Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Viking 1 planetary phase tracking operations: Mars orbit insertion through landing

This article describes tracking operations during the Viking 1 planetary phase. Particular attention is paid to special planning for critical phase tracking operations, and to the degree of success subsequently achieved by these special plans during the actual operations. In-depth coverage is provided for Mars orbit insertion (MOI), periapsis passage tracking, and Lander direct links. The article concludes that on balance, tracking operations during the Viking 1 planetary phase have been effectively implemented and quite successful.

Berman, A. L.↗

Forecasting the Economic Impact of Future Space Station Operations

Recent manned and unmanned Earth-orbital operations have suggested great promise of improved knowledge and of substantial economic and associated benefits to be derived from services offered by a space station. Proposed application areas include agriculture, forestry, hydrology, public health, oceanography, natural disaster warning, and search/rescue operations. The need for reliable estimates of economic and related Earth-oriented benefits to be realized from Earth-orbital operations is discussed and recent work in this area is reviewed. Emphasis is given to those services based on remote sensing. Requirements for a uniform, comprehensive and flexible methodology are discussed. A brief review of the suggested methodology is presented. This methodology will be exercised through five case studies which were chosen from a gross inventory of almost 400 user candidates. The relationship of case study results to benefits in broader application areas is discussed, Some management implications of possible future program implementation are included.

Summer, R. A.↗

The Mars Reconnaissance Orbiter Mission Operations: Architecture and Approach

The Mars Reconnaissance Orbiter (MRO) was launched on August 12, 2005 by an Atlas V launch vehicle from Cape Canaveral Air Force Station. MRO will carry a rich set of science instruments to Mars and provide global, regional survey, and targeted observations. In addition, a set of engineering instruments providing optical navigation, Ka band telecommunication and UHF relay services to future Mars missions are part of the MRO payload. During the mission, the MRO operations teams are presented with two major challenges - unprecedented high data rate and data volumes, and complex science planning and resource sharing. MRO has the capability to communicate with earth at a maximum of six Megabits per second (> 50 times any previous Mars missions). With the current Deep Space Network (DSN) contact schedule of 19 eight-hour tracks per week, the baseline mission plan is for MRO to return 34 Terabits of raw science data during the two year primary science phase. Each of the science instruments has its unique requirements for global mapping, regional survey, and targeted observations. Some instruments prefer nadir-only observations, while others require off-nadir observations (especially for stereo viewing). The requirements from these Mars viewing instruments presented a significant challenge for the operations team to design the complex science planning and resource sharing/allocation process. This paper describes what MRO project is implementing to solve these challenges.

Mars Reconnaissance Orbiter (MRO)↗

The Mars Reconnaissance Orbiter mission operations: architecture and approach

The Mars Reconnaissance Orbiter (MRO) was launched on August 12, 2005 by an Atlas V launch vehicle from Cape Canaveral Air Force Station. MRO will carry a rich set of science instruments to Mars and provide global, regional survey, and targeted observations. In addition, a set of engineering instruments providing optical navigation, Ka band telecommunication and UHF relay services to future Mars missions are part of the MRO payload.

MRO↗

Space Operations Center orbit altitude selection strategy

The strategy for the operational altitude selection has to respond to the Space Operation Center's (SOC) maintenance requirements and the logistics demands of the missions to be supported by the SOC. Three orbit strategies are developed: two are constant altitude, and one variable altitude. In order to minimize the effect of atmospheric uncertainty the dynamic altitude method is recommended. In this approach the SOC will operate at the optimum altitude for the prevailing atmospheric conditions and logistics model, provided that mission safety constraints are not violated. Over a typical solar activity cycle this method produces significant savings in the overall logistics cost.

Indrikis, J.↗

Correlation of ISS Electric Potential Variations with Mission Operations

Orbiting approximately 400 km above the Earth, the International Space Station (ISS) is a unique research laboratory used to conduct ground-breaking science experiments in space. The ISS has eight Solar Array Wings (SAW), and each wing is 11.7 meters wide and 35.1 meters long. The SAWs are controlled individually to maximize power output, minimize stress to the ISS structure, and minimize interference with other ISS operations such as vehicle dockings and Extra-Vehicular Activities (EVA). The Solar Arrays are designed to operate at 160 Volts. These large, high power solar arrays are negatively grounded to the ISS and collect charged particles (predominately electrons) as they travel through the space plasma in the Earth's ionosphere. If not controlled, this collected charge causes floating potential variations which can result in arcing, causing injury to the crew during an EVA or damage to hardware [1]. The environmental catalysts for ISS floating potential variations include plasma density and temperature fluctuations and magnetic induction from the Earth's magnetic field. These alone are not enough to cause concern for ISS, but when they are coupled with the large positive potential on the solar arrays, floating potentials up to negative 95 Volts have been observed. Our goal is to differentiate the operationally induced fluctuations in floating potentials from the environmental causes. Differentiating will help to determine what charging can be controlled, and we can then design the proper operations controls for charge collection mitigation. Additionally, the knowledge of how high power solar arrays interact with the environment and what regulations or design techniques can be employed to minimize charging impacts can be applied to future programs.

