Onboard orbit estimation with tracking and data relay satellite system data
Previously cited in issue 22, p. 3823, Accession no. A81-45856
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Previously cited in issue 22, p. 3823, Accession no. A81-45856
The results of a study to analyze the dependence of TDRSS user spacecraft orbit determination consistencies on varying tracking schedules are presented. In this study, the TDRS-East orbit determination results obtained utilizing Bilateration Ranging Transponder System data were evaluated. Six state parameters, three position and three velocity components and the solar radiation pressure coefficient, are estimated for TDRS-East. It is concluded that, in order to achieve high-precision orbit determination, the tracking coverage should not fall below 10 minutes every two orbits as decreasing it to every four orbits will significantly degrade the accuracy; present state-of-the-art consistency in orbit determination using TDRSS tracking is approximately 15 to 20 meters.
The Mars Network provides proximity based communications and navigation services to support Mars exploration. The network will be comprised of science orbiters with a MN relay transceiver, and potentially, dedicated telecommunication orbiters. The common MN transceiver, called Electra, is currently in deployment, and is being designed for both communications and radiometric tracking.
The main purpose of the Small Space-Based Geosynchronous Earth orbiting (GEO) satellite is to provide a space link to the user mission spacecraft for relaying data through ground networks to user Mission Control Centers. The Small Space Based Satellite (SSBS) will provide services comparable to those of a NASA Tracking Data Relay Satellite (TDRS) for the same type of links. The SSBS services will keep the user burden the same or lower than for TDRS and will support the same or higher data rates than those currently supported by TDRS. At present, TDRSS provides links and coverage below GEO; however, SSBS links and coverage capability to above GEO missions are being considered for the future, especially for Human Space Flight Missions (HSF). There is also a rising need for the capability to support high data rate links (exceeding 1 Gbps) for imaging applications. The communication payload on the SSBS will provide S/Ka-band single access links to the mission and a Ku-band link to the ground, with an optical communication payload as an option. To design the communication payload, various link budgets were analyzed and many possible operational scenarios examined. To reduce user burden, using a larger-sized antenna than is currently in use by TDRS was considered. Because of the SSBS design size, it was found that a SpaceX Falcon 9 rocket could deliver three SSBSs to GEO. This will greatly reduce the launch costs per satellite. Using electric propulsion was also evaluated versus using chemical propulsion; the power system size and time to orbit for various power systems were also considered. This paper will describe how the SSBS will meet future service requirements, concept of operations, and the design to meet NASA users' needs for below and above GEO missions. These users' needs not only address the observational mission requirements but also possible HSF missions to the year 2030. We will provide the trade-off analysis of the communication payload design in terms of the number of links looking above and below GEO; the detailed design of a GEO SSBS spacecraft bus and its accommodation of the communication payload, and a summary of the trade study that resulted in the selection of the Falcon 9 launch vehicle to deploy the SSBS and its impact on cost reductions per satellite. ======================================================================== Several initiatives have taken place within NASA1 and international space agencies2 to create a human exploration strategy for expanding human presence into the solar system; these initiatives have been driven by multiple factors to benefit Earth. Of the many elements in the strategy one stands out: to send robotic and human missions to destinations beyond Low Earth Orbit (LEO), including cis-lunar space, Near-Earth Asteroids (NEAs), the Moon, and Mars and its moons.3, 4 The time frame for human exploration to various destinations, based on the public information available,1,4 is shown in Figure 1. Advance planning is needed to define how future space communications services will be provided in the new budget environment to meet future space communications needs. The spacecraft for these missions can be dispersed anywhere from below LEO to beyond GEO, and to various destinations within the solar system. NASA's Space Communications and Navigation (SCaN) program office provides communication and tracking services to space missions during launch, in-orbit testing, and operation phases. Currently, SCaN's space networking relay satellites mainly provide services to users below GEO, at Near Earth Orbit (NEO), below LEO, and in deep space. The potential exists for using a space-based relay satellite, located in the vicinity of various solar system destinations, to provide communication space links to missions both below and above its orbit. Such relays can meet the needs of human exploration missions for maximum connectivity to Earth locations and for reduced latency. In the past, several studies assessed the ability of satellite-based relays working above GEO in conjunction with Earth ground stations. Many of these focused on the trade between space relay and direct-to-Earth station links5,6,7. Several others focused on top-level architecture based on relays at various destinations8,9,10,11,12. Much has changed in terms of microwave and optical technology since the publication of the referenced papers; Ka-band communication systems are being deployed, optical communication is being demonstrated, and spacecraft buses are becoming increasingly more functional and operational. A design concept study was undertaken to access the potential for deploying a Small Space-Based Satellite (SSBS) relay capable of serving missions between LEO and NEO. The needs of future human exploration missions were analyzed, and a notional relay-based architecture concept was generated as shown in Fig. 1. Relay satellites in Earth through cis-Lunar orbits are normally located in stable orbits requiring low fuel consumption. Relay satellites for Mars orbit are normally selected based on the mission requirement and projected fuel consumption. Relay satellites have extreme commonalities of functions between them, differing only in the redundancy and frequencies used; therefore, the relay satellite in GEO was selected for further analysis since it will be the first step in achieving a relay-based architecture for human exploration missions (see Fig.Figure 2). The mission design methodology developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team13 was used to produce the satellite relay design and to perform various design trades. At the start of the activity, the team was provided with the detailed concept of the notional architecture and the system and communication payload drivers.
