Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

Observation, Analysis, and Recommendations for ND Management Reviews (W88-0/Mk5 ALT 370 Program Report)

Progress and status reviews allow teams to provide updates and targeted information designed to inform the customer of progress and to help the customer understand current risks and challenges. Both presenters and the customer should have well-calibrated expectations for the level of content and information. However, what needs to be covered in systems-level management reviews can too often be poorly defined. These unclear expectations can lead teams to overpreparing or attempting to guess what information the customer considers as most critical. This aspect of the review process is stressful, disruptive, and bad for morale – and time spent overpreparing reports is time spent not focusing on the technical work necessary to stay on schedule. To define and address these issues, this report was designed to observe various aspects of development program coordination and review activities for NNSA and Navy customers, and then to conduct unbiased, independent Human Factors observation and analysis from an outside perspective. The report concludes with suggestions and recommendations for improving the efficiency of information flow related to reviews, with the goals of increasing productivity and benefitting both Sandia and the customer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear Safety [Vol. 30, No. 3, July-September 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 325 Safety of Framatome Advanced Nuclear Steam Supply Systems Designs by J. A. Charles and D. Lange, 333 Book Review of Nuclear Accidents: Intervention Levels for the Protection of the Public by H. B. Piper; ACCIDENT ANALYSIS: 335 Living PRA Computer Systems by S. C. Dinsmore and H.-P. Balfanz, 343 Summary of ICAP Assessments of RELAP5/MOD2 by W. E. Driskell and R. G. Hanson; CONTROL AND INSTRUMENTATION: 352 Thermal Performance Monitoring System at Maanshan Nuclear Power Plant by H.-J. Chao, Y.-P. Lin, G.-H. Jou, L.-Y. Liao, and Y.-B. Chen; DESIGN FEATURES: 358 Warning Systems for Nuclear Power Plant Emergencies by J. H. Sorensen and D. S. Mileti; WASTE AND SPENT FUEL MANAGEMENT: 371 Activities Related to Waste Management Compiled by E G. Silver; OPERATING EXPERIENCES: 382 Steam Generator Tube Performance: Experience with Water-Cooled Nuclear Power Reactors During 1985 by O. S. Tatone and R. L. Tapping, 400 Systems Interaction Analyses: Concepts and Techniques (Part II) by M. D. Muhlheim and G. A. Murphy, 413 Reactor Shutdown Experience Compiled by J. W. Cletcher, 416 Operating U.S. Power Reactors Compiled by E G. Silver; RECENT DEVELOPMENTS: 440 General Administrative Activities Compiled by E G. Silver, 460 Reports, Standards, and Safety Guides by D. S. Queener, 466 Status of Power-Reactor Licensing Activities Compiled by E G. Silver, 470 Proposed Rule Changes as of Mar. 31, 1989; ANNOUNCEMENTS: 334 Proceedings Published, 351 CEC Seminar on Methods and Codes for Assessing the Off-Site Consequences of Nuclear Accidents, 357 Short Course on Multiphase Flow and Heat Transfer: Bases and Applications in A: The Nuclear Power Industry B: The Process Industries, 357 International Conference on Probabilistic Safety Assessment and Management, 478 International Topical Meeting on the Safety, Status, and Future of Non-Commercial Reactors and Irradiation Facilities, 475 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Direct conversion technology

The overall objective of the Direct Conversion Technology task is to develop an experimentally verified technology base for promising direct thermal-to-electric energy conversion systems that have potential application for energy conservation in the end-use sectors. This report contains progress of research on the Alkali Metal Thermal-to-Electric Converter (AMTEC), and on the Two-Phase Liquid-Metal MHD Electrical Generator (LMMHD) for the period January 1988 through December 1988. Research on these concepts was initiated during October 1987. In addition, status reviews and assessments are presented for thermomagnetic converter concepts and for thermoelastic converters (Nitinol heat engines). Reports prepared on previous occasions contain discussions on the following other direct conversion concepts: thermoelectric, pyroelectric, thermionic thermophotovoltaic and thermoacoustic; and also, more complete discussions of AMTEC and LMMHD systems. A tabulated summary of the various systems which have been reviewed thus far has been prepared. Some of the important technical research needs are listed and a schematic of each system is shown.

