Search NASA⌕ Search

SEARCH · Search NASA

Results for “team building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Mission design of a Pioneer Jupiter Orbiter

The Mission analysis and design work performed in order to define a Pioneer mission to orbit Jupiter is described. This work arose from the interaction with a science advisory 'Mission Definition' team and led to the present mission concept. Building on the previous Jupiter Orbiter-Satellite Tour development at JPL a magnetospheric survey mission concept is developed. The geometric control of orbits which then provide extensive local time coverage of the Jovian system is analyzed and merged with the various science and program objectives. The result is a 'flower-orbit' mission design, yielding three large apoapse excursions at various local times and many interior orbits whose shape and orientation is under continual modification. This orbit design, together with a first orbit defined by delivery of an atmospheric probe, yields a mission of high scientific interest.

Friedman, L. D.↗

Operational aspects of a spacecraft planning/scheduling expert system

Various operational aspects of the Earth Radiation Budget Satellite (ERBS) Tracking and Data Relay Satellite System (TDRSS) are described. The ERBS-TDRSS Contract Planning System is an expert system which has been used operationally since June 1987 by the ERBS Flight Operations Team (FOT) at Goddard Space Flight Center to build weekly schedules of requests for service from the TDRSS. The basic operation of the system and significant enhancements and changes are discussed.

Mclean, David R.↗

NASA Research Announcement Phase 2 Final Report for the Development of a Power Assisted Space Suit Glove

The main goal of this program was to develop an unobtrusive power-assisted EVA glove metacarpalphalangeal (MCP) joint that could provide the crew member with as close to nude body performance as possible, and to demonstrate the technology feasibility of power assisted space suit components in general. The MCP joint was selected due to its being representative of other space suit joints, such as the shoulder, hip and carpometacarpal joint, that would also greatly benefit from this technology. In order to meet this objective, a development team of highly skilled and experienced personnel was assembled. The team consisted of two main entities. The first was comprised of ILC's experienced EVA space suit glove designers, who had the responsibility of designing and fabricating a low torque MCP joint which would be compatible with power assisted technology. The second part of the team consisted of space robotics experts from the University of Maryland's Space Systems Laboratory. This team took on the responsibility of designing and building the robotics aspects of the power-assist system. Both parties addressed final system integration responsibilities.

Lingo, Robert↗

New Human-Computer Interface Concepts for Mission Operations

The current climate of budget cuts has forced the space mission operations community to reconsider how it does business. Gone are the days of building one-of-kind control centers with teams of controllers working in shifts 24 hours per day, 7 days per week. Increasingly, automation is used to significantly reduce staffing needs. In some cases, missions are moving towards lights-out operations where the ground system is run semi-autonomously. On-call operators are brought in only to resolve anomalies. Some operations concepts also call for smaller operations teams to manage an entire family of spacecraft. In the not too distant future, a skeleton crew of full-time general knowledge operators will oversee the operations of large constellations of small spacecraft, while geographically distributed specialists will be assigned to emergency response teams based on their expertise. As the operations paradigms change, so too must the tools to support the mission operations team's tasks. Tools need to be built not only to automate routine tasks, but also to communicate varying types of information to the part-time, generalist, or on-call operators and specialists more effectively. Thus, the proper design of a system's user-system interface (USI) becomes even more importance than before. Also, because the users will be accessing these systems from various locations (e.g., control center, home, on the road) via different devices with varying display capabilities (e.g., workstations, home PCs, PDAS, pagers) over connections with various bandwidths (e.g., dial-up 56k, wireless 9.6k), the same software must have different USIs to support the different types of users, their equipment, and their environments. In other words, the software must now adapt to the needs of the users! This paper will focus on the needs and the challenges of designing USIs for mission operations. After providing a general discussion of these challenges, the paper will focus on the current efforts of creatin(y an effective USI for one specific suite of tools, SERS (The Spacecraft Emergency Response System), which has been built to enable lights-out operations. SERS is a Web-based collaborative environment that enables secure distributed fault management.