Willis, Emily M.↗

Determination of Eros Physical Parameters for Near Earth Asteroid Rendezvous Orbit Phase Navigation

Navigation of the orbit phase of the Near Earth steroid Rendezvous (NEAR) mission will re,quire determination of certain physical parameters describing the size, shape, gravity field, attitude and inertial properties of Eros. Prior to launch, little was known about Eros except for its orbit which could be determined with high precision from ground based telescope observations. Radar bounce and light curve data provided a rough estimate of Eros shape and a fairly good estimate of the pole, prime meridian and spin rate. However, the determination of the NEAR spacecraft orbit requires a high precision model of Eros's physical parameters and the ground based data provides only marginal a priori information. Eros is the principal source of perturbations of the spacecraft's trajectory and the principal source of data for determining the orbit. The initial orbit determination strategy is therefore concerned with developing a precise model of Eros. The original plan for Eros orbital operations was to execute a series of rendezvous burns beginning on December 20,1998 and insert into a close Eros orbit in January 1999. As a result of an unplanned termination of the rendezvous burn on December 20, 1998, the NEAR spacecraft continued on its high velocity approach trajectory and passed within 3900 km of Eros on December 23, 1998. The planned rendezvous burn was delayed until January 3, 1999 which resulted in the spacecraft being placed on a trajectory that slowly returns to Eros with a subsequent delay of close Eros orbital operations until February 2001. The flyby of Eros provided a brief glimpse and allowed for a crude estimate of the pole, prime meridian and mass of Eros. More importantly for navigation, orbit determination software was executed in the landmark tracking mode to determine the spacecraft orbit and a preliminary shape and landmark data base has been obtained. The flyby also provided an opportunity to test orbit determination operational procedures that will be used in February of 2001. The initial attitude and spin rate of Eros, as well as estimates of reference landmark locations, are obtained from images of the asteroid. These initial estimates are used as a priori values for a more precise refinement of these parameters by the orbit determination software which combines optical measurements with Doppler tracking data to obtain solutions for the required parameters. As the spacecraft is maneuvered; closer to the asteroid, estimates of spacecraft state, asteroid attitude, solar pressure, landmark locations and Eros physical parameters including mass, moments of inertia and gravity harmonics are determined with increasing precision. The determination of the elements of the inertia tensor of the asteroid is critical to spacecraft orbit determination and prediction of the asteroid attitude. The moments of inertia about the principal axes are also of scientific interest since they provide some insight into the internal mass distribution. Determination of the principal axes moments of inertia will depend on observing free precession in the asteroid's attitude dynamics. Gravity harmonics are in themselves of interest to science. When compared with the asteroid shape, some insight may be obtained into Eros' internal structure. The location of the center of mass derived from the first degree harmonic coefficients give a direct indication of overall mass distribution. The second degree harmonic coefficients relate to the radial distribution of mass. Higher degree harmonics may be compared with surface features to gain additional insight into mass distribution. In this paper, estimates of Eros physical parameters obtained from the December 23,1998 flyby will be presented. This new knowledge will be applied to simplification of Eros orbital operations in February of 2001. The resulting revision to the orbit determination strategy will also be discussed.

Miller, J. K.↗

Selected tether applications in space: An analysis of five selected concepts

Ground rules and assumptions; operations; orbit considerations/dynamics; tether system design and dynamics; functional requirements; hardware concepts; and safety factors are examined for five scenarios: tethered effected separation of an Earth bound shuttle from the space station; tether effected orbit boost of a spacecraft (AXAF) into its operational orbit from the shuttle; an operational science/technology platform tether deployed from space station; a tether mediated rendezvous involving an OMV tether deployed from space station to rendezvous with an aerobraked OTV returning to geosynchronous orbit from a payload delivery mission; and an electrodynamic tether used in a dual motor/generator mode to serve as the primary energy storage facility for space station.

