Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Orbital transfer vehicle concept definition and system analysis study. Volume 2: OTV concept definition and evaluation. Book 1: Mission and system requirements

The mission and system requirements for the concept definition and system analysis of the Orbital Transfer Vehicle (OTV) are established. The requirements set forth constitute the single authority for the selection, evaluation, and optimization of the technical performance and design of the OTV. This requirements document forms the basis for the Ground and Space Based OTV concept definition analyses and establishes the physical, functional, performance and design relationships to STS, Space Station, Orbital Maneuvering Vehicle (OMV), and payloads.

Kofal, Allen E.↗

Global Precipitation Measurement (GPM) Mission: Precipitation Processing System (PPS) GPM Mission Gridded Text Products Provide Surface Precipitation Retrievals

In February 2015, the Global Precipitation Measurement (GPM) mission core satellite will complete its first year in space. The core satellite carries a conically scanning microwave imager called the GPM Microwave Imager (GMI), which also has 166 GHz and 183 GHz frequency channels. The GPM core satellite also carries a dual frequency radar (DPR) which operates at Ku frequency, similar to the Tropical Rainfall Measuring Mission (TRMM) Precipitation Radar, and a new Ka frequency. The precipitation processing system (PPS) is producing swath-based instantaneous precipitation retrievals from GMI, both radars including a dual-frequency product, and a combined GMIDPR precipitation retrieval. These level 2 products are written in the HDF5 format and have many additional parameters beyond surface precipitation that are organized into appropriate groups. While these retrieval algorithms were developed prior to launch and are not optimal, these algorithms are producing very creditable retrievals. It is appropriate for a wide group of users to have access to the GPM retrievals. However, for researchers requiring only surface precipitation, these L2 swath products can appear to be very intimidating and they certainly do contain many more variables than the average researcher needs. Some researchers desire only surface retrievals stored in a simple easily accessible format. In response, PPS has begun to produce gridded text based products that contain just the most widely used variables for each instrument (surface rainfall rate, fraction liquid, fraction convective) in a single line for each grid box that contains one or more observations.This paper will describe the gridded data products that are being produced and provide an overview of their content. Currently two types of gridded products are being produced: (1) surface precipitation retrievals from the core satellite instruments GMI, DPR, and combined GMIDPR (2) surface precipitation retrievals for the partner constellation satellites. Both of these gridded products are generated for a.25 degree x.25 degree hourly grid, which are packaged into daily ASCII (American Standard Code for Information Interchange) files that can downloaded from the PPS FTP (File Transfer Protocol) site. To reduce the download size, the files are compressed using the gzip utility.This paper will focus on presenting high-level details about the gridded text product being generated from the instruments on the GPM core satellite. But summary information will also be presented about the partner radiometer gridded product. All retrievals for the partner radiometer are done using the GPROF2014 algorithmusing as input the PPS generated inter-calibrated 1C product for the radiometer.

precipitation↗

Lean Mission Operations Systems Design - Using Agile and Lean Development Principles for Mission Operations Design and Development

The Resource Prospector Mission seeks to rove the lunar surface with an in-situ resource utilization payload in search of volatiles at a polar region. The mission operations system (MOS) will need to perform the short-duration mission while taking advantage of the near real time control that the short one-way light time to the Moon provides. To maximize our use of limited resources for the design and development of the MOS we are utilizing agile and lean methods derived from our previous experience with applying these methods to software. By using methods such as "say it then sim it" we will spend less time in meetings and more time focused on the one outcome that counts - the effective utilization of our assets on the Moon to meet mission objectives.

Operations↗

Mission operations system for Russian space Very-Long-Baseline Interferometry mission

A mission operations system developed to meet the unique requirements of the prospective Russian space VLBI mission Radioastron is described. The challenges associated with the Radioastron operations are mainly due to the interrelationship between the space-based telescope and the ground observatories, and the mission's international character. The Radioastron project includes radio observatories located in 17 different countries, tracking facilities in possibly seven different countries, orbit determination centers in Russia and USA, and widely located data processing facilities. In addition, unique scheduling constraints arise from the competing demands placed on the ground observatory time by earth-based VLBI experiments, and the tracking station time by a Japanese space interferometry mission VSOP, which is expected to be in orbit concurrently with Radioastron. A diagram illustrating the organizational structure of the Radioastron project during operations is presented.

Altunin, V. I.↗

An Overview of Scientific and Space Weather Results from the Communication/Navigation Outage Forecasting System (C/NOFS) Mission

The Communication/Navigation Outage Forecasting System (C/NOFS) Mission of the Air Force Research Laboratory is described. C/NOFS science objectives may be organized into three categories: (1) to understand physical processes active in the background ionosphere and thermosphere in which plasma instabilities grow; (2) to identify mechanisms that trigger or quench the plasma irregularities responsible for signal degradation; and (3) to determine how the plasma irregularities affect the propagation of electromagnetic waves. The satellite was launched in April, 2008 into a low inclination (13 deg), elliptical (400 x 850 km) orbit. The satellite sensors measure the following parameters in situ: ambient and fluctuating electron densities, AC and DC electric and magnetic fields, ion drifts and large scale ion composition, ion and electron temperatures, and neutral winds. C/NOFS is also equipped with a GPS occultation receiver and a radio beacon. In addition to the satellite sensors, complementary ground-based measurements, theory, and advanced modeling techniques are also important parts of the mission. We report scientific and space weather highlights of the mission after nearly four years in orbit

