spacecraft have become more complex and flight software has become more sophisticated. Typically spacecraft are often one-of-a-kind entities that have different hardware designs, different capabilities, different instruments, etc. Ground software has become more complex and operations teams have had to learn a myriad of tools that all have different user interfaces and represent data in different ways. At Jet Propulsion Laboratory (JPL) these themes have collided to require an new approach to producing ground system software. Two different groups have been looking at tackling this particular problem. One group is working for the JPL Mars Technology Program in the Mars Science Laboratory (MSL) Focused Technology area. The other group is the JPL Multi-Mission Planning and Sequencing Group . The major concept driving these two approaches on a similar path is to provide software that can be a more cohesive flexible system that provides a act of planning and sequencing system of services. This paper describes the efforts that have been made to date to create a unified approach from these disparate groups.

flexible architectures↗

STS-110 Flight Day 6 Highlights

On the sixth day of the STS-110 mission, Mission Specialists Jerry Ross and Lee Morin are seen in the second extravehicular activity (EVA) of this mission to the International Space Station (ISS). The video opens with the two astronauts preparing for the EVA, which will be Ross' eighth, thereby making him the most experienced space-walker in history. This pair of astronauts has been dubbed the Silver Team, largely because they both have grandchildren. As Ross and Morin prepare for the EVA by breathing pure oxygen and experiencing reduced pressure, Mission Specialist Ellen Ochoa maneuvers the robotic arm towards the hatch of the Space Shuttle Atlantis. There is video footage of the astronauts exiting the hatch and preparing their tools and work areas. During this EVA the astronauts will install two tripod-like struts, which will serve as structural attachments between the S-0 truss segment and the Destiny Laboratory Module. While the construction takes place, helmet mounted cameras on the spacesuits provide live video of the astronauts at work, most often using a pistol grip tool used as an electric ratcheting-type drill to loosen and tighten bolts. Following the installation of the struts, Ross and Morin remove the draglinks and keelpins that had functioned to hold the S0 truss structure securely in Atlantis' payload bay during the launch sequence of the mission. They move these to temporary storage positions, bolted on the outside of the ISS. They then install an umbilical system that will provide power to the Mobile Transporter (MT).

Source record↗

Sleuthing the MSL EDL Performance from an X Band Carrier Perspective

During the Entry, Descent, and Landing (EDL) of NASA's Mars Science Laboratory (MSL), or Curiosity, rover to Gale Crater on Mars on August 6, 2012 UTC, the rover transmitted an X-band signal composed of carrier and tone frequencies and a UHF signal modulated with an 8kbps data stream. During EDL, the spacecraft's orientation is determined by its guidance and mechanical subsystems to ensure that the vehicle land safely at its destination. Although orientation to maximize telecom performance is not possible, antennas are especially designed and mounted to provide the best possible line of sight to Earth and to the Mars orbiters supporting MSL's landing. The tones and data transmitted over these links are selected carefully to reflect the most essential parameters of the vehicle's state and the performance of the EDL subsystems for post-EDL reconstruction should no further data transmission from the vehicle be possible. This paper addresses the configuration of the X band receive system used at NASA / JPL's Deep Space Network (DSN) to capture the signal spectrum of MSL's X band carrier and tone signal, examines the MSL vehicle state information obtained from the X band carrier signal only and contrasts the Doppler-derived information against the post-EDL known vehicle state. The paper begins with a description of the MSL EDL sequence of events and discusses the impact of the EDL maneuvers such as guided entry, parachute deploy, and powered descent on the frequency observables expected at the DSN. The range of Doppler dynamics possible is derived from extensive 6 Degrees-Of-Freedom (6 DOF) vehicle state calculations performed by MSL's EDL simulation team. The configuration of the DSN's receive system, using the Radio Science Receivers (RSR) to perform open-loop recording for both for nominal and off-nominal EDL scenarios, is detailed. Expected signal carrier power-to-noise levels during EDL are shown and their impact on signal detection is considered. Particular attention is given to the selection of the appropriate RSR processing bandwidths and to its configuration for real-time signal detection. The X-band carrier frequency obtained through post-processing of the open-loop recorded spectrum is given. Detection of spacecraft status and completion of key vehicle events through their Doppler signature is discussed and illustrated. This Doppler-derived information is compared against the very accurate vehicle data obtained post-EDL via MSL's UHF radio subsystem. The paper concludes with a discussion on the advantages and disadvantages of transmitting the X-band carrier and tone signal in the general context of EDL communications and lessons learned for future missions with EDL sequences are given

Mars Science Laboratory (MSL)↗

Extraterrestrial consumables production and utilization

Potential oxygen requirements for lunar-surface, lunar-orbit, and planetary missions are presented with emphasis on: (1) emergency survival of the crew, (2) provision of energy consumables for vehicles, and (3) nondependency on an earth supply of oxygen. Although many extraterrestrial resource processes are analytically feasible, this study has considered hydrogen and fluorine processing concepts to obtain oxygen or water (or both). The results are quite encouraging and are extrapolatable to other processes. Preliminary mission planning and sequencing analysis has enabled the programmatic evaluation of using lunar-derived oxygen relative to transportation cost as a function of vehicle delivery and operational capability.

