Search NASA⌕ Search

SEARCH · Search NASA

Results for “solar array deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Torsional Buckling Tests of a Simulated Solar Array

Spacecraft solar arrays are typically large structures supported by long, thin deployable booms. As such, they may be particularly susceptible to abnormal structural behavior induced by mechanical and thermal loading. One example is the Hubble Space Telescope solar arrays which consist of two split tubes fit one inside the other called BiSTEMs. The original solar arrays on the Hubble Space Telescope were found to be severely twisted following deployment and later telemetry data showed the arrays were vibrating during daylight to night and night to daylight transition. The solar array twist however can force the BiSTEM booms to change in cross-section and cause tile solar arrays to react unpredictably to future loading. The solar arrays were redesigned to correct for tile vibration, however, upon redeployment they again twisted. To assess the influence of boom cross-sectional configuration, experiments were conducted on two types of booms, (1)booms with closed cross-sections, and (2) booms with open cross-sections. Both models were subjected to compressive loading and imposed tip deflections. An existing analytical model by Chung and Thornton was used to define the individual load ranges for each model solar array configuration. The load range for the model solar array using closed cross-section booms was 0-120 Newtons and 0-160 Newtons for the model solar array using open cross-section booms. The results indicate the model solar array with closed cross-section booms buckled only in flexure. However, the results of the experiment with open cross-section booms indicate the model solar array buckled only in torsion and with imposed tip deflections the cross section can degrade by rotation of the inner relative to the outer STEM. For tile Hubble Space Telescope solar arrays the results of these experiments indicate the twisting resulted from the initial mechanical loading of the open cross-section booms.

Thornton, E. A.↗

PowerSat: A technology demonstration of a solar power satellite

PowerSat is a preliminary design strategy for microwave wireless power transfer of solar energy. Solar power satellites convert solar power into microwave energy and use wireless power transmission to transfer the power to the Earth's surface. The PowerSat project will show how new developments in inflatable technology can be used to deploy solar panels and phased array antennas.

Sigler, Douglas L.↗

Results from the International Heliophysical Year (IHY)

The International Heliophysical Year (IHY) involved the effort of thousands of scientists from over 70 countries, ended in February 2009. The major objectives of the IHY included over 60 collaborative studies of universal physical processes in the solar system, the deployment of arrays of small instruments to observe heliophysical processes, a unique program of educational and public outreach, and the preservation of the history of the IGY, during a two year period. A follow on effort, the International Space Weather Initiative (ISWI) is designed to build on the momentum developed during the IHY to develop the capability to observe, understand, and predict space weather phenomena.

Davila, Joseph M.↗

Evidence Report: Risk of Injury and Compromised Performance due to EVA Operations

During future missions to the Moon and Mars, each crewmember will most likely perform up to 24 hours a week of extravehicular activity (EVA) in support of exploration, science, construction, and maintenance tasks. Achieving mission objectives will require EVA systems and operations concepts that maximize human performance and efficiency while minimizing health and safety risks for crewmembers. Currently, over 450 EVAs have been performed in microgravity using the Extravehicular Mobility Unit (EMU). The EMU space suit has enabled the successful assembly and maintenance of the International Space Station (ISS) for over 20 years, as well as deployment of payload experiments, solar arrays, satellite launches and repairs. This EVA work was accomplished at a slower cadence than is expected for Moon and Mars, with ISS crewmembers performing no more than 7 EVAs during a single mission and without any back-to-back EVAs. Despite their success, ISS EVAs have resulted in more injury to EVA crewmembers than may be acceptable for long-duration exploration missions. The Apollo astronauts completed EVA tasks in suits that were designed for their short-duration lunar missions, although suit mobility problems were evident. The more frequent EVAs and more varied EVA tasks that are anticipated during the future longer-duration exploration missions will require EVA suits and systems that are better oriented to human health and performance than those used during the Apollo Program. Many of the problems that were encountered with the Apollo EVA suits (e.g., limited mobility and dexterity, high and aft center of gravity, and other features requiring significant crew compensation) will need to be corrected or mitigated to optimize EVA objectives of exploration missions. It is critical that we understand how EVA system design variables such as suit pressure, weight/mass, center-of-gravity location, joint ranges of motion, and biomedical monitoring, affects the ability of astronauts to perform safe, efficient, and effective EVAs. To achieve this understanding, EVA researchers will need to develop and execute an integrated human testing program across multiple environments. The research will provide objective data that will enable informed design decisions and crewmember standards, thereby ensuring EVA systems that optimize crewmember health, safety, efficiency, and performance. This report describes the risks to crew health, safety, performance, and efficiency caused by EVA operations, and it provides the evidence base to substantiate the importance of the risk.

