Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Approximation algorithms for planning and control

A control system operating in a complex environment will encounter a variety of different situations, with varying amounts of time available to respond to critical events. Ideally, such a control system will do the best possible with the time available. In other words, its responses should approximate those that would result from having unlimited time for computation, where the degree of the approximation depends on the amount of time it actually has. There exist approximation algorithms for a wide variety of problems. Unfortunately, the solution to any reasonably complex control problem will require solving several computationally intensive problems. Algorithms for successive approximation are a subclass of the class of anytime algorithms, algorithms that return answers for any amount of computation time, where the answers improve as more time is allotted. An architecture is described for allocating computation time to a set of anytime algorithms, based on expectations regarding the value of the answers they return. The architecture described is quite general, producing optimal schedules for a set of algorithms under widely varying conditions.

Boddy, Mark↗

Integrated Traffic Flow Management Decision Making

A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

Grabbe, Shon R.↗

Towards a decision support system for space flight operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The differences between the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the four increments of this vision. These increments include (1) the existing capabilities (2) hardware and software system components and interfaces with the NASA ground system, (3) uncertainty management and (4) re-planning and automated execution. Each of these increments provides value independently; but some may also enable building of a subsequent increment.

Ruszkowski, James↗

An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem

New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

Schlagheck, R. A.↗

Scheduling Mission Reconfiguration for an Interferometry Synthetic Aperture Radar Using Deep Reinforcement Learning

This paper presents a method to intelligently adapt the baseline of a synthetic aperture radar based on Deep Rein- forcement Learning to help create plans for missions that use formation flight for Earth observation purposes. The main contribution of this paper is the initial results we have found from applying the tool to a toy mission: measuring the ver- tical structure of forests by using a synthetic aperture radar mounted on a formation of 7 satellites orbiting the Earth in a Sun Synchronous Orbit. We have found that with a reward function based on expected science return over time and fuel usage, the Deep Reinforcement Learning planner is able to create plans with positive scientific returns while minimizing fuel usage. We also find that fuel usage and collision avoid- ance planning is better done with traditional methods, as Deep Reinforcement Learning does not converge to optimal solutions.

Viros-i-Martin, Antoni↗

EVA Swab Kit: Tools and Techniques for Collecting Aseptic Samples from Crewed Space Missions

