Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Autonomous Navigation Using Celestial Objects

In the twenty-first century, National Aeronautics and Space Administration (NASA) Enterprises envision frequent low-cost missions to explore the solar system, observe the universe, and study our planet. Satellite autonomy is a key technology required to reduce satellite operating costs. The Guidance, Navigation, and Control Center (GNCC) at the Goddard Space Flight Center (GSFC) currently sponsors several initiatives associated with the development of advanced spacecraft systems to provide autonomous navigation and control. Autonomous navigation has the potential both to increase spacecraft navigation system performance and to reduce total mission cost. By eliminating the need for routine ground-based orbit determination and special tracking services, autonomous navigation can streamline spacecraft ground systems. Autonomous navigation products can be included in the science telemetry and forwarded directly to the scientific investigators. In addition, autonomous navigation products are available onboard to enable other autonomous capabilities, such as attitude control, maneuver planning and orbit control, and communications signal acquisition. Autonomous navigation is required to support advanced mission concepts such as satellite formation flying. GNCC has successfully developed high-accuracy autonomous navigation systems for near-Earth spacecraft using NASA's space and ground communications systems and the Global Positioning System (GPS). Recently, GNCC has expanded its autonomous navigation initiative to include satellite orbits that are beyond the regime in which use of GPS is possible. Currently, GNCC is assessing the feasibility of using standard spacecraft attitude sensors and communication components to provide autonomous navigation for missions including: libration point, gravity assist, high-Earth, and interplanetary orbits. The concept being evaluated uses a combination of star, Sun, and Earth sensor measurements along with forward-link Doppler measurements from the command link carrier to autonomously estimate the spacecraft's orbit and reference oscillator's frequency. To support autonomous attitude determination and control and maneuver planning and control, the orbit determination accuracy should be on the order of kilometers in position and centimeters per second in velocity. A less accurate solution (one hundred kilometers in position) could be used for acquisition purposes for command and science downloads. This paper provides performance results for both libration point orbiting and high Earth orbiting satellites as a function of sensor measurement accuracy, measurement types, measurement frequency, initial state errors, and dynamic modeling errors.

Folta, David↗

Precise orbit determination for NASA's earth observing system using GPS (Global Positioning System)

An application of a precision orbit determination technique for NASA's Earth Observing System (EOS) using the Global Positioning System (GPS) is described. This technique allows the geometric information from measurements of GPS carrier phase and P-code pseudo-range to be exploited while minimizing requirements for precision dynamical modeling. The method combines geometric and dynamic information to determine the spacecraft trajectory; the weight on the dynamic information is controlled by adjusting fictitious spacecraft accelerations in three dimensions which are treated as first order exponentially time correlated stochastic processes. By varying the time correlation and uncertainty of the stochastic accelerations, the technique can range from purely geometric to purely dynamic. Performance estimates for this technique as applied to the orbit geometry planned for the EOS platforms indicate that decimeter accuracies for EOS orbit position may be obtainable. The sensitivity of the predicted orbit uncertainties to model errors for station locations, nongravitational platform accelerations, and Earth gravity is also presented.

Williams, B. G.↗

A Self Contained Method for Safe and Precise Lunar Landing

The return of humans to the Moon will require increased capability beyond that of the previous Apollo missions. Longer stay times and a greater flexibility with regards to landing locations are among the many improvements planned. A descent and landing system that can land the vehicle more accurately than Apollo with a greater ability to detect and avoid hazards is essential to the development of a Lunar Outpost, and also for increasing the number of potentially reachable Lunar Sortie locations. This descent and landing system should allow landings in more challenging terrain and provide more flexibility with regards to mission timing and lighting considerations, while maintaining safety as the top priority. The lunar landing system under development by the ALHAT (Autonomous precision Landing and Hazard detection Avoidance Technology) project is addressing this by providing terrain-relative navigation measurements to enhance global-scale precision, an onboard hazard-detection system to select safe landing locations, and an Autonomous GNC (Guidance, Navigation, and Control) capability to process these measurements and safely direct the vehicle to this landing location. This ALHAT landing system will enable safe and precise lunar landings without requiring lunar infrastructure in the form of navigation aids or a priori identified hazard-free landing locations. The safe landing capability provided by ALHAT uses onboard active sensing to detect hazards that are large enough to be a danger to the vehicle but too small to be detected from orbit, given currently planned orbital terrain resolution limits. Algorithms to interpret raw active sensor terrain data and generate hazard maps as well as identify safe sites and recalculate new trajectories to those sites are included as part of the ALHAT System. These improvements to descent and landing will help contribute to repeated safe and precise landings for a wide variety of terrain on the Moon.