Fox, Jeffrey A.↗

Challenges of Building, Launching, and Operating The Curiosity SAM Instrument on Mars

The Sample Analysis at Mars (SAM) Suite Investigation onboard the Mars Science Laboratory (MSL) Curiosity rover is currently roving up Mt Sharp in Gale Crater on Mars. It is investigating the present and past habitability of Mars by exploring molecular and elemental chemistry relevant to life. SAM is a suite of three instruments, a Quadrupole Mass Spectrometer (QMS), a Gas Chromatograph (GC), and a Tunable Laser Spectrometer (TLS). As Curiosity climbs Mt. Sharp, SAM’s instrument suite search for and measure the abundances of carbon, oxygen, hydrogen, and nitrogen - elements that are associated with life as we know it. SAM quantitatively addresses the habitability of Mars, an essential step in the search for past or present life on Mars. This talk provides a behind-the-scenes look at the vignettes of the engineering challenges of building, integrating, testing, launching, and the SAM’s team’s initial experiences of operating SAM on Mars.

Florence Tan↗

Empowering Open Science with the Science Discovery Engine

: This presentation will describe the work to date in building the SDE as well as what the team has learned about the SMD ecosystem, information curation, and data governance. A short demonstration of the SDE will be presented, and an overview of near- and long-term goals for future development will be shared. Community feedback will be welcomed about the interface, content, and other features to help inform actions to maximize the SDE’s performance and usability. Whether users aim to discover Earth-like atmospheres on planets outside of our solar system or better understand the impacts of solar energy on our own planet, the Science Discovery Engine provides a means for scientists and all curious individuals to find content to further their understanding of science across all time and space scales.

Emily Foshee↗

JETT3: A Holistic, Integrated Analog for Artemis Lunar Surface Exploration

Since 1972, NASA astronauts have performed hundreds of Extravehicular Activities (EVAs) in support of Skylab, Space Shuttle and International Space Station missions. Not since Apollo, however, have EVAs been driven by discovery-based principles of scientific exploration. Upcoming Artemis missions are challenged to build on lessons learned from Apollo, merging 50 years of EVA experience with the planetary science community’s expertise in the remote surface exploration of Mars. The highest-fidelity preparation for Artemis includes both operational and scientific underpinning to represent the complete, complex picture of lunar surface operations. The Joint EVA & Human Surface Mobility Test Team (JETT) is an interdisciplinary team providing such an environment for collaborative analog testing. JETT builds upon prior analog campaigns (e.g., [1, 2]) to provide high-fidelity environments for hardware and concept of operations development. Sponsored by the NASA EVA & Human Surface Mobility Program (EHP), JETT includes representatives from EHP, NASA Engineering, the Science Mission Directorate (SMD), Human Health & Performance, and the Flight Operations Directorate (FOD). JETT tests evaluate NASA reference designs for EVA (e.g., suits and tools), address gaps and risks for Artemis lunar surface operations, develop capabilities for EVA and science tasks, enable technology maturation, and provide training for Artemis EVA operations. JETT3, the final JETT field test of FY22, occurred Oct 3-11, 2022 in the San Francisco Volcanic Field north of Flagstaff, AZ. The test focused on developing the Artemis concept of operations and systems, including integrating an Artemis-like Science Team into a NASA Flight Control Team (FCT) to plan and execute a series of simulated lunar EVAs in an environment analogous to Artemis 3.

T. E. Caswell↗

JETT3: A Holistic, Integrated Analog for Artemis Lunar Surface Exploration

Since 1972, NASA astronauts have performed hundreds of Extravehicular Activities (EVAs) in support of Skylab, Space Shuttle and International Space Station missions. Not since Apollo, however, have EVAs been driven by discovery-based principles of scientific exploration. Upcoming Artemis missions are challenged to build on lessons learned from Apollo, merging 50 years of EVA experience with the planetary science community’s expertise in the remote surface exploration of Mars. The highest-fidelity preparation for Artemis includes both operational and scientific underpinning to represent the complete, complex picture of lunar surface operations. The Joint EVA & Human Surface Mobility Test Team (JETT) is an interdisciplinary team providing such an environment for collaborative analog testing. JETT builds upon prior analog campaigns (e.g., [1, 2]) to provide high-fidelity environments for hardware and concept of operations development. Sponsored by the NASA EVA & Human Surface Mobility Program (EHP), JETT includes representatives from EHP, NASA Engineering, the Science Mission Directorate (SMD), Human Health & Performance, and the Flight Operations Directorate (FOD). JETT tests evaluate NASA reference designs for EVA (e.g., suits and tools), address gaps and risks for Artemis lunar surface operations, develop capabilities for EVA and science tasks, enable technology maturation, and provide training for Artemis EVA operations. JETT3, the final JETT field test of FY22, occurred Oct 3-11, 2022 in the San Francisco Volcanic Field north of Flagstaff, AZ. The test focused on developing the Artemis concept of operations and systems, including integrating an Artemis-like Science Team into a NASA Flight Control Team (FCT) to plan and execute a series of simulated lunar EVAs in an environment analogous to Artemis 3.