This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.
A study has been performed to assess the feasibility of using a second Galileo spacecraft for a Titan-probe/Saturn-orbiter mission that would be launched on a Shuttle/Centaur in the early 1990s. The interplanetary transfer is accomplished by means of a Delta-V earth-gravity-assist trajectory with a 3-year flight time from launch to earth flyby. Just prior to arrival at Saturn, the Titan probe is released, and the orbiter is used to relay data from the probe back to earth as it performs a close gravity-assist flyby of Titan. The orbiter then conducts a satellite tour containing multiple encounters with Saturn's satellites. Discussed in detail are the optimal trajectory design, Saturn approach trajectory design (Titan flyby, probe relay, and initial orbit selection), satellite tour design, and mission performance.
The mission profile, instrumentation, and mission objectives of the Galileo probe are described. Scheduled for Shuttle launch in 1986, with a boost from the Centaur upper stage, the probe will require over 2 yr to reach the Jovian system. An atmospheric entry probe will be released during Jupiter approach, and the orbiting module will relay the temperature, pressure, radio signals, spectroscopy, magnetometry, and particle counts, originating from the parachuting probe. The orbiting module will then continue on to a series of flybys and orbits around the Jovian moons by using a gravity assist from Jupiter after each pass of a moon. The orbiter will record spectrometric, radiometric, dust, visual, magnetic, and radio propagation data. The television camera is a CCD device with 640,000 diodes forming an 800 x 800 array in one square centimeter.
The growth of the Tracking and Data Relay Satellite System (TDRSS) is the result of a greater reliance on the systems to provide nearly global coverage for relaying data from environmental satellites and to reduce or eliminate the reliance on global networks of tracking ground stations. Tracking data collected by TDRSS is often used to compute orbital solutions for moperational mission requirements. Investigations are in progress that seek to assess the feasibility of extending the use of tracking data collected by TDRSS as a means for computing precise orbital solutions. Specifically, this investigation will use covariance analysis techniques to evaluate this extended capability as applied to the TOPEX/Poseidon mission. This study will complement other investigations which carry out similar assessments of TDRSS using actual tracking data. This paper presents some preliminary results for Cycle 5 of the TOPEX/Poseidon mission using simulated two-way range-rate measurements.
The Mars Sample Return (MSR) Campaign is a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR will, for the firsttime ever, present a need to communicate with multiple surfaceassets that are co-located on Mars in a coordinated effort toaccomplish the unified objective of fetching, transporting, andreturning samples from Mars. Currently, Mars surface assetsrelay data to and from Earth using a number of orbiters inwhat’s known as the Mars Relay Network (MRN). This networkis characterized by a small number of surface assets distributedacross the Martian globe and a larger number of orbiters toprovide relay services. As of June 2020, there are two surfaceassets for which five orbiters are providing relay. During theMSR Campaign, there will be two rovers and a lander that allwill require relay communication from a small number of Marsorbiters to meet the aggressive MSR timeline. The inversion ofthe current MRN paradigm, a system of many surface assetsrequiring relay and few orbiters to provide relay, necessitatesthe unique challenge of optimally allocating relay passes tomaximize the operational capability of all assets. The allocationmust consider a large number of trade variables includingMars asset operational requirements and Earth ground systemconstraints, including staffing schedules, operations planningacross time zones, and more. To address these telecommunicationchallenges, the Mars Asset Relay Mission Link AllocationDesign Environment (MARMLADE) tool was developed. Itis a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets andquantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbitergeometry and telecommunication capabilities provided by JPL’sTelecom Orbit Analysis and Simulation Tool (TOAST) softwareto compute which asset should get each pass based on a seriesof heuristics and predictions of all assets’ states. WithinMARMLADE, the user can provide inputs including the optionfor time-based pass splitting, fixed FWD data rate capabilities,DFE communication capabilities, and link parameters allowingfor the assessment of complex operations and hardware tradesusing surface mission operational efficiency as a primary figureof merit. As the MSR mission concepts continue to mature,MARMLADE is being used to assess ability of all MSR elementsto meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.