Paschall, Stephen C., II↗

Shuttle tethered operations: The effect on orbital trajectory and inertial navigation

The first full scale test of a large tethered satellite system is planned. The Orbiter will be linked to a 500 kg payload by a 20 km tether, an action with a profound effect on the trajectory of the Orbiter. For the first time in the history of the Shuttle program, the vehicle will conduct prolonged operations with the center of mass of the orbiting system a significant distance from the center of mass of the Space Shuttle Orbiter, a violation of the fundamental assumption made in both the Orbiter ground-based and onboard navigation software. Inertial navigation of tethered operations with the Shuttle is further complicated by the presence of non-conservative forces in the system: Reaction Control System (RCS) translational effects, atmospheric drag, and electro-magnetic dynamics. These can couple with the conservative tether dynamics effects, and degrade the navigation software performance. The primary effects are examined on the Orbiter's trajectory, coupling by conservative forces during tethered operations, and the impact of both on the ability to meet inertial navigation constraints. The impact of electrodynamics, different RCS control modes, commanded attitudes, and attitude deadbands are presented. Operational guidelines which optimize successful mission navigation, and necessary navigation constraints are discussed.

Lardas, Mark N.↗

First In-Orbit Experience of TerraSAR-X Flight Dynamics Operations

TerraSAR-X is an advanced synthetic aperture radar satellite system for scientific and commercial applications that is realized in a public-private partnership between the German Aerospace Center (DLR) and the Astrium GmbH. TerraSAR-X was launched at June 15, 2007 on top of a Russian DNEPR-1 rocket into a 514 km sun-synchronous dusk-dawn orbit with an 11-day repeat cycle and will be operated for a period of at least 5 years during which it will provide high resolution SAR-data in the X-band. Due to the objectives of the interferometric campaigns the satellite has to comply to tight orbit control requirements, which are formulated in the form of a 250 m toroidal tube around a pre-flight determined reference trajectory (see [1] for details). The acquisition of the reference orbit was one of the main and key activities during the Launch and Early Orbit Phase (LEOP) and had to compensate for both injection errors and spacecraft safe mode attitude control thruster activities. The paper summarizes the activities of GSOC flight dynamics team during both LEOP and early Commissioning Phase, where the main tasks have been 1) the first-acquisition support via angle-tracking and GPS-based orbit determination, 2) maneuver planning for target orbit acquisition and maintenance, and 3) precise orbit and attitude determination for SAR processing support. Furthermore, a presentation on the achieved results and encountered problems will be addressed.

Kahle, R.↗

Jovian Plasma Torus Interaction with Europa: 3D Hybrid Kinetic Simulation. First results

The hybrid kinetic model supports comprehensive simulation of the interaction between different spatial and energetic elements of the Europa-moon-magnetosphere system with respect to variable upstream magnetic field and flux or density distributions of plasma and energetic ions, electrons, and neutral atoms. This capability is critical for improving the interpretation of the existing Europa flyby measurements from the Galileo orbiter mission, and for planning flyby and orbital measurements, (including the surface and atmospheric compositions) for future missions. The simulations are based on recent models of the atmosphere of Europa (Cassidy etal.,2007;Shematovichetal.,2005). In contrast to previous approaches with MHD simulations, the hybrid model allows us to fully take into account the finite gyro radius effect and electron pressure, and to correctly estimate the ion velocity distribution and the fluxes along the magnetic field (assuming an initial Maxwellian velocity distribution for upstream background ions).Non-thermal distributions of upstream plasma will be addressed in future work. Photoionization,electron-impact ionization, charge exchange and collisions between the ions and neutrals are also included in our model. We consider two models for background plasma:(a) with O(++) ions; (b) with O(++) and S(++) ions. The majority of O2 atmosphere is thermal with an extended cold population (Cassidyetal.,2007). A few first simulations already include an induced magnetic dipole; however, several important effects of induced magnetic fields arising from oceanic shell conductivity will be addressed in later work.

