An intelligent ground operator support system

This paper presents first results of the project 'Technologien fuer die intelligente Kontrolle von Raumfahrzeugen' (TIKON). The TIKON objective was the demonstration of feasibility and profit of the application of artificial intelligence in the space business. For that purpose a prototype system has been developed and implemented for the operation support of the Roentgen Satellite (ROSAT), a scientific spacecraft designed to perform the first all-sky survey with a high-resolution X-ray telescope and to investigate the emission of specific celestial sources. The prototype integrates a scheduler and a diagnosis tool both based on artificial intelligence techniques. The user interface is menu driven and provides synoptic displays for the visualization of the system status. The prototype has been used and tested in parallel to an already existing operational system.

Goerlach, Thomas↗

Advanced Power Regulator Developed for Spacecraft

The majority of new satellites generate electrical power using photovoltaic solar arrays and store energy in batteries for use during eclipse periods. Careful regulation of battery charging during insolation can greatly increase the expected lifetime of the satellite. The battery charge regulator is usually custom designed for each satellite and its specific mission. Economic competition in the small satellite market requires battery charge regulators that are lightweight, efficient, inexpensive, and modular enough to be used in a wide variety of satellites. A new battery charge regulator topology has been developed at the NASA Lewis Research Center to address these needs. The new regulator topology uses industry-standard dc-dc converters and a unique interconnection to provide size, weight, efficiency, fault tolerance, and modularity benefits over existing systems. A transformer-isolated buck converter is connected such that the high input line is connected in series with the output. This "bypass connection" biases the converter's output onto the solar array voltage. Because of this biasing, the converter only processes the fraction of power necessary to charge the battery above the solar array voltage. Likewise, the same converter hookup can be used to regulate the battery output to the spacecraft power bus with similar fractional power processing. The advantages of this scheme are: 1) Because only a fraction of the power is processed through the dc-dc converter, the single- stage conversion efficiency is 94 to 98 percent; 2) Costly, high-efficiency dc-dc converters are not necessary for high end-to-end system efficiency; 3) The system is highly fault tolerant because the bypass connection will still deliver power if the dc-dc converter fails; and 4) The converters can easily be connected in parallel, allowing higher power systems to be built from a common building block. This new technology will be spaceflight tested in the Photovoltaic Regulator Kit Experiment (PRKE) on TRW's Small Spacecraft Technology Initiative (SSTI) satellite scheduled for launch in 1996. This experiment uses commercial dc-dc converters (28 to 15 Vdc) and additional control circuitry to regulate current to a battery load. The 60-W, 87- percent efficiency converters can control 180 W of power at an efficiency of 94 percent in the new configuration. The power density of the Photovoltaic Regulator Kit Experiment is about 200 W/kg.

Source record↗

Managing Flagship Missions to Reduce Cost and Schedule

Flagship missions are highly complex with highly nested systems. This level of complexity poses unique management problems as complexity influences risk which, in turn, affects cost and schedule. Establishing a strong technical and programmatic leadership team is critical to mission success. Developing and using a mission architecture is critical to informing the management organization, product ownership, interface and integration relationships, schedule organization, and integration and test paths. In highly nested systems, the mission phasing can be significantly out of sync with product phasing. Targeted technology development prior to Phase A is critical to reducing risk. Early architecture, concept design, and requirements development is critical to reducing risk. Modular design; pathfinders; parallel manufacturing and integration and test paths; and properly handling institutional requirements across interfaces are all management techniques that can be applied to reduce risk. NASA’s large strategic missions, sometimes referred to as flagship missions, are designed to provide answers to some of the most compelling scientific questions being asked. These types of missions are a series of highly nested subsystems that pose unique management problems when compared to more traditional instrument and spacecraft designs. They typically have an overall architecture that is very complex and nested; they typically require a tremendous amount of technology development; they typically involve many contractors and subcontractors with many associated contracts; and they typically involve staff from all over the world. Successful management of a flagship requires the balance between science requirements, engineering and technology capabilities, and resource constraints. Mismanaging these flagship missions can and will lead to significant cost and schedule growth, both of which are detrimental to NASA’s overall reputation which, in turn, is detrimental to the development of future flagship missions. While many of the same management principles used on smaller instruments and spacecraft are relevant, managing flagship missions requires an evolution of those current best practices to better address the specific needs and additional complexity and vastness of these missions. This paper explores how to leverage lessons learned from previous flagship missions to better manage flagship missions in the future.