In [1] and [2], we introduce a new geometric trilateration method that simultaneously performs absolute positioning and relative positioning. The relative position is derived from a “differencing” function of two raw-range measurements between a known reference point and of the target from a navigation satellite, thereby eliminating most of the common errors like atmospheric delays, ephemeris errors, and instrument delays in real-time. In the Mars environment this “error-cancellation” function greatly reduces the need to perform extensive orbit determination (OD) of the navigation satellites like the Earth’s GPS, and only requires occasional tracks from the Earth’s large-aperture deep space antennas to perform OD’s. Leveraging on this scheme, we propose a low-cost, low-maintenance regional navigation satellite system architecture that provides in-situ navigation and timing services for robotic and human missions in the vicinity of a Mars landing site. This architecture is built upon the proposed Mars relay network infrastructure, and a number of notional Mars orbiting and surface missions in the human exploration era of Mars. We assume two areostationary Mars relay orbiters that have continuous line-of-sight visibility with the Mars landing site, a Deep Space Habitat (DSH) in an inclined 48-hour circular orbit, and a surface communication lander that could serve as the reference point. These orbiting and surface infrastructure elements broadcast GPS-like ranging signals and other ephemeris information to the mission users. With one or more additional orbiters in areosynchronous orbits that trace around a figure-8 path, a regional navigation satellite system can be realized that provides in-situ course absolute localization and precision relative localization and timing services to the users in the vicinity of a Mars landing site. This paper describes the system concept of the proposed Mars regional navigation satellite system.
Relay II satellite orbit perturbations due to lunar and solar gravitational effects and solar radiation pressure
This software provides a new capability for landed Mars assets to perform forward link relay through the Mars Express (MEX) European Union orbital spacecraft. It solves the problem of standardizing the relay interface between lander missions and MEX. The Mars Operations Relay Service (MaROS) is intended as a central point for relay planning and post-pass analysis for all Mars landed and orbital assets. Through the first two phases of implementation, MaROS supports relay coordination through the Odyssey orbiter and the Mars Reconnaissance Orbiter (MRO). With this new software, MaROS now fully integrates the Mars Express spacecraft into the relay picture. This new software generates and manages a new set of file formats that allows for relay request to MEX for forward and return link relay, including the parameters specific to MEX. Existing MEX relay planning interactions were performed via email exchanges and point-to-point file transfers. By integrating MEX into MaROS, all transactions are managed by a centralized service for tracking and analysis. Additionally, all lander missions have a single, shared interface with MEX and do not have to integrate on a mission-by mission basis. Relay is a critical element of Mars lander data management. Landed assets depend largely upon orbital relay for data delivery, which can be impacted by the availability and health of each orbiter in the network. At any time, an issue may occur to prevent relay. For this reason, it is imperative that all possible orbital assets be integrated into the overall relay picture.
