Search NASA⌕ Search

SEARCH · Search NASA

Results for “team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Planning to fail: mission design for modular repairable robot teams

This paper presents a method using stochastic simulation to evaluate the reliability of robot teams consisting of modular robots. For an example planetary exploration mission we use this method to compare the performance of a repairable robot team with spare modules versus nonrepairable robot teams.

mission planning↗

The Role of Current Sheets in Solar Eruptive Events: An ISSI International Team Project

Current sheets (CSs) are a prerequisite for magnetic reconnection. An International Space Science Institute (ISSI, of Bern, Switzerland) research team will work to empirically define current sheet properties in the solar atmosphere and their signatures in the interplanetary medium, and to understand their role in the development of solar eruptive events. The project was inspired by recently acquired ground and space based observations that reveal CS signatures at the time of flares and Coronal Mass Ejections (CMEs), in the chromosphere, in the corona and in the interplanetary medium. At the same time, theoretical studies predict the formation of CSs in different models and configurations, but theories and observational results have not yet developed an interaction efficient enough to allow us to construct a unified scenario. The team will generate synergy between observers, data analysts, and theoreticians, so as to enable a significant advance in understanding of current sheet behavior and properties. A further motivation for studying CSs is related to the expected electric fields in CSs that may be the source of solar energetic particles (SEPs). The team has 14 members from Europe and the US. The first meeting is in October 2006 and the second is late in 2007.

Suess, Steven T.↗

Structural Definition and Mass Estimation of Lunar Surface Habitats for the Lunar Architecture Team Phase 2 (LAT-2) Study

The Lunar Architecture Team Phase 2 study defined and assessed architecture options for a Lunar Outpost at the Moon's South Pole. The Habitation Focus Element Team was responsible for developing concepts for all of the Habitats and pressurized logistics modules particular to each of the architectures, and defined the shapes, volumes and internal layouts considering human factors, surface operations and safety requirements, as well as Lander mass and volume constraints. The Structures Subsystem Team developed structural concepts, sizing estimates and mass estimates for the primary Habitat structure. In these studies, the primary structure was decomposed into a more detailed list of components to be sized to gain greater insight into concept mass contributors. Structural mass estimates were developed that captured the effect of major design parameters such as internal pressure load. Analytical and empirical equations were developed for each structural component identified. Over 20 different hard-shell, hybrid expandable and inflatable soft-shell Habitat and pressurized logistics module concepts were sized and compared to assess structural performance and efficiency during the study. Habitats were developed in three categories; Mini Habs that are removed from the Lander and placed on the Lunar surface, Monolithic habitats that remain on the Lander, and Habitats that are part of the Mobile Lander system. Each category of Habitat resulted in structural concepts with advantages and disadvantages. The same modular shell components could be used for the Mini Hab concept, maximizing commonality and minimizing development costs. Larger Habitats had higher volumetric mass efficiency and floor area than smaller Habitats (whose mass was dominated by fixed items such as domes and frames). Hybrid and pure expandable Habitat structures were very mass-efficient, but the structures technology is less mature, and the ability to efficiently package and deploy internal subsystems remains an open issue.

Dorsey, John T.↗

The Astronaut Glove Challenge: Big Innovation from a (Very) Small Team

Many measurements were taken by test engineers from Hamilton Sundstrand, the prime contractor for the current EVA suit. Because the raw measurements needed to be converted to torques and combined into a final score, it was impossible to keep track of who was ahead in this phase. The final comfort and dexterity test was performed in a depressurized glove box to simulate real on-orbit conditions. Each competitor was required to exercise the glove through a defined set of finger, thumb, and wrist motions without any sign of abrasion or bruising of the competitor's hand. I learned a lot about arm fatigue! This was a pass-fail event, and both of the remaining competitors came through intact. After taking what seemed like an eternity to tally the final scores, the judges announced that I had won the competition. My glove was the only one to have achieved lower finger-bending torques than the Phase VI glove. Looking back, I see three sources of the success of this project that I believe also operate in other programs where small teams have broken new ground in aerospace technologies. These are awareness, failure, and trust. By remaining aware of the big picture, continuously asking myself, "Am I converging on a solution?" and "Am I converging fast enough?" I was able to see that my original design was not going to succeed, leading to the decision to start over. I was also aware that, had I lingered over this choice or taken time to analyze it, I would not have been ready on the first day of competition. Failure forced me to look outside conventional thinking and opened the door to innovation. Choosing to make incremental failures enabled me to rapidly climb the learning curve. Trusting my "gut" feelings-which are really an internalized accumulation of experiences-and my newly acquired skills allowed me to devise new technologies rapidly and complete both gloves just in time. Awareness, failure, and trust are intertwined: failure provides experiences that inform awareness and provide decision-making opportunities that build trust among team members and managers while opening minds to new pathways for development. All three are necessary for teams-large or small-to achieve big innovation.

