Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Payload Operations and Telescience on ISS

The objective of this paper is to provide future International Space Station (ISS) scientists and/or engineers with an overview of the ISS payload operations and integration process. This process begins with the payload being manifested on the ISS and continued through the integration and operations process. Emphasis is placed on the interfaces and tools that the payload will utilize when going through the process. For each of the Data Sets, the Payload Operations and Integration Center (POIC) provides a Data Set Manager to work with the PD's.

Cissom, Rickey D.↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Space tracking and data systems; Proceedings of the Symposium, Arlington, VA, June 16-18, 1981

The AIAA/NASA Symposium on Space Tracking and Data Systems, held in Pentagon City, Virginia, on June 16-18, 1981, had the purpose of reviewing international activities in space tracking and data systems for civil use in the 1980-2000 time frame. Participants included 225 representatives from industrial and government organizations in eight nations. The nations represented include the United States, France, Germany, India, Japan, Norway, Spain, and Sweden. The major functions of the systems described at the Symposium are related to the initial downlink of telemetry and spacecraft status data, attendant tracking activities, and uplink of spacecraft commands; communication between the associated acquisition sites and central processing and control stations; formulation and implementation of commands that control the spacecraft and its payload; and processing of spacecraft data needed to make command decisions. Attention is given to an overview of current activities and plans, and supporting developments, taking into account the time from 1980 to 1990. New developments are also considered.

Grey, J.↗

Real-Time Payload Operations on the International Space Station

This paper will focus on the challenges that Payload Operations have faced as Payload Utilization has evolved over the last three years of real-time experience. Specifically the paper will focus on the planning challenges and the constant battle over program allocation between core systems and payloads, the process of developing and implementing crew training in a centralized location that is being support by a payload development community spread out all over the US, the unique challenges associated with deployed pressurized payload payloads that are not located within an ISPR, and the importance of documenting specific requirements that the payload development community must implement to get through the crew reviews associated with training and procedures. The authors will focus on specific lessons learned and improvements that have been made in both the streamlining of the processes and the associated documentation.

Cissom, Rick D.↗

Shuttle payload interface verification equipment study. Volume 1: Executive summary

A preliminary design analysis of a stand alone payload integration device (IVE) is provided that is capable of verifying payload compatibility in form, fit and function with the shuttle orbiter prior to on-line payload/orbiter operations. The IVE is a high fidelity replica of the orbiter payload accommodations capable of supporting payload functional checkout and mission simulation. A top level payload integration analysis developed detailed functional flow block diagrams of the payload integration process for the broad spectrum of P/L's and identified degree of orbiter data required by the payload user and potential applications of the IVE.

Source record↗

Spacelab Data Processing Facility (SLDPF) quality assurance expert systems development

Spacelab Data Processing Facility (SLDPF) expert system prototypes were developed to assist in the quality assurance of Spacelab and/or Attached Shuttle Payload (ASP) processed telemetry data. The SLDPF functions include the capturing, quality monitoring, processing, accounting, and forwarding of mission data to various user facilities. Prototypes for the two SLDPF functional elements, the Spacelab Output Processing System and the Spacelab Input Processing Element, are described. The prototypes have produced beneficial results including an increase in analyst productivity, a decrease in the burden of tedious analyses, the consistent evaluation of data, and the providing of concise historical records.

Kelly, Angelita C.↗

Spacelab Data Processing Facility (SLDPF) quality assurance expert systems development

Spacelab Data Processing Facility (SLDPF) expert system prototypes have been developed to assist in the quality assurance of Spacelab and/or Attached Shuttle Payload (ASP) processed telemetry data. SLDPF functions include the capturing, quality monitoring, processing, accounting, and forwarding of mission data to various user facilities. Prototypes for the two SLDPF functional elements, the Spacelab Output Processing System and the Spacelab Input Processing Element, are described. The prototypes have produced beneficial results including an increase in analyst productivity, a decrease in the burden of tedious analyses, the consistent evaluation of data, and the providing of concise historical records.

Kelly, Angelita C.↗

STS-99 Payload Door Closure in Orbiter Processing Facility # 2, Endeavour, (SRTM)

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This videotape shows the SRTM in Endeavour's payload bay, while the payload bay doors are being closed. There are some views of the Orbiter Processing Facility and technicians in the clean room environment.

Source record↗

Telerobotic electronic materials processing experiment

The Office of Commercial Programs (OCP), working in conjunction with NASA engineers at the Goddard Space Flight Center, is supporting research efforts in robot technology and microelectronics materials processing that will provide many spinoffs for science and industry. The Telerobotic Materials Processing Experiment (TRMPX) is a Shuttle-launched materials processing test payload using a Get Away Special can. The objectives of the project are to define, develop, and demonstrate an automated materials processing capability under realistic flight conditions. TRMPX will provide the capability to test the production processes that are dependent on microgravity. The processes proposed for testing include the annealing of amorphous silicon to increase grain size for more efficient solar cells, thin film deposition to demonstrate the potential of fabricating solar cells in orbit, and the annealing of radiation damaged solar cells.

Ollendorf, Stanford↗

Certification Process for Commercial Batteries for Payloads

This viewgraph document reviews the use of electric batteries in space applications. Batteries are high energy devices that are used to power hardware for space applications The applications include IVA (Intra-Vehicular Activity) and EVA (Extra-Vehicular Activity) use. High energy batteries pose hazards such as cell/battery venting leading to electrolyte (liquid or gas) leakage, high temperatures, fire and explosion (shrapnel). It reviews the process of certifying of Commercial batteries for space applications in view of the multi-national purchasing for the International Space Station. The documentation used in the certification is reviewed.

