Search NASA⌕ Search

SEARCH · Search NASA

Results for “robot arm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

STS-100 Flight Day 10 Highlights

On this tenth day of the STS-100 mission, the computer problems that delayed tests on the Canadian robotic arm are discussed between the Atlantis and Mission Ground Control. The Canadian robotic arm is seen after it lifts Spacelab from the pallet on Atlantis and moves to meet the Space Shuttle's robotic arm as it 'hands over' Spacelab to the smaller robotic arm. The Canadian robotic arm with Spacelab are seen against a backdrop of Earth as the Space Shuttle and International Space Station pass to the northeast of Australia.

Source record↗

Parameter identification for a robotic manipulator arm

The development is described of a nonlinear dynamic model for large oscillations of a robotic manipulator arm about a single joint. Optimization routines are formulated and implemented for the identification of electrical and physical parameters from dynamic data taken from an industrial robot arm. Special attention is given to the role of sensitivity in the formulation of robust models of this motion. The importance of actuator effects in the reduction of sensitivity is established and used to develop an electromechanical model of the manipulator system.

Brewer, D. W.↗

InSight Mars Lander Instrument Deployment Arm Flight Software

The Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) lander landed on Mars on November 26, 2018 and continues to investigate the internal structure of the planet two years later. The Instrument Deployment Arm (IDA), a robotic arm on the lander, was used to deploy the science instrument payloads from the lander deck to the surface of Mars and to take images of the lander and the surrounding environment. This was the first precision deployment and release by a robotic arm on another planet. After deploying the instruments, the IDA has been used for instrument commissioning, scientific data gathering, and to assist with troubleshooting one of the science instruments. This paper provides a high-level summary of the flight software that controls the IDA. The paper provides an overview of the IDA software interfaces, task structure, command handling strategy, motion specification, motion planning, motor control, grapple control, fault protection, and telemetry.

Ali, Khaled S.↗

Phoenix Telemetry Processor

Phxtelemproc is a C/C++ based telemetry processing program that processes SFDU telemetry packets from the Telemetry Data System (TDS). It generates Experiment Data Records (EDRs) for several instruments including surface stereo imager (SSI); robotic arm camera (RAC); robotic arm (RA); microscopy, electrochemistry, and conductivity analyzer (MECA); and the optical microscope (OM). It processes both uncompressed and compressed telemetry, and incorporates unique subroutines for the following compression algorithms: JPEG Arithmetic, JPEG Huffman, Rice, LUT3, RA, and SX4. This program was in the critical path for the daily command cycle of the Phoenix mission. The products generated by this program were part of the RA commanding process, as well as the SSI, RAC, OM, and MECA image and science analysis process. Its output products were used to advance science of the near polar regions of Mars, and were used to prove that water is found in abundance there. Phxtelemproc is part of the MIPL (Multi-mission Image Processing Laboratory) system. This software produced Level 1 products used to analyze images returned by in situ spacecraft. It ultimately assisted in operations, planning, commanding, science, and outreach.

Stanboli, Alice↗

Demonstration of A High-Fidelity Predictive/Preview Display Technique for Telerobotic Servicing in Space

A highly effective predictive/preview display technique for telerobotic servicing in space under several seconds communication time delay has been demonstrated on a large laboratory scale in May, 1993, involving the Jet Propulsion Laboratory as the simulated ground control station and, 2500 miles away, the Goddard Space Flight Center as the simulated satellite servicing set-up. The technique isbased on a high-fidelity calibration procedure that enables a high-fidelity overlay of 3-D graphics robot arm and object models over given 2-D TV camera images of robot arm and objects. Togenerate robot arm motions, the operator can confidently interact in real time with the graphics models of the robot arm and objects overlaid on an actual camera view of the remote work site. The technique also enables the operator to generate high-fidelity synthetic TV camera views showing motion events that are hidden in a given TV camera view or for which no TV camera views are available...