Massier, P. F.↗

The Next Generation Radioisotope Thermoelectric Generator Project - Overview and Progress Status

The Next Generation Radioisotope Thermoelectric Generator (Next Gen RTG) Project is a spaceflight system project within NASA’s Radioisotope Power Systems (RPS) Program. The project, in partnership with the Idaho National Laboratory (INL) / Battelle Energy Alliance (BEA), will build and deliver an unfueled, flight qualified Radioisotope Thermoelectric Generator (RTG) system based on RPS Program needs. The Next Gen RTG Project aims to assure the availability of high-power, vacuum-rated RTGs to enable future deep space missions. The Project team is developing that capability through a multi-phase effort that leverages the heritage General Purpose Heat Source - RTG (GPHS-RTG) design and available legacy hardware. The Project’s primary aim is to re-establish the capability to manufacture a silicon germanium (SiGe) unicouple based thermoelectric converter and associated hardware with minimal changes to the heritage GPHS-RTG design. The project will also refurbish the GPHS-RTG Flight Unit #5 (F-5) located at INL and verify its compliance with heritage GPHS-RTG requirements. This paper will detail the project’s plans for the development of these systems. Management approaches, technical challenges, and risks will also be discussed.

Radioisotope↗

Validation of Procedures for Monitoring Crewmember Immune Function

There is ample evidence to suggest that space flight leads to immune system dysregulation, however the nature of the phenomenon as it equilibrates over longer flights has not been determined. This dysregulation may be a result of microgravity, confinement, physiological stress, radiation, environment or other mission-associated factors. The clinical risk (if any) for exploration-class space flight is unknown, but may include increased incidence of infection, allergy, hypersensitivity, hematological malignancy or altered wound healing. The objective of this Supplemental Medical Objective (SMO) is to determine the status of the immune system, physiological stress and latent viral reactivation (a clinical outcome that can be measured) during both short and long-duration spaceflight. In addition, this study will develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. Pre-mission, in-flight and post-flight blood and saliva samples will be obtained from participating crewmembers. Assays included peripheral immunophenotype, T cell function, cytokine profiles (RNA, intracellular, secreted), viral-specific immunity, latent viral reactivation (EBV, CMV, VZV), and stress hormone measurements. This study is currently ongoing. To date, 10 short duration and 5 long-duration crewmembers have completed the study. Technically, the study is progressing well. In-flight blood samples are being collected, and returned for analysis, including functional assays that require live cells. For all in-flight samples to date, sample viability has been acceptable. Preliminary data (n = 4/7; long/short duration, respectively) indicate that distribution of most peripheral leukocyte subsets is largely unaltered during flight. Exceptions include elevated T cells, reduced B/NK cells, increased memory T cells and increased central memory CD8+ T cells. General T cell function, early blastogenesis response to mitogenic stimulation, is markedly reduced in-flight. In-vivo cytokine production profiles are altered, with in-flight dysregulation observed in the Th1/Th2/Treg equilibrium. EBV specific T cell levels are increased during flight, whereas their function is reduced. VZV reactivation was observed inflight and several days post flight with highest levels measured later during long-duration flight. The shedding of CMV in the urine was detected of 4/5 long duration and 4/7 short duration crewmembers. Plasma cortisol was not elevated during flight. Further data will be required to validate the initial observations.

Crucian, Brian↗

AeroMACS System Characterization and Demonstrations

This The Aeronautical Mobile Airport Communications System (AeroMACS) is being developed to provide a new broadband wireless communications capability for safety critical communications in the airport surface domain, providing connectivity to aircraft and other ground vehicles as well as connections between other critical airport fixed assets. AeroMACS development has progressed from requirements definition through technology definition, prototype deployment and testing, and now into national and international standards development. The first prototype AeroMACS system has been deployed at the Cleveland Hopkins International Airport (CLE) and the adjacent NASA Glenn Research Center (GRC). During the past 3 years, extensive technical testing has taken place to characterize the performance of the AeroMACS prototype and provide technical support for the standards development process. The testing has characterized AeroMACS link and network performance over a variety of conditions for both fixed and mobile data transmission and has included basic system performance testing and fixed and mobile applications testing. This paper provides a summary of the AeroMACS performance testing and the status of standardization activities that the testing supports.

