Search NASA⌕ Search

SEARCH · Search NASA

Results for “terminal metering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

171 records · Page 10

Indigenous and Contaminant Microbes in Ultradeep Mines

Rock, air and service water samples were collected for microbial analyses from 3.2 kilometers depth in a working Au mine in the Witwatersrand basin, South Africa. The approx. 1 meter wide mined zone was comprised of a carbonaceous, quartz, sulfide, uraninite and Au bearing layer, called the Carbon Leader, sandwiched by quartzite and conglomerates. The microbial community in the service water was dominated by mesophilic aerobic and anaerobic, alpha, beta and gamma-Proteobacteria with a total biomass concentration approx. l0(exp 4) cells/ ml, whereas, that of the mine air was dominated by members of the Chlorobi and Bacteroidetes groups and a fungal component. The microorganisms in the Carbon Leader were predominantly mesophilic, aerobic heterotrophic, nitrate reducing and methylotrophic, beta and gamma - Proteobacteria that were more closely related to service water microorganisms rather than air microbes. Rhodamine WT dye and fluorescent microspheres employed as contaminant tracers, however, indicated that service water contamination of most of the rock samples was less that 0.01% during acquisition. The microbial contaminants most likely originated from the service water, infiltrated the low permeability rock through and accumulated within mining-induced fractures where they survived for several days prior to being mined. Combined PLFA and terminal restriction fragment length profile (T-RFLP) analyses suggest that the maximum concentration of indigenous microorganisms in the Carbon Leader was less than lo(exp 2) cells/ g. PLFA, S-35 autoradiography and enrichments suggest that the adjacent quartzite was less contaminated and contained -10(exp 3) cells/gram of a thermophilic, sulfate reducing bacteria, SRB, some of who are delta Proteobacteria. Pore water and rock geochemical analyses suggest that these SRB's may have been sustained by sulfate diffusing from the adjacent U-rich, Carbon Leader where it was formed by radiolysis of sulfide.

Onstott, T. C.↗

Flight Test of 31.2 Diameter Modified Ringsail Parachute Deployed at Mach 1.39, Dynamic Pressure 11 Pounds per Square Foot

A 31.2-foot (9.51 meter) nominal diameter (reference area 764 ft(exp 2) (71.0 m(exp 2)) ringsail parachute modified to provide 15-percent geometric porosity was flight tested while attached to a 201-pound mass (91.2 kilogram) instrumented payload as part of the rocket launch portion of the NASA Planetary Entry Parachute Program (PEPP). The parachute deployment was initiated by the firing of a mortar at a Mach number of 1.39 and a dynamic pressure of 11.0 lb/ft(exp 2) (527 newtons/m(exp 2)) at an altitude of 122,500 feet (37.3 kilometers). The parachute deployed to suspension-line stretch (snatch force) in 0.35 second, and 0.12 second later the drag force increase associated with parachute inflation began. The parachute inflated in 0.24 second to the full-open condition for a total elapsed opening time of 0.71 second. The maximum opening load of 3970 pounds (17,700 newtons) came at the time the parachute was just fully opened. During the deceleration period, the parachute exhibited an average drag coefficient of 0.52 and oscillations of the parachute canopy were less than 5 degrees. During the steady-state terminal descent portion of the test period, the average effective drag coefficient (based on vertical descent velocity) was 0.52.

TESTS↗

Characterizing the wake vortex signature for an active line of sight remote sensor

