Search NASA⌕ Search

SEARCH · Search NASA

Results for “reduced cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

Status of Rockwell-ERC high efficiency solar cell programs

Programs aimed at developing large area, high efficiency GaAs heteroface cells for low concentration space applications and high concentration terrestrial applications as well as other programs aimed at developing high efficiency multicolor devices for use in similar applications are described. An additional program aimed at achieving improved power to weight ratio by parting thin film solar cells from their growth substrates prior to their incorporation into an array assembly is also described. There is potential for multiple reuse of the substrates which could lead to reduced costs for such devices. Highlights of these programs and their interrelated contributions toward the goals of reducing specific weight, volume and cost of photovoltaic space power systems are discussed. Overall goals are summarized and current programs and their funding sources are listed.

Zehr, S. W.↗

Study of active cooling for supersonic transports

The potential benefits of using the fuel heat sink of hydrogen fueled supersonic transports for cooling large portions of the aircraft wing and fuselage are examined. The heat transfer would be accomplished by using an intermediate fluid such as an ethylene glycol-water solution. Some of the advantages of the system are: (1) reduced costs by using aluminum in place of titanium, (2) reduced cabin heat loads, and (3) more favorable environmental conditions for the aircraft systems. A liquid hydrogen fueled, Mach 2.7 supersonic transport aircraft design was used for the reference uncooled vehicle. The cooled aircraft designs were analyzed to determine their heat sink capability, the extent and location of feasible cooled surfaces, and the coolant passage size and spacing.

Brewer, G. D.↗

Solar array systems

The recent past, present state-of-the-art, and future needs in the area of large photovoltaic solar arrays are discussed. In the past most attention was focused upon performance whereas in the future most of the effort should go into cost reduction. Suggestions are made regarding possible approaches to reducing cost such as on-orbit maintenance, extended lifetime, solar concentrators, and high-voltage modular concepts.

Crabtree, W. L.↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Calibrating the Helium Pressurization System for the Space Shuttle Liquid-Hydrogen Tank

Analysis of the results from the STS-114 tanking tests and subsequent launch called into question existing thermal and mass models of helium pressurization of the liquid hydrogen tank. This hydrogen tank, which makes up the bottom two-thirds of the External Tank, is pressurized prior to launch to avoid cavitation in the Shuttle Main Engine pumps. At about 2 minutes prior to launch, the main vent valve is closed, and pressurized helium flows into the tank ullage space to achieve set point pressure. As the helium gas cools, its pressure drops, calling for additional helium. Subsequent helium flows are provided in short, timed pulses. The number of pulses is taken as a rough leak indicator. An analysis of thermal models by Marshall Space Flight Center showed considerable uncertainty in the pressure-versus-time behavior of the helium ullage space and the ability to predict the number of pulses normally expected. Kennedy Space Center proposed to calibrate the dime-sized orifice, which together with valves, controls the helium flow quantity (Figure 1). Pressure and temperature sensors were installed to provide upstream and downstream measurements necessary to compute flow rate based on the orifice discharge coefficient. An assessment of flow testing with helium indicated an extremely costly use of this critical resource. In order to reduce costs, we proposed removing the orifices from each Mobile Launcher Platform (MLP) and asking Colorado Engineering Experiment Station Inc. (CEESI) to calibrate the flow. CEESI has a high-pressure air flow system with traceable flow meters capable of handling the large flow rates. However, literature research indicated that square-edged orifices of small diameters often exhibit significant hysteresis and nonrepeatability in the vicinity of choked or sonic flow. Fortunately, the MLP orifices behaved relatively well in testing (Figure 2). Using curve fitting of the air-flow data, in conjunction with ASME orifice modeling equations, a method of relating the helium mass flow to measured air flow data was obtained. This analysis showed that the highest uncertainty in flow occurred in the vicinity of the choking pressure ratio, as would be expected. In addition, analysis of typical flow pulses showed that most of the helium flow occurred either well below or well above this uncertain area. The final result is the ability to provide postlaunch estimates of helium mass flows that are within 1.5 percent of the actual value.