Kerczewski, Robert J.↗

AeroMACS System Characterization and Demonstrations

The Aeronautical Mobile Airport Communications System (AeroMACS) is being developed to provide a new broadband wireless communications capability for safety critical communications in the airport surface domain, providing connectivity to aircraft and other ground vehicles as well as connections between other critical airport fixed assets. AeroMACS development has progressed from requirements definition through technology definition, prototype deployment and testing, and now into national and international standards development. The first prototype AeroMACS system has been deployed at the Cleveland Hopkins International Airport (CLE) and the adjacent NASA Glenn Research Center (GRC). During the past three years, extensive technical testing has taken place to characterize the performance of the AeroMACS prototype and provide technical support for the standards development process. The testing has characterized AeroMACS link and network performance over a variety of conditions for both fixed and mobile data transmission and has included basic system performance testing and fixed and mobile applications testing. This paper provides a summary of the AeroMACS performance testing and the status of standardization activities that the testing supports.

Kerczewski, Robert J.↗

Polymer infiltration studies

Progress was made in several areas on the preparation of carbon fiber composites using advanced polymer resins. Polymer infiltration studies dealt with ways of preparing composite materials from advanced polymer resins and carbon fibers. This effort is comprised of an integrated approach to the process of composite part fabrication. The goal is to produce advanced composite materials for automated part fabrication using textile and robotics technology in the manufacture of subsonic and supersonic aircraft. The object is achieved through investigations at the NASA Langley Research Center and by stimulating technology transfer between contract researchers and the aircraft industry. Covered here are literature reviews, a status report on individual projects, current and planned research, publications, and scheduled technical presentations.

Marchello, Joseph M.↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on the Status of Deep Borehole Disposal of High-Level Radioactive Waste in Germany - 20285

The phase-out of nuclear energy in Germany will take place in 2022. A site for final disposal of high level radioactive waste (HLRW) has not yet been found, but a site selection process was restarted by Act on the Search for and Selection of a Site for a Disposal Facility for High-Level Radioactive Waste (Site Selection Act - StandAG 2017). This act was based on a recommendation by a commission which also advised to follow up the development of deep borehole disposal (DBD) as an alternative option for final disposal of HLRW. This paper summarizes briefly the status of DBD in Germany and if this option should be pursued in Germany. Although there are some merits of DBD, it can only be a real option if research and development is supported. The technical equipment for boreholes of the required size will only be developed if there is funding and a feasibility test. Furthermore, any concept of DBD and technology must be detailed further, and some requirements of the act must be reconsidered. The paper concludes that despite the possible merits of DBD, the political and financial support for R and D will only be provided for the time being if DBD is pushed by interested parties. Alternatively, if the site selection procedure is not progressing well, then the alternative option of DBD may find greater interest in the future. However, its availability will be severely limited due to the missing development of detailed concepts and its demonstration of feasibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Dominican Republic’s Commercial and Industrial Scale Energy Efficiency Sector

In this paper the National Renewable Energy Laboratory (NREL) explores the commercial and industrial (C&I) energy efficiency market in the Dominican Republic, including the market’s current status. During NREL’s engagement with its Dominican counterparts, NREL noted market gaps, identified by both public and private sector market actors, that became the focus of this report. The intent is two-fold. First, to assist potential customers, project financing institutions, and various government agencies understand where the energy efficiency sector stands, in August 2020. Second to help them recognize the scope, scale, and opportunity for energy savings from untapped potential large reductions in energy expenditures. This research identified how savings could be captured through improvements to the enabling environment, technical capacity, and level of activity in the sector. Moreover, it determined that through taking action to catalyze energy efficiency investment, the government could make significant progress towards its self-declared NDC goals, and result in tens of millions of dollars in savings across the Dominican economy for both the private and public sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS

Stetson, Howard K.↗

Report on a 2009 mini-demonstration of the ARG-US Radio Frequency Identification (RFID) system in transportation.