A recurring phenomenon, described as a wake vortex, develops as an aircraft approaches the runway to land. As the aircraft moves along the runway, each of the wing tips generates a spiraling and expanding cone of air. During the lifetime of this turbulent event, conditions exist over the runway which can be hazardous to following aircraft, particularly when a small aircraft is following a large aircraft. Left to themselves, these twin vortex patterns will converge toward each other near the center of the runway, harmlessly dissipating through interaction with each other or by contact with the ground. Unfortunately, the time necessary to disperse the vortex is often not predictable, and at busy airports can severely impact terminal area productivity. Rudimentary methods of avoidance are in place. Generally, time delays between landing aircraft are based on what is required to protect a small aircraft. Existing ambient wind conditions can complicate the situation. Reliable detection and tracking of a wake vortex hazard is a major technical problem which can significantly impact runway productivity. Landing minimums could be determined on the basis of the actual hazard rather than imposed on the basis of a worst case scenario. This work focuses on using a windfield description of a wake vortex to generate line-of-sight Doppler velocity truth data appropriate to an arbitrarily located active sensor such as a high resolution radar or lidar. The goal is to isolate a range Doppler signature of the vortex phenomenon that can be used to improve detection. Results are presented based on use of a simplified model of a wake vortex pattern. However, it is important to note that the method of analysis can easily be applied to any vortex model used to generate a windfield snapshot. Results involving several scan strategies are shown for a point sensor with a range resolution of 1 to 4 meters. Vortex signatures presented appear to offer potential for detection and tracking.

Heil, Robert Milton↗

Parachute Decelerator System Performance During the Low Density Supersonic Decelerator Program's First Supersonic Flight Dynamics Test

During the first Supersonic Flight Dynamics Test (SFDT-1) for NASA's Low Density Supersonic Decelerator (LDSD) Program, the Parachute Decelerator System (PDS) was successfully tested. The main parachute in the PDS was a 30.5-meter supersonic Disksail parachute. The term Disksail is derived from the canopy's constructional geometry, as it combined the aspects of a ringsail and a flat circular round (disk) canopy. The crown area of the canopy contained the disk feature, as a large flat circular disk that extended from the canopy's vent down to the upper gap. From this upper gap to the skirt-band the canopy was constructed with characteristics of sails seen in a ringsail. There was a second lower gap present in this sail region. The canopy maintained a nearly 10x forebody diameter trailing distance with 1.7 Do suspension line lengths. During the test, the parachute was deployed at the targeted Mach and dynamic pressure. Although the supersonic Disksail parachute experienced an anomaly during the inflation process, the system was tested successfully in the environment it was designed to operate within. The nature of the failure seen originated in the disk portion of the canopy. High-speed and high-resolution imagery of the anomaly was captured and has been used to aid in the forensics of the failure cause. In addition to the imagery, an inertial measurement unit (IMU) recorded test vehicle dynamics and loadcells captured the bridle termination forces. In reviewing the imagery and load data a number of hypothesizes have been generated in an attempt to explain the cause of the anomaly.