Source record↗

Challenges and Potential Solutions to Develop and Fund NASA Flagship Missions

Large, strategic "Flagship" missions have unique characteristics that lead to challenging developmental difficulties for the National Aeronautics and Space Administration (NASA). Missions such as the Hubble Space Telescope (HST), James Webb Space Telescope (JWST), and the Mars Science Laboratory (MSL) had technical and programmatic challenges that led to significant schedule delays and subsequent cost growth. Although NASA has instituted policies that have reduced cost growth for more "typical" NASA science missions, NASA Flagship missions remain a distinct challenge due to their requirement to provide unprecedented science or tackle bold exploration goals, typically while concurrently developing new technologies. The unique challenges presented by Flagship missions make it extremely difficult to fully predict cost and schedule given that the technical and programmatic advances needed to meet performance requirements are unprecedented. This paper addresses why Flagship missions are unique and proposes a new programmatic approach to develop and fund Flagship missions.

Develop↗

Challenges and Potential Solutions to Develop and Fund NASA Flagship Missions

Large, strategic "Flagship" missions have unique characteristics that lead to challenging developmental difficulties for the National Aeronautics and Space Administration (NASA). Missions such as the Hubble Space Telescope (HST), James Webb Space Telescope (JWST), and the Mars Science Laboratory (MSL) had technical and programmatic challenges that led to significant schedule delays and subsequent cost growth. Although NASA has instituted policies that have reduced cost growth for more "typical" NASA science missions, NASA Flagship missions remain a distinct challenge due to their requirement to provide unprecedented science or tackle bold exploration goals, typically while concurrently developing new technologies. The unique challenges presented by Flagship missions make it extremely difficult to fully predict cost and schedule given that the technical and programmatic advances needed to meet performance requirements are unprecedented. This paper addresses why Flagship missions are unique and proposes a new programmatic approach to develop and fund Flagship missions.

flagship missions↗

Airspace Technology Demonstration 2 (ATD-2): Analysis of APREQ Flights at CLT

5/22/2019 National Aeronautics and Space Administration 1 Airspace Technology Demonstration 2 (ATD-2) Analysis of APREQ Flights at CLT May 22, 2019 5/22/2019 Objective 2 Quantify impact of IADS Phase 1 & 2 capabilities on APREQ flights at CLT with respect to: • Compliance to the Controlled Take Off Time (CTOT) • Benefits for APREQ flights that use IDAC to renegotiate for an earlier CTOT • Benefits of pre-scheduling APREQ flights using the Earliest Off Block Time (EOBT) • Relationship between EOBT compliance and rescheduling CTOT 5/22/2019 CLT APREQ Daily Compliance(Compliance Improvement Since ATD-2 Start) 3 Steady increase of APREQ compliance over the life of the project. Reduced variation in compliance leading to improved predictability. In addition to overall improved compliance into TBM systems, the predictability is increasing 5/22/2019 APREQ Compliance 10K Rolling Window 4 The most substantial APREQ compliance improvements started with Phase 2 capability (AEFS integration, ZTL IDAC, pre-scheduling and scheduler updates). 5/22/2019 IADS Phase 1 & 2 Benefit Mechanisms 5 1. Collaborative surface metering •Reduced engine run time •Reduced fuel consumption and emissions 2. Overhead stream operational integration a.Scheduling controlled flights at the gate •Reduced engine run time •Reduced fuel consumption and emissions b.APREQ renegotiating for an earlier slot •Reduced total delay •Passenger value of time and crew costs •Reduced engine run time •Reduced fuel consumption and emissions Benefits (1) and (2a) achieved through tactical gate holds Benefit (2b) achieved through APREQ renegotiation process described below Step 1: APREQ flight has a release time but is capable of taking off earlier Step 2: FAA TMC uses the IDAC green space / red space to identify and request an earlierslot in the overhead stream Step 3: Aircraft receives earlierrelease time and the difference between the release times is the reduction in delay 5/22/2019 Benefits for APREQ flights using IDAC to renegotiate for earlierCTOT 6 LBS Fuel 270.7 hours of delay saved by electronically renegotiating a better overhead stream time for 2,071 flights. • The benefits described here are associated with better use of existing capacity in the overhead stream, and technology to reduce surface delay. •These benefits are in addition to (distinct from) surface metering savings. 5/22/2019 APREQ Delay For Pre-Scheduled Flights into KATL Have Been Reduced and are More Predictable For the Last Five Months 7 Substantial Improvements in predictability of delay for the last 5 months 5/22/2019 EOBT Compliance / CTOT Reschedulefor Pre-Scheduled Flights into KATL 8 5/22/2019 Wrap-up 9 • Compliance to the CTOT has improved throughout the lifecycle of ATD-2 with biggest improvements following the introduction of Phase 2 capabilities • Rescheduling APREQ flights using IDAC has reduced 270.7 hours of delay at CLT • Predictability of local surface delay for APREQ flights is substantially improved via pre-scheduling with the IADS system • Pre-scheduled flights that reschedule for later times tend to call ready later with respect to EOBT