Introduction: When we send humans to search for life on other planets, we'll need to know what we brought with us versus what may already be there. To ensure our crewed spacecraft meet planetary protection requirements—and to protect our science from human contamination—we'll need to assess and verify whether micro-organisms may be leaking/venting from our spacesuits. This requires collecting samples under Extravehicular Activity (EVA) conditions. Detailed, systematic research on forward contamination from robotic spacecraft has been steadily progressing since the Viking missions, but systematic studies of contamination from space suits has not been conducted in many years. The modern EMU (Extravehicular Mobility Unit) suit used by NASA is designed to leak at rates as high as 100 cc/min. Before humans land on Mars there is a critical need to understand the types and quantities of microbes that could be introduced via space suits. The Human Forward Contamination Assessment team at NASA’s Johnson Space Center (JSC) has developed a prototype EVA swab tool [1,2,3,4] designed for use in space to sample cleaned and uncleaned space suits to determine the present day microbial load and eventually the rate of leakage. The ability to assess microbial leakage early in advanced space suit and life support system design cycles will help avoid costly hardware redesign later. Test Objectives: The primary objective of EMU testing was to characterize the type of micro-organisms typically found on or near selected suit pressure joints under suit differential pressure conditions. Most human-borne microbes can fit through a 0.5 to 1.0 µm gap. Knowing which joints are more likely to leak will inform hardware design decisions. Knowing which types of micro-organisms may leak from EVA suits provides a basis for subsequent studies to characterize the viability of those organisms under destination conditions, as well as how far they might spread through natural or human-influenced processes. That data, in turn, will inform exploration mission operations and hardware design. The secondary objective of testing was to evaluate the interface between a fully suited test subject and the EVA swab tool at vacuum. Bulky EVA suits can restrict movement and limit visibility through the helmet visor. Fully suited testing is important for identifying tool design issues prior to flight. At exploration destinations, such as Mars, suited crew may be required to periodically sample their suits as part of an environmental monitoring protocol. Suit Microbial Sampling Results: This report details results of microbial swabs collected from current flight suit configurations worn by crew members assigned to upcoming ISS expedition missions as well as swabs collected from prototype suits intended for use on the Orion spacecraft. These tests were intended to characterize the types of contaminants found on flight suits under current, typical handling conditions. No attempt was made to change suit handling procedures, provide additional sterilization, or to limit typical potential contaminant sources. Using culture based techniques, we cultivated 235 CFU (colony forming units) comprised of 26 bacterial species and one fungal species on the outside of the suits. The fungal species and 14 of the bacterial species were unique to the suit surfaces and were not detected in any of the background samples collected within the chambers. We sequenced 755,434 ribosomal fragments on all of the suit surfaces from swab samples. 557,016 of these sequences represent DNA that survived at least 4 hours at vacuum. These sequences formed 2,464 OTU's (Operational Taxonomic Units, 97% similarity) showing low diversity in the samples. The most abundant sequences that survived vacuum belong to the genera Staphyloccocus, Ralstona, Bacillus and Rhodobacter all of which are common to the human microbiome. [5] See Danko et al., (2021) for more complete details of these first analyses. Further analysis of EVA suit materials with respect to the efficacy of various cleaning protocols and engineered containment solutions is planned to inform suit design for NASA’s Artemis Moon to Mars program crew testing. Swab Tool Function Results: The kit was demonstrated for fit and function in suited subject vacuum tests to determine how well the tool worked as an aseptic microbial sampling device as well as to identify any design elements that could be upgraded for EVA task specific improvement. It was found that sample acquisition efficacy could be enhanced by redesign of the sample canister to end-effector interface. Several modifications of the sample caddy assemblies to optimize EVA safety and functionality were also identified. Consequently, fabrication of the redesigned sample canister to end-effector assembly interfaces and and the sample caddy assemblies are required. Fabrication of sixteen flight sample canister assemblies (8 per each of two EVA Swab Kits) and two sample caddy assemblies are in process to be followed by hardware testing and certification to produce two flight-certified EVA Swab Kits for transport to ISS no earlier than summer of 2022. Sampling Strategy: The International Space Station is an ideal testbed for systematic studies of contamination from crewed vehicles since it has been continuously occupied for 20 years and exposed to non-terrestrial conditions. We will sample the exterior of the ISS during EVA using a purpose-built swab tool capable of maintaining sterility while undergoing temperature changes from -151 to +121°C under hard vacuum. Prior to each EVA, the project team will work with ISS mission managers to identify precise sampling locations, which will vary by EVA based on the translation paths and worksites scheduled for that particular EVA. Ideally, translation path handrails and areas near ECLSS (Environmental Control and Life Support System) external vent openings on a spacecraft would be assessed. There are currently more than a dozen ECLSS external vents on the ISS. Some are connected to systems that vent waste products, while others are intended to equalize cabin pressure. As EVA opportunity allows, microbial samples from any of these external vents would provide a valuable data point, though some will be more useful than others. Four criteria have been identified to help prioritize sampling sites near vents: • EVA Accessibility: To minimize cost, it is desired to piggy-back onto a planned EVA. Therefore, the sampling location must be readily accessible by an EVA crew • Type of Vented Products: Vent products that have been in direct contact with crew, such as cabin air, are more likely to contain microorganisms than vent products associated with isolated systems, such as experiment module combustion products. • Mass of Vented Products: Higher-flow vents are more likely to contain detectible levels of microbial contaminants than lower-flow vents. • Local Environment: Sample locations with relatively benign local conditions, such as warm surfaces shielded from direct ultraviolet (UV) radiation exposure, may be more likely to support microbial growth than locations with harsher local environmental conditions. Because EVA accessibility is the most important criteria, the proposal team worked with an astronaut and flight controllers using the Dynamic Onboard Ubiquitous Graphics (DOUG) tool. The DOUG virtual environment allows an operator to “fly” around the current ISS vehicle configuration to assess EVA translation paths, attach points, and keep-out zones. While analysis on station or rapid return to Earth would be preferable, samples collected from the exterior of the ISS have already been exposed to temperature variations between -157 and +121 °C as well as hard vacuum. Therefore, they should be fairly stable and robust. We hypothesize that samples collected from the ISS exterior could be stored for up to 6 months at -80°C without degradation. Sample canisters will be returned to Earth while frozen at -80°C for analysis, and sterilized canisters can be re-flown back to ISS to support additional sampling opportunities Relevance to NASA Exploration Objectives: These data will allow us to identify new or improved methods, technologies, and procedures for spacecraft sterilization and leakage mitigation to minimize the amount of contamination introduced to the environment by human explorers. This work is funded by NASA research grant: NNH18ZDA001N-PPR References: [1] Bell, M.S. et al. (2015) LPS XLVI, Abst. #1832 [2] Rucker et al. (2018) 42nd COSPAR (PPP.3) [3] Bell, M.S. et al. (2019) Mars Extant Life Conference, Abst. #5096.[4] Bell, M.S. et al., (2020) 43rd COSPAR (BO.2).[5] Danko D, et.al.,(2021)Front.Microbiol.12:608478.