Gallon, John C.↗

Navigation Strategy for the Mars 2001 Lander Mission

The Mars Surveyor Program (MSP) is an ongoing series of missions designed to robotically study, map and search for signs of life on the planet Mars. The MSP 2001 project will advance the effort by sending an orbiter, a lander and a rover to the red planet in the 2001 opportunity. Each vehicle will carry a science payload that will Investigate the Martian environment on both a global and on a local scale. Although this mission will not directly search for signs of life, or cache samples to be returned to Earth, it will demonstrate certain enabling technologies that will be utilized by the future Mars Sample Return missions. One technology that is needed for the Sample Return mission is the capability to place a vehicle on the surface within several kilometers of the targeted landing site. The MSP'01 Lander will take the first major step towards this type of precision landing at Mars. Significant reduction of the landed footprint will be achieved through two technology advances. The first, and most dramatic, is hypersonic aeromaneuvering; the second is improved approach navigation. As a result, the guided entry will produce in a footprint that is only tens of kilometers, which is an order of magnitude improvement over the Pathfinder and Mars Polar Lander ballistic entries. This reduction will significantly enhance scientific return by enabling the potential selection of otherwise unreachable landing sites with unique geologic interest and public appeal. A landed footprint reduction from hundreds to tens of kilometers is also a milestone on the path towards human exploration of Mars, where the desire is to place multiple vehicles within several hundred meters of the planned landing site. Hypersonic aeromaneuvering is an extension of the atmospheric flight goals of the previous landed missions, Pathfinder and Mars Polar Lander (MPL), that utilizes aerodynamic lift and an autonomous guidance algorithm while in the upper atmosphere. The onboard guidance algorithm will control the direction of the lift vector, via bank angle modulation, to keep the vehicle on the desired trajectory. While numerous autonomous guidance algorithms have been developed for use during hypersonic flight at Earth, this will be the first flight of an autonomously directed lifting entry vehicle at Mars. However, without sufficient control and knowledge of the atmospheric entry conditions, the guidance algorithm will not perform effectively. The goal of the interplanetary navigation strategy is to deliver the spacecraft to the desired entry condition with sufficient accuracy and knowledge to enable satisfactory guidance algorithm performance. Specifically, the entry flight path angle must not exceed 0.27 deg. to a 3 sigma confidence level. Entry errors will contribute directly to the size of the landed footprint and the most significant component is entry flight path angle. The size of the entry corridor is limited on the shallow side by integrated heating constraints, and on the steep side by deceleration (g-load) and terminal descent propellant. In order to meet this tight constraint it is necessary to place a targeting maneuver seven hours prior to the time of entry. At this time the trajectory knowledge will be quite accurate, and the effects of maneuver execution errors will be small. The drawback is that entry accuracy is dependent on the success of this final late maneuver. Because propulsive maneuvers are critical events, it is desirable to minimize their occurrence and provide the flight team with as much response time as possible in the event of a spacecraft fault. A mission critical maneuver at Entry - 7 hours does not provide much fault tolerance, and it is desirable to provide a strategy that minimizes reliance on this maneuver. This paper will focus on the Improvements in interplanetary navigation that will decrease entry errors and will reduce the landed footprint, even in the absence of aeromaneuvering. The easiest to take advantage of are Improvements In the knowledge of the Mars ephemeris and gravity field due to the MGS and MSP'98 missions. Improvements In data collection and reduction techniques such as "precislon ranging' and near-simultaneous tracking will also be utilized. In addition to precise trajectory control, a robust strategy for communications and flight operations must also be demonstrated. The result Is a navigation and communications strategy on approach that utilizes optimal maneuver placement to take advantage of trajectory knowledge, minimizes risk for the flight operations team, is responsive to spacecraft hardware limitations, and achieves the entry corridor. The MSP2001 mission Is managed at JPL under the auspices of the Mars Exploration Directorate. The spacecraft flight elements are built and managed by Lockheed-Martin Astronautics in Denver, Colorado.

Mase, Robert A.↗

Wind Prediction Accuracy for Air Traffic Management Decision Support Tools

The performance of Air Traffic Management and flight deck decision support tools depends in large part on the accuracy of the supporting 4D trajectory predictions. This is particularly relevant to conflict prediction and active advisories for the resolution of conflicts and the conformance with of traffic-flow management flow-rate constraints (e.g., arrival metering / required time of arrival). Flight test results have indicated that wind prediction errors may represent the largest source of trajectory prediction error. The tests also discovered relatively large errors (e.g., greater than 20 knots), existing in pockets of space and time critical to ATM DST performance (one or more sectors, greater than 20 minutes), are inadequately represented by the classic RMS aggregate prediction-accuracy studies of the past. To facilitate the identification and reduction of DST-critical wind-prediction errors, NASA has lead a collaborative research and development activity with MIT Lincoln Laboratories and the Forecast Systems Lab of the National Oceanographic and Atmospheric Administration (NOAA). This activity, begun in 1996, has focussed on the development of key metrics for ATM DST performance, assessment of wind-prediction skill for state of the art systems, and development/validation of system enhancements to improve skill. A 13 month study was conducted for the Denver Center airspace in 1997. Two complementary wind-prediction systems were analyzed and compared to the forecast performance of the then standard 60 km Rapid Update Cycle - version 1 (RUC-1). One system, developed by NOAA, was the prototype 40-km RUC-2 that became operational at NCEP in 1999. RUC-2 introduced a faster cycle (1 hr vs. 3 hr) and improved mesoscale physics. The second system, Augmented Winds (AW), is a prototype en route wind application developed by MITLL based on the Integrated Terminal Wind System (ITWS). AW is run at a local facility (Center) level, and updates RUC predictions based on an optimal interpolation of the latest ACARS reports since the RUC run. This paper presents an overview of the study's results including the identification and use of new large mor wind-prediction accuracy metrics that are key to ATM DST performance.