T. E. Caswell↗

ATTRACTOR: Toward Trustworthy and Trusted Autonomous Systems

The question of what it means and what it takes for an autonomous system to consider another autonomous system justifiably trustworthy must be addressed by all who seek to integrate intelligent machine agents into real-world operations. A satisfactory answer to this question is an essential component in accepting autonomous machine decision-making in safety-critical and time-critical environments, such as aviation. Historically, simulation platforms for test and evaluation of complex systems have proven to be effective in assessing performance and contributing to decisions on the fitness of systems to operate in current general and commercial aviation airspace. Moreover, simulations have informed the definition of safety-critical constraints. However, as machine systems progressively take on responsibilities for decision-making traditionally supplied by humans, simulations require enhancement. Mixed reality simulation that integrates real-world platforms and data or high-fidelity simulation data in a sim-to-flight paradigm provides insight into agent interaction and the rationale behind autonomous agent decision-making as well as the capacity for seamless integrated implementation, testing, and operation of systems. Strong simulation capabilities are especially important in the presence of algorithms that hold great promise in decision-making yet increase the uncertainty in the system. Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) is a subproject of NASA’s Convergent Aeronautics Solutions (CAS) Project. ATTRACTOR’s objective is to build a basis for understanding trust and trustworthiness in multi-agent autonomous teams, and thus to inform future certification of safety-critical and time-critical autonomous systems in aviation. Because the concepts of trust and trustworthiness must be addressed in a context, ATTRACTOR has chosen Search and Rescue (SAR) in dynamic and unstructured environments, with emphasis on search, as its design reference mission (DRM). During dynamic planning and execution of trajectory-based operations, autonomous agents determine their trajectories given an assigned mission or missions and call for assistance from an appropriate teammate when needed. This experience along with the attendant human-machine and machine-machine interactions, serve as a platform for developing approaches to identifying and measuring trustworthiness and increasing trust. In this paper, we give an overview of some of ATTRACTOR’s research and development activities, findings, and ongoing work.

ATTRACTOR↗

A Modified Delphi Method to Accelerate Consensus Building in Expert Judgment Elicitation

The 2017 Earth Science Decadal Survey recommends the implementation of a novel Earth Observing mission to study Aerosols, Clouds, Convection, and Precipitation. The assessment of the candidate architectures under consideration requires the use of Expert Judgment Elicitation. Some of the assessment scores are obtained through consensus among the Science Leadership Team. A modified Delphi method was developed to accelerate the consensus building process and reduce the number of cycles required to converge. This paper discusses which elements of the traditional method were modified, how the method was applied, and the impact of the modifications on generating consensus.

Expert Judgement↗

A Modified Delphi Method to Accelerate Consensus Building in Expert Judgment Elicitation

The 2017 Earth Science Decadal Survey recommends the implementation of a novel Earth Observing mission to study Aerosols, Clouds, Convection, and Precipitation. The assessment of the candidate architectures under consideration requires the use of Expert Judgment Elicitation. Some of the assessment scores are obtained through consensus among the Science Leadership Team. A modified Delphi method was developed to accelerate the consensus building process and reduce the number of cycles required to converge. This paper discusses which elements of the traditional method were modified, how the method was applied, and the impact of the modifications on generating consensus.