EVA↗

A 1 MW Solar Electric and Chemical Propulsion Vehicle for Piloted Mars Opposition Class Missions

Previous investigations have extensively explored crew missions to and from Mars, with a prevailing approach termed the 'conjunction' class, necessitating an approximately 500-day stay at Mars for a cost-effective return. However, this configuration results in a mission duration exceeding 1000 days (roughly 3 years). In order to reduce crew health and surface operations risks, a shortened mission duration of 850 days is being explored by using a short ~30 day Mars surface stay and a ‘opposition’ class approach. A non-nuclear approach is possible by combining solar electric propulsion and a chemical stage. While past mission concepts for the conjunction missions also used solar electric propulsion they limited the SEP power to <700 kW. In order to achieve the 850 day round trip more SEP power is needed. A 1MW class SEP-Chem vehicle was found sufficient to perform the 850 day mission. The biggest challenge for the design will be the large, high power solar arrays, mainly from their deployment and stability. This work describes the design of the SEP-Chem vehicle, assembled in a Near Rectilinear Halo Orbit (NRHO) and employing super-heavy class and the Space Launch System (SLS) launchers.

SEP-Chem↗

The Roman Space Telescope Optical System: Status, Test, and Verification Update

The Nancy Grace Roman Space Telescope (“Roman”) is NASA’s next flagship observatory. Launching in 2026, Roman will explore the nature of dark energy as well as expand the census of exoplanets in our galaxy via microlensing. Roman’s large field of view, agile survey capabilities, and excellent stability enable these scientific objectives, yet present unique challenges for the design, test, and verification of its optical system. Roman recently completed a comprehensive thermal vacuum test of the Spacecraft bus + Integrated Payload Assembly (SCIPA), followed by integrating the Outer Barrel Assembly (OBA), Solar Array Sunshield (SASS), and Deployable Aperture Cover (DAC) with SCIPA to complete the Observatory. This paper will present an overview of the thermal vacuum optical testing as well as a status of the optical system performance and verification.

Matthew Bolcar↗

The Submillimeter Wave Astronomy Satellite (SWAS) solar array system

The SWAS (Submillimeter Wave Astronomy Satellite) solar array system is described. It is an innovative approach to meet the missions requirements. The SWAS satellite provides a three axis stabilized platform to survey a variety of galactic cloud structures. This system includes highly reliable, lightweight launch latch, deployment, and lock mechanisms, and solar array panels that provide the maximum solar cell area. The design of the solar arrays are the result of system trades that included instrument and spacecraft thermal constraints, attitude control system maneuvering rates and pointing accuracies, the power system, and the spacecraft structure.

Sneiderman, Gary↗

Offloading techniques for large deployable space structures

The validation and verification of large deployable space structures are continual challenges which face the integration and test engineer today. Spar Aerospace Limited has worked on various programs in which such structure validation was required and faces similar tasks in the future. This testing is reported and the different offloading and deployment methods which were used, as well as the proposed methods which will be used on future programs, are described. Past programs discussed include the Olympus solar array ambient and thermal vacuum deployments, and the Anik-E array and reflector deployments. The proposed MSAT reflector and boom ambient deployment tests, as well as the proposed RADARSAT Synthetic Aperture Radar (SAR) ambient and thermal vacuum deployment tests will also be presented. A series of tests relating to various component parts of the offloading equipment systems was required. These tests included the characterization and understanding of linear bearings and large (180 in-lbf) constant force spring motors in a thermal vacuum environment, and the results from these tests are presented.