Cole, Rod↗

Selection and Assessment of Predictions of the Mars Pathfinder Landing Site

The successful landing of the Mars Pathfinder spacecraft on Mars allows the review of the process of selecting the landing site and assessing predictions made for the site based on Viking and Earth-based data. Selection of the landing site for Mars Pathfinder was a two-phase process. The first phase took place from October 1993 to June 1994 and involved: initial identification of engineering constraints, definition of environmental conditions at the site for spacecraft design, and evaluation of the scientific potential of different landing sites. This phase culminated with the first "Mars Pathfinder Landing Site Workshop", held at the Lunar and Planetary Institute in Houston, Texas on April 18-19, 1994, in which suggested approaches and landing sites were solicited from the entire scientific community. A preliminary site was selected by the project for design purposes in June 1994. The second phase took place from July 1994 to March 1996 and involved: developing criteria for evaluating site safety using images and remote sensing data, testing of the spacecraft and landing subsystems (with design improvements) to establish quantitative engineering constraints on landing site characteristics, evaluating all potential landing sites on Mars, and certification of the site by the project. This phase included a second open workshop, "Mars Pathfinder Landing Site Workshop II: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington" held in Spokane and Moses Lake September 24-30, 1995 and formal acceptance of the site by NASA Headquarters. Engineering constraints on Pathfinder landing sites were developed from the initial design of the spacecraft and the entry, descent and landing scenario. The site must be within 5 degrees of the subsolar latitude at the time of landing (15N for maximum solar power and flexible communications with Earth. It also must be below 0 km elevation to enable enough time for the parachute to bring the lander to the proper terminal velocity for landing. The entire landing ellipse, which is 70 km by 200 km due to navigational, ephemeris and atmospheric uncertainties, must be free of steep slopes, scarps and obvious hazards in Viking orbiter images, have acceptable radar reflectivity, moderate rock abundances and have little or no dust. Scientific considerations of the Mars Pathfinder payload and mission indicate that analyses of "grab bag" samples at the mouths of outflow channels can offer a first order assessment of a variety of rock types on Mars. Highland sites offer the advantage of in situ analysis of ancient rocks on Mars that record crustal differentiation and the nature of the early environment. Dark gray sites offer the potential of analyzing unweathered and unoxidized materials. Following a general assessment of the safety of different sites, a preliminary selection of a "grab bag" site was made. This site, Ares Vallis, is near the mouth of an outflow channel that may contain ancient Noachian terrain, Hesperian ridged plains, and reworked channel materials. All potential landing sites on Mars that met basic safety criteria were analyzed in detail. Sites (100 by 200 km target ellipses) were considered safe if they were below 0 km elevation, were free of obvious hazards (high relief surface features) in high-resolution (< 50 m/pixel) Viking orbiter images and had acceptable reflectivity and roughness at radar wavelengths, high thermal inertia, moderate rock abundance, low red to violet ratio, and low albedo. Only 4 sites on Mars met all the above criteria, which included 1995 opposition 3.5 cm delay-Doppler radar data. Complete data were evaluated for 7 sites and the Viking landing sites for comparison for all the above criteria as well as crater abundance, hill and mesa abundance, slopes over meter to kilometer scales, low altitude winds (from global circulation models and slopes), the size-frequency distribution of large rocks, as well as rover trafficability and science potential. Discussion of potential hazards at Ares Vallis using a variety of data sets (including radar) at a second open workshop, indicated this site cannot be shown to be any more hazardous than the Viking landing sites. Field trips to the Channeled Scabland and the Ephrata Fan, analogs for Ares Vallis and the landing site, respectively, provided valuable insight into possible geologic processes and potential surface characteristics. Three sites met all the data requirements and safety criteria for landing Pathfinder. Ares Vallis was selected by the project because it appeared acceptably safe (although it appeared to have greater rock abundances than other sites, its elevation was likely the best known) and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which would enable addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early martian environment and its subsequent