Search NASA⌕ Search

SEARCH · Search NASA

Results for “notification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Summary of the Seattle Urban Area Consequence Management Guidance for a Wide-Area Biological Attack

A terrorist attack involving a release of biological warfare agent in the Seattle urban area would require decision-makers to make a host of important, and sometimes untested, choices concerning how best to respond and recover. This technical supplement supports the Puget Sound Regional Biological Attack Recovery Plan Annex to the Regional Catastrophic Plan, which structures the region’s response and recovery approach, by providing technical details on how to conduct a biological remediation. More specifically, the technical supplement identifies the principal issues that must be addressed following a wide-area release of aerosolized Bacillus anthracis (B. anthracis) spores; explains the resources that are available to address the release; sets forth strategies to reduce the time required for consequence management; and focuses on remediation options, procedures, and tools that can be implemented today should such an incident occur. The content is intended to be used with the Interim Consequence Management Guidance for a Wide-Area Biological Attack (LLNL 2009). A second and related purpose of this technical supplement is to serve as a detailed guide for other geographical regions interested in formulating their own consequence management plans. This technical supplement is funded by, and was developed as part of, the Interagency Biological Restoration Demonstration (IBRD) program—a collaborative effort among Department of Homeland Security, Department of Defense, and numerous other Federal, state, and local agencies—to improve the nation’s ability to respond to and recover from a wide-area biological incident. Content of the technical supplement follows the six-phase diagram for responding to and recovering from a biological contamination incident (see Figure 1 on the next page), which represents a consensus scheme developed after multi-agency review and approval. Whereas the focus of the document is on remediation/cleanup activities, the topics of response and recovery structure (Section 2), notification (Section 3), and initial response (also known as first response, Section 4) are discussed relatively briefly because some early decisions related to those three topics can affect subsequent decisions pertaining to remediation and potentially affect timelines and overall effectiveness.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Orchestrating Distributed Resource Ensembles for Petascale Science

Distributed, data-intensive computational science applications of interest to DOE scientific com- munities move large amounts of data for experiment data management, distributed analysis steps, remote visualization, and accessing scientific instruments. These applications need to orchestrate ensembles of resources from multiple resource pools and interconnect them with high-capacity multi- layered networks across multiple domains. It is highly desirable that mechanisms are designed that provide this type of resource provisioning capability to a broad class of applications. It is also important to have coherent monitoring capabilities for such complex distributed environments. In this project, we addressed these problems by designing an abstract API, enabled by novel semantic resource descriptions, for provisioning complex and heterogeneous resources from multiple providers using their native provisioning mechanisms and control planes: computational, storage, and multi-layered high-speed network domains. We used an extensible resource representation based on semantic web technologies to afford maximum flexibility to applications in specifying their needs. We evaluated the effectiveness of provisioning using representative data-intensive ap- plications. We also developed mechanisms for providing feedback about resource performance to the application, to enable closed-loop feedback control and dynamic adjustments to resource allo- cations (elasticity). This was enabled through development of a novel persistent query framework that consumes disparate sources of monitoring data, including perfSONAR, and provides scalable distribution of asynchronous notifications.

97 MATHEMATICS AND COMPUTING↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Audits Made Simple

A company just got notified there is a big external audit coming in 3 months. Getting ready for an audit can be challenging, scary, and full of surprises. This Gold Paper describes a typical audit from notification of the intent to audit through disposition of the final report including Best Practices, Opportunities for Improvement (OFI), and issues that must be fixed. Good preparation can improve the chances of success. Ensuring the auditors understand the environment and requirements is paramount to success. It helps the auditors understand that the enterprise really does think that security is important. Understanding and following a structured process ensures a smooth audit process. Ensuring follow-up on OFIs and issues in a structured fashion will also make the next audit easier. It is important to keep in mind that the auditors will use the previous report as a starting point. Now the only worry is the actual audit and subsequent report and how well the company has done. “Virtualization, mobilization, and cloud technology have created new points of entry into business, leaving them vulnerable to covert cyber-attacks,” states a report by Ernst & Young. Executives are struggling with the potential for a data breach, and resolving this business risk is high on their agenda. While most audit committee members are financially solid, they lack knowledge of technology issues, making understanding of this risk difficult. Success with an audit helps management understand the risk management is accepting, highlight gaps in security, and generate ideas on how to improve. These results are an important aspect of managing the business risk.