Bejczy, A. K.↗

Autonomous space processor for orbital debris

The development of an Autonomous Space Processor for Orbital Debris (ASPOD) was the goal. The nature of this craft, which will process, in situ, orbital debris using resources available in low Earth orbit (LEO) is explained. The serious problem of orbital debris is briefly described and the nature of the large debris population is outlined. The focus was on the development of a versatile robotic manipulator to augment an existing robotic arm, the incorporation of remote operation of the robotic arms, and the formulation of optimal (time and energy) trajectory planning algorithms for coordinated robotic arms. The mechanical design of the new arm is described in detail. The work envelope is explained showing the flexibility of the new design. Several telemetry communication systems are described which will enable the remote operation of the robotic arms. The trajectory planning algorithms are fully developed for both the time optimal and energy optimal problems. The time optimal problem is solved using phase plane techniques while the energy optimal problem is solved using dynamic programming.

Ramohalli, Kumar↗

Demonstration of a High-Fidelity Predictive/Preview Display Technique for Telerobotic Servicing in Space

A highly effective predictive/preview display technique for telerobotic servicing in space under several seconds communication time delay has been demonstrated on a large laboratory scale in May 1993, involving the Jet Propulsion Laboratory as the simulated ground control station and, 2500 miles away, the Goddard Space Flight Center as the simulated satellite servicing set-up. The technique is based on a high-fidelity calibration procedure that enables a high-fidelity overlay of 3-D graphics robot arm and object models over given 2-D TV camera images of robot arm and objects. To generate robot arm motions, the operator can confidently interact in real time with the graphics models of the robot arm and objects overlaid on an actual camera view of the remote work site. The technique also enables the operator to generate high-fidelity synthetic TV camera views showing motion events that are hidden in a given TV camera view or for which no TV camera views are available. The positioning accuracy achieved by this technique for a zoomed-in camera setting was about +/-5 mm, well within the allowable +/-12 mm error margin at the insertion of a 45 cm long tool in the servicing task.

Kim, Won S.↗

Design and testing of a model CELSS chamber robot

A robot system for use in an enclosed environment was designed and tested. The conceptual design will be used to assist in research performed by the Controlled Ecological Life Support System (CELSS) project. Design specifications include maximum load capacity, operation at specified environmental conditions, low maintenance, and safety. The robot system must not be hazardous to the sealed environment, and be capable of stowing and deploying within a minimum area of the CELSS chamber facility. This design consists of a telescoping robot arm that slides vertically on a shaft positioned in the center of the CELSS chamber. The telescoping robot arm consists of a series of links which can be fully extended to a length equal to the radius of the working envelope of the CELSS chamber. The vertical motion of the robot arm is achieved through the use of a combination ball screw/ball spline actuator system. The robot arm rotates cylindrically about the vertical axis through use of a turntable bearing attached to a central mounting structure fitted to the actuator shaft. The shaft is installed in an overhead rail system allowing the entire structure to be stowed and deployed within the CELSS chamber. The overhead rail system is located above the chamber's upper lamps and extends to the center of the CELSS chamber. The mounting interface of the actuator shaft and rail system allows the entire actuator shaft to be detached and removed from the CELSS chamber. When the actuator shaft is deployed, it is held fixed at the bottom of the chamber by placing a square knob on the bottom of the shaft into a recessed square fitting in the bottom of the chamber floor. A support boot ensures the rigidity of the shaft. Three student teams combined into one group designed a model of the CELSS chamber robot that they could build. They investigated materials, availability, and strength in their design. After the model arm and stand were built, the class performed pre-tests on the entire system. A stability pre-test was used to determine whether the model robot arm would tip over on the stand when it was fully extended. Results showed the stand tipped when 50 Newtons were applied horizontally to the top of the vertical shaft while the arm was fully extended. This proved that it was stable. Another pre-test was the actuator slip test used to determine if there is an adequate coefficient of friction between the actuator drive wheels and drive cable to enable the actuator to fully extend and retract the arm. This pre-test revealed that the coefficient of friction was not large enough to prevent slippage. Sandpaper was glued to the drive wheel and this eliminated the slippage problem. The class preformed a fit test in the CELSS chamber to ensure that the completed robot arm is capable of reaching the entire working envelope. The robot was centered in the chamber and the arm was fully extended to the sides of the chamber. The arm was also able to retract to clear the drain pipes separating the upper and lower plant trays.

