Search NASA⌕ Search

SEARCH · Search NASA

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

STS-51, RSRM-033, 360T033 KSC processing configuration and data report

KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build up, motor assembly, and closeout for STS-51, RSRM flight set 360T033. Section 2.0 contains a summary of RSRM-033 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-033 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-033 flow. Section 7.0 provides recommendations for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumable information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

Hillard, Robert C.↗

STS-56, RSRM-031, 360L031 KSC processing configuration and data report

KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

Source record↗

NASA's Next Generation Launch Technology Program - Strategy and Plans

The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.

Hueter, Uwe↗

Emergency Response Manual

Safety and security is very important at NASA. The Security Management and Safeguards Office goal is ensure safety and security for all NASA Lewis and Plum Brook Station visitors and workers. The office protects against theft, sabotage, malicious damage, espionage, and other threats or acts of violence. There are three types of security at NASA: physical, IT, and personnel. IT is concerned with sensitive and classified information and computers. Physical security includes the officers who check visitors and workers in and patrol the facility. Personnel security is concerned with background checks during hiring. During my internship, I met people from and gained knowledge about all three types of security. I primarily worked with Dr. Richard Soppet in physical security. During my experience with physical security, I observed and worked with many aspects of it. I attended various security meetings at both NASA Lewis and Plum Brook. The meetings were about homeland security and other improvements that will be made to both facilities. I also spent time with a locksmith. The locksmith makes copies of keys and unlocks doors for people who need them. I rode around in a security vehicle with an officer as he patrolled. I also observed the officer make a search of a visitor s vehicle. All visitors vehicles are searched upon entering NASA. I spent time and observed in the dispatch office. The officer answers calls and sends out officers when needed. The officer also monitors the security cameras. My primary task was completing an emergency response manual. This manual would assist local law enforcement and fire agencies in case of an emergency. The manual has pictures and descriptions of the buildings. It also contains the information about hazards inside of the buildings. This information will be very helpul to law enforcement so that when called upon during an emergency, they will not create an even bigger problem with collateral damage.

Barnett, Traci M.↗

Training Artemis Astronauts to Explore the Moon

To prepare for human exploration of the Moon in the mid-2020s, NASA is developing a program to provide geoscience and planetary science classroom training and geologic eld training to astronauts and other mission personnel. The Artemis geoscience training plan builds on a long legacy: NASA has trained astronauts in geology, planetary science, and geological eld work for more than 50 years. From ~1965-1972, the geology focus for astronauts included orbital Earth observations during the early NASA missions, but the endgame was preparation for the Apollo missions to the Lunar surface [see Phinney (2015), NASA-SP-2015-626; Lofgren et al.(2011);Schmitt, et al. (2011); and El Baz (2011), all from GSA SP483]. From the mid 1970s through2017, the primary purpose for geoscience training was to prepare astronauts to observe theEarth and document a wide variety of Earth processes from orbital platforms (Skylab, SpaceShuttle and International Space Station). Astronaut observations of Earth from the InternationalSpace Station remain an important activity today, but the prospect of exploration of the lunar surface through the Artemis Program lends additional purpose to the geoscience content and eld experiences that we provide the astronauts. We recently completed the geology and eld training with Astronaut Class 22 and are now planning both focused eld exercises and simulations for future Artemis crews, as well as the accompanying classroom lessons on lunar and planetary sciences. The training we offer extends beyond the astronaut office – we partner across operational and engineering organizations at NASA and provide eld work exercises and opportunities to personnel in the Flight Operations Directorate (responsible for the overall training and certification), as well as the exploration Extravehicular Activity Oce (developing spacewalk suits and tools). These partnerships contribute to building a common language and sense of purpose, and also help to ensure that NASA’s geoscience training and science operations are fully integrated with the teams and systems responsible for getting the next generation of astronauts to the surface of the Moon.

