Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk identification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Millimeter wave satellite concepts. Volume 1: Executive summary

The objectives of the program were: (1) development of methodology based on the technical requirements of potential services that might be assigned to millimeter wave bands for identifying the viable and appropriate technologies for future NASA millimeter research and development programs, and (2) testing of this methodology with user applications and services. The scope of the program included the entire communications network, both ground and space subsystems. The reports include: (1) cost, weight, and performance models for the subsystems, (2) conceptual design for point-to-point and broadcast communications satellites, (3) analytic relationships between subsystem parameters and an overall link performance, (4) baseline conceptual systems, (5) sensitivity studies, (6) model adjustment analyses, (7) identification of critical technologies and their risks, (8) brief R&D program scenarios for the technologies judged to be moderate or extensive risks.

Hilsen, N. B.↗

Program Models Propagation Of Failures

FIRM is software tool for identification of failure and management of risk based on directed-graph ("digraph") approach. Three core algorithms optimized for processing singletons and doubletons and also handle tripletons. FIRM identifies loops in digraphs and displays direct failure paths between any two nodes. Solves for reachability for given node without computing reachability for entire digraph. Represents hybrid between schematic-diagram and fault-tree approaches. Written in C.

Hackler, Donald B.↗

Fire Analysis of the Thomas Fire in California Using NASA Data in a GIS

NASA's Earth Observing System Data Information System (EOSDIS) manages Earth Observation satellites and the Distributed Active Archive Centers (DAACs), where the data is stored and processed. This poster presents the use of satellite data from NASA's inventory that have the potential for use in identification and analysis of forest fire risk and subsequent after-effects within a geographic information system (GIS). The challenge is that Earth Observation data is complicated. There is plenty of data available, however, the science teams have had a "top-down" approach: define what it is you are trying to study -select a set of satellite(s) and sensor(s), and drill down for the data.

Worldview↗

NASA Systems Engineering and Safety Culture: Aerospace Project Design and Implementation Challenges

Using Systems Engineering principles and the NASA Glenn Safety procedures and protocols, a rigorous method was developed to ensure safe testing and operation of a small, commercial off the shelf turbofan engine at the Aero-Acoustic Propulsion Laboratory (AAPL). The DGEN380 is a small, ~500-lbf thrust class, high-bypass, geared- turbofan engine with a separate flow nozzle. It is a modular, compact, lightweight turbofan with Full-Authority Digital Engine Control. It’s general characteristics make it an ideal candidate for utilization as a testbed for engine aero-acoustic technology maturation in a relevant performance environment. The DGEN380 is the core component of the DGEN Aero-propulsion Research Turbofan (DART) mobile test rig. The full presentation will describe the risk assessment and mitigation process applied to the DART by the project team. The identification and analysis of failure modes led to the development of risk mitigation plans, which include administrative, engineering, and physical controls for the safe operation of the DART test rig at the AAPL facility.

Systems Engineering, Aeronautics, safety↗

The 7 Year Evolution of EOS CA Support for Planning & Executing Risk Mitigation Maneuvers

This presentation will discuss the evolution of Collision Avoidance (CA) support for planning and executing Risk Mitigation Maneuvers (RMMs) for the Earth Observing System (EOS) Aqua, Aura, and Terra satellites within the seven-year period of January 2015 through December 2021. Several enhancements were implemented by the EOS team to expedite and improve the RMM planning and execution process, including updates to High Interest Event (HIE) analysis, maneuver preparation, maneuver ephemeris generation, conjunction event data screening, and maneuver commanding. As of 2022, these advancements allow the EOS team to plan and execute an RMM within 5 hours of identification with an accurate and low-risk solution. This represents a vast improvement from the 30 hours required to turn around an RMM back in 2015. In addition, the current process is substantially less error prone. Details of this progression and the specific aspects of each supporting component are explicated in the content of the presentation.