97 MATHEMATICS AND COMPUTING↗

Dynamic Analysis Methods for Detecting Anomalies in Asynchronously Interacting Systems

Detecting modifications to digital system designs, whether malicious or benign, is problematic due to the complexity of the systems being analyzed. Moreover, static analysis techniques and tools can only be used during the initial design and implementation phases to verify safety and liveness properties. It is computationally intractable to guarantee that any previously verified properties still hold after a system, or even a single component, has been produced by a third-party manufacturer. In this paper we explore new approaches for creating a robust system design by investigating highly-structured computational models that simplify verification and analysis. Our approach avoids the need to fully reconstruct the implemented system by incorporating a small verification component that dynamically detects for deviations from the design specification at run-time. The first approach encodes information extracted from the original system design algebraically into a verification component. During run-time this component randomly queries the implementation for trace information and verifies that no design-level properties have been violated. If any deviation is detected then a pre-specified fail-safe or notification behavior is triggered. Our second approach utilizes a partitioning methodology to view liveness and safety properties as a distributed decision task and the implementation as a proposed protocol that solves this task. Thus the problem of verifying safety and liveness properties is translated to that of verifying that the implementation solves the associated decision task. We develop upon results from distributed systems and algebraic topology to construct a learning mechanism for verifying safety and liveness properties from samples of run-time executions.

97 MATHEMATICS AND COMPUTING↗

Intermittent Renewable Management Pilot Phase 2

The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets. The customer had the option of committing to either three contiguous hour blocks for 24 days or six contiguous hours for 12 days a month with day-ahead notification that aligned with the CAISO integrated forward market. As a result of their being available, the customer was paid $10/ kilowatt (kW)-month for capacity in addition to CAISO energy settlements. The participants were limited to no more than a 2 megawatt (MW) capacity with a six-month commitment. Four participants successfully engaged in the pilot. In this report, we provide the description of the pilot, participant performance results, costs and value to participants as well as outline some of the issues encountered through the pilot. Results show that participants chose to participate with storage and the value of CAISO settlements were significantly lower than the capacity payments provided by the utility as incentive payments. In addition, this pilot revealed issues both on the participant side and system operations side. These issues are summarized in the report.The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets.