CLT↗

First Experimental Demonstration of Full-Duplex Optical Communication on a Single Beam

The satellite industry is driven by the need to reduce costs. One way they have sought to do this is by reducing the size and weight of the satellite because of the extremely high cost per kilogram incurred launching a payload into orbit. The main difficulty in this approach is the lack of power capacity in a small satellite. One of the largest loads on a satellite's power system is the communications system. This has driven the need for a low-power communications system. This document examines a novel method of communicating optically with a low-Earth-orbit satellite from the ground without the need for a laser on the payload. The goal is to show the feasibility of such a system as a solution to the small satellite low-powered communication problem. Specially, that the system described herein: is capable of ground to low-Earth-orbit communications, has very little space-borne mass, and draws little power from the satellite. First, the system (hereafter referred to as LOWCAL "Lightweight Optical Wavelength Communication without A Laser in space") will be explained with details of the formats used and the link budgets. Discussions will be presented on the development of some of the system hardware (the laser diode driver, liquid crystal driver, and decision electronics for both the up and down links.) Finally, experimental test results of the entire system operating in a laboratory environment are presented and compared to theory. The results of the laboratory experiment support the original thesis: retro-modulated optical communications can meet the needs of the small satellite community. The system is capable of 10-kbps communication, has low space-borne mass, and draws little power from the satellite (less than 100-mW measured for the laboratory experiment, less than 1.5-W calculated for the Shuttle experiment).

Garrett, Christopher David↗

Leveraging Terrestrial Industry for Utilization of Space Resources

NASA's Journey to Mars: Pioneering Next Steps in Space Exploration released in October of 2015 states that NASA is working toward the capability to work, operate, and sustainably live safely beyond Earth. To progress from our current "Earth-Reliant" approach to exploration and eventually become "Earth Independent", we need to first identify resources in space and then learn to use and harvest them to minimize logistics from Earth, reduce costs, and enable sustainable and affordable space transportation and surface operations. Known as In Situ Resource Utilization (ISRU), the collection and conversion of space resources into products such as propellants, fuel cell reactants, and life support consumables can greatly reduce the mass, cost, and risk of space exploration. Also, the ability to perform civil engineering, construction, and manufacturing at sites of exploration can also allow for increased crew safety and sustainable growth in critical infrastructure. Much of what NASA wants to do on the Moon and Mars with respect to harnessing and utilizing space resources has been performed and perfected on Earth over the centuries. While minimizing mass and operating in the vacuum of space may be unique challenges to NASA, both terrestrial industry and NASA face many of the same challenges associated with operating in severe environments, minimizing maintenance and logistics, maximizing performance per unit mass and volume, performing remote and autonomous operations, and integrating hardware from many vendors and countries. In the end, both NASA and terrestrial industry need to obtain a return on the investment for the development and deployment of these capabilities. This paper will first examine what is ISRU and what are the space resources of interest. The paper will than discuss what are NASA's approach, life cycle, and economic considerations for implementing ISRU. The paper will outline the site and infrastructure needs associated with a phased implementation of ISRU into human missions to the Moon and Mars. The paper will than assess what technologies and operations from terrestrial industries are relevant and synergistic with ISRU (from prospecting to product storage), and what challenges and similarities between the two can be exploited. Lastly, the paper will end with a discussion on where do we go from here for industry and NASA to collaborate.