Source record↗

The ReSWARM microgravity flight experiments: Planning, control, and model estimation for on‐orbit close proximity operations

Abstract On‐orbit close proximity operations involve robotic spacecraft maneuvering and making decisions for a growing number of mission scenarios demanding autonomy, including on‐orbit assembly, repair, and astronaut assistance. Of these scenarios, on‐orbit assembly is an enabling technology that will allow large space structures to be built in situ, using smaller building block modules. However, like many of these scenarios, robotic on‐orbit assembly involves several technical hurdles, such as changing system models. For instance, grappled modules moved by a free‐flying “assembler” robot can cause significant changes in the combined system inertia, which have cascading impacts on motion planning and control portions of the autonomy stack. Further, on‐orbit assembly and other scenarios require collision‐avoiding motion planning, particularly when operating in a “construction site” scenario of multiple assembler robots and structures. Multiple key technologies that address these complicating factors for autonomous microgravity close proximity operations are detailed in this work, in particular: (1) application of global long‐horizon planning, accomplished using offline and online sampling‐based planner options that consider the system dynamics; (2) adaptation of the recently proposed RATTLE information‐aware planning framework for on‐orbit reconfiguration model learning; and (3) connection with robust control tools to provide low‐level control robustness using current system knowledge. These approaches were demonstrated for an autonomous on‐orbit assembly use case by the RElative Satellite sWarming and Robotic Maneuvering (ReSWARM) experiments using NASA's Astrobee robots on the International Space Station. Results of the ReSWARM experiments are provided along with significant operational and implementation detail discussing the practicalities of hardware implementation and unique aspects of working with the Astrobee free‐flyer robots in microgravity. ReSWARM provides a base set of planning and control tools for robotic close proximity operations, demonstrates them in microgravity, and outlines some of the important hardware aspects that future autonomous free‐flyers will need to consider.

Robotics↗

A definition study of the on-orbit assembly operations for the outboard photovoltaic power modules for Space Station Freedom

A concept is described for the assembly of the outboard PV modules for Space Station Freedom. Analysis of the on-orbit assembly operations was performed using CADAM design graphics software. A scenario for assembly using the various assembly equipment, as currently defined, is described in words, tables and illustrations. This work is part of ongoing studies in the area of space station assembly. The outboard PV module and the assembly equipment programs are all in definition and preliminary design phases. An input is provided to the design process of assembly equipment programs. It is established that the outboard PV module assembly operations can be performed using the assembly equipment currently planned in the Space Station Freedom Program.

Sours, Thomas J.↗

New dimensions for man

The functions of man in space have been in a state of constant change since the first manned orbital flight. Initially, the onboard crewmen performed those tasks essential to piloting and navigating the spacecraft. The time devoted to these tasks has steadily decreased and the crewman's time is being allotted to functions other than orbital operations. The evolving functions include added orbital operational capabilities, experimentation, spacecraft maintenance, and fabrication of useful end items. The new functions will include routine utilization of the crewman to extend mission life, satellite retrieval and servicing, remote manipulator systems operations, and piloting of free-flying teleoperator systems. The most demanding tasks are anticipated to be associated with construction of large space structures. The projected changes will introduce innovative designs and revitalize the concepts for utilizing man in space.

Louviere, A. J.↗

Safety concerns for first entry operations of orbiting spacecraft

The Space Station Freedom crew will face operational problems unique to the spacecraft environment due to the absence of convection currents and the confined atmosphere within the habitable modules. Airborne contaminants from the materials offgassing or contingency incidents like thermodegradation may accumulate until they reach hazardous concentrations. Flow modeling and experiences from previous space flight missions confirm that caution must be exercised during first-entry operations. A review of the first-entry procedures performed during the Skylab Program will be presented to highlight the necessity for carefully planned operations. Many of the environmental conditions that can be expected on the Space Station are analogous to those which exist in confined storage or work spaces in the industrial setting. Experience with closed-loop environmental operations (e.g., atmospheric control of submarines) have also demonstrated that the buildup of trace contaminant gases could result in conditions that lead to mission termination or loss of crew. Consequently, some first-entry issues for the Station can be addressed by comparing them to familiar techniques developed on Earth. The instruments of the Environmental Health System (EHS) will provide the necessary monitoring capability to protect crew health and safety during the planned first-entry procedures of the MTC phase of the SSF Program. The authors of this paper will describe those procedures and will cite an example of the consequences when proper first-entry procedures are not followed.