The National Aeronautics and Space Administration (NASA) has developed the Tracking and Data Relay Satellite (TDRS) System (TDRSS) for tracking and communications support of low Earth-orbiting satellites. TDRSS has the operational capability of providing 85% coverage for TDRSS-user spacecraft. TDRSS currently consists of five geosynchronous spacecraft and the White Sands Complex (WSC) at White Sands, New Mexico. The Bilateration Ranging Transponder System (BRTS) provides range and Doppler measurements for each TDRS. The ground-based BRTS transponders are tracked as if they were TDRSS-user spacecraft. Since the positions of the BRTS transponders are known, their radiometric tracking measurements can be used to provide a well-determined ephemeris for the TDRS spacecraft. For high-accuracy orbit determination of a TDRSS user, such as the Ocean Topography Experiment (TOPEX)/Poseidon spacecraft, high-accuracy TDRS orbits are required. This paper reports on successive refinements in improved techniques and procedures leading to more accurate TDRS orbit determination strategies using the Goddard Trajectory Determination System (GTDS). These strategies range from the standard operational solution using only the BRTS tracking measurements to a sophisticated iterative process involving several successive simultaneous solutions for multiple TDRSs and a TDRSS-user spacecraft. Results are presented for GTDS-generated TDRS ephemerides produced in simultaneous solutions with the TOPEX/Poseidon spacecraft. Strategies with different user spacecraft, as well as schemes for recovering accurate TDRS orbits following a TDRS maneuver, are also presented. In addition, a comprehensive assessment and evaluation of alternative strategies for TDRS orbit determination, excluding BRTS tracking measurements, are presented.
The Lunar Relay Satellite (LRS) COllaborative Modeling and Parametric Assessment of Space Systems (COMPASS) session was tasked to design a satellite to orbit in an elliptical lunar polar orbit to provide relay communications between lunar South Pole assets and the Earth. The design included a complete master equipment list, power requirement list, configuration design, and brief risk assessment and cost analysis. The LRS is a half-TDRSS sized box spacecraft, which provides communications and navigation relay between lunar outposts (via Lunar Communications Terminals (LCT)) or Sortie parties (with user radios) and large ground antennas on Earth. The LRS consists of a spacecraft containing all the communications and avionics equipment designed by NASA Jet Propulsion Laboratory s (JPL) Team X to perform the relay between lunar-based assets and the Earth. The satellite design is a standard box truss spacecraft design with a thermal control system, 1.7 m solar arrays for 1 kWe power, a 1 m diameter Ka/S band dish which provides relay communications with the LCT, and a Q-band dish for communications to/from the Earth based assets. While JPL's Team X and Goddard Space Flight Center s (GSFC) I M Design Center (IMDC) have completed two other LRS designs, this NASA Glenn Research Center (GRC) COMPASS LRS design sits between them in terms of physical size and capabilities.
The Second Robotic Lunar Exploration Program (RLEP) mission has two primary objectives. Broadly stated, they are "To See the Light" and "To Touch the Ice", meaning one mission objective is to survey the lighting conditions on the rim of a candidate crater over the course of a year, and the second objective is to descend into th.! s crater to search for water ice. The Space Communications Program Office at NASA/GSFC is supporting the RLEP-2 Project by developing a communications and navigation architecture for the mission. The primary candidate crater studied is the Shackleton Crater near the South Pole of the Moon. The rim of this crater has approximately 14 contiguous days of visibility to the Earth over the course of a month, while mission elements in the crater have no line of sight to either the Earth or potentially an element on the rim of the crater. One solution studied is to launch a relay spacecraft with RLEP-2 to provide communications and navigation services to the elements on the lunar surface. To support operations concepts requiring long duration contacts between the relay and the elements in the crater, an inclined elliptical orbit originally conceived by Todd Ely a t JPL was chosen for the relay. The orbit was adjusted to lower the maximum range while maintaining its "frozen" nature, meaning once placed in this orbit little delta-V is required for orbit maintenance. The orbital parameters were adjusted such that the relay has visibility into the crater for approximately 8.7 hours of the 12 hour orbital period. The relay satellite design draws heavily upon heritage concepts and hardware to achieve a very low risk implementation. The design concept is a 3-axis spacecraft that is capable of supporting return communication links from multiple surface elements concurrently through a four-element S-Band Multiple Access phased array with two forward links provided through single dedicated elements. The payload is a bent-pipe relay with beamforming performed on the ground (Earth). To mitigate concerns with multipath observed during Mars missions, the preliminary design employs PN-spread signal structures which have been used successfully by Tracking and Data Relay Satellite System (TDRSS) users for simultaneous real-time and recorded data playback. Details of the relay communication trade studies and rationale for the selected design elements are discussed in the paper.