Artemis↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Oklahoma NASA EPSCoR

The mission of Oklahoma EPSCoR is to make Oklahoma researchers more successful in competing for research funding. Specific goals, objectives, and strategies were developed for each federal EPSCoR program, based on federal and state needs. A theme of stimulating collaboration among campuses and building on common research strengths is a strong component of the Oklahoma EPSCoR strategic plan. It extends also to our relationships with the federal agencies, and wherever possible, Oklahoma EPSCoR projects are developed collaboratively with federal research laboratories and program offices. Overall, Oklahoma EPSCoR seeks to capitalize on unique research capabilities and opportunities. The NASA EPSCoR Program in Oklahoma was developed through this grant as a joint effort between Oklahoma EPSCoR and the NASA Oklahoma Space Grant Consortium (OSGC). The major goal of the Oklahoma NASA EPSCoR Plan established in 1996 is to develop an academic research enterprise directed towards a long-term, self-sustaining, nationally competitive capability in areas of mutual self-interest to NASA and Oklahoma. Our final technical summary pie chart demonstrates the strong successes we have achieved during this period as a result of the award.

Snowden, Victoria Duca↗

Control-structure-thermal interactions in analysis of lunar telescopes

The lunar telescope project was an excellent model for the CSTI study because a telescope is a very sensitive instrument, and thermal expansion or mechanical vibration of the mirror assemblies will rapidly degrade the resolution of the device. Consequently, the interactions are strongly coupled. The lunar surface experiences very large temperature variations that range from approximately -180 C to over 100 C. Although the optical assemblies of the telescopes will be well insulated, the temperature of the mirrors will inevitably fluctuate in a similar cycle, but of much smaller magnitude. In order to obtain images of high quality and clarity, allowable thermal deformations of any point on a mirror must be less than 1 micron. Initial estimates indicate that this corresponds to a temperature variation of much less than 1 deg through the thickness of the mirror. Therefore, a lunar telescope design will most probably include active thermal control, a means of controlling the shape of the mirrors, or a combination of both systems. Historically, the design of a complex vehicle was primarily a sequential process in which the basic structure was defined without concurrent detailed analyses or other subsystems. The basic configuration was then passed to the different teams responsible for each subsystem, and their task was to produce a workable solution without requiring major alterations to any principal components or subsystems. Consequently, the final design of the vehicle was not always the most efficient, owing to the fact that each subsystem design was partially constrained by the previous work. This procedure was necessary at the time because the analysis process was extremely time-consuming and had to be started over with each significant alteration of the vehicle. With recent advances in the power and capacity of small computers, and the parallel development of powerful software in structural, thermal, and control system analysis, it is now possible to produce very detailed analyses of intermediate designs in a much shorter period of time. The subsystems can thus be designed concurrently, and alterations in the overall design can be quickly adopted into each analysis; the design becomes an iterative process in which it is much easier to experiment with new ideas, configurations, and components. Concurrent engineering has the potential to produce efficient, highly capable designs because the effect of one subystem on another can be assessed in much more detail at a very early point in the program. The research program consisted of several tasks: scale a prototype telescope assembly to a 1 m aperture, develop a model of the telescope assembly by using finite element (FEM) codes that are available on site, determine structural deflections of the mirror surfaces due to the temperature variations, develop a prototype control system to maintain the proper shape of the optical elements, and most important of all, demonstrate the concurrent engineering approach with this example. In addition, the software used for the finite element models and thermal analysis was relatively new within the Program Development Office and had yet to be applied to systems this large or complex; understanding the software and modifying it for use with this project was also required. The I-DEAS software by Structural Dynamics Research Corporation (SDRC) was used to build the finite element models, and TMG developed by Maya Heat Transfer Technologies, Ltd. (which runs as an I-DEAS module) was used for the thermal model calculations. All control system development was accomplished with MATRIX(sub X) by Integrated Systems, Inc.