Caravaggio, Levino↗

SCARLET I: Mechanization solutions for deployable concentrator optics integrated with rigid array technology

The SCARLET I (Solar Concentrator Army with Refractive Linear Element Technology) solar array wing was designed and built to demonstrate, in flight, the feasibility of integrating deployable concentrator optics within the design envelope of typical rigid array technology. Innovative mechanism designs were used throughout the array, and a full series of qualification tests were successfully performed in anticipation of a flight on the Multiple Experiment Transporter to Earth Orbit and Return (METEOR) spacecraft. Even though the Conestoga launch vehicle was unable to place the spacecraft in orbit, the program effort was successful in achieving the milestones of analytical and design development functional validation, and flight qualification, thus leading to a future flight evaluation for the SCARLET technology.

Wachholz, James J.↗

Electrical design and analysis of the TOPEX/Poseidon solar array

TOPEX/Poseidon, a scientific satellite to be launched into low earth orbit, will map the surface topography of the earth's oceans. The satellite derives its primary electrical power from a deployable, sun tracking, rigid, single wing, rectangular solar array with overall dimensions of approximately 26 by 11 ft. The requirements which affect the electrical performance of the solar array and the method by which each requirement is satisfied are addressed. The worst-case power calculations used to size the solar array and to verify power capability are discussed. Also included is a detailed description of the solar array configuration and a summary of the qualification and acceptance testing.

Roufberg, Lew↗

Thin Film GaAs For Space--Moving Out of the Laboratory

In 1991, NASA-JPL completed the APSA (Advanced Photovoltaic Solar Array) program, demonstrating a lightweight deployable flexible array wing capable of 130 W/kg specific performance, a substantial improvement over convetional flight hardware. The design was based on the use of thin (55 microns) silicon or thin (100 microns) GaAs/Ge solar cells (Reference 1). Further array performance enhancements will require the implementation of a new advanced Solar Cell.

Film GaAs Solar Array↗

A 100 kW-Class Technology Demonstrator for Space Solar Power

A first step in the development of solar power from space is the flight demonstration of critical technologies. These fundamental technologies include efficient solar power collection and generation, power management and distribution, and thermal management. In addition, the integration and utilization of these technologies into a viable satellite bus could provide an energy-rich platform for a portfolio of payload experiments such as wireless power transmission (WPT). This paper presents the preliminary design of a concept for a 100 kW-class free-flying platform suitable for flight demonstration of technology experiments. Recent space solar power (SSP) studies by NASA have taken a stepping stones approach that lead to the gigawatt systems necessary to cost-effectively deliver power from space. These steps start with a 100 kW-class satellite, leading to a 500 kW and then a 1 MW-class platform. Later steps develop a 100 MW bus that could eventually lead to a 1-2 GW pilot plant for SSP. Our studies have shown that a modular approach is cost effective. Modular designs include individual laser-power-beaming satellites that fly in constellations or that are autonomously assembled into larger structures at geosynchronous orbit (GEO). Microwave power-beamed approaches are also modularized into large numbers of identical units of solar arrays, power converters, or supporting structures for arrays and microwave transmitting antennas. A cost-effective approach to launching these modular units is to use existing Earth-to-orbit (ETO) launch systems, in which the modules are dropped into low Earth orbit (LEO) and then the modules perform their own orbit transfer to GEO using expendable solar arrays to power solar electric thrusters. At GEO, the modules either rendezvous and are assembled robotically into larger platforms, or are deployed into constellations of identical laser power-beaming satellites. Since solar electric propulsion by the modules is cost-effective for both self-transport of the modules from LEO to GEO, and for on-orbit stationkeeping and repositioning capability during the satellite’s lifetime, this technology is also critical in technology development for SSP. The 100 kW-class technology demonstrator will utilize advanced solar power collection and generation technologies, power management and distribution, advanced thermal management, and solar electric propulsion. State-of-the-art solar concentrators, highly efficient multi-junction solar cells, integrated thermal management on the arrays, and innovative deployable structure design and packaging make the 100 kW satellite feasible for launch on one existing launch vehicle. Early SSP studies showed that a major percentage of the on-orbit mass for power-beaming satellites was from massive power converters at the solar arrays, at the bus, at the power transmitter, or at combinations of these locations. Higher voltage mays and power management and distribution (PMAD) systems reduce or eliminate the need for many of these massive power converters, and could enable direct-drive of high-voltage solar electric thrusters. Lightweight, highly efficient thermal management systems are a critical technology that must be developed and flown for SSP feasibility. Large amounts of power on satellites imply that large amounts of waste heat will need to be managed. In addition, several of the more innovative lightweight configurations proposed for SSP satellites take advantage of solar concentrators that are intractable without advanced thermal management technologies for the solar arrays. These thermal management systems include efficient interfaces with the WPT systems or other high-power technology experiments, lightweight deployable radiators that can be easily integrated into satellite buses, and efficient reliable thermal distribution systems that can pipe heat from the technology experiments to the radiators. In addition to demonstrating the integration and use of these mission-critical technologies, the 100 kw-class satellite will provide a large experiment deck for a portfolio of technology experiments. Current plans for this technology demonstrator allow 2000 kg of payload capability and up to 100 kW of power. The technology experiments could include one or more wireless power transmission demonstrations, either to the Earth’s surface or to a suitable space-based receiver. Technology experiments to quantify the on-orbit performance of critical technologies for SSP or space exploration are welcomed. In addition, the technology experiments provide an opportunity for international cooperation, to advance technology readiness levels of SSP technologies that require flight demonstration. This paper will present the preliminary design for a 100 kW solar-powered satellite and a variety of technology experiments that may be suitable for flight demonstration. In addition, a space-to-Earth-surface WPT experiment will be discussed.