Syed Hasan↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 - ENGINEERING↗

Genesis Mission-Enabled Secure AI to Fortify Energy Process Safety (Genesis-SAFE)

Argonne National Laboratory is supporting the U.S. Department of Transportation’s (USDOT’s) Bureau of Transportation Statistics (BTS) with collaborative research on development and application of privacy preserving AI frameworks that leverage unmatched AI expertise and secure computing resources made available through the U.S. Genesis Mission1 . This research advances U.S. energy security goals by supporting a safe offshore energy industry with secure, domain-specific AI tools to analyze confidential industry datasets collected by BTS to rapidly improve identification of hazards, precursors, and systemic safety risks in high-risk operational environments. The staged, security-first approach begins with development and testing of Argonne’s Genesis Mission-enabled Secure AI to Fortify Energy Process Safety (Genesis-SAFE) framework within Argonne’s accredited secure computing enclave (ABLE) leveraging Argonne’s AI scientific assistant substrate (AISAC). Methods to build synthetic datasets were developed together with BTS for use in preparing synthetic datasets that can be used to validate data containment, governance, and security controls in the ABLE environment. Future research directions would focus on applying the Genesis-SAFE framework to CIPSEA-protected datasets entirely within ABLE to support confidentiality-preserving analysis of safety risks, trends, and contributing factors.

Kim, Hyekyung [Argonne National Laboratory (ANL), ↗

Space Station Freedom/lunar transfer vehicle propellant operation hazard analysis

Space Station Freedom (SSF), as a transportation node for Space Exploration Initiative missions, would involve the assembly and refurbishing of lunar and Mars transfer vehicles. This includes operations involving cryogenic propellants (LH2 7 LO2) such as storing and handling of loaded propellant tanks, assembly onto the vehicle, and propellant transfer. Cryogenic propellants dictate rigorous safety precautions and impose unique requirements to ensure flight safety to both personnel and SSF elements. The objective of this study is to identify potential hazards and risks associated with cryogenic propellants. This involves identification of pertinent system design features and operational procedures. Criticality of identified risks/hazards shall be assessed and those that fall in the catastrophic and critical categories shall include mitigating solutions.

Dominick, Sam↗

An overview of the NASA Advanced Propulsion Concepts program

NASA Advanced Propulsion Concepts (APC) program for the development of long-term space propulsion system schemes is managed by both NASA-Lewis and the JPL and is tasked with the identification and conceptual development of high-risk/high-payoff configurations. Both theoretical and experimental investigations have been undertaken in technology areas deemed essential to the implementation of candidate concepts. These APC candidates encompass very high energy density chemical propulsion systems, advanced electric propulsion systems, and an antiproton-catalyzed nuclear propulsion concept. A development status evaluation is presented for these systems.

Curran, Francis M.↗

Simulation Assisted Risk Assessment: Blast Overpressure Modeling

A probabilistic risk assessment (PRA) approach has been developed and applied to the risk analysis of capsule abort during ascent. The PRA is used to assist in the identification of modeling and simulation applications that can significantly impact the understanding of crew risk during this potentially dangerous maneuver. The PRA approach is also being used to identify the appropriate level of fidelity for the modeling of those critical failure modes. The Apollo launch escape system (LES) was chosen as a test problem for application of this approach. Failure modes that have been modeled and/or simulated to date include explosive overpressure-based failure, explosive fragment-based failure, land landing failures (range limits exceeded either near launch or Mode III trajectories ending on the African continent), capsule-booster re-contact during separation, and failure due to plume-induced instability. These failure modes have been investigated using analysis tools in a variety of technical disciplines at various levels of fidelity. The current paper focuses on the development and application of a blast overpressure model for the prediction of structural failure due to overpressure, including the application of high-fidelity analysis to predict near-field and headwinds effects.