Sanders, Gerald B.↗

The OFP-6M transport jet

This report presents a preliminary design of a commercial jet transport that meets the criteria of the Request For Proposal presented by the American Institute of Aeronautics and Astronauts (AIAA). The proposal requires an innovative design of a low cost domestic commercial transport that will reduce operating costs for airline companies while still meeting present and future requirements of the Federal Aviation Regulations for this type of aircraft. Specifications for the design include a mixed class, 153 passenger aircraft, traveling a range of 3000 nm. The intent of the project is to identify factors that reduce cost and to design within the limits of these constraints. The project includes techniques or options that incorporate new technologies but do not override practicality, alternative design approaches, and a comparison between the new design and current aircraft in its class. The OFP-6M is an alternative design approach to the conventional commercial transport jet and is geared towards customer satisfaction through efficiency and reliability. The goals of the OFP-6M transport design are to provide original, sensible, and practical solutions by combining essential preliminary design factors with growing technology. The design focus of the OFP-6M reduces costs by simplifying systems where significant weight or maintenance savings can be achieved, and by integrating advanced technology for improved performance. Key aspects of the OFP-6M design are efficient use of materials like composites, and efficient advanced ducted high bypass turbofan engines. The high bypass engines lower fuel consumption and aid in reducing costs and meeting future noise emission restrictions. Composites are used for most structural components, including flooring and wing box. Although composites are an emerging technology and presently, a high maintenance material, they can be cost effective and an alternative to aluminum structures when correct manufacturing and design strategies are applied. Since, composites are lighter and require less manufacturing of complex parts, they can significantly reduce structural weight. Because of the large 17 ft. diameter, sophisticated aerodynamic considerations were implemented to significantly lower the drag. Supercritical airfoils were chosen with simple control surface design which allows for less maintenance and manufacturing costs. The interior configuration accommodates either all passenger, dual and single class flights or complete cargo. Also, a relaxed conventional stability is integrated with a stability augmentation system. As a result of these design implementations, the OFP-6M bottom line direct operating costs, compare favorably with the Boeing 737 and 757, at 3.49 cents per available seat mile and costs are expected to reduce when improved manufacturing and maintenance methods are implemented.

Alexander, Kelly↗

Mission Implementation Constraints on Planetary Muon Radiography

Cost: Use heritage hardware, especially use a tested landing system to reduce cost (Phoenix or MSL EDL stage). The sky crane technology delivers higher mass to the surface and enables reaching targets at higher elevation, but at a higher mission cost. Rover vs. Stationary Lander: Rover-mounted instrument enables tomography, but the increased weight of the rover reduces the allowable payload weight. Mass is the critical design constraint for an instrument for a planetary mission. Many factors that are minor factors or do not enter into design considerations for terrestrial operation are important for a planetary application. (Landing site, diurnal temperature variation, instrument portability, shock/vibration)

entry, descent, and landing (EDL)↗

Design and development of an F/A-18 inlet distortion rake: A cost and time saving solution

An innovative inlet total pressure distortion measurement rake has been designed and developed for the F/A-18 A/B/C/D aircraft inlet. The design was conceived by NASA and General Electric Aircraft Engines personnel. This rake has been flight qualified and flown in the F/A-18 High Alpha Research Vehicle at NASA Dryden Flight Research Center, Edwards, California. The eight-legged, one-piece, wagon wheel design of the rake was developed at a reduced cost and offered reduced installation time compared to traditional designs. The rake features 40 dual-measurement ports for low- and high-frequency pressure measurements with the high-frequency transducer mounted at the port. This high-frequency transducer offers direct absolute pressure measurements from low to high frequencies of interest, thereby allowing the rake to be used during highly dynamic aircraft maneuvers. Outstanding structural characteristics are inherent to the design through its construction and use of lightweight materials.

