Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

Design of Critical Experiments Targeting Epithermal Cross Sections of Tantalum

Sandia National Laboratories (SNL) and Oak Ridge National Laboratory (ORNL) are collaborating to develop a capability to test the epithermal/intermediate cross sections of tantalum (Ta) at the SNL critical experiments facility using the Seven Percent Critical Experiment (7uPCX) fuel. The Sandia Critical Experiments (SCX) Program provides a specialized facility for performing water moderated and reflected critical experiments with UO 2 fuel rod arrays. A history of safe reactor operations and flexibility in reactor core configuration has resulted in the completion of several benchmark critical experiment evaluations that are published in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The critical experiments described here are scheduled to be performed at SCX in fiscal year 2023. Currently, fabrication details for the needed new equipment are being finalized for completion of the procurement process. The experiments will then be executed and documented for publication consideration by the ICSBEP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems

The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.

Ratajczak, Anthony F.↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The project will explore near and long-term visions towards the commercialization of grid integrated electrolysis systems to inform deployment across the planning, procurement, and operation stages of hydrogen production on the grid. It will leverage NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios, also creating a digital twin for emulation in the Advanced Research on Integrated Energy Systems (ARIES) virtual environment and performing hardware-in-the-loop (HIL) testing of pilot scale, decentralized, and centralized hydrogen systems.

electrolysis systems↗

Voluntary Renewable Energy Procurement Programs in Regulated Utility Markets

Multinational corporations are increasingly purchasing renewable energy (RE) to fulfill international commitments, reduce supply chain emissions, limit environmental impact, and secure stable and affordable electricity. The potential scale of global corporate RE purchasing has been estimated to be nearly 100 GW and growing; however, many markets still lack supportive enabling environments for corporations to access RE through on-site project development or private sector transactions. Even where allowed by law, on-site generation may be insufficient due to space and technical constraints, introducing additional challenges. Utility green pricing and utility green tariff programs backed by renewable energy certificates (RECs), referred to as utility green procurement programs (GPPs) in this report, offer powerful market-based solutions to utilities, regulators, and policymakers to provide corporate and other consumers with RE product options while generating revenue to support RE development. As RE markets expand around the globe, GPPs have proven to be effective mechanisms in market regimes, ranging from fully integrated state-owned utilities to broadly liberalized power markets. GPPs utilize RECs, which are a type of energy attribute certificate and closely resemble guarantees of origin, to track and ultimately monetize RE attributes that corporations and other buyers must procure to demonstrate progress against their RE commitments and make public claims of RE use. Time-tested and transparent REC accounting mechanisms provide market confidence, while at the same time offering flexibility to utilities, regulators, and customers for a range of applications. RECs are used in all types of electricity market structures, as indicated in Figure 1, but REC-based program designs and supporting components differ depending on the type of market. Liberalized markets allow for customers to contract directly with generators for electricity and RECs, while traditionally regulated markets with vertically integrated utility structures may have greater restrictions on generation asset ownership and electricity sales. RE markets can be further defined as being either mandatory or voluntary. Mandatory markets require suppliers to deliver specified amounts of RE to grid customers, such as under a renewable portfolio standard (RPS), while voluntary markets involve no legal mandates, but demand is driven by self-imposed customer goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equipment Procurement and Final Design for the MARVEL High-Grade Heat Extraction System (HGHES)

This summer I worked on the design of a high-grade heat extraction system (HGHES) of the MARVEL Project. The MARVEL project at INL is a first-of-a-kind terrestrial microreactor to help provide a test platform to demonstrate the use of a microreactor to end customers and enable technology developers to test enabling microreactor technologies with a functional nuclear reactor. One of the project's main requirements is the reactors’ ability to deliver high-grade thermal power to end users, both for industrial and commercial use. The project required communication with multiple vendors for custom-made equipment, working with a high-temperature and high-pressure helium coolant system, and research of a Thermal Storage Unit (TSU).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

Cost analysis of new and retrofit hot-air type solar assisted heating systems

A detailed cost analysis/cost improvement study was performed on two Department of Energy/National Aeronautics and Space Administration operational test sites to determine actual costs and potential cost improvements of new and retrofit hot air type, solar assisted heating and hot water systems for single family sized structures. This analysis concentrated on the first cost of a system which included procurement, installation, and integration of a solar assisted heating and hot water system on a new or retrofit basis; it also provided several cost projections which can be used as inputs to payback analyses, depending upon the degree of optimism or future improvements assumed. Cost definitions were developed for five categories of cost, and preliminary estimates were developed for each. The costing methodology, approach, and results together with several candidate low cost designs are described.