Hylan, Jason↗

Update on Parallel Process Execution in the Next Generation System Analysis Model

As of the end of 2021, 88,880 metric tons of heavy metal (MTHM) (44,741 MTHM in dry storage; 44,139 MTHM in wet storage) of spent nuclear fuel (SNF) were stored at various reactor sites across the United States [1]. The Office of Storage and Transportation in the Department of Energy is planning for the transportation, storage, and eventual disposal of SNF and high-level radioactive waste (HLW). To aid in this effort and inform decision-makers about the backend of the spent fuel cycle, systems analysis tools capable of analyzing the various options with respect to SNF and HLW management are being used as well as continuously improved to meet the evolving needs of the program. System analysts typically use these tools to vary underlying assumptions (shipping rates, allocation priority, available facilities, start dates, etc.) and study the implications of these changes on site clearance schedules, campaign costs, transportation infrastructure acquisition, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Parallel plan execution with self-processing networks

A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

Dautrechy, C. Lynne↗

Parallel plan execution with self-processing networks

A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

D'Autrechy, C. Lynne↗

HEP - A semaphore-synchronized multiprocessor with central control

The paper describes the design concept of the Heterogeneous Element Processor (HEP), a system tailored to the special needs of scientific simulation. In order to achieve high-speed computation required by simulation, HEP features a hierarchy of processes executing in parallel on a number of processors, with synchronization being largely accomplished by hardware. A full-empty-reserve scheme of synchronization is realized by zero-one-valued hardware semaphores. A typical system has, besides the control computer and the scheduler, an algebraic module, a memory module, a first-in first-out (FIFO) module, an integrator module, and an I/O module. The architecture of the scheduler and the algebraic module is examined in detail.

Gilliland, M. C.↗

A software tool for dataflow graph scheduling

A graph-theoretic design process and software tool is presented for selecting a multiprocessing scheduling solution for a class of computational problems. The problems of interest are those that can be described using a dataflow graph and are intended to be executed repetitively on multiple processors. The dataflow paradigm is very useful in exposing the parallelism inherent in algorithms. It provides a graphical and mathematical model which describes a partial ordering of algorithm tasks based on data precedence.

Jones, Robert L., III↗

The NASA Hyper-X Program

This paper provides an overview of NASA's Hyper-X Program; a focused hypersonic technology effort designed to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. This paper presents an overview of the flight test program, research objectives, approach, schedule and status. Substantial experimental database and concept validation have been completed. The program is currently concentrating on the first, Mach 7, vehicle development, verification and validation in preparation for wind-tunnel testing in 1998 and flight testing in 1999. Parallel to this effort the Mach 5 and 10 vehicle designs are being finalized. Detailed analytical and experimental evaluation of the Mach 7 vehicle at the flight conditions is nearing completion, and will provide a database for validation of design methods once flight test data are available.