Pfaff, R.↗

A Multifaceted Approach to Modernizing NASA's Advanced Multi-Mission Operations System (AMMOS) System Architecture

The Advanced Multi-Mission Operations Systems (AMMOS) is NASA's premier space mission operations product line offering for use in deep-space robotic and astrophysics missions. The general approach to AMMOS modernization over the course of its 29-year history exemplifies a continual, evolutionary approach with periods of sponsor investment peaks and valleys in between. Today, the Multimission Ground Systems and Services (MGSS) office-the program office that manages the AMMOS for NASA-actively pursues modernization initiatives and continues to evolve the AMMOS by incorporating enhanced capabilities and newer technologies into its end-user tool and service offerings. Despite the myriad of modernization investments that have been made over the evolutionary course of the AMMOS, pain points remain. These pain points, based on interviews with numerous flight project mission operations personnel, can be classified principally into two major categories: 1) information-related issues, and 2) process-related issues. By information-related issues, we mean pain points associated with the management and flow of MOS data across the various system interfaces. By process-related issues, we mean pain points associated with the MOS activities performed by mission operators (i.e., humans) and supporting software infrastructure used in support of those activities. In this paper, three foundational concepts-Timeline, Closed Loop Control, and Separation of Concerns-collectively form the basis for expressing a set of core architectural tenets that provides a multifaceted approach to AMMOS system architecture modernization intended to address the information- and process-related issues. Each of these architectural tenets will be further explored in this paper. Ultimately, we envision the application of these core tenets resulting in a unified vision of a future-state architecture for the AMMOS-one that is intended to result in a highly adaptable, highly efficient, and highly cost-effective set of multimission MOS products and services.

Estefan, Jeff A.↗

The Evolving Earth Observing System (EOS) mission operations concept: Then and now

The earth observing system (EOS) mission, a component of NASA's mission to planet earth program, is considered with emphasis on its evolution. The restructuration, re-scoping, re-baselining and re-shaping of the EOS mission are reviewed. The spacecraft and the ground system concepts were re-examined and adjusted in response to the need of identifying better and more cost-effective ways of conducting earth observations while fulfilling the objective of providing comprehensive data for climate change studies. The original mission concept is compared with the current configuration, considering the operation profile and the changes in the ground system.

Kelly, Angelita Castro↗

A summary of mission and system performance requirements for large space antennas

Mission definition studies and system analyses have been described for a number of potential civilian missions and a few military missions. In this paper, an attempt is made to summarize the most formidable mission and system performance requirements for large space antennas. The emphasis will be on the civilian systems; only those aspects of military mission and system requirements that are unclassified are included.

Keafer, L. S., Jr.↗

SCOSII: ESA's new generation of mission control systems: The user's perspective

In 1974 ESOC decided to develop a reusable Mission Control System infrastructure for ESA's missions operated under its responsibility. This triggered a long and successful product development line, which started with the Multi Mission Support System (MSSS) which entered in service in 1977 and is still being used today by the MARECS and ECS missions; it was followed in 1989 by a second generation of systems known as SCOS-I, which was/is used by the Hipparcos, ERS-1 and EURECA missions and will continue to support all future ESCO controlled missions until approximately 1995. In the meantime the increasing complexity of future missions together with the emergence of new hardware and software technologies have led ESOC to go for the development of a third generation of control systems, SCOSII, which will support their future missions up to at least the middle of the next decade. The objective of the paper is to present the characteristics of the SCOSII system from the perspective of the mission control team; i.e. it will concentrate on the improvements and advances in the performance, functionality and work efficiency of the system.

Kaufeler, P.↗

CHANGO: A Software Tool for Boost Stage Guidance of the Space Launch System Exploration Mission 1

The Space Launch System (SLS) Exploration Mission 1 (EM-1) test flight will use open-loop guidance for Boost Stage (BS) flight. A table of attitude commands as a function of altitude, called the chi table, will be loaded onto the flight computers. The chi table will be generated using the measured winds on launch day by the Chi Angle Optimizer (CHANGO) software tool. Details of CHANGO’s design are given, including a Three Degrees-of-Freedom (3-DOF) simulation and a numerical minimization routine. CHANGO’s use in launch day operations is also described.

Ahmad, Naeem↗

Space construction system analysis study: Project systems and missions descriptions

Three project systems are defined and summarized. The systems are: (1) a Solar Power Satellite (SPS) Development Flight Test Vehicle configured for fabrication and compatible with solar electric propulsion orbit transfer; (2) an Advanced Communications Platform configured for space fabrication and compatible with low thrust chemical orbit transfer propulsion; and (3) the same Platform, configured to be space erectable but still compatible with low thrust chemical orbit transfer propulsion. These project systems are intended to serve as configuration models for use in detailed analyses of space construction techniques and processes. They represent feasible concepts for real projects; real in the sense that they are realistic contenders on the list of candidate missions currently projected for the national space program. Thus, they represent reasonable configurations upon which to base early studies of alternative space construction processes.

Source record↗