The Packaging Certification Program (PCP) of the U.S. Department of Energy (DOE) Environmental Management (EM), Office of Packaging and Transportation (EM-14), has developed a radio frequency identification (RFID) tracking and monitoring system for the management of nuclear materials during storage and transportation. The system, developed by the PCP team at Argonne National Laboratory, consists of hardware (Mk-series sensor tags, fixed and handheld readers, form factor for multiple drum types, seal integrity sensors, and enhanced battery management), software (application programming interface, ARG-US software for local and remote/web applications, secure server and database management), and cellular/satellite communication interfaces for vehicle tracking and item monitoring during transport. The ability of the above system to provide accurate, real-time tracking and monitoring of the status of multiple, certified containers of nuclear materials has been successfully demonstrated in a week-long, 1,700-mile DEMO performed in April 2008. While the feedback from the approximately fifty (50) stakeholders who participated in and/or observed the DEMO progression were very positive and encouraging, two major areas of further improvements - system integration and web application enhancement - were identified in the post-DEMO evaluation. The principal purpose of the MiniDemo described in this report was to verify these two specific improvements. The MiniDemo was conducted on August 28, 2009. In terms of system integration, a hybrid communication interface - combining the RFID item-monitoring features and a commercial vehicle tracking system by Qualcomm - was developed and implemented. In the MiniDemo, the new integrated system worked well in reporting tag status and vehicle location accurately and promptly. There was no incompatibility of components. The robust commercial communication gear, as expected, helped improve system reliability. The MiniDemo confirmed that system integration is technically feasible and reliable with the existing RFID and Qualcomm satellite equipment. In terms of web application, improvements in mapping, tracking, data presentation, and post-incident spatial query reporting were implemented in ARG-US, the application software that manages the dataflow among the RFID tags, readers, and servers. These features were tested in the MiniDemo and found to be satisfactory. The resulting web application is both informative and user-friendly. A joint developmental project is being planned between the PCP and the DOE TRANSCOM that uses the Qualcomm gear in vehicles for tracking and communication of radioactive material shipments across the country. Adding an RFID interface to TRANSCOM is a significant enhancement to the DOE infrastructure for tracking and monitoring shipments of radioactive materials.

42 ENGINEERING↗

The 2020 photovoltaic technologies roadmap

Over the past decade, the global cumulative installed photovoltaic (PV) capacity has grown exponentially, reaching 591 GW in 2019. Rapid progress was driven in large part by improvements in solar cell and module efficiencies, reduction in manufacturing costs and the realization of levelized costs of electricity that are now generally less than other energy sources and approaching similar costs with storage included. Given this success, it is a particularly fitting time to assess the state of the photovoltaics field and the technology milestones that must be achieved to maximize future impact and forward momentum. This roadmap outlines the critical areas of development in all of the major PV conversion technologies, advances needed to enable terawatt-scale PV installation, and cross-cutting topics on reliability, characterization, and applications. Each perspective provides a status update, summarizes the limiting immediate and long-term technical challenges and highlights breakthroughs that are needed to address them. In total, this roadmap is intended to guide researchers, funding agencies and industry in identifying the areas of development that will have the most impact on PV technology in the upcoming years.

14 SOLAR ENERGY↗

Integration of the Trigger and Data Acquisition Systems in ATLAS

During 2006 and the first half of 2007, the installation, integration and commissioning of trigger and data acquisition (TDAQ) equipment in the ATLAS experimental area have progressed. There have been a series of technical runs using the final components of the system already installed in the experimental area. Various tests have been run including ones where level 1 preselected simulated proton-proton events have been processed in a loop mode through the trigger and dataflow chains. The system included the readout buffers containing the events, event building, level 2 and event filter trigger algorithms. The scalability of the system with respect to the number of event building nodes used has been studied and quantities critical for the final system, such as trigger rates and event processing times, have been measured using different trigger algorithms as well as different TDAQ components. This paper presents the TDAQ architecture, the current status of the installation and commissioning and highlights the main test results that validate the system.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Status Report on ASME Code Development for Nonmetallic Core Components in 2020

