Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

An Overview of Wind Energy Production Prediction Bias, Losses, and Uncertainties

The financing of a wind farm directly relates to the preconstruction energy yield assessments which estimate the annual energy production for the farm. The accuracy and the precision of the preconstruction energy estimates can dictate the profitability of the wind project. Historically, the wind industry tended to overpredict the annual energy production of wind farms. Experts have been dedicated to eliminating such prediction errors in the past decade, and recently the industry is recording near-zero average energy prediction bias. Herein, we present an overview of the energy yield assessment errors across the global wind energy industry. We identify a long-term trend of reduction in the overprediction bias, whereas the uncertainty associated with the prediction error is prominent. We also summarize the recent advancements of the wind resource assessment process that justify the bias reduction, including the improvements in modeling and measurement techniques. Additionally, because the energy losses and uncertainties substantially influence the prediction error, we document and examine the estimated and observed loss and uncertainty values from the literature, according to the proposed framework in the International Electrotechnical Commission 61400-15 wind resource assessment standard. From our findings, we highlight the opportunities for the industry to move forward, such as the validation and reduction of prediction uncertainty, and the prevention of energy losses caused by wake effect and environmental events. Overall, this study provides a summary on how the wind energy industry has been quantifying and reducing prediction errors, energy losses, and production uncertainties. Finally, for this work to be as reproducible as possible, we include all of the data used in the analysis in appendices to the manuscript.

literature review↗

Physically based correction of systematic errors of Rotating Shadowband Irradiometers

Accurate measurements of direct normal, diffuse horizontal and global horizontal irradiance (DNI, DHI and GHI) are needed for meteorological studies and are essential for the solar resource assessment at potential solar power plant sites. Often, these potential sites are remote and hence require robust sensors that require minimal maintenance that are not affected strongly by soiling. Therefore, Rotating Shadowband Irradiometers (RSI) are widely used for resource assessment. To achieve the required accuracy, corrections for the raw values of RSIs depending on systematic temperature, incidence angle and spectral errors must be used, and a thorough calibration of the sensor head must be applied. The existing correction functions are derived from comparisons of RSIs to thermopile radiometers at selected sites and therefore empirical. Their accuracy is considered to be site dependent. In this work a new correction and calibration method is presented that removes the systematic errors using a physical approach. It is based on information of the sensor properties as well as measurements of its directional response, and incorporates the atmospheric conditions at the measurement site. In this case, no empiric relations obtained from a specific site are required. The method requires estimates of the current DHI and GHI spectra during each measurement of the RSI. Based on these spectra, a spectral correction, which includes a spectrum dependent temperature correction, can be made without employing empirical relationships. The new physical calibration and correction method is tested at three sites and reaches similar results compared to the empirical functions. This is already achieved with rudimentary estimations of the GHI and DHI spectra and we expect that these estimations can be improved in the future. The results indicate that the physical approach reduces the problematic location dependence of the current calibration and correction methods. The physical correction and calibration method show promise for a further improvement of the RSI accuracy.

47 OTHER INSTRUMENTATION↗

Analysis of Selected Publicly Available Geothermal Exploration Data Gaps

As part of a United States Department of Energy (DOE) supported retrospective analysis of DOE's Play Fairway Analysis (PFA) projects, the National Renewable Energy Laboratory (NREL) compiled and analyzed publicly available geothermal exploration datasets to identify and highlight data gaps in areas prospective for hosting geothermal resources. The analysis was intended to understand the existing geographic coverage of selected datasets commonly utilized both by the PFA projects and geothermal developers during resource assessments including geologic mapping, temperature gradient drilling, and aeromagnetic, gravimetric, and lidar surveys. Results indicate that broad areas of the western United States estimated to have geothermal potential lack sufficient geologic and geophysical coverage necessary for even regional resource exploration. The study directly informed the recent Geoscience Data Acquisition for Western Nevada, or GeoDAWN - which united DOE's Geothermal Technologies Office (GTO) with the U.S. Geological Survey (USGS) of the U.S. Department of the Interior to assist U.S. needs for energy and critical minerals. The study also has the potential to inform public investment in further data acquisition for characterization of the Earth both for geothermal and other natural resource assessments.