Mary Suzanne Bell↗

Continuation of the University of Michigan Sounding Rocket Program

This interim report gives the activity on this grant through 31 October 1998, and the planned activities for the next fiscal year. A Project Initiation Conference (PIC) was held at the Wallops Flight Facility (WFF), with planning for the launch of flight 36.174 in Fall 1998. However, following the PIC, the WFF personnel decided that the experiment telemetry system had to be completely rewired, which required substantial design and wiring changes on the experiment side of the payload. These costs had not been anticipated in the FY98 budget, and used up considerable resources of the experimenters. In addition, the telemetry re-design was not completed until Fall 1998, so that there was no opportunity for a launch in 1998 (the Jupiter window closes in late November 1998 and it will reopen in late summer 1999). A Design Review was held by telecon with WFF personnel on 26 October 1998, with plans for the 36.174 launch now in late August 1999 with a launch window which extends into winter 2000. On a more positive note, we have been developing a vacuum UV calibration chamber in Michigan's Space Physics Research Lab, for future measurements of our experiment components, and this facility is now undergoing initial measurements of various calibration lamps in preparation for testing of the telescope UV reflective efficiency. This facility will greatly increase our ability to optimize our experiment for UV efficiency, which has been lacking in the past, and it will be made available for support of other NASA missions at Michigan and for visitors from other institutions. For the next flight 36.174, the following activities will be accomplished: (1) prepare the experiment, including replacement and upgrading of critical components, at University of Michigan; (2) pre-integrate the payload at the Wallops Flight Facility; (3) perform final far-UV calibration of instrument (4) perform final alignment, integration, and electrical checks at WSMR; (5) launch payload from WSMR and check condition of recovered payload; (6) perform post-flight calibration, if necessary and applicable (7) reduce and analyze flight data. The following pages contain information from the experimenter package for the Design Review for the next flight, 36.174, listing the plans, changes, and schedule for this flight.

Clarke, John↗

Improvements to Integrated Tradespace Analysis of Communications Architectures (ITACA) Network Loading Analysis Tool

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by replicating the analysis capabilities of commercially licensed software which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. SCENIC differs from current tools that perform similar analyses in that it 1) does not require any licensing fees, 2) will provide an all-in-one package for various analysis capabilities that normally requires add-ons or multiple tools to complete. As part of SCENIC's capabilities, the ITACA network loading analysis tool will be responsible for assessing the loading on a given network architecture and generating a network service schedule. ITACA will allow users to evaluate the quality of service of a given network architecture and determine whether or not the architecture will satisfy the mission's requirements. ITACA is currently under development, and the following improvements were made during the fall of 2017: optimization of runtime, augmentation of network asset pre-service configuration time, augmentation of Brent's method of root finding, augmentation of network asset FOV restrictions, augmentation of mission lifetimes, and the integration of a SCaN link budget calculation tool. The improvements resulted in (a) 25% reduction in runtime, (b) more accurate contact window predictions when compared to STK(Registered Trademark) contact window predictions, and (c) increased fidelity through the use of specific SCaN asset parameters.