Lipatov, A. S.↗

Jovian Plasmas Torus Interaction with Europa. Plasma Wake Structure and Effect of Inductive Magnetic Field: 3D Hybrid Kinetic Simulation

The hybrid kinetic model supports comprehensive simulation of the interaction between different spatial and energetic elements of the Europa moon-magnetosphere system with respect to a variable upstream magnetic field and flux or density distributions of plasma and energetic ions, electrons, and neutral atoms. This capability is critical for improving the interpretation of the existing Europa flyby measurements from the Galileo Orbiter mission, and for planning flyby and orbital measurements (including the surface and atmospheric compositions) for future missions. The simulations are based on recent models of the atmosphere of Europa (Cassidy et al., 2007; Shematovich et al., 2005). In contrast to previous approaches with MHD simulations, the hybrid model allows us to fully take into account the finite gyroradius effect and electron pressure, and to correctly estimate the ion velocity distribution and the fluxes along the magnetic field (assuming an initial Maxwellian velocity distribution for upstream background ions). Photoionization, electron-impact ionization, charge exchange and collisions between the ions and neutrals are also included in our model. We consider the models with Oþ þ and Sþ þ background plasma, and various betas for background ions and electrons, and pickup electrons. The majority of O2 atmosphere is thermal with an extended non-thermal population (Cassidy et al., 2007). In this paper, we discuss two tasks: (1) the plasma wake structure dependence on the parameters of the upstream plasma and Europa's atmosphere (model I, cases (a) and (b) with a homogeneous Jovian magnetosphere field, an inductive magnetic dipole and high oceanic shell conductivity); and (2) estimation of the possible effect of an induced magnetic field arising from oceanic shell conductivity. This effect was estimated based on the difference between the observed and modeled magnetic fields (model II, case (c) with an inhomogeneous Jovian magnetosphere field, an inductive magnetic dipole and low oceanic shell conductivity).

Jovian magnetosphere↗

Low-Earth-Orbiter resource allocation and capacity planning for the DSN using LEO4CAST

The Deep Space Network provides tracking and communication services for a number of U.S. and international low-Earth-orbiting (LEO) and near-Earth missions. This service is supplied by the 26-m subnet (located at each of the DSN complexes), the 9-m and the 34-m Antenna Research System antennas at Goldstone, and the 11-m antennas (following the orbital VLBI mission). An increasing number of LEO missions are planned for DSN support, which will result in increasingly complex ground resource allocation and mission support trades. To support TDA decision making on mission support and cost-effective ground system evolution for this 26-m subnet, LEO4CAST has been developed. LEO4CAST is a tool that uses statistical approaches to provide useful information for long-term ground system capacity planning and near-term resource allocation (prior to detailed time-of-day scheduling). LEO4CAST is currently beta-test software and is being exercised by both the Office of Telecommunications and Data Acquisition (TDA) and the JPL Systems Division.

Fox, G.↗

The Dawn of Vesta Science

The Dawn mission is part of NASA's Discovery Program and has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total ?V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Fullpower thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ?V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 210 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of approximately 2,735 km. To date the IPS has been operated for 23,621 hours, consumed approximately 252 kg of xenon, and provided a delta-V of approximately 6.7 km/s. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. The only significant issue in over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in the Digital Control and Interface Unit-1 (DCIU-1), resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture restored DCIU-1 to full functionality. After about three weeks of Survey orbit operations the IPS will be used to transfer the spacecraft to the other planned science orbit altitudes. After approximately one year of science operations the IPS will be used for escape from Vesta and then for thrusting to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of science operations at Vesta.

electric propulsion↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

Dunbar, J. C.↗

Conversion Of Classical Orbital Elements

OSMEAN is sophisticated program that converts between osculating and mean classical orbital elements. Enables engineer to exploit advantages of each approach for design and planning or orbital trajectories and maneuvers. Converts mean elements to osculating elements or vice-versa. Conversion based on mathematical modeling of all first-order aspherical terrestrial, lunar, and solar gravitational perturbations plus second-order aspherical term based on second-degree central-body zonal perturbation. Written in FORTRAN 77.

