Search NASA⌕ Search

SEARCH · Search NASA

Results for “test facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Propulsion test facilities - Capabilities and use

A review is conducted of the additional test facilities required in connection with the National Aeronautical Facilities Program and of other new propulsion test facilities. Attention is given to the National Transonic Facility, the AMES wind tunnel, the Turbine Engine Load Simulator, facilities for the conduction of compressor research, a fuels and lubricants laboratory, and test facilities in the UK, France, and Germany. It is pointed out that there is a need for government and industry to support the facility investment necessary to make progress in aerospace technology. Aspects of international cooperation are also discussed.

Kamchi, J. S.↗

Fusion Nuclear Science Facility (FNSF) before Upgrade to Component Test Facility (CTF)

The compact (R0~1.2-1.3m) Fusion Nuclear Science Facility (FNSF) is aimed at providing a fully integrated, continuously driven fusion nuclear environment of copious fusion neutrons. This facility would be used to test, discover, understand, and innovate scientific and technical solutions for the challenges facing DEMO, by addressing the multi-scale synergistic interactions involving fusion plasma material interactions, tritium fuel cycle, power extraction, and the nuclear effects on materials. Such a facility properly designed would provide, initially at the JET-level plasma pressure (~30%T2) and conditions (e.g., Hot-Ion H-Mode), an outboard fusion neutron flux of 0.25 MW/m2 while requiring a fusion power of 19 MW. If and when this research operation is successful, its performance can be extended to 1 MW/m2 and 76 MW by reaching for twice the JET plasma pressure and Q. High-safety factor q and moderate- plasmas would minimize plasma-induced disruptions, helping to deliver reliably a neutron fluence of 1 MW-yr/m2 and a duty factor of 10% presently anticipated for the FNS research. Success of this research will depend on achieving time-efficient installation and replacement of all components using extensive remote handling (RH). This in turn requires modular designs for all internal components, including the single-turn toroidal field coil center-post with RH-compatible bi-directional sliding joints. Such device goals would further dictate placement of support structures and vacuum seal welds behind the internal and shielding components. If these further goals could be achieved, the FNSF would provide a ready upgrade path to the Component Test Facility (CTF), which would aim to test, at higher neutron fluence and duty cycle, the demanding fusion nuclear engineering and technologies for DEMO. This FNSF-CTF strategy would be complementary to the ITER and the Broader Approach programs, and thereby help mitigate the risks of an aggressive world fusion DEMO R&D Program. The key physics and technology research needed in the next decade to manage the potential risks of this FNSF are identified.

Peng, Yueng Kay Martin↗

CRYOGENIC INFRASTRUCTURE FOR FERMILAB'S ILC VERTICAL CAVITY TEST FACILITY

Fermilab is building a Vertical Cavity Test Facility (VCTF) to provide for R and D and pre-production testing of bare 9-cell, 1.3-GHz superconducting RF (SRF) cavities for the International Linear Collider (ILC) program. This facility is located in the existing Industrial Building 1 (IB1) where the Magnet Test Facility (MTF) also resides. Helium and nitrogen cryogenics are shared between the VCTF and MTF including the existing 1500-W at 4.5-K helium refrigerator with vacuum pumping for super-fluid operation (125-W capacity at 2-K). The VCTF is being constructed in multiple phases. The first phase is scheduled for completion in mid 2007, and includes modifications to the IB1 cryogenic infrastructure to allow helium cooling to be directed to either the VCTF or MTF as scheduling demands require. At this stage, the VCTF consists of one Vertical Test Stand (VTS) cryostat for the testing of one cavity in a 2-K helium bath. Planning is underway to provide a total of three Vertical Test Stands at VCTF, each capable of accommodating two cavities. Cryogenic infrastructure improvements necessary to support these additional VCTF test stands include a dedicated ambient temperature vacuum pump, a new helium purification skid, and the addition of helium gas storage. This paper describes the system design and initial cryogenic operation results for the first VCTF phase, and outlines future cryogenic infrastructure upgrade plans for expanding to three Vertical Test Stands.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Oxy-Combustion Burner and Integrated Pollutant Removal Research and Development Test Facility

A high flame temperature oxy-combustion test facility consisting of a 5 MWe equivalent test boiler facility and 20 KWe equivalent IPR® was constructed at the Hammond, Indiana manufacturing site. The test facility was operated natural gas and coal fuels and parametric studies were performed to determine the optimal performance conditions and generated the necessary technical data required to demonstrate the technologies are viable for technical and economic scale-up. Flame temperatures between 4930-6120F were achieved with high flame temperature oxy-natural gas combustion depending on whether additional recirculated flue gases are added to balance the heat transfer. For high flame temperature oxy-coal combustion, flame temperatures in excess of 4500F were achieved and demonstrated to be consistent with computational fluid dynamic modeling of the burner system. The project demonstrated feasibility and effectiveness of the Jupiter Oxygen high flame temperature oxy-combustion process with Integrated Pollutant Removal process for CCS and CCUS. With these technologies total parasitic power requirements for both oxygen production and carbon capture currently are in the range of 20% of the gross power output. The Jupiter Oxygen high flame temperature oxy-combustion process has been demonstrated at a Technology Readiness Level of 6 and is ready for commencement of a demonstration project.