99 GENERAL AND MISCELLANEOUS↗

Center for Efficiency in Sustainable Energy Systems

The main goal of the Center for Efficiency in Sustainable Energy Systems is to produce a methodology that evaluates a variety of energy systems. Task I. Improved Energy Efficiency for Industrial Processes: This task, completed in partnership with area manufacturers, analyzes the operation of complex manufacturing facilities to provide flexibilities that allow them to improve active-mode power efficiency, lower standby-mode power consumption, and use low cost energy resources to control energy costs in meeting their economic incentives; (2) Identify devices for the efficient transformation of instantaneous or continuous power to different devices and sections of industrial plants; and (3) use these manufacturing sites to demonstrate and validate general principles of power management. Task II. Analysis of a solid oxide fuel cell operating on landfill gas: This task consists of: (1) analysis of a typical landfill gas; (2) establishment of a comprehensive design of the fuel cell system (including the SOFC stack and BOP), including durability analysis; (3) development of suitable reforming methods and catalysts that are tailored to the specific SOFC system concept; and (4) SOFC stack fabrication with testing to demonstrate the salient operational characteristics of the stack, including an analysis of the overall energy conversion efficiency of the system. Task III. Demonstration of an urban wind turbine system: This task consists of (1) design and construction of two side-by-side wind turbine systems on the YSU campus, integrated through power control systems with grid power; (2) preliminary testing of aerodynamic control effectors (provided by a small business partner) to demonstrate improved power control, and evaluation of the system performance, including economic estimates of viability in an urban environment; and (3) computational analysis of the wind turbine system as an enabling activity for development of smart rotor blades that contain integrated sensor/actuator/controller modules to enhance energy capture and reduce aerodynamic loading and noise by way of virtual aerodynamic shaping. Accomplishments: Task I. Improved Energy Efficiency for Industrial Processes: We organized an energy management training session held on February 22, 2011, which was advertised through a regional manufacturing association to provide wide-ranging notification. Over two dozen companies were represented a the seminar, ranging from heavy manufacturing businesses with $5,000,000 per year energy expenses, to small, light manufacturing facilities. Task 2. Landfill Fuel Cell Power Generation Solid Oxide Fuel Cells (SOFCs) were constructed and evaluated as a means of obtaining electrical energy from landfill gas. Analysis of landfill gas. Attempts at collecting gas samples at the landfill and evaluating them on campus were still unsuccessful. Even a Teflon® sample bag would lose its H2S content. Evaluation of Gas Clean-up We consider this a confirmation of the CO2 effect on the solubility of H2S in water making much less sulfide available for the photocatalyst. It also means that another method should be employed to clean up landfill gas. Nonetheless, composition of impurities in landfill gas was reduced sufficiently to allow successful operation of the test fuel cell. Comparison to a PEM fuel cell system. If a PEMFC were to be operated with landfill gas as the fuel, the gas would have to be treated for sulfur removal, and then processed in a reformer large enough to drive the equilibrium far toward the products, so that negligible CO would flow into the fuel cell. Analysis of a fuel cell running on landfill gas. Using a Gow-Mac gas chromatograph with a thermal conductivity detector, unambiguous determination of CO can be made, at least as a primary constituent Task 3: Task 3 Plasma Controlled Turbine Blades Wind Turbine Selection. After carefully reviewing the various model available in the market the team selected the ARE 110 (2.5kW). The ARE 110 provides a very long life with little maintenance due to their relatively low rotational speeds (low RPM). The turbines large swept area (10.2ms2/110sq.ft), high-efficiency blades, purpose built alternator, and optimized power electronics ensure maximum energy capture from a wide range of wind speeds. Two wind turbines were installed side-by-side at the Melnick Hall site to compare their performance. Evaluate and Optimize Aerodynamically Enhanced Turbine Blades Due to delays in the installation of the wind turbines, no actual data was obtained within the contract period. At this time, the turbines are installed and operational at YSU with standard blades. We are in contact with Orbital Research and in discussion as to how best the required data can be obtained.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fault Tolerance Assistant (FTA): An Exception Handling Programming Model for MPI Applications

Future high-performance computing systems may face frequent failures with their rapid increase in scale and complexity. Resilience to faults has become a major challenge for large-scale applications running on supercomputers, which demands fault tolerance support for prevalent MPI applications. Among failure scenarios, process failures are one of the most severe issues as they usually lead to termination of applications. However, the widely used MPI implementations do not provide mechanisms for fault tolerance. We propose FTA-MPI (Fault Tolerance Assistant MPI), a programming model that provides support for failure detection, failure notification and recovery. Specifically, FTA-MPI exploits a try/catch model that enables failure localization and transparent recovery of process failures in MPI applications. We demonstrate FTA-MPI with synthetic applications and a molecular dynamics code CoMD, and show that FTA-MPI provides high programmability for users and enables convenient and flexible recovery of process failures.

97 MATHEMATICS AND COMPUTING↗

EERE Showcase Event (Solar Decathlon 2015)