Thompson, Roger C.↗

Mission Overview and Status IGARSS Conference

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Scheduled for launch in January 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). The PACE project office at NASA’s GSFC is responsible for the satellite development, launch and operations. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which will include field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The mission is planned for launch into a Sun synchronous polar orbit at 676.5 km with an inclination of 98 degrees and a 1 pm local ascending node crossing time. The PACE observatory is comprised of three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The OCI is the primary instrument on the observatory and is being developed at Goddard Space Flight Center (GSFC). The OCI is a hyperspectral scanning radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and atmospheric aerosol science [2]. The HARP2 and SPEXone are complimentary instruments on the PACE observatory, acquired outside of GSFC. The HARP2 is multi-spectral, wide swath (supporting atmospheric correction of OCI), and hyper-angular, with capabilities for cloud science that exceed what is capable from OCI alone. The SPEXone is narrow swath, multi-angular, and hyperspectral, with capabilities for atmospheric aerosol science that exceed what can be accomplished with OCI. NASA Headquarters directed the mission development to be guided by a Design-to-Cost (DTC) process. All elements of the mission, other than the cost, are in the DTC trade space. At the heart of the DTC process are the mission studies, performed across all the mission elements. The mission studies were used to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. Baseline mission requirements are a product of the mission studies and are defined by the project office as part of the DTC process. At the time of this writing, OCI, HARP2 and SPEXone are integrated onto the PACE spacecraft, creating the PACE observatory. The instruments and spacecraft subsystems are undergoing combined functional performance testing in preparation for observatory-level environmental testing prior to shipment to the launch site. Here, we will provide an update on science capabilities and observatory readiness for its early 2024 launch.

remote sensing↗

An Integrated Architecture Study for Autonomous Lunar Construction

Lunar construction is an expanding field within NASA’s Moon to Mars objectives that presents many challenges and requires innovative and reliable forms of autonomous operations on the surface of the Moon to further the technologies needed for human space exploration. Marshal Space Flight Center’s (MSFC) Advanced Concepts Office (ACO) addressed Lunar Infrastructure Objective LI-4 l by developing a Pre-Phase A, integrated architecture to inform a demonstration for lunar construction operations. The ACO study traded three architectures that would survey and prepare a construction area to build a landing pad out of lunar regolith using MMPACT (Moon-to-Mars Planetary Autonomous Construction Technology) platforms, rovers, and navigation outposts. The main trades examined navigation for the system/architecture, options for rover navigation, battery vs continuous tether power for the MMPACT robotic arm, and assigning site prep functionality to the rovers vs the platforms. Results of the study determined that the best options for the scenario provided would be local navigation (more accurate and continuous), a combination of Light Detection and Ranging (LiDAR) for initial site mapping with subsequent Smart Video Guidance Sensors (SVGS) to save power for construction, and using tethered power to decrease mission duration. The team also concluded that assigning site prep functionality to either the rovers or the platforms has benefits and challenges; future studies could explore having that functionality on both the rovers and platforms. Lastly, the team provided a Concept of Operations (ConOps) timeline that can be used in real-time ground demonstrations to explore the mission timeline, construction processes, autonomous operations, and communication systems that can be tested using MSFC’s lunar regolith field and Lunar Utilization Control Area (LUCA).

Sarah Triana↗

STS-114: Discovery Shuttle Processing Overview Briefing

This video of a briefing to representatives from the national media took the form of a slide show presentation by Jon Cowart, Manager of the Resident Office at Johnson Space Center. The presentation was an overview of ground maintainance facilities and procedures at Kennedy Space Center used to support Space Shuttle operations. The photographs in the slide show: Shuttle ground transport, maintenance, computers, and payloads, the Vehicle Assembly Building, ground operations, launch operations, crew boarding, liftoff, Pad A and Pad B, Solid Rocket Motor retrieval, crew procedures on-orbit, and landing. After the presentation is a brief question and answer session, in which reporters ask Cowart about Shuttle readiness, changes in Shuttle operations made for the Return to Flight, and how weather affects Shuttle operations.