Homer, Peter↗

Cammp Team

The International Space Station (ISS) Configuration Analysis Modeling and Mass Properties (CAMMP) Team is presenting a demo of certain CAMMP capabilities at a Booz Allen Hamilton conference in San Antonio. The team will be showing pictures of low fidelity, simplified ISS models, but no dimensions or technical data. The presentation will include a brief description of the contract and task, description and picture of the Topology, description of Generic Ground Rules and Constraints (GGR&C), description of Stage Analysis with constraints applied, and wrap up with description of other tasks such as Special Studies, Cable Routing, etc. The models include conceptual Crew Exploration Vehicle (CEV) and Lunar Lander images and animations created for promotional purposes, which are based entirely on public domain conceptual images from public NASA web sites and publicly available magazine articles and are not based on any actual designs, measurements, or 3D models. Conceptual Mars rover and lander are completely conceptual and are not based on any NASA designs or data. The demonstration includes High Fidelity Computer Aided Design (CAD) models of ISS provided by the ISS 3D CAD Team which will be used in a visual display to demonstrate the capabilities of the Teamcenter Visualization software. The demonstration will include 3D views of the CAD models including random measurements that will be taken to demonstrate the measurement tool. A 3D PDF file will be demonstrated of the Blue Book fidelity assembly complete model with no vehicles attached. The 3D zoom and rotation will be displayed as well as random measurements from the measurement tool. The External Configuration Analysis and Tracking Tool (ExCATT) Microsoft Access Database will be demonstrated to show its capabilities to organize and track hardware on ISS. The data included will be part numbers, serial numbers, historical, current, and future locations, of external hardware components on station. It includes dates of all external ISS events and flights and the associated hardware changes for each event. The hardware location information does not always reveal the exact location of the hardware, only the general location. In some cases the location is a module or carrier, in other cases it is a WIF socket, handrail, or attach point. Only small portions of the data will be displayed for demonstration purposes.

Evertt, Shonn F.↗

Economic Analysis on the Space Transportation Architecture Study (STAS) NASA Team

The National Aeronautics and Space Administration (NASA) performed the Space Transportation Architecture Study (STAS) to provide information to support end-of-the-decade decisions on possible near-term US Government (USG) investments in space transportation. To gain a clearer understanding of the costs and benefits of the broadest range of possible space transportation options, six teams, five from aerospace industry companies and one internal to NASA, were tasked to answer three primary questions: a) If the Space Shuttle system should be replaced; b) If so, when the replacement should take place and how the transition should be implemented; and c) If not, what is the upgrade strategy to continue safe and affordable flight of the Space Shuttle beyond 2010. The overall goal of the Study was "to develop investment options to be considered by the Administration for the President's FY2001 budget to meet NASA's future human space flight requirements with significant reductions in costs." This emphasis on government investment, coupled with the participation by commercial f'trms, required an unprecedented level of economic analysis of costs and benefits from both industry and government viewpoints. This paper will discuss the economic and market models developed by the in-house NASA Team to analyze space transportation architectures, the results of those analyses, and how those results were reflected in the conclusions and recommendations of the STAS NASA Team. Copyright 1999 by the American Institute of Aeronautics and Astronautics, Inc. No copyright is asserted in the United States under Title 17, U.$. Code. The U.S. Government has a royalty-free license to exercise all rights under the copyright claimed herein for Governmental purposes. All other rights are reserved by the copyright owner.