analysis↗

HyTES: Thermal Imaging Spectrometer Development

The Jet Propulsion Laboratory has developed the Hyperspectral Thermal Emission Spectrometer (HyTES). It is an airborne pushbroom imaging spectrometer based on the Dyson optical configuration. First low altitude test flights are scheduled for later this year. HyTES uses a compact 7.5-12 micrometer m hyperspectral grating spectrometer in combination with a Quantum Well Infrared Photodetector (QWIP) and grating based spectrometer. The Dyson design allows for a very compact and optically fast system (F/1.6). Cooling requirements are minimized due to the single monolithic prism-like grating design. The configuration has the potential to be the optimal science-grade imaging spectroscopy solution for high altitude, lighter-than-air (HAA, LTA) vehicles and unmanned aerial vehicles (UAV) due to its small form factor and relatively low power requirements. The QWIP sensor allows for optimum spatial and spectral uniformity and provides adequate responsivity which allows for near 100mK noise equivalent temperature difference (NEDT) operation across the LWIR passband. The QWIP's repeatability and uniformity will be helpful for data integrity since currently an onboard calibrator is not planned. A calibration will be done before and after eight hour flights to gage any inconsistencies. This has been demonstrated with lab testing. Further test results show adequate NEDT, linearity as well as applicable earth science emissivity target results (Silicates, water) measured in direct sunlight.

remote sensing↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

For planning of Mars surface missions, to be operated on a sol-by-sol basis by a team on Earth (where a "sol" is a Martian day), activities are described in terms of "sol types" that are strung together to build a surface mission scenario. Some sol types require ground decisions based on a previous sol's results to feed into the activity planning ("ground in the loop"), while others do not. Due to the differences in duration between Earth days and Mars sols, for a given Mars local solar time, the corresponding Earth time "walks" relative to the corresponding times on the prior sol/day. In particular, even if a communication window has a fixed Mars local solar time, the Earth time for that window will be approximately 40 minutes later each succeeding day. Further complexity is added for non-Mars synchronous communication relay assets, and when there are multiple control centers in different Earth time zones. The solution is the development of "ops efficiency factors" that reflect the efficiency of a given operations configuration (how many and location of control centers, types of communication windows, synchronous or non-synchronous nature of relay assets, sol types, more-or-less sustainable operations schedule choices) against a theoretical "optimal" operations configuration for the mission being studied. These factors are then incorporated into scenario models in order to determine the surface duration (and therefore minimum spacecraft surface lifetime) required to fulfill scenario objectives. The resulting model is used to perform "what-if" analyses for variations in scenario objectives. The ops efficiency factor is the ratio of the figure of merit for a given operations factor to the figure of merit for the theoretical optimal configuration. The current implementation is a pair of models in Excel. The first represents a ground operations schedule for 500 sols in each operations configuration for the mission being studied (500 sols was chosen as being a long enough time to capture variations in relay asset interactions, Earth/Mars time phasing, and seasonal variations in holidays). This model is used to estimate the ops efficiency factor for each operations configuration. The second model in a separate Excel spreadsheet is a scenario model, which uses the sol types to rack up the total number of "scenario sols" for that scenario (in other words, the ideal number of sols it would take to perform the scenario objectives). Then, the number of sols requiring ground in the loop is calculated based on the soil types contained in the given scenario. Next, the scenario contains a description of what sequence of operations configurations is used, for how many days each, and this is used with the corresponding ops efficiency factors for each configuration to calculate the "ops duration" corresponding to that scenario. Finally, a margin is applied to determine the minimum surface lifetime required for that scenario. Typically, this level of analysis has not been performed until much later in the mission, and has not been able to influence mission design. Further, the notion of moving to sustainable operations during Prime Mission - and the effect that that move would have on surface mission productivity and mission objective choices - has not been encountered until the most recent rover missions (MSL and Mars 2018).

Layback, Sharon L.↗

A Geosynchronous Orbit Optical Communications Relay Architecture

NASA is planning to fly a Next Generation Tracking and Data Relay Satellite (TDRS) next decade. While the requirements and architecture for that satellite are unknown at this time, NASA is investing in communications technologies that could be deployed on the satellite to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in December 2017 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the Next Generation TDRS. While it is obvious that a small to medium sized optical communications terminal could be flown on a GEO satellite to provide support to Near Earth missions, it is also possible to deploy a large terminal on the satellite to support Deep Space missions. Onboard data processing and Delay Tolerant Networking (DTN) are two additional technologies that could be used to optimize optical communications link services and enable additional mission and network operations. This paper provides a possible architecture for the optical communications augmentation of a Next Generation TDRS and touches on the critical technology work currently being done at NASA. It will also describe the impact of clouds on such an architecture and possible mitigation techniques.

optics↗

Estimating the Need for Medical Intervention due to Sleep Disruption on the International Space Station