Connie Carrington↗

Gimbals Drive and Control Electronics Design, Development and Testing of the LRO High Gain Antenna and Solar Array Systems

Launched June 18, 2009 on an Atlas V rocket, NASA's Lunar Reconnaissance Orbiter (LRO) is the first step in NASA's Vision for Space Exploration program and for a human return to the Moon. The spacecraft (SC) carries a wide variety of scientific instruments and provides an extraordinary opportunity to study the lunar landscape at resolutions and over time scales never achieved before. The spacecraft systems are designed to enable achievement of LRO's mission requirements. To that end, LRO's mechanical system employed two two-axis gimbal assemblies used to drive the deployment and articulation of the Solar Array System (SAS) and the High Gain Antenna System (HGAS). This paper describes the design, development, integration, and testing of Gimbal Control Electronics (GCE) and Actuators for both the HGAS and SAS systems, as well as flight testing during the on-orbit commissioning phase and lessons learned.

Chernyakov, Boris↗

Study of Automated Module Fabrication for Lightweight Solar Blanket Utilization

Cost-effective automated techniques for accomplishing the titled purpose; based on existing in-house capability are described. As a measure of the considered automation, the production of a 50 kilowatt solar array blanket, exclusive of support and deployment structure, within an eight-month fabrication period was used. Solar cells considered for this blanket were 2 x 4 x .02 cm wrap-around cells, 2 x 2 x .005 cm and 3 x 3 x .005 cm standard bar contact thin cells, all welded contacts. Existing fabrication processes are described, the rationale for each process is discussed, and the capability for further automation is discussed.

Gibson, C. E.↗

Hipot and continuity qualification est experience

High voltage potential (Hipot) and module frame continuity tests are important parts of determining the suitability of solar modules for deployment into large arrays for electrical power production. Since field arrays operate at hundreds of volts above (or below) ground potential at some point in the field, it is necessary to assure adequate voltage isolation of the solar cell circuits.

Griffith, J. S.↗

Solar Electric Power System Analyses for Mars Surface Missions

The electric power system is a crucial element of any architecture supporting human surface exploration of Mars. In this paper, we describe the conceptual design and detailed analysis of solar electric power system using photovoltaics and regenerative fuel cells to provide surface power on Mars. System performance, mass and deployed area predictions are discussed along with the myriad environmental factors and trade study results that helped to guide system design choices. Based on this work, we have developed a credible solar electric power option that satisfies the surface power requirements of a human Mars mission. The power system option described in this paper has a mass of approximately 10 metric tons, a approximately 5000-sq m deployable photovoltaic array using thin film solar cell technology.

Kerslake, Thomas W.↗