Yuhas, Andrew J.↗

Design and development of an F/A-18 inlet distortion rake: A cost and time saving solution

An innovative inlet total-pressure distortion measurement rake has been designed and developed for the F/A-18 A/B/C/D aircraft inlet. The design was conceived by NASA and General Electric Aircraft Engines (Evendale, Ohio). This rake has been flight qualified and flown in the F-18 High Alpha Research Vehicle (HARV) at NASA Dryden Flight Research Center. The rake's eight-legged, one-piece wagon wheel design was developed at a reduced cost and offers reduced installation time compared with traditional designs. The rake features 40 dual measurement ports for both low- and high-frequency pressure measurements with the high-frequency transducer mounted at the port. The high-frequency transducer offers direct absolute pressure measurements from low frequency to the highest frequency of interest, thereby allowing the rake to be used during highly dynamic aircraft maneuvers. Outstanding structural characteristics are inherent to the design through its construction and use of lightweight materials.

Yuhas, Andrew J.↗

Performance of a small annular turbojet combustor designed for low cost

Performance investigations were conducted on a combustor utilizing several cost-reducing innovations and designed for use in a low-cost 4448-N thrust turbojet engine for commercial light aircraft. Low-cost features included simple, air-atomizing fuel injectors; combustor liners of perforated sheet; and the use of inexpensive type 304 stainless-steel material. Combustion efficiencies at the cruise and sea-level-takeoff design points were approximately 97 and 98 percent, respectively. The combustor isothermal pressure loss was 6.3 percent at the cruise-condition diffuser inlet Mach number of 0.34. The combustor exit temperature pattern factor was less than 0.24 at both the cruise and sea-level-takeoff design points. The combustor exit average radial temperature profiles at all conditions were in very good agreement with the design profile.

Fear, J. S.↗

Cost study of solar cell space power systems

Historical costs for solar cell space power systems were evaluated. The study covered thirteen missions that represented a broad cross section of flight projects over the past decade. Fully burdened costs in terms of 1971 dollars are presented for the system and the solar array. The costs correlate reasonably well with array area and do not increase in proportion to array area. The trends for array costs support the contention that solar cell and module standardization reduce costs.

Bernatowicz, D. T.↗

Titan Orbiter Aerorover Mission

We propose a combined Titan orbiter and Titan Aerorover mission with an emphasis on both in situ and remote sensing measurements of Titan's surface, atmosphere, ionosphere, and magnetospheric interaction. The biological aspect of the Titan environment will be emphasized by the mission (i.e., search for organic materials which may include simple organics to 'amono' analogues of amino acids and possibly more complex, lightening detection and infrared, ultraviolet, and charged particle interactions with Titan's surface and atmosphere). An international mission is assumed to control costs. NASA will provide the orbiter, launch vehicle, DSN coverage and operations, while international partners will provide the Aerorover and up to 30% of the cost for the scientific instruments through collaborative efforts. To further reduce costs we propose a single PI for orbiter science instruments and a single PI for Aerorover science instruments. This approach will provide single command/data and power interface between spacecraft and orbiter instruments that will have redundant central DPU and power converter for their instruments. A similar approach could be used for the Aerorover. The mission profile will be constructed to minimize conflicts between Aerorover science, orbiter radar science, orbiter radio science, orbiter imaging science, and orbiter fields and particles (FP) science. Additional information is contained in the original extended abstract.

Sittler Jr., E. C.↗