Guinn, Joseph R.↗

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

Source record↗

The X-33/VentureStar Program

The VentureStar reusable launch vehicle is discussed in this viewgraph presentation. The objectives of the VentureStar program are reviewed: (1) expendables cost too much, (2) commercial space market is growing (3) meets NASA's goals, (4) Users want fast ground turnaround, (5) users want quick access to space, (6) the offline payload processing saves time, (7) low cost access to space will enable new markets. Flight tests of the X-33, which was designed to test the technology and is pictured in several slides, built credibility for VentureStar. One slide shows the dimensions, weight, length, LEO payload capacity, and the propulsion, in comparison for the X-33, the VentureStar, the Space Shuttle, the Proton D-1e, and the Ariane V. Yet other slides outline the vehicle's features, the plan for the operation of the vehicle, from the runway, to the pad, to orbit. The planned containerized payload operation will allow for a 7 day turnaround for the system, which will allow for the planned 40 flights per year.

Laube, J.↗

James Webb Space Telescope Navigation Optimization Challenges

The James Webb Space Telescope (JWST) is a NASA flagship mission launched on December 25, 2021. The early orbit phase was highlighted by three midcourse correction burns that were performed to maneuver the vehicle into a libration orbit at the second Sun-Earth-Moon (SEM) libration point (L2). During the coast to L2, the vehicle’s primary observatory and sunshield were deployed. Once the tennis-court-sized sunshield was unfurled and tensioned into place, the large area exposed to solar radiation pressure (SRP) dictated that the SRP force model would need to account for the vehicle’s geometry, reflective properties, and orientation relative to the Sun. Following the insertion of JWST into its L2 libration orbit on January 24, 2022, the commissioning phase for the vehicle’s observatory commenced along with the first cycle of routine station-keeping maneuvers. The NASA Goddard Space Flight Center’s Flight Dynamics Facility (FDF) provides navigation services for the JWST mission. The FDF serves as the prime or backup navigation operations center for more than 30 active missions spanning a wide array of flight regimes performing orbit determination, maneuver planning, trajectory optimization, and tracking data evaluation. Definitive orbit determination for JWST is performed by the FDF using an Extended Kalman Filter (EKF) to estimate the vehicle’s trajectory and reflective properties using Deep Space Network (DSN) TRK-2-34 tracking data and spacecraft attitude telemetry. For the purposes of orbit prediction and station-keeping maneuver targeting, the sensitivity of the SRP force to the vehicle’s orientation requires that predictive attitude information must be incorporated to generate accurate orbit predictions and maneuver plans. Predictive attitude plans are provided to the FDF by the JWST Spacecraft Operations Center (SOC). Short-term (28 day) orbit predictions are propagated using a Short Range Attitude Plan (SRAP) to model the vehicle’s future attitude states for up to a week. SRAP attitude data is highly reliable, as it reflects finalized planned attitude states that the vehicle will be commanded to attain during the ensuing week. A Long Range Attitude Plan (LRAP) can be implemented to model predicted attitude states beyond one week, but these predictions are tentative and subject to revision due to changes in science operations plans. Instead, a conservative approach of applying a Sun-Pointing Neutral (SPN) attitude configuration is utilized for long-term (2 year) orbit predictions where reliable planned attitude data is not available. SPN attitude mode aligns the net SRP force along the JWST-to-Sun vector where it becomes independent of the vehicle’s angle of rotation about this vector, defined as the Sun yaw. Given the dynamic instability of the libration orbit, station-keeping thrust must be applied in either the sunward or anti-sunward direction to balance the resulting orbit. The attitude constraints of the vehicle also impose limits on the available pointing directions for station-keeping thrusters. The thrusters cannot be aligned with the optimal pointing direction for sunward maneuvers, rendering sunward maneuvers to be significantly less fuel efficient than anti-sunward maneuvers. Consequently, station-keeping maneuvers must be targeted to balance the orbit while ensuring that the next maneuver will also be performed in the anti-sunward direction to optimize propellant usage. When targeting a station-keeping maneuver, the attitude and SRP modeling configuration which is applied to the predicted post-maneuver trajectory will dictate the direction of the subsequent station-keeping maneuver, assuming nominal propulsion system performance. If the predicted post-maneuver attitude states result in an SRP model which under-predicts the cumulative SRP impact on the post-maneuver orbit, a targeted anti-sunward maneuver will be larger than necessary and the next maneuver will need to be executed sunward in order to compensate. In contrast, an anti-sunward maneuver which is targeted using an SRP model which over-predicts the cumulative SRP impact will achieve station-keeping while ensuring that the next maneuver will likewise be performed anti-sunward. For this reason, station-keeping maneuvers are targeted while applying the SPN attitude mode, as this mode entails the largest possible SRP area cross-section and therefore a larger modeled cumulative SRP impact. This paper documents the NASA Goddard Space Flight Center’s FDF support for JWST on-orbit operations and the analysis projects undertaken utilizing the experiences and data accumulated throughout the first full year of routine science operations. The results of these analysis efforts have been used to implement improvements to orbit prediction accuracy and maneuver efficiency which have the potential to prolong the lifespan of JWST to continue to conduct ground-breaking infrared astronomy for decades to come.