Shaw, Eric J.↗

Improved Temperature Sounding and Quality Control Methodology Using AIRS/AMSU Data: The AIRS Science Team Version 5 Retrieval Algorithm

This paper describes the AIRS Science Team Version 5 retrieval algorithm in terms of its three most significant improvements over the methodology used in the AIRS Science Team Version 4 retrieval algorithm. Improved physics in Version 5 allows for use of AIRS clear column radiances in the entire 4.3 micron CO2 absorption band in the retrieval of temperature profiles T(p) during both day and night. Tropospheric sounding 15 micron CO2 observations are now used primarily in the generation of clear column radiances .R(sub i) for all channels. This new approach allows for the generation of more accurate values of .R(sub i) and T(p) under most cloud conditions. Secondly, Version 5 contains a new methodology to provide accurate case-by-case error estimates for retrieved geophysical parameters and for channel-by-channel clear column radiances. Thresholds of these error estimates are used in a new approach for Quality Control. Finally, Version 5 also contains for the first time an approach to provide AIRS soundings in partially cloudy conditions that does not require use of any microwave data. This new AIRS Only sounding methodology, referred to as AIRS Version 5 AO, was developed as a backup to AIRS Version 5 should the AMSU-A instrument fail. Results are shown comparing the relative performance of the AIRS Version 4, Version 5, and Version 5 AO for the single day, January 25, 2003. The Goddard DISC is now generating and distributing products derived using the AIRS Science Team Version 5 retrieval algorithm. This paper also described the Quality Control flags contained in the DISC AIRS/AMSU retrieval products and their intended use for scientific research purposes.

Susskind, Joel↗

Ares I Integrated Vehicle System Safety Team

Complex systems require integrated analysis teams which sometimes are divided into subsystem teams. Proper division of the analysis in to subsystem teams is important. Safety analysis is one of the most difficult aspects of integration.

Wetherholt, Jon↗

Flight Team Development in Support of LCROSS - A Class D Mission

The LCROSS (Lunar Crater Observation and Sensing Satellite) project presented a number of challenges to the preparation for mission operations. A class D mission under NASA s risk tolerance scale, LCROSS was governed by a $79 million cost cap and a 29 month schedule from "authority to proceed" to flight readiness. LCROSS was NASA Ames Research Center s flagship mission in its return to spacecraft flight operations after many years of pursuing other strategic goals. As such, ARC needed to restore and update its mission support infrastructure, and in parallel, the LCROSS project had to newly define operational practices and to select and train a flight team combining experienced operators and staff from other arenas of ARC research. This paper describes the LCROSS flight team development process, which deeply involved team members in spacecraft and ground system design, implementation and test; leveraged collaborations with strategic partners; and conducted extensive testing and rehearsals that scaled in realism and complexity in coordination with ground system and spacecraft development. As a testament to the approach, LCROSS successfully met its full mission objectives, despite many in-flight challenges, with its impact on the lunar south pole on October 9, 2009.

Tompkins, Paul D.↗

OSMA Research and Technology Strategy Team Summary

This slide presentation reviews the work of the Office of Safety and Mission Assurance (OSMA), and the OSMA Research and Technology Strategy (ORTS) team. There is discussion of the charter of the team, Technology Readiness Levels (TRLs) and how the teams responsibilities are related to these TRLs. In order to improve the safety of all levels of the development through the TRL phases, improved communication, understanding and cooperation is required at all levels, particularly at the mid level technologies development.

Wetherholt, Martha↗

Staying Alive! Training High-Risk Teams for Self Correction

Research examining teams working in high-risk operations has been lacking. The present symposium showcases research on team training that helps to optimize team performance in environments characterized by life or death situations arising spontaneously after long periods of mundane activity by pulling experts from diverse areas of industry: space flight, health care, and medical simulation.