evolution. The selection was reviewed by an external board at a number of meetings and accepted, and the site was approved by NASA Headquarters. Data gathered by the Pathfinder lander' and rover provides the opportunity to test the predictions made for the site in the selection process based on remote observations from Earth, orbit, and the surface. The discussion below is taken from Golombek et al. to which the reader is referred for a more complete discussion and a complete list of references, which are omitted here for brevity. Many characteristics of the landing site are consistent with its being shaped and deposited by the Ares and Tiu catastrophic floods. The rocky surface is consistent a depositional plain comprising semi-rounded pebbles, cobbles and tabular boulders (some of which appear imbricated and/or inclined in the direction of flow) that appear similar to depositional plains in terrestrial catastrophic floods. The Twin Peaks appear to be streamlined hills in lander images, which is consistent with interpretations of larger hills in Viking orbiter images of the region that suggest the lander is on the flank of a broad, gentle ridge trending northeast from Twin Peaks. This ridge, which is the rise to the north of the lander, is aligned in the downstream direction from the Ares and Tiu Valles floods, and may be a debris tail deposited in the wake of the Twin Peaks. Channels visible throughout the scene may be a result of late stage drainage. As predicted by delay-Doppler radar measurements and tracking results, the average elevation of the center of the site was about the same as Viking Lander I relative to the 6.1 mbar geoid. The Doppler tracking and two-way ranging estimate for the elevation of the spacecraft is only 45 in lower than the Viking I Lander and within 100 in of that expected, which is within the uncertainties of the measurements. After landing, surface pressures and winds (5-10 m/s) were found to be similar to expectations based on Viking data, although temperatures were about 10 K warmer. The temperature profile below 50 km was also roughly 20 K warmer. As a result, predicted densities were 5% higher near the surface and up to 40% lower at 50 km but within the entry, descent and landing design margins. The populations of craters and small hills and the slopes of the hills measured in high-resolution (38 m/pixel) Viking orbiter images and the radar derived slopes of the landing site are all consistent with observations of these properties in the lander images. A rocky surface was expected from Viking Infra-Red Thermal Mapper (IRTM) observations and comparisons with the Viking landing sites. The observed cumulative fraction of area covered by rocks with diameters greater than 3 cm and heights greater than 0.5 in (potentially hazardous to landing) at Ares is similar to that predicted by IRTM observations and models of Viking lander and Earth analog rock size-frequency distributions. The IRTM prediction postulated an effective thermal inertia of 30 (10(exp -3) cgs units - cal/cubic cm/s(exp 0.5)/K) for the rock population, but we obtain a slightly different effective thermal inertia for the actual rock population. The validity of interpretations of radar echoes prior to landing are supported by a simple radar echo model, an estimate of the reflectivity of the soil from its bulk density, and the fraction of area covered by rocks. In the calculations, the soil produces the quasi-specular echo and the rocks produce the diffuse echo. The derived quasispecular cross section is comparable to the cross-sections and reflectivities reported for 3.5-cm wavelength observations. The model yields a diffuse echo that is modestly larger than the polarized diffuse echo reported for 3.5-cm wavelength observations. At 12.5-cm wavelength, similar rock populations at Ares and the Viking I site were expected because the diffuse echoes are comparable, but the large normal reflectivities suggests that bulk densities of the soils at depth are greater than those at the surface. We also obtain a fine-component inertia near 8.4 which agrees with the fine-component inertia of 8.7 (in 10(exp -3) cgs units) estimated from thermal observations from orbit by the IRTM; for this estimate, we used a bulk thermal inertia of 10.4 for the landing site, an effective thermal inertia near 40 (10(exp -3) cgs units) for the rock population, and a graphical representation of Kieffer's model. Color and albedo data for Ares suggested surfaces of materials at Ares Vallis would be relatively dust free or unweathered prior to landing compared with the materials at the Viking landing sites. This suggestion is supported by the abundance of relatively dark-gray rocks at Ares and their relative rarity at the Viking landing sites, where rocks are commonly coated with bright red dust. Finally, the 40 km long Ephrata Fan of the Channeled Scabland in Washington state, which was deposited where c