Sanders, A. P.↗

Multiple rendezvous maneuvers at synchronous altitude

Rendezvous techniques between synchronous satellites were found using a cotangential elliptic phasing (CEP) transfer. This transfer is a closed elliptic orbit which is cotangent to the synchronous orbits of the chase vehicle and target satellite. The cotangent point lies on the line of apsides of the transfer orbit which coincides with the line of intersection of the synchronous orbits. The rendezvous maneuvers accomplish plane changes and phase shifts simultaneously, and these maneuvers are found to be optimal when the plane change is split equally between the velocity increments. The CEP transfer can be extended to several revolutions for a further reduction of fuel usage. A set of synchronous satellites was used in a simulated mission. An optimal sequence for rendezvous among these satellites was established such that the total sum of velocity increments is within the realm of estimated 1980 technology.

Creehan, E. J., Jr.↗

Materials Experiment Carrier - An approach to expanded space processing capability

Conceptual design studies and mission analyses within the NASA Materials Processing in Space (MPS) program of the Materials Experiment Carrier (MEC) approach to conducting near-term as well as future free-flying experiments in materials processing in space are discussed. The experimental background of the MPS program is reviewed, and it is pointed out that the use of the MEC coupled with the 25-kW power system can provide an order-of-magnitude cost savings over conventional Shuttle-based systems, as well as increased orbital stay time and microgravity stability. The determination of the physical and engineering requirements for future MEC scientific/commercial candidate payloads is then discussed, and two proposed candidates for the MEC configuration, which is intended to be a self-contained, general-purpose, versatile and reusable carrier, are illustrated. Possible MEC operations are considered, including mission profiles, deployment sequences, on-orbit payload/sample change-out, optimal power system utilization, the use of real-time, ground-based control and advanced automatic payload operation. Areas in which technology development could benefit the MEC project are also identified.

Taylor, K. R.↗

RTJ-303: Variable geometry, oblique wing supersonic aircraft

This document is a preliminary design of a High Speed Civil Transport (HSCT) named the RTJ-303. It is a 300 passenger, Mach 1.6 transport with a range of 5000 nautical miles. It features four mixed-flow turbofan engines, variable geometry oblique wing, with conventional tail-aft control surfaces. The preliminary cost analysis for a production of 300 aircraft shows that flyaway cost would be 183 million dollars (1992) per aircraft. The aircraft uses standard jet fuel and requires no special materials to handle aerodynamic heating in flight because the stagnation temperatures are approximately 130 degrees Fahrenheit in the supersonic cruise condition. It should be stressed that this aircraft could be built with today's technology and does not rely on vague and uncertain assumptions of technology advances. Included in this report are sections discussing the details of the preliminary design sequence including the mission to be performed, operational and performance constraints, the aircraft configuration and the tradeoffs of the final choice, wing design, a detailed fuselage design, empennage design, sizing of tail geometry, and selection of control surfaces, a discussion on propulsion system/inlet choice and their position on the aircraft, landing gear design including a look at tire selection, tip-over criterion, pavement loading, and retraction kinematics, structures design including load determination, and materials selection, aircraft performance, a look at stability and handling qualities, systems layout including location of key components, operations requirements maintenance characteristics, a preliminary cost analysis, and conclusions made regarding the design, and recommendations for further study.

Antaran, Albert↗

Multibody Modeling and Simulation for the Mars Phoenix Lander Entry, Descent and Landing

A multi-body flight simulation for the Phoenix Mars Lander has been developed that includes high fidelity six degree-of-freedom rigid-body models for the parachute and lander system. The simulation provides attitude and rate history predictions of all bodies throughout the flight, as well as loads on each of the connecting lines. In so doing, a realistic behavior of the descending parachute/lander system dynamics can be simulated that allows assessment of the Phoenix descent performance and identification of potential sensitivities for landing. This simulation provides a complete end-to-end capability of modeling the entire entry, descent, and landing sequence for the mission. Time histories of the parachute and lander aerodynamic angles are presented. The response of the lander system to various wind models and wind shears is shown to be acceptable. Monte Carlo simulation results are also presented.

Queen, Eric M.↗

STS-38 Space Shuttle mission report

The STS-38 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem activities on this thirty-seventh flight of the Space Shuttle and the seventh flight of the Orbiter vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of an External Tank (ET) (designated as ET-40/LWT-33), three Space Shuttle main engines (SSME's) (serial numbers 2019, 2022, 2027), and two Solid Rocket Boosters (SRB's), designated as BI-039. The STS-38 mission was a classified Department of Defense mission, and as much, the classified portions of the mission are not presented in this report. The sequence of events for this mission is shown. The significant problems that occurred in the Space Shuttle Orbiter subsystem during the mission are summarized and the official problem tracking list is presented. In addition, each Space Shuttle Orbiter problem is cited in the subsystem discussion.

Camp, David W.↗

Apollo Soyuz mission, toxic gas entered cabin during earth landing sequence

A postflight analysis is presented of the sequence which caused toxic gas to enter the cabin during repressurization for 30 seconds from manual deployment of the drogue parachutes at 18,550 feet to disabling of the reaction control system at 9600 feet. Results and conclusions are discussed.

Source record↗

Summary of attitude dynamic analysis for IMP-J wire antenna spacecraft

The work is reported in the determination of acceptable deployment sequences, simulation of EFM antenna deployment, and contingency analysis for the IMP-J S/C. The spacecraft, mission profile and deployment sequences are described along with the simulation of EFM deployment and deployment failure.

Bell, L. W.↗