During ISS and shuttle missions, difficulties with sleep affect more than half of all US crews. Mitigation strategies to help astronauts cope with the challenges of disrupted sleep patterns can negatively impact both mission planning and vehicle design. The methods for addressing known detrimental impacts for some mission scenarios may have a substantial impact on vehicle specific consumable mass or volume or on the mission timeline. As part of the Integrated Medical Model (IMM) task, NASA Glenn Research Center is leading the development of a Monte Carlo based forecasting tool designed to determine the consumables required to address risks related to sleep disruption. The model currently focuses on the International Space Station and uses an algorithm that assembles representative mission schedules and feeds this into a well validated model that predicts relative levels of performance, and need for sleep (SAFTE Model, IBR Inc). Correlation of the resulting output to self-diagnosed needs for hypnotics, stimulants, and other pharmaceutical countermeasures, allows prediction of pharmaceutical use and the uncertainty of the specified prediction. This paper outlines a conceptual model for determining a rate of pharmaceutical utilization that can be used in the IMM model for comparison and optimization of mitigation methods with respect to all other significant medical needs and interventions.

Myers, Jerry G.↗

The application of artificial intelligence to astronomical scheduling problems

Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike to other problem domains, and plans for the future evolution of the system.

Johnston, Mark D.↗

Norton-Thevenin Receptance Coupling (NTRC) as a Payload Design Tool

The NASA Engineering and Safety Center (NESC) is funding a study to develop an alternate method for performing coupled loads analysis called Norton-Thevenin Receptance Coupling (NTRC). NTRC combines Receptance Coupling (RC), a frequency-domain synthesis method and Norton-Thevenin (NT) theory, an impedance based approach for simulating the interaction between dynamic systems. The goal of developing the NTRC method is to provide a tool that payload developers can use to reduce the conservatism in defining preliminary design loads, assess the impact of design changes between formal load cycles, and to perform trade studies for design optimization with a minimum amount of data required from the launch vehicle (LV) provider. NTRC also has the ability to perform parametric loads analysis where many different design configurations can be evaluated. This will result in cost and schedule benefits to the payload developer that are currently not possible under the standard coupled loads analysis (CLA) flow where typically only 2-3 official load cycles are performed by the LV provider over the life of a payload program. NTRC is not envisioned as a replacement for the official load cycles performed by the LV provider but rather as a means to address the types of design issues faced by the payload developer before and between official load cycles.The presentation provides an overview of the NTRC methodology and discusses how NTRC can be used to replicate the results from a standard LV CLA. The presentation covers the benchmarking that has been performed as part of the NESC study to demonstrate the accuracy of the technique for both frequency and time domain dynamic analyses. Future plans for benchmarking the NTRC approach against CLA results for NASAs Space Launch System (SLS) and commercial launch vehicles are discussed and the role that NTRC is envisioned to play in the payload development cycle.

Structural Dynamics↗

Experimental Investigation of a Point Design Optimized Arrow Wing HSCT Configuration

The M2.4-7A Arrow Wing HSCT configuration was optimized for straight and level cruise at a Mach number of 2.4 and a lift coefficient of 0.10. A quasi-Newton optimization scheme maximized the lift-to-drag ratio (by minimizing drag-to-lift) using Euler solutions from FL067 to estimate the lift and drag forces. A 1.675% wind-tunnel model of the Opt5 HSCT configuration was built to validate the design methodology. Experimental data gathered at the NASA Langley Unitary Plan Wind Tunnel (UPWT) section #2 facility verified CFL3D Euler and Navier-Stokes predictions of the Opt5 performance at the design point. In turn, CFL3D confirmed the improvement in the lift-to-drag ratio obtained during the optimization, thus validating the design procedure. A data base at off-design conditions was obtained during three wind-tunnel tests. The entry into NASA Langley UPWT section #2 obtained data at a free stream Mach number, M(sub infinity), of 2.55 as well as the design Mach number, M(sub infinity)=2.4. Data from a Mach number range of 1.8 to 2.4 was taken at UPWT section #1. Transonic and low supersonic Mach numbers, M(sub infinity)=0.6 to 1.2, was gathered at the NASA Langley 16 ft. Transonic Wind Tunnel (TWT). In addition to good agreement between CFD and experimental data, highlights from the wind-tunnel tests include a trip dot study suggesting a linear relationship between trip dot drag and Mach number, an aeroelastic study that measured the outboard wing deflection and twist, and a flap scheduling study that identifies the possibility of only one leading-edge and trailing-edge flap setting for transonic cruise and another for low supersonic acceleration.