data↗

Factors Determining Commercially Optimal Development Strategies for CO 2 Storage With and Without CO 2 -EOR

This report is a draft white paper on the factors determining commercially optimal development strategies for CO 2 storage with and without CO 2 -EOR. The draft report provides a summary of accomplishments during the first budget period of the Southeast Offshore Storage Resource Assessment for the Gulf of Mexico (SECARB Offshore GOM) project. It also identifies “Next Steps” to be undertaken during Budget Period II. A final white paper will be prepared at the end of Budget Period II. The goal of this draft white paper is to expand the knowledge base required for commercially viable, secure, longterm, large-scale carbon dioxide (CO 2 ) subsea storage in the U.S. Gulf of Mexico (GOM), both with and without enhanced hydrocarbon recovery. This effort supports the U.S. Department of Energy’s (DOE) long-term objective of ensuring a comprehensive assessment of the potential for offshore CO 2 subsea storage in the GOM. The groundwork that has been completed in the draft white paper advanced by expanding the membership of the Southern States Energy Board’s (SSEB) existing Southeast Offshore Storage Resource Assessment (DE-FE0026082) GOM government-industry partnership during the next budget period. Further, the team plans to consult with U.S. federal and state agencies to develop recommendations to remove barriers and streamline the regulatory process to encourage subsea CO 2 storage with or without enhanced hydrocarbon recovery.

02 PETROLEUM↗

Acoustic Impedance Inversions for Offshore CO 2 Storage: South Georgia Embayment, United States

This study builds and expands on previous CO 2 storage resource assessment studies of the southeastern offshore Atlantic margin by providing a detailed evaluation on how rock porosities and permeabilities are distributed across the Upper Cretaceous strata restricted to the South Georgia Embayment (SGE). Using legacy industry two-dimensional seismic reflection and well data, this assessment is the first application of multiple seismic inversion techniques in this area. This workflow provides a reliable and repeatable model-based inversion which gives an improved image to discriminate lithology and predict porosity. The workflow is applicable to future CO 2 storage resource assessment studies elsewhere. The inversion results indicate that distinct porosity and permeability regimes are present and distributed in the Upper Cretaceous strata within the SGE. The impedance and porosity relationships show well-founded and reliable correlation. These relationships reveal low impedance coincident to the high porosity intervals which are proposed as potential reservoir intervals for CO 2 storage. In addition, the result shows that the Upper Cretaceous strata have two main potential reservoirs in the lower part. These are overlain by a thick impermeable interval, mostly shale, which has high impedance, low porosity, and low permeability and extends within the SGE. This result is in agreement with a previous study that also proposed two significant storage reservoirs for CO 2 in the Upper Cretaceous strata. Since porosity distribution is estimated using multiple methods, it follows the trends of seismic signature and structures of the Upper Cretaceous strata. The extracted values of porosity, ranging from 15 to 36%, and permeability, ranging from 1 to 100 mD, are close to the measured values from the well core data at the Upper Cretaceous strata interval.

54 ENVIRONMENTAL SCIENCES↗

Alaskan resources, current development. Traditional cultural values, and the role of LANDSAT data in current and future land use management planning

Past, present, and proposed applications of LANDSAT data for renewable resource assessments in Alaska are described. Specific projects briefly discussed include: a feasibility investigation applying LANDSAT data to caribou habitat mapping in northeast Alaska, analysis of a native corporate region in southwest Alaska, analysis of a game management unit in interior Alaska, and two proposed analyses in northwest Alaska. These analyses principally address range evaluations concerning caribou, moose, and Dall sheep, but results have application to other renewable resource themes. Application of resource assessment results to a statewide land use management plan is discussed.