Davis, Mark↗

Small, Lightweight Inspection Robot With 12 Degrees Of Freedom

Small serpentine robot weighs only 6 lbs. and has link diameter of 1.5 in. Designed to perform inspections. Multiple degrees of freedom enables it to reach around obstacles and through small openings into simple or complexly shaped confined spaces to positions where difficult or impossible to perform inspections by other means. Fiber-optic borescope incorporated into robot arm, with inspection tip of borescope located at tip of arm. Borescope both conveys light along robot arm to illuminate scene inspected at tip and conveys image of scene back along robot arm to external imaging equipment.

Lee, Thomas S.↗

Tactile Robotic Topographical Mapping Without Force or Contact Sensors

A method of topographical mapping of a local solid surface within the range of motion of a robot arm is based on detection of contact between the surface and the end effector (the fixture or tool at the tip of the robot arm). The method was conceived to enable mapping of local terrain by an exploratory robot on a remote planet, without need to incorporate delicate contact switches, force sensors, a vision system, or other additional, costly hardware. The method could also be used on Earth for determining the size and shape of an unknown surface in the vicinity of a robot, perhaps in an unanticipated situation in which other means of mapping (e.g., stereoscopic imaging or laser scanning with triangulation) are not available. The method uses control software modified to utilize the inherent capability of the robotic control system to measure the joint positions, the rates of change of the joint positions, and the electrical current demanded by the robotic arm joint actuators. The system utilizes these coordinate data and the known robot-arm kinematics to compute the position and velocity of the end effector, move the end effector along a specified trajectory, place the end effector at a specified location, and measure the electrical currents in the joint actuators. Since the joint actuator current is approximately proportional to the actuator forces and torques, a sudden rise in joint current, combined with a slowing of the joint, is a possible indication of actuator stall and surface contact. Hence, even though the robotic arm is not equipped with contact sensors, it is possible to sense contact (albeit with reduced sensitivity) as the end effector becomes stalled against a surface that one seeks to measure.

Burke, Kevin↗

STS-110 Flight Day 7 Highlights

On the seventh day of STS-110, Mission Specialists Steven Smith and Rex Walheim are shown preparing for their second extravehicular activity (EVA) and the third of the mission, with the assistance of Mission Specialist Jerry Ross. Following this mission, Ross and Smith will be the first and second most experienced spacewalkers, respectively, in history. A camera mounted on the Space Shuttle Atlantis shows footage of the International Space Station. While Smith and Walheim are on EVA, Mission Specialists Ross and Lee Morin will provide choreography from inside the Atlantis crew cabin, Pilot Stephen Frick will operate the robotic arm, and Commander Mike Bloom will control the cameras on the robotic arm. Smith and Walheim are shown exiting the airlock hatch and then installing an PFR (Portable Foot Restraint) on the end of the robotic arm, from which much of the work will be done. Following the switching off of a circuit breaker, the main EVA task of rewiring umbilical cables that provide power, commands, and video is begun. These cables will be connected to the Mobile Transporter's (MT) robotic arm. The MT, an external transportation system which runs on rails, is seen with a helmet mounted camera as the astronauts work to release bolts that had served to secure the MT during launch. After a final check of the umbilical connections mated, the Umbilical Reconfiguration Panel is fitted over the cables, and the astronauts make their way to the airlock hatch.