Narducci, Robert P.↗

Turnaround Time Modeling for Conceptual Rocket Engines

Recent years have brought about a paradigm shift within NASA and the Space Launch Community regarding the performance of conceptual design. Reliability, maintainability, supportability, and operability are no longer effects of design; they have moved to the forefront and are affecting design. A primary focus of this shift has been a planned decrease in vehicle turnaround time. Potentials for instituting this decrease include attacking the issues of removing, refurbishing, and replacing the engines after each flight. less, it is important to understand the operational affects of an engine on turnaround time, ground support personnel and equipment. One tool for visualizing this relationship involves the creation of a Discrete Event Simulation (DES). A DES model can be used to run a series of trade studies to determine if the engine is meeting its requirements, and, if not, what can be altered to bring it into compliance. Using DES, it is possible to look at the ways in which labor requirements, parallel maintenance versus serial maintenance, and maintenance scheduling affect the overall turnaround time. A detailed DES model of the Space Shuttle Main Engines (SSME) has been developed. Trades may be performed using the SSME Processing Model to see where maintenance bottlenecks occur, what the benefits (if any) are of increasing the numbers of personnel, or the number and location of facilities, in addition to trades previously mentioned, all with the goal of optimizing the operational turnaround time and minimizing operational cost. The SSME Processing Model was developed in such a way that it can easily be used as a foundation for developing DES models of other operational or developmental reusable engines. Performing a DES on a developmental engine during the conceptual phase makes it easier to affect the design and make changes to bring about a decrease in turnaround time and costs.

Nix, Michael↗

TPSAS-NF1676L-12168-DND

The Federal Aviation Administration’s Surveillance and Broadcast Services Program Office considers Interval Management (IM) to be one of the three key, near-term applications to make use of ADS-B-In, the receiving and processing of Automatic Dependent Surveillance – Broadcast data on-board an aircraft. Interval Management is used to describe a wide range of operational applications and uses of airborne spacing technology. Interval Management makes use of improved scheduling and sequencing capabilities for the air traffic controllers (ATC) and precise, relative spacing of aircraft, to improve airport throughput, increase the use of Optimized Profile Descents (OPD), and reduce tactical controller workload. The IM applications are subdivided into two categories: one where the flight crew is authorized to manage their speed to achieve the IM goal while the controller retains separation responsibility and a second where the flight crew takes responsibility for both managing speed but also for separation from the specified target aircraft. The former is referred to as Interval Management-Spacing (IM-S) and the latter as Interval Management-Delegated Separation (IM-DS). For the past 10 years NASA has been working on a specific IM application called Airborne Precision Spacing (APS). This concept has focused on increasing runway throughput while enabling OPDs. It is seen as a specific application within the IM class of applications. This talk will present the current state of the APS concept including support for dependent parallel runway operations and how NASA is working to have APS support the broader IM activities. Planned development and testing of APS, including extensions to support IM-DS and FAA-planned flight trials will be presented along with several up-coming simulations.

Bryan E Barmore↗

TPSAS-NF1676L-12329-DND

The Federal Aviation Administration’s Surveillance and Broadcast Services Program Office considers Interval Management (IM) to be one of the three key, near-term applications to make use of ADS-B-In, the receiving and processing of Automatic Dependent Surveillance – Broadcast data on-board an aircraft. Interval Management is used to describe a wide range of operational applications and uses of airborne spacing technology. Interval Management makes use of improved scheduling and sequencing capabilities for the air traffic controllers (ATC) and precise, relative spacing of aircraft, to improve airport throughput, increase the use of Optimized Profile Descents (OPD), and reduce tactical controller workload. The IM applications are subdivided into two categories: one where the flight crew is authorized to manage their speed to achieve the IM goal while the controller retains separation responsibility and a second where the flight crew takes responsibility for both managing speed but also for separation from the specified target aircraft. The former is referred to as Interval Management-Spacing (IM-S) and the latter as Interval Management-Delegated Separation (IM-DS). For the past 10 years NASA has been working on a specific IM application called Airborne Precision Spacing (APS). This concept has focused on increasing runway throughput while enabling OPDs. It is seen as a specific application within the IM class of applications. This talk will present the current state of the APS concept including support for dependent parallel runway operations and how NASA is working to have APS support the broader IM activities. Planned development and testing of APS, including extensions to support IM-DS and FAA-planned flight trials will be presented along with several up-coming simulations.

Brian T Baxley↗