Jeevarajan, Judith↗

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark↗

The space shuttle payload planning working groups: Volume 9: Materials processing and space manufacturing

The findings and recommendations of the Materials Processing and Space Manufacturing group of the space shuttle payload planning activity are presented. The effects of weightlessness on the levitation processes, mixture stability, and control over heat and mass transport in fluids are considered for investigation. The research and development projects include: (1) metallurgical processes, (2) electronic materials, (3) biological applications, and (4)nonmetallic materials and processes. Additional recommendations are provided concerning the allocation of payload space, acceptance of experiments for flight, flight qualification, and private use of the space shuttle.

Source record↗

International Space Station Payload Analytical Integration Overview

This paper contains a general description of the NASA Space Station Payloads Office (SSPO) integration process for International Space Station (ISS) payloads. The end-to-end processes described herein cover the Increment and execute preparation, real-time operations and post-flight phases of payload integration. The paper describes the necessary agreements, plans, documents and reviews required to integrate and operate payloads into standard payload locations. It also summarizes the Program boards, panels and points of contact that a Payload Developer (PI)) will participate in or interface with during the course of the process. The purpose is to provide potential PDs with an outline of the SSPO processes to deliver payloads to orbit, conduct research on orbit and return them to Earth.

Scheib, J.↗

The Mars surveyor operations project command generation process

The methods employed by the Mars surveyor operations project (MSOP) flight team to accelerate the command generation process are described. The approach adopted was to develop a ground system which could simultaneously support as many as three spacecraft in various phases of flight and two in development. The uplink element of the MSOP is discussed, including the control of the science instruments and the spacecraft bus using real-time commands as well as time-tagged stored sequences. The non-interactive payload command process, the express command process, the coordinated command process and the stored sequence process are described. The automation of these processes resulted in flight operations cost savings while maintaining a minimum of risk.

Brooks, Robert N., Jr.↗

Estimation of payload loads using rigid body interface accelerations

In the design/analysis process of a payload structural system, the accelerations at the payload/launch vehicle interface obtained from a system analysis using a rigid payload are often used as the input forcing function to the elastic payload to obtain structural design loads. Such an analysis is at best an approximation since the elastic coupling effects are neglected. This paper develops a method wherein the launch vehicle/rigid payload interface accelerations are modified to account for the payload elasticity. The advantage of the proposed method, which is exact to the extent that the physical system can be described by a truncated set of generalized coordinates, is that the complete design/analysis process can be performed within the organization responsible for the payload design. The method requires the updating of the system normal modes to account for payload changes, but does not require a complete transient solution using the composite system model. An application to a real complex structure, the Viking Spacecraft System, is given.

Chen, J. C.↗

Ares V: Enabling Unprecedented Payloads for Space in the 21st Century

Numerous technical and programmatic studies since the U.S. space program began in the 1960s has emphasized the need for a heavy lift capability for exploration beyond low Earth orbit (LEO). The Saturn V once embodied that capability until it was retired. Now the Ares V cargo launch vehicle (CaLV) promises to restore and improve on that capability, providing unprecedented opportunities for human and robotic exploration, science, national security and commercial uses. This paper provides an overview of the capabilities of Ares V, both as an opportunity for payloads of increased mass and/or volume, and as a means of reducing risk in the payload design process. The Ares V is part of NASA s Constellation Program, which also includes the Ares I crew launch vehicle (CLV), Orion crew exploration vehicle (CEV), and Altair lunar lander. This architecture is designed to carry out the national space policy goals of completing the International Space Station (ISS), retiring the Space Shuttle fleet, and expanding human exploration beyond LEO. The Ares V is designed to loft upper stages and/or cargo, such as the Altair lander, into LEO. The Ares I is designed to put Orion into LEO with a crew of up to four for rendezvous with the ISS or with the Ares V Earth departure stage for journeys to the Moon. While retaining the goals of heritage hardware and commonality, the Ares V configuration continues to be refined through a series of internal trades. The current reference configuration was recommended by the Ares Projects and approved by the Constellation Program during the Lunar Capabilities Concept Review (LCCR) June 2008. The reference configuration defines the Ares V as 381 feet (116m) tall with a gross lift-off mass (GLOM) of 8.1 million pounds (3,704.5 mT). Its first stage will generate 11 million pounds of sea-level liftoff thrust. It will be capable of launching 413,800 pounds (187.7 mT) to LEO, 138,500 pounds (63 mT) direct to the Moon or 156,700 pounds (71.1 mT) in its dual-launch architecture role with Ares I. It could also launch 123,100 pounds (55.8 mT) to Sun-Earth L2. Assessment of astronomy payload requirements since Spring 2008 has indicated that Ares V has the potential to support a range of payloads and missions. Some of these missions were impossible in the absence of Ares V s capabilities. Collaborative design/architecture inputs, exchanges, and analyses have already begun between scientists and payload developers. A 2008 study by a National Research Council (NRC) panel, as well as analyses presented by astronomers and planetary scientists at two weekend conferences in 2008, support the position that Ares V has benefit to a broad range of planetary and astronomy missions. This early dialogue with Ares V engineers is permitting the greatest opportunity for payload/transportation/mission synergy and with the least financial impact to Ares V development. In addition, independent analyses suggest that Ares V has the opportunity to enable more cost-effective mission design. 1

Creech, Steve↗

Landsat missions

This paper gives a description and present status of NASA's Landsat program, including the orbital coverage, payload, data processing, and data products. Data uses are discussed in general terms. Also discussed are NASA's plans for the Landsat-3 and Landsat-D missions and the improved capabilities represented by these missions. The Shuttle retrieval of Landsat-D and the Shuttle launch of future Landsat satellites are discussed conceptually.

Mannheimer, H.↗