Freeman, Delman C., Jr.↗

Automating CPM-GOMS

CPM-GOMS is a modeling method that combines the task decomposition of a GOMS analysis with a model of human resource usage at the level of cognitive, perceptual, and motor operations. CPM-GOMS models have made accurate predictions about skilled user behavior in routine tasks, but developing such models is tedious and error-prone. We describe a process for automatically generating CPM-GOMS models from a hierarchical task decomposition expressed in a cognitive modeling tool called Apex. Resource scheduling in Apex automates the difficult task of interleaving the cognitive, perceptual, and motor resources underlying common task operators (e.g. mouse move-and-click). Apex's UI automatically generates PERT charts, which allow modelers to visualize a model's complex parallel behavior. Because interleaving and visualization is now automated, it is feasible to construct arbitrarily long sequences of behavior. To demonstrate the process, we present a model of automated teller interactions in Apex and discuss implications for user modeling. available to model human users, the Goals, Operators, Methods, and Selection (GOMS) method [6, 21] has been the most widely used, providing accurate, often zero-parameter, predictions of the routine performance of skilled users in a wide range of procedural tasks [6, 13, 15, 27, 28]. GOMS is meant to model routine behavior. The user is assumed to have methods that apply sequences of operators and to achieve a goal. Selection rules are applied when there is more than one method to achieve a goal. Many routine tasks lend themselves well to such decomposition. Decomposition produces a representation of the task as a set of nested goal states that include an initial state and a final state. The iterative decomposition into goals and nested subgoals can terminate in primitives of any desired granularity, the choice of level of detail dependent on the predictions required. Although GOMS has proven useful in HCI, tools to support the construction of GOMS models have not yet come into general use.

GOMS↗

Energy efficient engine sector combustor rig test program

Under the NASA-sponsored Energy Efficient Engine program, Pratt & Whitney Aircraft has successfully completed a comprehensive combustor rig test using a 90-degree sector of an advanced two-stage combustor with a segmented liner. Initial testing utilized a combustor with a conventional louvered liner and demonstrated that the Energy Efficient Engine two-stage combustor configuration is a viable system for controlling exhaust emissions, with the capability to meet all aerothermal performance goals. Goals for both carbon monoxide and unburned hydrocarbons were surpassed and the goal for oxides of nitrogen was closely approached. In another series of tests, an advanced segmented liner configuration with a unique counter-parallel FINWALL cooling system was evaluated at engine sea level takeoff pressure and temperature levels. These tests verified the structural integrity of this liner design. Overall, the results from the program have provided a high level of confidence to proceed with the scheduled Combustor Component Rig Test Program.

Dubiel, D. J.↗

Characterization and Optimization of the Fitting of Quantum Correlation Functions

This case study presents a characterization and optimization of an application code for extracting parton distribution functions from high energy electron-proton scattering data. Profiling this application code reveals that the phase-space density computation accounts for 93% of the overall execution time for a single iteration on a single core. When executing multiple iterations in parallel on a multicore system, the application spends 78% of its overall execution time idling due to load imbalance. We address these issues by first transforming the application code from Python to C++ and then tackling the application load imbalance via a hybrid scheduling strategy that combines dynamic and static scheduling. These techniques result in a 62% reduction in CPU idle time and a 2.46x speedup in overall execution time per node. In addition, the typically enabled power-management mechanisms in supercomputers (e.g., AMD Turbo Core, Intel Turbo Boost, and RAPL) can significantly impact intra-node scalability when more than 50% of the CPU cores are used. This finding underscores the importance of understanding system interactions with power management, as they can adversely impact application performance, and highlights the necessity of intra-node scaling tests to identify performance degradation that inter-node scaling tests might otherwise overlook.

Chuang, Pi-Yueh [Virginia Tech,Dept. of Computer S↗

Comparing barrier algorithms

A barrier is a method for synchronizing a large number of concurrent computer processes. After considering some basic synchronization mechanisms, a collection of barrier algorithms with either linear or logarithmic depth are presented. A graphical model is described that profiles the execution of the barriers and other parallel programming constructs. This model shows how the interaction between the barrier algorithms and the work that they synchronize can impact their performance. One result is that logarithmic tree structured barriers show good performance when synchronizing fixed length work, while linear self-scheduled barriers show better performance when synchronizing fixed length work with an imbedded critical section. The linear barriers are better able to exploit the process skew associated with critical sections. Timing experiments, performed on an eighteen processor Flex/32 shared memory multiprocessor, that support these conclusions are detailed.