Flight Dynamics↗

Slow Solar Wind Connection Science during Solar Orbiter's First Close Perihelion Passage

The Slow Solar Wind Connection Solar Orbiter Observing Plan (Slow Wind SOOP) was developed to utilize the extensive suite of remote-sensing and in situ instruments on board the ESA/NASA Solar Orbiter mission to answer significant outstanding questions regarding the origin and formation of the slow solar wind. The Slow Wind SOOP was designed to link remote-sensing and in situ measurements of slow wind originating at open–closed magnetic field boundaries. The SOOP ran just prior to Solar Orbiter's first close perihelion passage during two remote-sensing windows (RSW1 and RSW2) between 2022 March 3–6 and 2022 March 17–22, while Solar Orbiter was at respective heliocentric distances of 0.55–0.51 and 0.38–0.34 au from the Sun. Coordinated observation campaigns were also conducted by Hinode and IRIS. The magnetic connectivity tool was used, along with low-latency in situ data and full-disk remote-sensing observations, to guide the target pointing of Solar Orbiter. Solar Orbiter targeted an active region complex during RSW1, the boundary of a coronal hole, and the periphery of a decayed active region during RSW2. Postobservation analysis using the magnetic connectivity tool, along with in situ measurements from MAG and SWA/PAS, showed that slow solar wind originating from two out of three of the target regions arrived at the spacecraft with velocities between ∼210 and 600 km s −1 . The Slow Wind SOOP, despite presenting many challenges, was very successful, providing a blueprint for planning future observation campaigns that rely on the magnetic connectivity of Solar Orbiter.

Slow solar wind↗

Orbit Transfers for Dawn's Vesta Operations : Navigation and Mission Design Experience

Dawn, a mission belonging to NASA's Discovery Program, was launched on September 27, 2007 to explore main belt asteroids in order to yield insights into important questions about the formation and evolution of the solar system. From July of 2011 to August of 2012, the Dawn spacecraft successfully returned valuable science data, collected during the four planned mapping orbits at its first target asteroid, Vesta. Each mapping orbit was designed to enable a different set of scientific observations. Such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn's flight team at NASA's Jet Propulsion Laboratory. Each transfer needs a robust plan that accounts for uncertainties in maneuver execution, orbit determination, and physical characteristics of Vesta. This paper discusses the mission design and navigational experience during Dawn's Vesta operations. Topics include requirements and constraints from Dawn's science and spacecraft teams, orbit determination and maneuver design and building process for transfers, developing timelines for thrust sequence build cycles, and the process of scheduling very demanding coverage with ground antennae at NASA's Deep Space Network.

low thrust↗

Manned Orbital Transfer Vehicle (MOTV). Volume 6: Five year program plan

The five year program plan for the manned orbit transfer vehicle (MOTV) is presented. The planning, schedules, cost estimates, and supporting data (objectives, constraints, assumptions, etc.) associated with the development of the MOTV are discussed. The plan, in addition to the above material, identifies the supporting research and technology required to resolve issues critical to MOTV development.

Boyland, R. E.↗