Source record↗

In-Situ Water Vapor Probe for a Robot Arm-Mounted, Compact Water Vapor Analyzer: Preliminary Results

This work describes the ongoing development of an instrument package for the in-situ detection and isotopic analysis of water (from ice, icy soils, and hydrated minerals) on future lunar, asteroid, or martian exploration missions. This instrument is intended to be mounted on a robotic arm and be brought to the sample, rather than necessitating expensive and complicated sample handling to bring the sample to the instrument.

Socki, Richard A.↗

Integrated multi-sensory control of space robot hand

Dexterous manipulation of a robot hand requires the use of multiple sensors integrated into the mechanical hand under distributed microcomputer control. Where space applications such as construction, assembly, servicing and repair tasks are desired of smart robot arms and robot hands, several critical drives influence the design, engineering and integration of such an electromechanical hand. This paper describes a smart robot hand developed at the Jet Propulsion Laboratory for experimental use and evaluation with the Protoflight Manipulator Arm (PFMA) at the Marshall Space Flight Center (MSFC).

Bejczy, A. K.↗

Verifying Mars 2020 Sampling and Caching Robotic Functions with Position Budgeting Process and Tool

The Mars 2020 Perseverance Rover was launched on July 30th, 2020 with one of the most complex robotic systems ever implemented on an interplanetary mission. Much of this robotic complexity resides in the Rover Sampling and Caching Subsystem (SCS) to enable collection of Martian samples for eventual return to earth and preparation of surfaces for close-up surface science observations. Two robotic arms are used by SCS: the large Robotic Arm (RA) positions the coring drill and science instruments mounted to the Turret for surface interactions, and the smaller Sample Handling Assembly (SHA) manipulates Sample Tube Assemblies (STA) within the Adaptive Caching Assembly (ACA) to prepare them for sample collection, processing, and hermetic sealing. The robotic arms interact with the Martian surface and other SCS components in many ways and in a variety of configurations, with positioning accuracy requirements ranging from tens of millimeters for some surface interactions down to sub-millimeter accuracy for some ACA interactions.This paper describes the process and tool used to calculate the SCS robotic interaction positioning budgets and verify the as-built hardware when delivered. To ensure that these robotic systems are able to perform their tasks, each robotic interaction with another element was broken down into its composite functions. To calculate a positioning budget margin for each function, an allowable was defined and then compared to the list of error sources that contribute to misalignment. Across the subsystem, over 250 functions were identified to be assessed, with almost 500 error sources feeding into their budget calculations. In addition to using as-built values in the budgets for SCS Verification and Validation (V&V) after the hardware was complete, these budgets were populated with design data during the design phase to identify areas of concern and guide hardware design to ensure positive position budget margins.Because of the size of the SCS team that had inputs to the positioning budgets and the sheer number of items in the budgets that needed to be created, updated, and verified, having a tool that would allow for simultaneous access and robust data integrity and processing was imperative. To accomplish this, a web-based MySQL database was created that allowed users to create function position budgets, link individual errors and allowables to them, and view function position budget margin reports. Each error and allowable records data for lateral, normal, angular, and clocking errors, with the ability to add as-built data for up to four different hardware builds. Margin reports can be generated for either design values alone or replacing design data with as-built data when available. These as-built reports are used for final verification of the SCS positioning requirements. Ultimately, the SCS positioning budget process and database tool led to successful interactions during test and an SCS robotic system that is ready to perform sample acquisition and caching on the surface of Mars.

Williams, Jeffrey↗

Control strategy for cooperating disparate manipulators: Non-colocated control of disturbances of a flexible arm

The long term objectives for this research are to use a small robot arm to compliment a large robot arm. Disturbances generated by robot tasks were studied. Available equipment made it convenient to study disturbances generated by an abrasive cut off saw mounted on the tip of a large armed robot, and used to cut through rods and pipes in the range of 0.5 in. to 1.5 in. The abrasive process was modeled as a friction operation. The operation of the cut off saw was performed autonomously and under teleoperated control. The behavior was stable in both cases for a P-D joint control algorithm. It was found that broad band excitation during the cutting operation is capable of exciting arm natural frequencies to above the third natural frequency of the arm. The direction of cut changed the modes excited due to the change in coupling coefficients.