Stewart, R. D.↗

Data Interconnection Exploration

This project involves innovating the way the Quality Assurance organization at the Jet Propulsion Laboratory (JPL) tracks the receiving inspection of JPL Critical Items (JCI) procured from suppliers. The Quality Assurance organization uses a Microsoft Access based front-end to enter items into an inspection queue. The current design has grown to be much more than was expected when the inspection queue system was created in 2007. The goal is to migrate to a web based solution that will allow the handling of more data, multiple input interfaces, and customizable display options. This has been achieved by implementing a divided tables scheme, the use of ColdFusion programming language, and the usage of Web 2.0 technologies such as AJAX and jQuery. These updates will allow for future expansion as well as the standardization of inspection queues for the Quality Assurance organization. When engineers and scientists order flight hardware, they cannot use it straight away. After a spacecraft or a satellite has been launched, it will be impossible to repair; therefore, the parts used must be inspected to make sure they are operating correctly and within the required specifications. The task of inspecting these JPL Critical Items (JCI) falls on the Quality Assurance organization. One of the tools the receiving inspection group uses is a database to maintain a queue of inspections that need to be done and of inspections that have been completed. The current Access interface has worked well but increased amounts of data, multiple input interfaces, and changes to how data is handled have made it necessary to seek a new way of organizing items for inspection. In addition, the different inspection groups have recently been merged and each has different ways of keeping track of inspection information. The ultimate goal is for the new group to have one shared inspection queue and website. To achieve this goal, I have been working with Ian Luczon of Procurement Quality Assurance and 3 Myers Hawkins, another intern, to not only create the new queue for receiving inspection but also a central web portal for the newly combined inspection group.

flight hardware↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One - Abridged

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3.

25 - ENERGY STORAGE↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3. (Full Version)

25 - ENERGY STORAGE↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

Artificial intelligence - New tools for aerospace project managers

Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.

Moja, D. C.↗

PIP-II SRF Couplers Fabrication Status and Addressing Ceramic Yield Challenges

The PIP-II project requires reliable SRF couplers to deliver high RF power to the cavities. This talk presents the current status of coupler fabrication, including progress on procurement, assembly, and testing. In particular, it focuses on the challenges encountered with ceramic window production, where limited yield has become a concern. Observed issues and inspection results will be discussed, together with the actions taken to improve quality and consistency. The path forward, including ongoing work with vendors and process adjustments, will also be outlined.

Aiazzi, Tommaso [Fermilab] (ORCID:0009000297503407↗

Identification and measurement of shrub type vegetation on large scale aerial photography

Important range-shrub species were identified at acceptable levels of accuracy on large-scale 70 mm color and color infrared aerial photographs. Identification of individual shrubs was significantly higher, however, on color infrared. Photoscales smaller than 1:2400 had limited value except for mature individuals of relatively tall species, and then only if crown margins did not overlap and sharp contrast was evident between the species and background. Larger scale photos were required for low-growing species in dense stands. The crown cover for individual species was estimated from the aerial photos either with a measuring magnifier or a projected-scale micrometer. These crown cover measurements provide techniques for earth-resource analyses when used in conjunction with space and high-altitude remotely procured photos.

Driscoll, R. S.↗

Battery Review Board

The topics covered are presented in viewgraph form: NASA Battery Review Board Charter; membership, board chronology; background; statement of problem; summary of problems with 50 AH standard Ni-Cd; activities for near term programs utilizing conventional Ni-Cd; present projects scheduled to use NASA standard Ni-Cd; other near-term NASA programs requiring secondary batteries; recommended direction for future programs; future cell/battery procurement strategy; and the NASA Battery Program.

Vaughn, Chester↗

Software for Managing Inventory of Flight Hardware

The Flight Hardware Support Request System (FHSRS) is a computer program that relieves engineers at Marshall Space Flight Center (MSFC) of most of the non-engineering administrative burden of managing an inventory of flight hardware. The FHSRS can also be adapted to perform similar functions for other organizations. The FHSRS affords a combination of capabilities, including those formerly provided by three separate programs in purchasing, inventorying, and inspecting hardware. The FHSRS provides a Web-based interface with a server computer that supports a relational database of inventory; electronic routing of requests and approvals; and electronic documentation from initial request through implementation of quality criteria, acquisition, receipt, inspection, storage, and final issue of flight materials and components. The database lists both hardware acquired for current projects and residual hardware from previous projects. The increased visibility of residual flight components provided by the FHSRS has dramatically improved the re-utilization of materials in lieu of new procurements, resulting in a cost savings of over $1.7 million. The FHSRS includes subprograms for manipulating the data in the database, informing of the status of a request or an item of hardware, and searching the database on any physical or other technical characteristic of a component or material. The software structure forces normalization of the data to facilitate inquiries and searches for which users have entered mixed or inconsistent values.

Salisbury, John↗