Laperriere, A. J.↗

Benchmarking Near-Surface Winds in the HRRR Analyses Using Multisource Observations over Complex Terrain in the Southeastern United States

Wind energy plays a crucial role in sustainable power generation, yet its full potential in the southeast United States (SEUS) remains underexplored. This study advances wind resource assessment in the SEUS using existing regional modeling and multisource observations. We find that terrain complexity, influenced by orography and forest canopy, significantly impacts the accuracy of modeled wind speed. While the High-Resolution Rapid Refresh (HRRR) model effectively simulates wind profiles over flat, nonforested terrain, larger errors are produced above forest canopies, and particularly for those stands in hilly and mountainous terrain where there are no observations aloft that could be used by HRRR’s data assimilation software. Seasonal variations, e.g., changes in the leaf area index, further complicate the relationship between terrain complexity and simulation errors. Here, our findings emphasize the critical need for comprehensive wind profile measurements, extending from below the canopy to height above the canopy and through the lower planetary boundary layer, to fully quantify model performance over and near forests, and for improving wind resource assessment, planning, and management. This study provides valuable insights not only for further model development but also for future field campaign deployment with the goal of further improving our understanding of wind resources in the region.

Complex terrain↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Trees Outside Forests are an Underestimated Resource in a Country with Low Forest Cover

Trees outside forests (TOF) are an underrepresented resource in forest poor nations. As a result of their frequent omission from national forest resource assessments and a lack of readily available very-high-resolution remotely sensed imagery, TOF status and characterization has until now, been unknown. Here, we assess the capacity of openly available 10 m ESA Sentinel constellation satellite imagery for mapping TOF extent at the national level in Bangladesh. In addition, we estimate canopy height for TOF using a TanDEM-X DEM. We map 2,233,578 ha of TOF in Bangladesh with a mean canopy height of 7.3 m. We map 31 and 53% more TOF than existing estimates of TOF and forest, respectively. We find TOF in Bangladesh is nationally fragmented as a consequence of agricultural activity, yet is capable of maintaining connectedness between remaining stands. Now, TOF accounting is feasible at the national scale using readily available datasets, enabling the mainstream inclusion of TOF in national forest resource assessments for other countries.

Nathan Thomas↗

Geophysical Methods: an Overview

Geophysics is expected to have a major role in lunar resource assessment when manned systems return to the Moon. Geophysical measurements made from a lunar rover will contribute to a number of key studies: estimating regolith thickness, detection of possible large-diameter lava tubes within maria basalts, detection of possible subsurface ice in polar regions, detection of conductive minerals that formed directly from a melt (orthomagmatic sulfides of Cu, Ni, Co), and mapping lunar geology beneath the regolith. The techniques that can be used are dictated both by objectives and by our abilities to adapt current technology to lunar conditions. Instrument size, weight, power requirements, and freedom from orientation errors are factors we have considered. Among the geophysical methods we believe to be appropriate for a lunar resource assessment are magnetics, including gradiometry, time-domain magnetic induction, ground-penetrating radar, seismic reflection, and gravimetry.

Becker, A.↗

CEOS Contributions to Informing Energy Management and Policy Decision Making Using Space-Based Earth Observations

Earth observations are playing an increasingly significant role in informing decision making in the energy sector. In renewable energy applications, space-based observations now routinely augment sparse ground-based observations used as input for renewable energy resource assessment applications. As one of the nine Group on Earth Observations (GEO) societal benefit areas, the enhancement of management and policy decision making in the energy sector is receiving attention in activities conducted by the Committee on Earth Observation Satellites (CEOS). CEOS has become the "space arm" for the implementation of the Global Earth Observation System of Systems (GEOSS) vision. It is directly supporting the space-based, near-term tasks articulated in the GEO three-year work plan. This paper describes a coordinated program of demonstration projects conducted by CEOS member agencies and partners to utilize Earth observations to enhance energy management end-user decision support systems. I discuss the importance of engagement with stakeholders and understanding their decision support needs in successfully increasing the uptake of Earth observation products for societal benefit. Several case studies are presented, demonstrating the importance of providing data sets in formats and units familiar and immediately usable by decision makers. These projects show the utility of Earth observations to enhance renewable energy resource assessment in the developing world, forecast space-weather impacts on the power grid, and improve energy efficiency in the built environment.