The goal of the Orange County Great Park Corporation (Great Park) is to successfully host the U.S. Department of Energy Solar Decathlon 2015. In furtherance of that goal, tasks to be performed within the current reporting period include the following: Task 1.0 Arrange Site Team Visits for January 2015 The Great Park arranged appropriate meeting space for the site team visits over a three-day period, January 8, 2015 through January 10, 2015. Instead of a meeting in Hanger 244, the DOE requested a different meeting space. The working team met in the Operations offices on January 8th. The student teams were welcomed at the City of Irvine’s Lakeview Senior Center on January 9th, and came back on January 10th for breakout sessions. Task 2.0 Outreach Activities The following outreach activities related to the U.S. Department of Energy Solar Decathlon 2015 occurred during and prior to the event: • Promoted the return of the Solar Decathlon 2015 on the City’s website. (cityofirvine.org) • Promoted the return of the Solar Decathlon 2015 through the City’s and Great Park’s social media channels, including Facebook and Twitter. (facebook.com/cityofirvine, facebook.com/orangecountygreatpark, twitter.com/City_of_Irvine, twitter.com/ocgreatpark) • Promoted the return of the Solar Decathlon 2015 and student visit through a City Council Announcement. • Worked to set-up meetings between the U.S. Department of Energy team and potential donors/key stakeholders in Irvine. • Began ICTV filming and coverage of the Solar Decathlon 2015 teams. This includes student team interviews, interview with Richard King and b-roll footage. • Facilitated an interview with Sarah Farrar and the Orange County Register during the recent student visit in January • Information in May was provided to Irvine Unified School District and Tustin Unified School District promoting the three Education Days that the DOE will host during the event. More DOE information is due in August, which will be forwarded to the school districts that will provide important information for school tours. • A promotional ICTV video has been sent through the Irvine Chamber of Commerce and to dozens of businesses in Irvine promoting the Solar Decathlon 2015 and inviting attendance. • Cover story of Fall Inside Irvine magazine detailed teams competing in Solar Decathlon. Magazine goes to more than 100,000 Irvine residences. • Produced public service announcement with KPCC radio to air 9/28-10/16. Outreach also included a web banner on the station’s website. • Full-page advertisements in special sections of the Orange County Register, including UCI 50th Anniversary magazine that went to over 1 million readers of the Register, the Riverside Press Enterprise and the L.A. Times; Best of Orange County magazine; and Solar Decathlon special section. • Full-page ad in Urban Land magazine Sept./Oct. issue. • Produced ad for Irvine Global Village Festival brochure (tens of thousands in attendance at event.) • Ten posters displayed at Irvine Company properties throughout the City, including the Irvine Spectrum Center. • Rack cards promoting Solar Decathlon displayed at Irvine Spectrum Center, Discovery Science Center, Orange County Farm Bureau (at farmers markets) and at City facilities. • Tote bags promoting Solar Decathlon filled with magnets and rack cards on the event distributed at Irvine Global Village Festival, Great Park farmers market and UCI Festival of Discovery; some 8,000 bags handed out. • E-blast from City of Irvine Community Services Department included information on Solar Decathlon. (List contains 51,000 recipients.) • E-blast to Irvine Co. mailing list sent out 9/30. Web banner posted at shopirvinespectrumcenter.com. • E-blast sent to Orange County Register mailing list on 10/6. • Web banner posted on Orange County Register’s homepage. • E-blast sent by Irvine Chamber of Commerce on 10/9. • E-blast using City’s GovDelivery to 2,100 on 10/12. • Produced additional ads for the Orange County Register to fulfill the in-kind agreement between the DOE and the Register: Friday, Oct. 9, Local front page strip ad; Saturday, Oct. 10, half-page Home & Garden section ad; Sunday, Oct. 11, full page Local section ad; Wednesday, Oct. 14, ½ page Main or Local ad; Friday, Oct. 16, full Local or Main section ad; Saturday, Oct. 17, half-page Home & Garden section ad; Sunday Oct. 18, full page Local or Main ad. • Produced two additional Register ads promoting final days of the event: Full page Main or Local ad for Thursday, Oct. 15 and full page ad in Irvine World News weekly publication. • Produced separate press releases on Solar Decathlon, Volunteer Effort, Children’s Activities Area and Final Days. • Produced and distributed Children’s Activities Days rack cards. • Continued to promote the event on the City’s webpage, Great Park webpage and social media channels. • ICTV produced the “Solar Decathlon Minute” videos, which were posted on the City’s YouTube channel and the solardecathlon.gov website. • Four-minute video promoting Solar Decathlon shown on iShuttles in the City in weeks leading up to event. • Promoted a “Business Day” to local businesses in which businesses could sign up for tour led by Solar Decathlon docents. • Access Irvine Special Event Button running 9/28-10/18/15. • Access Irvine Push Notification on 10/15/15. • Facebook ad boost 10/13-10/18.

14 SOLAR ENERGY↗

Data Validation Package May 2016 Groundwater Sampling at the Lakeview, Oregon, Processing Site August 2016

This biennial event includes sampling five groundwater locations (four monitoring wells and one domestic well) at the Lakeview, Oregon, Processing Site. For this event, the domestic well (location 0543) could not be sampled because no one was in residence during the sampling event (Note: notification was provided to the resident prior to the event). Per Appendix A of the Groundwater Compliance Action Plan, sampling is conducted to monitor groundwater quality on a voluntary basis. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). One duplicate sample was collected from location 0505. Water levels were measured at each sampled monitoring well. The constituents monitored at the Lakeview site are manganese and sulfate. Monitoring locations that exceeded the U.S. Environmental Protection Agency (EPA) Secondary Maximum Contaminant Levels for these constituents are listed in Table 1. Review of time-concentration graphs included in this report indicate that manganese and sulfate concentrations are consistent with historical measurements.