Golombek, M. P.↗

Electrolyte and Cutoff Potential Effects on Cycle Life of Li4Ti5O12/LiNi0.9Mn0.1O2 Batteries for Behind-the-Meter Storage Applications

Behind-the-Meter Storage (BTMS) is a stationary battery energy storage system that is connected to the electrical distribution system on the customer's side of the utility's service meter. BTMS systems are used to store electrical energy from the grid as well as inconstant, renewable energy, such as local solar and wind generation. A successful BTMS system will allow the customer to pair their energy generation and storage to optimize electrical consumption from the grid, improving reliability and minimizing cost. For BTMS applications, batteries must be designed and optimized with different set of criteria from other leading segments of the Li-ion battery market, like transportation, due the system being stationary and proximal to the residential or commercial building it's benefitting. BTMS applications prioritize safety, cost (low/no-critical materials), reliability (20-year calendar life), and durability (10,000 cycle life), while having the ability to (minimally) compromise energy density and rate capability. Lithium titanate (Li4Ti5O12-, LTO) is a promising anode candidate for BTMS applications due to its high safety and capacity retention, while maintaining a reasonable 160 mAhg-1 reversable capacity and composition of relatively abundant materials. (1) Specifically, LTO has a high working voltage which helps to prevent Li dendrite formation, improving safety. Furthermore, LTO also has negligible lithiation-based volume change, leading to less mechanical pulverization, or loss of active material, upon cycling. For the cathode, materials with little or no Co are of high interest due to the high cost and low abundance of Co. LiMn2O4 (LMO) has been paired with LTO for BTMS applications in the past due to its safety, low cost (abundancy), and reasonably high operating voltage. (2-4) However, the low capacity of LMO limits energy density and specific energy. While not the highest priority for BTMS applications, increasing energy density will enable deployment in space constrained BTMS applications and decrease total cost. LiNi0.9Mn0.1O2 (LN-MO) is a recently developed material with promise due to its high operating voltage and relatively low price. (5) However, Ni-rich layered oxides, including LNMO, tend to struggle with capacity retention during high-voltage cycling due to mechanical pulverization, irreversible phase transitions, and unstable solid-electrolyte interphase. The study presented here focuses on building an understanding of how electrolyte solvent and varied cutoff potentials will impact the cycle life of LTO/LN-MO cells. Specifically, a comparison is provided between ethylene carbonate (EC), ethyl methyl carbonate (EMC), fluoroethylene carbonate (FEC), and Gen2 electrolyte solvents with 1M Lithium hexafluorophosphate (LiPF6) salt, cycling to two upper termination potentials, 2.6V and 2.7V. Electrochemical testing and diagnostics (e.g., differential capacity analysis, area specific impedance, constant voltage hold, and rate capability) and post-mortem characterization will be used to understand the aging behavior and failure mechanisms of the 8 cell combinations (four electrolytes and two voltage cutoffs). Cells with FEC electrolyte showed a lower initial capacity compared to cells with Gen2, EMC, and EC cycling at both voltages; however, the cells with FEC showed consistent trends in capacity retention with 2.6V and 2.7V termination potentials, while the cells with the other electrolytes showed much higher rates of capacity loss when cycling to the higher voltage. These results indicate that FEC may play a role in improving durability of high-voltage, Ni-rich electrode systems for use in high-cycle applications, such as BTMS.

electrolyte↗

Real Time Metrics and Analysis of Integrated Arrival, Departure, and Surface Operations

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. As trajectory-based departure scheduling and collaborative decision making tools are introduced in order to reduce delays and uncertainties in taxi and climb operations across the National Airspace System, users of the tools across a number of roles benefit from a real time system that enables common situational awareness. A real time dashboard was developed to inform and present users notifications and integrated information regarding airport surface operations. The dashboard is a supplement to capabilities and tools that incorporate arrival, departure, and surface air-traffic operations concepts in a NextGen environment. In addition to shared situational awareness, the dashboard offers the ability to compute real time metrics and analysis to inform users about capacity, predictability, and efficiency of the system as a whole. This paper describes the architecture of the real time dashboard as well as an initial proposed set of metrics. The potential impact of the real time dashboard is studied at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport (CLT). The architecture of implementing such a tool as well as potential uses are presented for operations at CLT. Metrics computed in real time illustrate the opportunity to provide common situational awareness and inform users of system delay, throughput, taxi time, and airport capacity. In addition, common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are explored. The potential of the real time tool to inform users of the predictability and efficiency of using a trajectory-based departure scheduling system is also discussed.

integrated arrival departure surface operations↗