Eckman, Richard S.↗

Application of Satellite Gravimetry for Water Resource Vulnerability Assessment

The force of Earth's gravity field varies in proportion to the amount of mass near the surface. Spatial and temporal variations in the gravity field can be measured via their effects on the orbits of satellites. The Gravity Recovery and Climate Experiment (GRACE) is the first satellite mission dedicated to monitoring temporal variations in the gravity field. The monthly gravity anomaly maps that have been delivered by GRACE since 2002 are being used to infer changes in terrestrial water storage (the sum of groundwater, soil moisture, surface waters, and snow and ice), which are the primary source of gravity variability on monthly to decadal timescales after atmospheric and oceanic circulation effects have been removed. Other remote sensing techniques are unable to detect water below the first few centimeters of the land surface. Conventional ground based techniques can be used to monitor terrestrial water storage, but groundwater, soil moisture, and snow observation networks are sparse in most of the world, and the countries that do collect such data rarely are willing to share them. Thus GRACE is unique in its ability to provide global data on variations in the availability of fresh water, which is both vital to life on land and vulnerable to climate variability and mismanagement. This chapter describes the unique and challenging aspects of GRACE terrestrial water storage data, examples of how the data have been used for research and applications related to fresh water vulnerability and change, and prospects for continued contributions of satellite gravimetry to water resources science and policy.

Rodell, Matthew↗

An independent analysis of bias sources and variability in wind plant pre-construction energy yield estimation methods

The wind resource assessment community has long had the goal of reducing the bias between wind plant pre-construction energy yield assessment (EYA) and the observed annual energy production (AEP). This comparison is typically made between the 50% probability of exceedance (P50) value of the EYA and the long-term corrected operational AEP (hereafter OA P50), and is known as the P50 bias. The industry has critically lacked an independent analysis of bias reduction investigated across multiple consultants to identify the greatest sources of uncertainty and variance in the EYA process and the best opportunities for uncertainty reduction. The present study addresses this gap by benchmarking consultant methodologies against each other and against operational data at a scale not seen before in industry collaborations. We consider data from 10 wind plants and evaluate discrepancies between eight consultancies in the steps taken from estimates of gross to net energy. Consultants tend to overestimate the gross energy produced at the turbines and then compensate by further overestimating downstream losses, leading to a mean P50 bias near zero, still with significant variability among the individual wind plants. Within our data sample, we find that consultant estimates of all loss categories, except environmental losses, tend to reduce the project-to-project variability of the P50 bias. The disagreement between consultants, however, remains flat throughout the addition of losses. Finally, we find that differences in consultants’ estimates of project performance can lead to differences up to $10/MWh in the levelized cost of energy for a wind plant.

Todd, Austin C.↗

Evaluating the WFIP2 updates to the HRRR model using scanning Doppler lidar measurements in the complex terrain of the Columbia River Basin

The wind-energy (WE) industry relies on numerical weather prediction (NWP) forecast models as foundational or base models for many purposes, including wind-resource assessment and wind-power forecasting. During the Second Wind Forecast Improvement Project (WFIP2) in the Columbia River Basin of Oregon and Washington, a significant effort was made to improve NWP forecasts through focused model development, to include experimental refinements to the High Resolution Rapid Refresh (HRRR) model physics and horizontal grid spacing. In this study, the performance of an experimental version of HRRR that includes these refinements is tested against a control version, which corresponds to that of the operational HRRR run by National Oceanic and Atmospheric Administration/National Centers for Environmental Protection at the outset of WFIP2. Furthermore, the effects of horizontal grid resolution were also tested by comparing wind forecasts from the HRRR (with 3-km grid spacing) with those from a finer-resolution HRRR nest with 750-m grid spacing. Model forecasts are validated against accurate wind-profile measurements by three scanning, pulsed Doppler lidars at sites separated by a total distance of 71 km. Model skill and improvements in model skill, attributable to physics refinements and improved horizontal grid resolution, varied by season, by site, and during periods of atmospheric phenomena relevant to WE. In general, model errors were the largest below 150 m above ground level (AGL). Experimental HRRR refinements tended to reduce the mean absolute error (MAE) and other error metrics for many conditions, but degradation in skill (increased MAE) was noted below 150 m AGL at the two lowest-elevation sites at night. Finer resolution was found to produce the most significant reductions in the error metrics.