Slack, Kelley↗

Space Missions Trade Space Generation and Assessment Using JPL Rapid Mission Architecture (RMA) Team Approach

The JPL Rapid Mission Architecture (RMA) capability is a novel collaborative team-based approach to generate new mission architectures, explore broad trade space options, and conduct architecture-level analyses. RMA studies address feasibility and identify best candidates to proceed to further detailed design studies. Development of RMA first began at JPL in 2007 and has evolved to address the need for rapid, effective early mission architectural development and trade space exploration as a precursor to traditional point design evaluations. The RMA approach integrates a small team of architecture-level experts (typically 6-10 people) to generate and explore a wide-ranging trade space of mission architectures driven by the mission science (or technology) objectives. Group brainstorming and trade space analyses are conducted at a higher level of assessment across multiple mission architectures and systems to enable rapid assessment of a set of diverse, innovative concepts. This paper describes the overall JPL RMA team, process, and high-level approach. Some illustrative results from previous JPL RMA studies are discussed.

real time systems↗

Examination of Communication Delays on Team Performance: Utilizing the International Space Station (ISS) as a Test Bed for Analog Research

Operational conjectures about space exploration missions of the future indicate that space crews will need to be more autonomous from mission control and operate independently. This is in part due to the expectation that communication quality between the ground and exploration crews will be more limited and delayed. Because of potential adverse effects on communication quality, both researchers and operational training and engineering experts have suggested that communication delays and the impact these delays have on the quality of communications to the crew will create performance decrements if crews are not given adequate training and tools to support more autonomous operations. This presentation will provide an overview of a research study led by the Behavioral Health and Performance Element (BHP) of the NASA Human Research Program that examines the impact of implementing a communication delay on ISS on individual and team factors and outcomes, including performance and related perceptions of autonomy. The methodological design, data collection efforts, and initial results of this study to date will be discussed . The results will focus on completed missions, DRATS and NEEMO15. Lessons learned from implementing this study within analog environments will also be discussed. One lesson learned is that the complexities of garnishing a successful data collection campaign from these high fidelity analogs requires perseverance and a strong relationship with operational experts. Results of this study will provide a preliminary understanding of the impact of communication delays on individual and team performance as well as an insight into how teams perform and interact in a space-like environment . This will help prepare for implementation of communication delay tests on the ISS, targeted for Increment 35/36.

Keeton, K. E.↗

NASA Human Spaceflight Architecture Team Lunar Destination Activities

NASA's Human Spaceflight Architecture Team (HAT) Lunar Destination Team has been developing a number of "Design Reference Missions" (DRM) to inform exploration architecture development, transportation approaches, and destination elements and operations. There are four destinations being considered in the HAT studies: Cis-Lunar, Lunar, Near Earth Asteroids and Mars. The lunar destination includes all activities that occur on the moon itself, but not low lunar orbit operations or Earth Moon LaGrange points which are the responsibility of the HAT Cis-Lunar Team. This paper will review the various surface DRMs developed as representative scenarios that could occur in a human lunar return. The approaches have been divided into two broad categories: a seven day short stay mission with global capabilities and a longer extended duration stay of 28 days which is limited to the lunar poles as a landing zone. The surface elements, trade studies, traverses, concept of operations and other relevant issues and methodologies will be presented and discussed in the context and framework of the HAT ground rules and assumptions which are constrained by NASA's available transportation systems. An international collaborative effort based on the 2011 Global Exploration Roadmap (GER) will also be examined and evaluated.

Connolly, J. F.↗

Forming Human-Robot Teams Across Time and Space

NASA pushes telerobotics to distances that span the Solar System. At this scale, time of flight for communication is limited by the speed of light, inducing long time delays, narrow bandwidth and the real risk of data disruption. NASA also supports missions where humans are in direct contact with robots during extravehicular activity (EVA), giving a range of zero to hundreds of millions of miles for NASA s definition of "tele". . Another temporal variable is mission phasing. NASA missions are now being considered that combine early robotic phases with later human arrival, then transition back to robot only operations. Robots can preposition, scout, sample or construct in advance of human teammates, transition to assistant roles when the crew are present, and then become care-takers when the crew returns to Earth. This paper will describe advances in robot safety and command interaction approaches developed to form effective human-robot teams, overcoming challenges of time delay and adapting as the team transitions from robot only to robots and crew. The work is predicated on the idea that when robots are alone in space, they are still part of a human-robot team acting as surrogates for people back on Earth or in other distant locations. Software, interaction modes and control methods will be described that can operate robots in all these conditions. A novel control mode for operating robots across time delay was developed using a graphical simulation on the human side of the communication, allowing a remote supervisor to drive and command a robot in simulation with no time delay, then monitor progress of the actual robot as data returns from the round trip to and from the robot. Since the robot must be responsible for safety out to at least the round trip time period, the authors developed a multi layer safety system able to detect and protect the robot and people in its workspace. This safety system is also running when humans are in direct contact with the robot, so it involves both internal fault detection as well as force sensing for unintended external contacts. The designs for the supervisory command mode and the redundant safety system will be described. Specific implementations were developed and test results will be reported. Experiments were conducted using terrestrial analogs for deep space missions, where time delays were artificially added to emulate the longer distances found in space.