Introduction: Uranus was identified as the third highest priority flagship mission in the 2012-2022 Planetary Science Decadal Survey. This latest concept study was requested by the Decadal Survey panel to determine NASA’s planetary science priorities from 2022-2032. This study focused on the probe’s entry and descent aspects and associated trades for viable trajectory options. Uranus Mission and Descent Probe: The proposed Uranus Orbiter and Probe (UOP) Flagship mission will investigate Uranus and its surrounding moons using an orbiting spacecraft with a Uranus descent probe. Unlike previous studies the probe release will occur after orbit insertion allowing sufficient separation of critical events during the orbit insertion burn. The probe will be released at an altitude that allows one hour of in situ atmospheric readings that will be relayed to the orbiter. Afterwards the orbiter will transition to the moon tour phase of the mission. The configuration chosen for the entry aeroshell was a 45° sphere-cone. This shape has been used in the past in the Pioneer Venus Galileo missions. However, the nose radius considered in the present study differed from the values used in either of the previous configurations, primarily to reduce the heat flux at the stagnation point. A two-step approach was used in the development of flight trajectories for the chosen configuration. In the first step, the trajectory code POST2 was used to screen the thousands of entry states provided by interplanetary trajectory simulations, which were terminated at an altitude of 2000 km from the reference surface (1 bar) of Uranus. The screening criteria were: (i) optimization of the communication geometry between the entry probe and orbiter to ensure at least 1 hour of science measurements, (ii) peak stagnation point pressures to be less than six bar, (iii) peak heat fluxes to be less than 5 kW/cm2; the latter two constraints being the limits of ground-test capabilities of the arc jets at NASA Ames Research Center. The entry team investigated two trajectories that met the criteria above, a shallow entry (high heat load ~44 kJ/cm2) and a steeper entry (high heat rate ~1950 W/cm2). In the second step, the two bounding candidate entry states from the POST2 screening process were used in developing flight trajectories using TRAJ coupled with FIAT (a materials thermal response and sizing code) and a margins policy to determine a margined uniform thickness (hence mass) of the forward heatshield material based on the aerothermal environments at the stagnation point. Since the combination of TRAJ and FIAT size the TPS based on stagnation point environments only, flow field computations using DPLR were necessary to determine turbulent aerothermal environments on the conical flank, and the augmentation of these environments due to surface roughness. The environments at select locations on the forward heatshield were then used to size the thermal protection material, with the largest thickness value then used to estimate the mass. The newly developed woven thermal protection material –HEEET (Heatshield for Extreme Entry Environments Technology) –was considered for the forward heatshield and PICA (Phenolic-Impregnated Carbon Ablator) was considered for the backshell. These NASA-developed materials are at TRL 6 and TRL 9, respectively. Furthermore, two options were considered for the HEEET material: (i) a dual-layer option with a denser recession layer on top and an insulative layer underneath it, and (ii) a single layer option consisting of the insulative layer alone. Results: It is clear that probe entry states are feasible and the selected TPS options are able to perform in the predicted aerothermal environments thus enabling the mission to meet of the descent probe portion of this flagship mission
The Cassini/Huygens mission is an international cooperative effort between NASA, the European Space Agency, and the Italian Space Agency to conduct a scientific investigation of the Saturnian system. The spacecraft, which was launched in October of 1997, will use a Venus-Venus-Earth-Jupiter gravity assisted trajectory to arrive at Saturn in July of 2004. The spacecraft, composed of an orbiter and an atmospheric entry probe, will be placed in orbit about Saturn, after which the Huygens probe will be released to enter the atmosphere of Titan, the largest moon of Saturn. The probe data is transmitted during its descent and possible survival on the surface to the orbiter overhead, where it is stored and later relayed to Earth. The orbiter then continues in a four-year mission about Saturn, conducting detailed studies of the atmosphere, the rings, the magnetosphere, Titan, and the icy satellites. The probe carries six instruments to explore the atmosphere and surface of Titan; the orbiter carries twelve instruments for its investigations. This paper characterizes the performance of the Cassini/Huygens spacecraft during its first year and three-quarters of flight, up through the second of the two Venus flybys. The flight system, including the 18 scientific instruments, is described, as well as the detailed overall objectives of the mission.
A relay satellite following a halo trajectory will always maintain line-of-sight contact with the earth and the moon's far side. The Integrated Program Plan for lunar exploration in the 1980s and beyond calls for a fully reusable earth-moon transportation system. The principal elements of the system are a Translunar Shuttle, a Lunar-Orbit Space Station or Halo-Orbit Space Station, and a Lunar Space Tug. It is shown that a halo-orbit space station could offer important operational and performance advantages compared to a lunar-orbit station in a second-generation lunar program.