2016 Groundwater Sampling Lakeview, Oregon↗

Multi-static Serial LiDAR for Surveillance and Identification of Marine Life at MHK Installations

Final Report for project DE-EE0006787: Multi-static Serial LiDAR for Surveillance and Identification of Marine Life at MHK Installations. This project developed and tested an optical monitoring system prototype that will be suitable for marine and hydrokinetic (MHK) full project lifecycle observation (baseline, commissioning, and decommissioning), with automated real-time classification of marine animals. This system can be deployed to collect pre-installation baseline species observations at a proposed deployment site with minimal post-processing overhead. To satisfy deployed MHK project species of concern (e.g. Endangered Species Act-listed) monitoring requirements, the system provides automated tracking and notification of the presence of managed animals within established perimeters of MHK equipment and provides high resolution imagery of their behavior through a wide range of conditions. During a project’s decommissioning stage, the system can remain installed to provide resource managers with post-installation data. Our technology, known as an Unobtrusive Multi-static Serial LiDAR Imager (UMSLI), is a technology transfer of underwater distributed LiDAR imaging technology that preserves the advantages of traditional optical and acoustic solutions while overcoming associated disadvantages for MHK environmental monitoring applications. This new approach is a purposefully-designed, reconfigurable adaptation of an existing technology that can be easily mounted on or around different classes of MHK equipment. The system uses low average power red (638nm) laser illumination to be invisible and eye-safe to marine animals and is compact and cost effective. The equipment is designed for long term, maintenance-free operations, to inherently generate a sparse primary dataset that only includes detected anomalies (animal presence information), and to allow robust real-time automated animal classification/identification with a low data bandwidth requirement. Advantages of the technology over others currently being used or being considered for MHK monitoring include: Unlike a conventional camera, the depth of field is near-infinite and limited by attenuation (approximately 5-8 m) rather than focal properties of a lens; Operation in an adaptive mode which can project a sparse grid of pulses with higher peak power for longer range detection (>10 meters) and track animals within a zone of interest with high resolution imagery for identification of marine life at closer range (<5m); System detection limit and Signal-to-Noise-Ratio is superior to a camera, due to rejection of both backscattering component and ambient solar background; Multiple wide-angle pulsed laser illuminators and bucket detectors can be flexibly configured to cover a 4pi steradian (i.e. omnidirectional) scene volume, while also retrieving 3D features of animal targets from timing information; Process and classification framework centered around a novel active learning and incremental classification classifier that enables accurate identification of a variety of marine animals automatically; A two-tiered monitoring architecture and invisible watermarking-based data archiving and retrieving approach ensures significant data reduction while preserving high fidelity monitoring. A methodology to train and optimize the classifier for target species of concern to optimize site monitoring effectiveness. This technological innovation addresses a high priority regulatory requirement to observe marine life interaction near MHK projects. Our solution improves resource manager confidence that any interactions between marine animals and equipment are observed in a cost-effective and automated manner. Without EERE funding, this novel application of multi-static LiDAR would not have been available to the MHK community for environmental monitoring.

16 TIDAL AND WAVE POWER↗

After Action Report: Idaho National Lab 2017 Exercise September 20, 2017

The purpose of this report is to document the results of the 2017 annual exercise conducted on September 20, 2017 at the Idaho National Laboratory (INL). This exercise was conducted in coordination with other INL contractors and applicable local jurisdictions, Department of Energy Idaho Operations Office (DOE ID), and DOE Headquarters (DOE HQ). The INL contractor, Battelle Energy Alliance, LLC (BEA) conducted the annual emergency exercise to demonstrate appropriate response measures to mitigate an event and protect the health and safety of personnel, the environment, and property. Offsite response organizations participated in the notification process to demonstrate appropriate response measures. This exercise evaluation serves as a management assessment of the performance for the INL Emergency Management (EM) Program.