17 WIND ENERGY↗

Leveraging Improvements in Precipitation Measuring from GPM Mission to Achieve Prediction Improvements in Climate, Weather and Hydrometeorology

The main scientific goal of the GPM mission, currently planned for start in the 2007 time frame, is to investigate important scientific problems arising within the context of global and regional water cycles. These problems cut across a hierarchy of scales and include climate-water cycle interactions, techniques for improving weather and climate predictions, and better methods for combining observed precipitation with hydrometeorological prediction models for applications to hazardous flood-producing storms, seasonal flood/draught conditions, and fresh water resource assessments. The GPM mission will expand the scope of precipitation measurement through the use of a constellation of some 9 satellites, one of which will be an advanced TRMM-like "core" satellite carrying a dual-frequency Ku-Ka band precipitation radar and an advanced, multifrequency passive microwave radiometer with vertical-horizontal polarization discrimination. The other constellation members will include new dedicated satellites and co-existing Operational/research satellites carrying similar (but not identical) passive microwave radiometers. The goal of the constellation is to achieve approximately 3-hour sampling at any spot on the globe. The constellation's orbit architecture will consist of a mix of sun-synchronous and non-sun-synchronous satellites with the core satellite providing measurements of cloud-precipitation microphysical processes plus calibration-quality rainrate retrievals to be used with the other retrieval information to ensure bias-free constellation coverage. GPM is organized internationally, currently involving a partnership between NASA in the US and the National Space Development Agency in Japan. Additionally, the program is actively pursuing agreements with other international partners and domestic scientific agencies and institutions, as well as participation by individual scientists from academia, government, and the private sector to fulfill mission goals and to pave the way for what ultimately is expected to become an internationally-organized operational global precipitation observing system. Notably, the broad societal applications of GPM are reflected in the United Nation s identification of this mission as a foremost candidate for its Peaceful Uses of Space Program. In this presentation, an overview of the GPM mission design will be presented, followed by an explanation of its scientific agenda as an outgrowth of making improvements in rain retrieval accuracy, microphysics dexterity, sampling frequency, and global coverage. All of these improvements offer new means to observe variability in precipitation and water cycle fluxes and to achieve improved predictability of weather, climate, and hydrometeorology. Specifically, the scientific agenda of GPM has been designed to leverage the measurement improvements to improve prognostic model performance, particularly quantitative precipitation forecasting and its linked phenomena at short, intermediate, and extended time scales. The talk will address how GPM measurements will enable better detection of accelerations and decelerations in regional and global water cycle processes and their relationship to climate variability, better impacts of precipitation data assimilation on numerical weather prediction and global climate reanalysis, and better performance from basin scale hydrometeorological models for short and long term flood-drought forecasting and seasonal fresh water resource assessment. Improved hydrometeorological forecasting will be possible by using continuous global precipitation observations to obtain better closure in water budgets and to generate more realistic forcing of the models themselves to achieve more accurate estimates of interception, infiltration, evaporation/transpiration fluxes, storage, and runoff.