Wilson, Steven H.↗

Orbit Control Operations for the Cassini-Huygens Mission

The Cassini-Huygens spacecraft was launched in 1997 as an international and collaborative mission to study Saturn and its many moons. After a seven-year cruise, Cassini began orbiting Saturn for a four- year tour. This tour consists of 157 planned maneuvers, and their back-up locations, designed to target 52 encounters, mostly of Saturn's largest moon Titan. One of the mission's first activities was to release the Huygens probe to Titan in December 2004. Currently in its last year of the prime mission, Cassini-Huygens continues to obtain valuable data on Saturn, Titan, and Saturn's other satellites. Return of this information is in large part due to a healthy spacecraft and successful navigation. A two-year extended mission, beginning July 2008, will offer the opportunity to continue science activities. With a demanding navigation schedule that compares with the prime tour, the Cassini Navigation team relies on operations procedures developed during the prime mission to carry-out the extended mission objectives. Current processes for orbit control operations evolved from the primary navigational requirement of staying close to predetermined targeting conditions according to Cassini science sequence planning. The reference trajectory is comprised of flyby conditions to be accomplished at minimal propellant cost. Control of the planned reference trajectory orbit, and any trajectory updates, is achieved with the execution of Orbit Trim Maneuvers (OTMs). The procedures for designing, processing, and analyzing OTMs during Cassini operations is presented. First, a brief overview of the Cassini-Huygens Mission is given, followed by a general description of navigation. Orbit control and maneuver execution methods are defined, along with an outline of the orbit control staffing and operations philosophy. Finally, an example schedule of orbit control operations is shown.

navigation↗

On-orbit assembly operations and in-space infrastructure

The paper describes the development of a set of top-level system requirements for an in-space infrastructure which will accommodate the vehicles proposed for the Space Exploration Initiative (SEI). Issues considered include the current SEI mission strategy, the launch capability, the role of Space Station Freedom (SSF), the on-orbit assembly operations, and the manned tended versus robotic capability. Current SEI mission strategy coupled with SSF planning led to the conclusion that an independent assembly servicing facility (ASF) will best meet the requirements of the SEI program, and an analysis was performed to define the functions required at an ASF. It is shown that the ASF functions can be performed by telerobotic operations.

Cockrell, Charles E.↗

ISS Operations for the Special Purpose Dexterous Manipulator (SPDM) Experiences from the Robotic Systems Evaluation Laboratory (RSEL)

The International Space Station (ISS) will present a new era of telerobotic operations on-orbit. Operating the Special Purpose Dexterous Manipulator (SPDM) in its tasks of maintaining the multitude of Space Station Orbital Replaceable Units (ORUs) creates numerous operational considerations not seen in the existing Shuttle Remote Manipulator System (SRMS) or the future Space Station Remote Manipulator System (SSRMS). The differences between the large arms and the dexterous arm greatly affect the interconnection of man, robot, and task. This paper presents some of the issues arising from this new breed of on-orbit robotics as garnered from over three years of ORU testing experience within the Robotic Systems Evaluation Laboratory (RSEL) at NASA Johnson Space Center. The effects of new robotic features on operations, the issues surrounding targets and visual cues, the differences in operating with Force Moment Accommodation (FMA), the effects of changes in task complexity and scale, the lack of supporting flight information, and the changes in procedures required by the dexterous task will be discussed.

Spinler, Anthony B.↗

LISA Propulsion Module Separation Study

The Laser Interferometer Space Antenna (LISA) mission is a space-borne gravitational wave detector consisting of three spacecraft in heliocentric orbit. Each spacecraft is delivered to it operational orbit by a propulsion module. Because of the strict thermal and mass balancing requirements of LISA, the baseline mission concept requires that the propulsion module separate from the sciencecraft after delivery. The only propulsion system currently baselined for the sciencecraft are micronewton level thrusters, such as FEEP or colloid thrusters, that are used to balance the 30-40 microN of solar radiation pressure and provide the drag-free and attitude control of the spacecraft. Due to these thrusters limited authority, the separation of the propulsion module from the sciencecraft must be well controlled to not induce a large tip-off rotation of the sciencecraft. We present here the results of a design study of the propulsion module separation system that is shown to safely deliver the LISA sciencecraft to its final operational orbit.

Merkowitz, Stephen↗

Dawn Statistical Maneuver Design for Vesta Operations

In July of 2011 the Dawn spacecraft is scheduled to begin orbital operations at Vesta, a large main-belt asteroid. Dawn is a NASA Discovery mission that uses solar-electric low-thrust ion propulsion for both interplanetary cruise and orbital operations. Navigating between the Dawn project's four targeted science orbits at Vesta requires a plan that accounts for uncertainties not only in thrust execution, orbit determination, and other spacecraft forces, but also large uncertainties in characteristics of Vesta - such as the asteroid's gravity field and pole orientation. Accommodating these uncertainties requires strategic use of low-thrust maneuvers reserved for statistical trajectory corrections. This paper describes the placement and evaluation of low-thrust statistical maneuvers during two key phases of the Vesta mission along with a discussion of the tools, constraints, and methods used to plan those maneuvers.

Solar Electric Propulsion↗