99 GENERAL AND MISCELLANEOUS↗

After Action Report: Idaho National Laboratory Continuity of Operations Program 2017 Exercise September 26, 2017

On September 26, 2017, the Battelle Energy Alliance, LLC (BEA) Continuity of Operations Program (COOP) conducted an annual exercise to demonstrate the COOP responder’s ability to maintain COOP’s primary mission essential function (PMEF) and essential supporting activities (ESAs) during a national loss of commercial power caused by a malware attack to the United States power grid. The continuity emergency management team (CEMT) and continuity emergency response group (CERG) responded to CERG notifications and worked through simulated challenges, using COOP’s 3-D scenario visualization tool (3DSVT), that challenged COOP’s PMEF, essential support activities (ESAs), and impacted mission critical personnel’s human capital. The PMEF and ESAs were successfully maintained as the CERG developed incident action plans through several phases of the scenario, addressing appropriate needs, concerns and strategic planning.

99 GENERAL AND MISCELLANEOUS↗

National Renewable Energy Laboratory Environmental Performance Report for 2009 (Annual Site Environmental Report per DOE Orders 231.1 and 5400.1)

This report presents a summary of NREL's environmental protection programs and activities for CY 2009. It is organized according to the different environmental media (e.g., air, waste, ground water, etc.), and includes a brief summary of how the program is managed in that area, any permitting or notification efforts that have been completed during the reporting period or are ongoing, andactivities that have occurred during the reporting period in that environmental area. A description of the environmental condition and features of NREL's sites is also included to provide a basis for the program overview.

54 ENVIRONMENTAL SCIENCES↗

2020 Exascale Computing Project Annual Meeting (Executive Summary Report)

The Exascale Computing Project (ECP) delivers specific applications, software products, and outcomes on DOE computing facilities. Integration across these elements for specific hardware technologies for exascale system instantiations is fundamental to ECP success. The outcome of the ECP is the delivery of a capable exascale computing ecosystem to provide breakthrough solutions addressing our most critical challenges in scientific discovery, energy assurance, economic competitiveness, and national security. This outcome is not a matter of ensuring more powerful computing systems. The ECP is designed to create more valuable and rapid insights from a wide variety of applications (“capable”), which requires a much higher level of inherent efficacy in all methods, software tools, and ECP-enabled computing technologies to be acquired by DOE laboratories (“ecosystem”). The ECP annual meeting provides a unique opportunity for the core technical expertise in the United States focused on achieving this next plateau of computational science and computing performance to engage in direct discussions on project execution. Face-to-face gatherings in technical communities like this are common and needed for the exchange of scientific ideas and technical performance. The ECP annual meeting stands apart from other technical conferences and meetings in the computing community as it is uniquely and solely focused on the execution of the ECP and the integration of technical activities leading to the creation of the exascale computing ecosystem for the future. The direct interaction of key critical technical staff, who are leaders in their respective fields, and the resulting give-and-take between software, applications, and hardware and the technical co-design therein, is unique and essential to the effective execution of the ECP. The first annual meeting was held in Knoxville, Tennessee, January 31 – February 2, 2017 and brought together, for the first time, a diverse collection of researchers from 16 DOE national laboratories as well as university computer and computational science researchers to discuss shared problems and joint solutions for the development of a capable exascale computing ecosystem. These interactions resulted in focused technical plans and an energized community centered on advances for ECP. The second annual meeting was held in Knoxville, Tennessee, February 5–9, 2018. It included 643 individual thought leaders and performers in application development, software research and deployment, and hardware research and integrators, all of whom are part of the multifaceted, billion dollar HPC community. This meeting provided a platform to discuss and disseminate numerous examples where researchers with common goals and synergistic solutions came together for the first time to deliver tangible results. Additionally, at the 2018 meeting, ECP researchers had the opportunity to digest all US HPC vendor R&D product roadmaps pointing to exascale – not only to learn how their research can play a role, but, more importantly, to influence those roadmaps to ensure successful delivery on DOE applications that will contribute to (if not solve) problems of national interest in national security, science, energy, and health, as well as growing security threats. The third annual meeting was held in Houston, Texas, January 14–17, 2019. With a 19% increase in the number of registrations (768 people), and the change in location, the third annual meeting was considered the most impactful of the three at the time. The new website provided a better platform for the dissemination of the content, the new venue as a meeting hotel instead of a conference center facilitated interactions and discussions after event hours, and the addition of an award-winning mobile event conference app (Whova) transformed dramatically the attendee experience at the event. This fourth annual meeting was held in Houston, Texas, February 3-7, 2020. This meeting had an increase in the number of attendees for a total of 824 people registered (782 attendees) and included numerous enhancements based on feedback and lessons learned from previous meetings, some of which are listed here: Improved quality of the sessions, their material and the whole program.; Had more industry participation and addition of external collaborators from overseas.; Published the full agenda earlier to better accommodate attendance and travel plans based on schedule.; Centralized all sessions in one venue.; Provided additional hotels and room blocks for the attendees.; Improved communication with the audience (links, material, directions, notifications, etc.) to go paperless.; Enhanced side meeting scheduling, management and user experience.; Made available additional space and tables for impromptu meetings and side discussions.; Improved IT and A/V solutions for speakers. In addition, our final survey captured the following points as opportunities for improvement in future meetings: consider a different meeting location that is more pedestrian friendly, reduce talks during working meals to allow more collaboration and informal time, adapt the agenda to acknowledge attendees from different timezones, consider recording some of the tutorials and/or sessions to share broadly with the HPC community, have a larger poster room, provide additional power strips, and improve the WiFi.