Lawrence, Scott L.↗

Multiple aspects maintenance ontology-based intelligent maintenance optimization framework for safety-critical systems

Abstract Maintenance optimization is a process for improving the efficiency of maintenance strategies and activities, considering various aspects of the target system and components, such as the probabilities of system failures and the cost of repair and replacement of a failed component. The improvement of maintenance optimization algorithms generally requires information from various data sources. For example, it may require the system risk information derived from risk analysis tools or the residual lifetime of a component from fault prognosis tools. The requirements of data acquisition (DAQ) and aggregation pose new challenges for maintenance management systems (MMSs) that implement and use these maintenance optimization algorithms. This paper proposes a multiple aspects maintenance ontology-based framework to facilitate DAQ from MMSs, online monitoring systems, fault detection and discrimination tools, risk assessment tools, decision-making tools, and component identification tools, and accelerate the implementation and verification of contemporary maintenance optimization models and algorithms. The proposed framework consists of a multi-aspect maintenance ontology with critical information for maintenance optimization and application interfaces for collecting information from various data sources, such as fault prognosis tools, online monitoring tools, risk assessment tools, and decision-making algorithms. In addition, this paper proposes a heuristic method for integrating concepts and properties from other existing ontologies into the proposed framework when the existing ontology is not fully compatible with the ontology under construction. Finally, the paper verifies the proposed ontology framework using a feedwater system designed for nuclear power plants with valves and filters as the components under maintenance.

Diao, Xiaoxu (ORCID:0000000346726352)↗

Risk Assessment and Management Workflow—An Example of the Southwest Regional Partnership

This paper summarizes the risk assessment and management workflow developed and applied to the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project. The risk assessment and management workflow consists of six primary tasks, including management planning, identification, qualitative analysis, quantitative analysis, response planning, and monitoring. Within the workflow, the SWP assembled and iteratively updated a risk registry that identifies risks for all major activities of the project. Risk elements were ranked with respect to the potential impact to the project and the likelihood of occurrence. Both qualitative and quantitative risk analyses were performed. To graphically depict the interactions among risk elements and help building risk scenarios, process influence diagrams were used to represent the interactions. The SWP employed quantitative methods of risk analysis including Response Surface Method (RSM), Polynomial Chaos Expansion (PCE), and the National Risk Assessment Partnership (NRAP) toolset. The SWP also developed risk response planning and performed risk control and monitoring to prevent the risks from affecting the project and ensure the effectiveness of risk management. As part of risk control and monitoring, existing and new risks have been tracked and the response plan was subsequently evaluated. Findings and lessons learned from the SWP’s risk assessment and management efforts will provide valuable information for other commercial geological CO2 storage projects.

Lee, Si-Yong↗

Carbon/graphite fiber risk analysis and assessment study: Assessment of risk to the Lockheed Model L-1011 commercial transport aircraft

The risk associated with the accidental release of carbon/graphite fibers (CF) from fires on commercial transport aircraft incorporating composite materials was assessed. Data are developed to evaluate the potential for CF damage to electrical and electronic equipment, assess the cost risk, and evaluate the hazard to continued operation. The subjects covered include identification of susceptible equipments, determination of infiltration transfer functions, analysis of airport operations, calculation of probabilities of equipment failures, assessment of the cost risk, and evaluation of the hazard to continued operation. The results show the risks associated with CF contamination are negligible through 1993.

Daniledes, J.↗

Space-based solar power conversion and delivery systems study. Volume 1: Executive summary

The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.

Hazelrigg, G. A., Jr.↗

Road map to adaptive optimal control

A building block control structure leading toward adaptive, optimal control for jet engines is developed. This approach simplifies the addition of new features and allows for easier checkout of the control by providing a baseline system for comparison. Also, it is possible to eliminate certain features that do not have payoff by being selective in the addition of new building blocks to be added to the baseline system. The minimum risk approach specifically addresses the need for active identification of the plant to be controlled in real time and real time optimization of the control for the identified plant.

Boyer, R.↗

Risk analysis methodology survey

NASA regulations require that formal risk analysis be performed on a program at each of several milestones as it moves toward full-scale development. Program risk analysis is discussed as a systems analysis approach, an iterative process (identification, assessment, management), and a collection of techniques. These techniques, which range from simple to complex network-based simulation were surveyed. A Program Risk Analysis Handbook was prepared in order to provide both analyst and manager with a guide for selection of the most appropriate technique.

Batson, Robert G.↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