Lew, Jae Y.↗

Investigation on experimental techniques to detect, locate and quantify gear noise in helicopter transmissions

A robotic system to automate the detection, location, and quantification of gear noise using acoustic intensity measurement techniques has been successfully developed. Major system components fabricated under this grant include an instrumentation robot arm, a robot digital control unit and system software. A commercial, desktop computer, spectrum analyzer and two microphone probe complete the equipment required for the Robotic Acoustic Intensity Measurement System (RAIMS). Large-scale acoustic studies of gear noise in helicopter transmissions cannot be performed accurately and reliably using presently available instrumentation and techniques. Operator safety is a major concern in certain gear noise studies due to the operating environment. The man-hours needed to document a noise field in situ is another shortcoming of present techniques. RAIMS was designed to reduce the labor and hazard in collecting data and to improve the accuracy and repeatability of characterizing the acoustic field by automating the measurement process. Using RAIMS a system operator can remotely control the instrumentation robot to scan surface areas and volumes generating acoustic intensity information using the two microphone technique. Acoustic intensity studies requiring hours of scan time can be performed automatically without operator assistance. During a scan sequence, the acoustic intensity probe is positioned by the robot and acoustic intensity data is collected, processed, and stored.

Flanagan, P. M.↗

Odyssey in Space Human Factors: The Challenges of Going Where No One has Gone Before

Some human factors challenges for space missions include: 1) Reduced Gravity; 2) Remote Operation; 3) Information; 4) Multi-Purpose Design. This viewgraph presentation addresses each of these topics. It describes how the design and layout of equipment on spacecraft can accomodate human activity in a microgravity environment. It describes the remote operation of robotic arms and robots. Displays, procedures, information sharing, and automation are means of conveying information. Multi-purpose design facilitates accomodating and supporting tasks onboard a single vehicle.

Blume, Jenifer Linda↗

STS-112 Flight Day 4 Highlights

On the fourth day of STS-112, its crew (Jeffrey Ashby, Commander; Pamela Melroy, Pilot; David Wolf, Mission Specialist; Piers Sellers, Mission Specialist; Sandra Magnus, Mission Specialist; Fyodor Yurchikhin, Mission Specialist) onboard Atlantis and the Expedition 5 crew (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) onboard the International Space Station (ISS) are seen preparing for the installation of the S1 truss structure. Inside the Destiny Laboratory Module, Korzun and other crewmembers are seen as they busily prepare for the work of the day. Sellers dons an oxygen mask and uses an exercise machine in order to purge the nitrogen from his bloodstream, in preparation for an extravehicular activity (EVA). Whitson uses the ISS's Canadarm 2 robotic arm to grapple the S1 truss and remove it from Atlantis' payload bay, with the assistance of Magnus. Using the robotic arm, Whitson slowly maneuvers the 15 ton truss structure into alignment with its attachment point on the starboard side of the S0 truss structure, where the carefully orchestrated mating procedures take place. There is video footage of the entire truss being rotated and positioned by the arm, and ammonia tank assembly on the structure is visible, with Earth in the background. Following the completion of the second stage capture, the robotic arm is ungrappled from truss. Sellers and Wolf are shown exiting the the Quest airlock hatch to begin their EVA. They are shown performing a variety of tasks on the now attached S1 truss structure, including work on the Crew Equipment Translation Cart (CETA), the S-band Antenna Assembly, and umbilical cables that provide power and remote operation capability to cameras. During their EVA, they are shown using a foot platform on the robotic arm. Significant portions of their activities are shown from the vantage of helmet mounted video cameras. The video closes with a final shot of the ISS and its new S1 truss.

Source record↗