Hambuchen, Kimberly↗

Zero-Fidelity Simulation: Engaging Team Coordination without Physical, Functional, or Psychological Re-Creation

Team coordination is essential across domains, enabling efficiency and safety. As technology improves, our temptation is to simulate with ever-higher fidelity, by making simulators re-create reality through their physical interfaces, functionality, and by making participants believe they are undertaking the simulated task. However, high-fidelity simulations often miss salient human-human work practices. We introduce the concept of zero-fidelity simulation (ZFS), a move away from literal high-fidelity mimesis of the concrete environment. ZFS alternatively models cooperation and communication as the basis of simulation. The ZFS Team Coordination Game (TeC) is developed from observation of fire emergency response work practice. We identify ways in which team members are mutually dependent on one another for information, and use these as the basis for the ZFS game design. The design creates a need for cooperation by restricting individual activity and requiring communication. The present research analyzes the design of interdependence in the validated ZFS TeC game. We successfully simulate interdependence between roles in emergency response without simulating the concrete environment.

Toups, Zachary O.↗

Automation and Process Improvement Enables a Small Team to Operate a Low Thrust Mission in Orbit Around the Asteroid Vesta

NASA's Dawn mission to the asteroid Vesta and dwarf planet Ceres launched September 27, 2007 and arrived at Vesta in July of 2011. This mission uses ion propulsion to achieve the necessary delta-V to reach and maneuver at Vesta and Ceres. This paper will show how the evolution of ground system automation and process improvement allowed a relatively small engineering team to transition from cruise operations to asteroid operations while maintaining robust processes. The cruise to Vesta phase lasted almost 4 years and consisted of activities that were built with software tools, but each tool was open loop and required engineers to review the output to ensure consistency. Additionally, this same time period was characterized by the evolution from manually retrieved and reviewed data products to automatically generated data products and data value checking. Furthermore, the team originally took about three to four weeks to design and build about four weeks of spacecraft activities, with spacecraft contacts only once a week. Operations around the asteroid Vesta increased the tempo dramatically by transitioning from one contact a week to three or four contacts a week, to fourteen contacts a week (every 12 hours). This was accompanied by a similar increase in activity complexity as well as very fast turn around activity design and build cycles. The design process became more automated and the tools became closed loop, allowing the team to build more activities without sacrificing rigor. Additionally, these activities were dependent on the results of flight system performance, so more automation was added to analyze the flight data and provide results in a timely fashion to feed the design cycle. All of this automation and process improvement enabled up the engineers to focus on other aspects of spacecraft operations, including spacecraft health monitoring and anomaly resolution.

ground system automation↗

Marshall Team Complete Testing for Lunar Atmosphere and Dust Environment Explorer

Dr. Huu Trinh and his team with the Propulsion Systems and Test Departments at Marshall Space Flight Center in Huntsville, Ala. successfully complete a simulated cold-flow test series on the propulsion system used for the Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft. NASA Ames Research Center, Moffett Field, Calif., is leading NASA s work on the development of the LADEE spacecraft, and the Marshall center is the program office for the project. The spacecraft, scheduled for launch this fall, will orbit the Moon and gather information about the lunar atmosphere, conditions near the surface of the Moon, and collect samples of lunar dust. A thorough understanding of these characteristics will address long-standing unknowns, and help scientists understand other planetary bodies as well. The test team at the Marshall center conducted the cold flow test to identify how the fluid flows through the propulsion system feed lines, especially during critical operation modes. The test data will be used to assist the LADEE team in identifying any potential flow issues in the propulsion system, and allow them to address and correct them in advance of the launch.

Swofford, Philip↗