Arenstorf, Norbert S.↗

Comparing barrier algorithms

A barrier is a method for synchronizing a large number of concurrent computer processes. After considering some basic synchronization mechanisms, a collection of barrier algorithms with either linear or logarithmic depth are presented. A graphical model is described that profiles the execution of the barriers and other parallel programming constructs. This model shows how the interaction between the barrier algorithms and the work that they synchronize can impact their performance. One result is that logarithmic tree structured barriers show good performance when synchronizing fixed length work, while linear self-scheduled barriers show better performance when synchronizing fixed length work with an imbedded critical section. The linear barriers are better able to exploit the process skew associated with critical sections. Timing experiments, performed on an eighteen processor Flex/32 shared memory multiprocessor that support these conclusions, are detailed.

Arenstorf, Norbert S.↗

A Simulation Testbed for Airborne Merging and Spacing

The key innovation in this effort is the development of a simulation testbed for airborne merging and spacing (AM&S). We focus on concepts related to airports with Super Dense Operations where new airport runway configurations (e.g. parallel runways), sequencing, merging, and spacing are some of the concepts considered. We focus on modeling and simulating a complementary airborne and ground system for AM&S to increase efficiency and capacity of these high density terminal areas. From a ground systems perspective, a scheduling decision support tool generates arrival sequences and spacing requirements that are fed to the AM&S system operating on the flight deck. We enhanced NASA's Airspace Concept Evaluation Systems (ACES) software to model and simulate AM&S concepts and algorithms.

Santos, Michel↗

Comparing the Performance of Two Dynamic Load Distribution Methods

Parallel processing of symbolic computations on a message-passing multi-processor presents one challenge: To effectively utilize the available processors, the load must be distributed uniformly to all the processors. However, the structure of these computations cannot be predicted in advance. go, static scheduling methods are not applicable. In this paper, we compare the performance of two dynamic, distributed load balancing methods with extensive simulation studies. The two schemes are: the Contracting Within a Neighborhood (CWN) scheme proposed by us, and the Gradient Model proposed by Lin and Keller. We conclude that although simpler, the CWN is significantly more effective at distributing the work than the Gradient model.

Kale, L. V.↗

Using Apex To Construct CPM-GOMS Models

process for automatically generating computational models of human/computer interactions as well as graphical and textual representations of the models has been built on the conceptual foundation of a method known in the art as CPM-GOMS. This method is so named because it combines (1) the task decomposition of analysis according to an underlying method known in the art as the goals, operators, methods, and selection (GOMS) method with (2) a model of human resource usage at the level of cognitive, perceptual, and motor (CPM) operations. CPM-GOMS models have made accurate predictions about behaviors of skilled computer users in routine tasks, but heretofore, such models have been generated in a tedious, error-prone manual process. In the present process, CPM-GOMS models are generated automatically from a hierarchical task decomposition expressed by use of a computer program, known as Apex, designed previously to be used to model human behavior in complex, dynamic tasks. An inherent capability of Apex for scheduling of resources automates the difficult task of interleaving the cognitive, perceptual, and motor resources that underlie common task operators (e.g., move and click mouse). The user interface of Apex automatically generates Program Evaluation Review Technique (PERT) charts, which enable modelers to visualize the complex parallel behavior represented by a model. Because interleaving and the generation of displays to aid visualization are automated, it is now feasible to construct arbitrarily long sequences of behaviors. The process was tested by using Apex to create a CPM-GOMS model of a relatively simple human/computer-interaction task and comparing the time predictions of the model and measurements of the times taken by human users in performing the various steps of the task. The task was to withdraw $80 in cash from an automated teller machine (ATM). For the test, a Visual Basic mockup of an ATM was created, with a provision for input from (and measurement of the performance of) the user via a mouse. The times predicted by the automatically generated model turned out to approximate the measured times fairly well (see figure). While these results are promising, there is need for further development of the process. Moreover, it will also be necessary to test other, more complex models: The actions required of the user in the ATM task are too sequential to involve substantial parallelism and interleaving and, hence, do not serve as an adequate test of the unique strength of CPM-GOMS models to accommodate parallelism and interleaving.

John, Bonnie↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