Expert Judgment↗

The Join-Up Meeting

I recently took on a new assignment and, as is my norm, I scheduled a series of one-hour, 1:1 join-up meetings with the various lead personnel on the team and their hierarchy. During one of these meetings, the person I was meeting with informed me how pleasantly surprised she was that I had scheduled this meeting as very few individuals took the time anymore to have them. I was shocked. I was taught that establishing a 1:1 relationship with the people on your team is critical to the project's success. This was the first time I'd heard anything like this about join-up meetings. I filed this feedback away. Later I was talking to my project manager-mentor, and he indicated he had finished his join-up meetings with every person in his new organization. He also indicated his predecessor had conducted few, if any, join-up meetings. Again, I was shocked. When I reflected on these two experiences, I realized a very negative trend might be emerging in our fast-paced, schedule-driven, 500-e-mail-per-day, cell-phone -ringing, 24/7 -communication, multi-tasking work lives: NO FACE TIME! Face time is what you spend with people to talk about the project you are working on, their expectations of you, your expectations of them, your hierarchy's expectations about each of you, and/or-last but certainly not least-what each of you plans on achieving during the project. A 1:1, face-to-face, join-up meeting is the only way I know to build solid trust between the project manager and the team members and their hierarchy.

Cameron, W. Scott↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗

Lessons We Learned Designing and Building the Chandra Telescope

2014 marks the crystal (15th) anniversary of the launch of the Chandra X‐ray Observatory. This paper offers some of the major lessons learned by some of the key members of the Chandra Telescope team. We offer some of the lessons gleaned from our experiences developing, designing, building and testing the telescope and its subsystems, with 15 years of hindsight. Among the topics to be discussed are the early developmental tests, known as VETA‐I and VETA‐II, requirements derivation, the impact of late requirements and reflection on the conservatism in the design process.

Arenberg, Jonathan↗

Serious Gaming for Building a Basis of Certification via Trust and Trustworthiness of Autonomous Systems

Autonomous systems governed by a variety of adaptive and nondeterministic algorithms are being planned for inclusion into safety-critical environments, such as unmanned aircraft and space systems in both civilian and military applications. However, until autonomous systems are proven and perceived to be capable and resilient in the face of unanticipated conditions, humans will be reluctant or unable to delegate authority, remaining in control aided by machine-based information and decision support. Proving capability, or trustworthiness, is a necessary component of certification. Perceived capability is a component of trust. Trustworthiness is an attribute of a cyber-physical system that requires context-driven metrics to prove and certify. Trust is an attribute of the agents participating in the system and is gained over time and multiple interactions through trustworthy behavior and transparency. Historically, artificial intelligence and machine learning systems provide answers without explanation - without a rationale or insight into the machine “thinking”. In order to function as trusted teammates, machines must be able to explain their decisions and actions. This transparency is a product of both content and communication. NASA’s Autonomy Teaming & TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project seeks to build a basis for certification of autonomous systems via establishing metrics for trustworthiness and trust in multi-agent team interactions, using AI (Artificial Intelligence) explainability and persistent modeling and simulation, in the context of mission planning and execution, with analyzable trajectories. Inspired by Massively Multiplayer Online Role Playing Games (MMORPG) and Serious Gaming, the proposed ATTRACTOR modeling and simulation environment is similar to online gaming environments in which player (aka agent) participants interact with each other, affect their environment, and expect the simulation to persist and change regardless of any individual agent’s active participation. This persistent simulation environment will accommodate individual agents, groups of self-organizing agents, and large-scale infrastructure behavior. The effects of the emerging adaptation and coevolution can be observed and measured to building a basis of measurable trustworthiness and trust, toward certification of safety-critical autonomous systems.

Allen, B. Danette↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

COTSAT Small Spacecraft Cost Optimization for Government and Commercial Use

Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) is an ongoing spacecraft research and development project at NASA Ames Research Center (ARC). The prototype spacecraft, also known as CheapSat, is the first of what could potentially be a series of rapidly produced low-cost spacecraft. The COTSAT-1 team is committed to realizing the challenging goal of building a fully functional spacecraft for $500K parts and $2.0M labor. The project's efforts have resulted in significant accomplishments within the scope of a limited budget and schedule. Completion and delivery of the flight hardware to the Engineering Directorate at NASA Ames occurred in February 2009 and a cost effective qualification program is currently under study. The COTSAT-1 spacecraft is now located at NASA Ames Research Center and is awaiting a cost effective launch opportunity. This paper highlights the advancements of the COTSAT-1 spacecraft cost reduction techniques.

Swank, Aaron J.↗