97 MATHEMATICS AND COMPUTING↗

Final Fugitive Dust Control NOV Causal Report

On June 30, 2020, a Notice of Violation (NOV) was issued by the City of Albuquerque (COA) Environmental Health Department, Air Quality Program. The NOV identified two violations of New Mexico Administrative Code (NMAC) 20.11.20, Fugitive Dust Control, stemming from an August 30, 2019 inspection of the construction site at Sandia/New Mexico (SNL/NM) Building 812. After the August 30 inspection, a Post-Instruction Notification (PIN) was issued to the SNL Construction Facilities Manager. The PIN was acknowledged by Department 4722 and sent to the COA on September 13, 2020 via email. The PIN "Comply by" date was September 13, 2019 was transmitted by National Nuclear Security Administration/ Sandia Field Office (NNSA/SFO) to COA offices on November 12, 2019. The PIN response was 48 business days past due for various reasons which were explored during the causal analysis.

54 ENVIRONMENTAL SCIENCES↗

MACCS (MELCOR Accident Consequence Code System) User Guide

The MELCOR Accident Consequence Code System (MACCS) is used by Nuclear Regulatory Commission (NRC) and various national and international organizations for probabilistic consequence analysis of nuclear power accidents. This User Guide is intended to assist analysts in understanding the MACCS/WinMACCS model and to provide information regarding the code. This user guide version describes MACCS Version 3.10.0. Features that have been added to MACCS in subsequent versions are described in separate documentation. This User Guide provides a brief description of the model history, explains how to set up and execute a problem, and informs the user of the definition of various input parameters and any constraints placed on those parameters. This report is part of a series of reports documenting MACCS. Other reports include the MACCS Theory Manual, MACCS Verification Report, Technical Bases for Consequence Analyses Using MACCS, as well as documentation for preprocessor codes including SecPop, MelMACCS, and COMIDA2. PAPERWORK REDUCTION ACT STATEMENT The NUREG does not contain information collection requirements and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 USC 3501, et seq.). PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. ACKNOWLEDGEMENTS Contributions to this User Guide were received from NRC and Sandia National Laboratories (SNL) project managers, technical experts, and code authors dedicated to the production of a valuable resource for the MACCS user community. Instructions and guidance included herein were developed over many years and include advancements in the code that provide users the ability to develop complex consequence modeling scenarios. WinMACCS and many of the early MACCS developments were due to vision of an earlier Project Manager, Jocelyn Mitchell. Jonathan Barr and AJ Nosek also contributed to the development of this report. The current NRC Project Manager, Salman Haq, provided the leadership to ensure this document was completed. Several other NRC and Sandia staff provided insights supporting development of the MACCS code and of this document.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

GMS Station SOH Monitoring Configuration Guide (V.1.2)

The GMS Station State-of-Health (SOH) monitoring capability provides the system controller the ability to view current SOH values and calculated statistics for stations and channels, view trend plots of SOH values, be notified when station SOH status changes, and acknowledge or quiet notifications while the station issues are being investigated. The SOH monitoring capability includes components to acquire CD 1.1 protocol station data, extract SOH information from the raw data packets, process the raw SOH information for display, store the SOH information, and display the SOH information in an interactive display. All these components use system and processing configuration to provide the system controller mission-relevant information about station health. This document is a guide to setting the processing configuration for GMS SOH monitoring.

97 MATHEMATICS AND COMPUTING↗