The purpose of this report is to provide a status update on the progress and ongoing activities of the current ASME Boiler Pressure Vessel (BPV) Code Section III, Division 5, on nonmetallic core components and assemblies which includes the design rules for graphite and ceramic composite materials. Section III is concerned with the design and construction of nuclear reactor components and Division 5 focuses on high temperature reactors (HTR). The ASME Section III Committee’s function for nuclear items other than pressure-retaining components, is to establish rules of safety related to structural integrity. The term “construction” refers to the all-inclusive effort comprising of materials, design, fabrication, examination, inspection, testing, certification, and pressure relief. The Department of Energy (DOE) supports industry codes and standards development through focused research providing the technical basis for new or modified codes and standards and the participation of subject matter experts in codes and standards committees. The activities for the nonmetallic core components and assemblies committees are the pursuit of two working groups that meet quarterly during ASME BPV Code Week meetings. The two working groups are General Requirements for Graphite and Ceramic Composite Core Components and Assemblies (GR GCCCCA) and Nonmetallic Design and Materials (NDM). The rules on general requirements for nonmetallic core components are discussed in the articles of Subsection HA subpart B. Ceramic composites were recently incorporated within the rules, and the GR GCCCCA working group is now in the process of aligning the requirements with the subsections and articles of ASME BPV Code Section III NCA, the general requirements for Division 1 and 2 of the code. The NDM working group is concerned with the design rules for graphite and composite materials for core components and assemblies discussed in Subsection HH (Class SN Nonmetallic Core Components) subpart A and subpart B which reference graphite and composite materials respectively. The bulk of the progress and work is done within this working group. A significant undertaking, with discussion that started in 2015, is to gain endorsement of ASME Section III, Division 5, by the U.S. Nuclear Regulatory Commission (NRC). In June 2018, ASME formally recommended endorsement to the NRC. The NRC has since initiated the endorsement review process, which is to be concluded early in 2021. ASME task groups on metallic structures and components, as well as non-metallic core support structures, have been formed to define potential pathways and schedules for NRC endorsement of Division 5. NRC determined to perform a review on the 2017 edition of Section III Division 5 as a baseline. As a result, the use of graphite as nonmetallic core components formed part of the review, but it excluded composite materials (which were first introduced in the 2019 edition). This report documents progress in FY 2020 directed toward ASME’s efforts to develop design codes for graphite and composites. Progress includes a major code review by NRC, the first code enquiry, and its solution, an overhaul of the treatment of Weibull Statistics, and the addition of Nonmandatory Appendices to the composites code relating to carbon-carbon composite materials.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

2006 Status of the Momentum eXchange Electrodynamic Re-Boost (MXER) Tether Development

The MXER Tether technology development is a high-payoff/high-risk investment area within the NASA In-Space Propulsion Technology (ISPT) Program. The ISPT program is managed by the NASA Headquarters Science Mission Directorate and implemented by the Marshall Space Flight Center in Huntsville, Alabama. The MXER concept was identified and competitively ranked within NASA's comprehensive Integrated In-Space Transportation Plan (IISTP); an agency-wide technology assessment activity. The objective of the MXER tether project within ISPT is to advance the technological maturation level for the MXER system, and its subsystems, as well as other space and terrestrial tether applications. Recent hardware efforts have focused on the manufacturability of space-survivable high-strength tether material and coatings, high-current electrodynamic tether, lightweight catch mechanism, high-accuracy propagator/predictor code, and efficient electron collection/current generation. Significant technical progress has been achieved with modest ISPT funding to the extent that MXER has evolved to a well-characterized system with greater capability as the design has been matured. Synergistic efforts in high-current electrodynamic tethers and efficient electron collection/current generation have been made possible through SBIR and STTR support. The entire development endeavor was orchestrated as a collaborative team effort across multiple individual contracts and has established a solid technology resource base, which permits a wide variety of future space cable/tether applications to be realized.

Bonometti, Joseph A.↗