Smith, Eric A.↗

Anticipated Improvements in Precipitation Physics and Understanding of Water Cycle from GPM Mission

The GPM mission is currently planned for start in the late-2007 to early-2008 time frame. Its main scientific goal is to help answer pressing scientific problems arising within the context of global and regional water cycles. These problems cut across a hierarchy of scales and include climate-water cycle interactions, techniques for improving weather and climate predictions, and better methods for combining observed precipitation with hydrometeorological prediction models for applications to hazardous flood-producing storms, seasonal flood/draught conditions, and fresh water resource assessments. The GPM mission will expand the scope of precipitation measurement through the use of a constellation of some 9 satellites, one of which will be an advanced TRMM-like core satellite carrying a dual-frequency Ku-Ka band precipitation radar and an advanced, multifrequency passive microwave radiometer with vertical-horizontal polarization discrimination. The other constellation members will include new dedicated satellites and co-existing operational/research satellites carrying similar (but not identical) passive microwave radiometers. The goal of the constellation is to achieve approximately 3-hour sampling at any spot on the globe -- continuously. The constellation s orbit architecture will consist of a mix of sun-synchronous and non-sun-synchronous satellites with the core satellite providing measurements of cloud-precipitation microphysical processes plus calibration-quality rainrate retrievals to be used with the other retrieval information to ensure bias-free constellation coverage. GPM is organized internationally, involving existing, pending, projected, and under-study partnerships which will link NASA and NOAA in the US, NASDA in Japan, ESA in Europe, ISRO in India, CNES in France, and possibly AS1 in Italy, KARI in South Korea, CSA in Canada, and AEB in Brazil. Additionally, the program is actively pursuing agreements with other international collaborators and domestic scientific agencies and institutions, as well as participation by individual scientists from academia, government, and the private sector to fulfill mission goals and to pave the way for what is expected to become an internationally-organized operational global precipitation observing system. Notably, the broad societal applications of GPM are reflected in the United Nation s identification of GPM as a foremost candidate for its Peaceful Uses of Space Program. An overview of the GPM mission design is given, followed by an explanation of its scientific agenda as an outgrowth of making improvements in rain retrieval accuracy, microphysics dexterity, sampling frequency, and global coverage. All of these improvements offer new means to observe variability in precipitation and water cycle fluxes and to achieve improved predictability of weather, climate, and hydrometeorology. Specifically, the scientific agenda of GPM has been designed to leverage the measurement improvements to improve prognostic model performance, particularly quantitative precipitation forecasting and its linked phenomena at short, intermediate, and extended time scales. The talk addresses how GPM measurements will enable better detection of accelerations and decelerations in regional and global water cycle processes and their relationship to climate variability, better impacts of precipitation data assimilation on numerical weather prediction and global climate reanalysis, and better performance from basin scale hydrometeorological models for short and long term flood-drought forecasting and seasonal fresh water resource assessment. These improvements become possible by using more accurate, more microphysically-centric, more frequent, and fully global precipitation observations to achieve better water budget closure and to provide more realistic forcing and assessment of prediction models.

Smith, Eric A.↗

Mapping and Synthesis of International Biomass Supply Assessments

This report, Mapping and Synthesis of International Biomass Supply Assessments (or Global Biomass Resource Assessment) is the first step in a long-term process to assemble data from around the globe into a virtual repository that can be updated and provide user-friendly access to the data. The Clean Energy Ministerial (CEM) Biofuture Platform Initiative recommended that research be completed to “address the need for internationally accepted benchmarks quantifying sustainable biomass feedstock supplies.” To act upon the CEM Biofuture recommendation, in 2024, the U.S. Department of Energy (DOE) commissioned Oak Ridge National Laboratory (ORNL) to prepare this report as the primary deliverable for a one-year assignment to assemble data into a citable form that could help resolve the persistent question presented related to bioenergy policy, “Is there enough sustainable biomass?” In response to that query, this report includes information received by August 2024 from national CEM representatives, collaborators, and public sources on current and future sustainable biomass supplies in 62 nations,and subsequently documents (a) the approach used by ORNL to analyze and categorize the information received in a manner that enables aggregation and comparability; and (b) recommendations for next steps and guidelines to help others update and harmonize future assessments of global sustainable biomass supplies.

09 BIOMASS FUELS↗