Source record↗

NASA’s Safety, Reliability, and Mission Assurance Digital Future

The evolution from “document-centric” to “data-centric” and “model-centric” information leveraging structured data and model-based approaches is at the heart of digital engineering transformational efforts underway across industry and government. It is these approaches that pave the way for data lakes, Authoritative Sources of Truth (ASOTs), and systems- of-systems interoperability and the corresponding transformational benefits thereof. Such benefits include increased data availability, data access equity, data traceability, real-time analytics, batch analytics, and (most importantly) acceleration of the time-to-value and time-to-insights associated with engineering products and analyses. The longer-term benefits of reusability, customization and traceability are even more promising. For Safety and Mission Assurance (SMA), and Mission Success (SMS) activities; realization of such benefits is essential to provide engineers and analysts alike vital information when needed to support critical decision making throughout the entire life cycle. The SMA community often operate in parallel with engineering activities, for which information exchange with relevant context is paramount. Far too often, such information lags key decision points and/or is absent of the robust, integrated, knowledge needed, given inherent barriers associated with traditional document-centric means to data sharing, analysis, and reporting. This paper provides an overview of how NASA’s Office of Safety and Mission Assurance (OSMA) is evolving its policies, standards, guidance, and training to transform to eliminate such barriers, thus realizing the benefits emerging in this new digital era. A roadmap for achieving this digital future is presented along with key building blocks involving use and implementation of concepts such as: Objectives-Hierarchies, Objective-Driven Requirements, Accepted Standards, Safety and Assurance Cases, data digitization (i.e., ontologies, structured data, and model-centric data), FAIR (Findable, Accessible, Interoperable, & Reusable) and/or FAIRUST (Findable, Accessible, Interoperable, Reusable, Understandable, Secure, and Trusted) principles [1]. This paper also describes how OSMA, leveraging the Agency’s overall commitment to Digital Transformation (DT), is using the power of Policy, “Digital” Domain representation, Product Evolution, and Community Outreach and Engagement as part of a strategic vision and roadmap to evolve and transform its SMA organizations to become better able to serve its stakeholders and customers. Future publications will elaborate on these building blocks and deeper concepts.

Authoritative Source of Truth (ASOT),↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration directs NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. This decision was reached after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by building on the Apollo Program and other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Snoddy, Jim↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo-era experts to derive other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, William D.↗

Creation and Implementation of a Workforce Development Pipeline Program at MSFC

Within the context of NASA's Education Programs, this Workforce Development Pipeline guide describes the goals and objectives of MSFC's Workforce Development Pipeline Program as well as the principles and strategies for guiding implementation. It is designed to support the initiatives described in the NASA Implementation Plan for Education, 1999-2003 (EP-1998-12-383-HQ) and represents the vision of the members of the Education Programs office at MSFC. This document: 1) Outlines NASA s Contribution to National Priorities; 2) Sets the context for the Workforce Development Pipeline Program; 3) Describes Workforce Development Pipeline Program Strategies; 4) Articulates the Workforce Development Pipeline Program Goals and Aims; 5) List the actions to build a unified approach; 6) Outlines the Workforce Development Pipeline Programs guiding Principles; and 7) The results of implementation.

Hix, Billy↗

Learning to Fly: The Wright Brothers' Adventure. A Guide for Educators and Students with Activities in Aeronautics

This guide was produced by the NASA Glenn Research Center Office of Educational Programs in Cleveland, OH, and the NASA Aerospace Educational Coordinating Committee. It includes activity modules for students, including the history of the Wright Brothers and their family in Dayton, Ohio and flight experimentation in Kitty Hawk, North Carolina. Student activities such as building models of the Wright Brothers glider and writing press releases of the initial flight are included.

WILBUR WRIGHT↗