36 MATERIALS SCIENCE↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

aThe increase over the last years of the testing activities related to superconducting quantum materials, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4kL Dewar and two Mycom compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three regulatory valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

The increase over the last years of the testing activities related to quantum systems, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4 kL Dewar and two Mycom ® compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair ® compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three control valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two Dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

43 PARTICLE ACCELERATORS↗

A Unique Outside Neutron and Gamma Ray Instrumentation Development Test Facility at NASA's Goddard Space Flight Center

An outside neutron and gamma ray instrumentation test facility has been constructed at NASA's Goddard Space Flight Center (GSFC) to evaluate conceptual designs of gamma ray and neutron systems that we intend to propose for future planetary lander and rover missions. We will describe this test facility and its current capabilities for operation of planetary in situ instrumentation, utilizing a l4 MeV pulsed neutron generator as the gamma ray excitation source with gamma ray and neutron detectors, in an open field with the ability to remotely monitor and operate experiments from a safe distance at an on-site building. The advantage of a permanent test facility with the ability to operate a neutron generator outside and the flexibility to modify testing configurations is essential for efficient testing of this type of technology. Until now, there have been no outdoor test facilities for realistically testing neutron and gamma ray instruments planned for solar system exploration

Bodnarik, J.↗

Space chemical propulsion test facilities at NASA Lewis Research Center

The NASA Lewis Research Center, located in Cleveland, Ohio has a number of space chemical propulsion test facilities which constitute a significant national space testing resource. The purpose of this paper is to make more users aware of these test facilities and to encourage their use through cooperative agreements between the government, industry, and universities. Research which is of interest to the government is especiallly encouraged and often can be done in a cooperative manner that best uses the resources of all parties. This paper presents an overview of the Lewis test facilities. These facilities are clustered into three test areas: the Rocket Engine Test Facilities (RETF), the Rocket Laboratory (RL), and the Cryogenic Components Laboratory (CCL).

Urasek, Donald C.↗

VICS-120 - A tube-vehicle system test facility.

Description of a large test facility for carrying out research in support of the aerodynamic and ventilation section of a handbook on subway design. The facility described is vertically oriented and has a test section with a nominal inside diameter of 2 in. and a length of 109 ft. It is capable of operating at Reynolds numbers up to full-scale (60,000,000) under open-end tube conditions. The facility is distinguished by a high degree of flexibility in configuration and operational limits. Details are given concerning the plenum assembly, the test section tubes, the scaffold, the instrumentation, the model launcher, the model arrestor, and the models themselves. A step-by-step account is given of the operation of the facility, and a brief sample of the type of data obtained from the facility is presented.

Marte, J. E.↗

THE INTEGRATED EQUIPMENT TEST FACILITY AT OAK RIDGE AS A NONPROLIFERATION TEST LOOP

The apparent renaissance in nuclear power has resulted in a new focus on nonproliferation measures. There is a lot of activity in development of new measurement technologies and methodologies for nonproliferation assessment. A need that is evolving in the United States is for facilities and test loops for demonstration of new technologies. In the late 1970s, the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL) was engaged in advanced reprocessing technology development. As part of the program, the Integrated Equipment Test (IET) facility was constructed as a test bed for advanced technology. The IET was a full-scale demonstration facility, operable on depleted uranium, with a throughput capacity for 0.5 Mt/d. At the front end, the facility had a feed surge vessel, input accountability tank, and feed vessel for the single cycle of solvent extraction. The basic solvent extraction system was configured to use centrifugal contactors for extraction and scrub and a full-size pulsed column for strip. A surge tank received the solvent extraction product solution and fed a continuous operating thermo-syphon-type product evaporator. Product receiving and accountability vessels were available. Feed material could be prepared using a continuous rotary dissolve or by recycling the product with adjustment as new feed. Continuous operations 24/7 could be realized with full chemical recovery and solvent recycle systems in operation. The facility was fully instrumented for process control and operation, and a full solution monitoring application had been implemented for safeguards demonstrations, including actual diversion tests for sensitivity evaluation. A significant effort for online instrument development was a part of the program at the time. The fuel recycle program at Oak Ridge ended in the early 1990s, and the IET facility was mothballed. However, the equipment and systems remain and could be returned to service to support nonproliferation demonstrations. This paper discusses the status of the facility and operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Heat transfer results and operational characteristics of the NASA Lewis Research Center Hot Section Cascade Test Facility

The NASA Lewis Research Center gas turbine hot section test facility has been developed to provide a real-engine environment with well known boundary conditions for the aerothermal performance evaluation/verification of computer design codes. The initial aerothermal research data obtained are presented and the operational characteristics of the facility are discussed. This facility is capable of testing at temperatures and pressures up to 1600 K and 18 atm which corresponds to a vane exit Reynolds number range of 0.5x10(6) to 2.5x10(6) based on vane chord. The component cooling air temperature can be independently modulated between 330 and 700 K providing gas-to-coolant temperature ratios similar to current engine application. Research instrumentation of the test components provide conventional pressure and temperature measurements as well as metal temperatures measured by IR-photography. The primary data acquisition mode is steady state through a 704 channel multiplexer/digitizer. The test facility was configured as an annular cascade of full coverage filmcooled vanes for the initial series of research tests.

Gladden, H. J.↗

Transient behavior of a scaled RCCS test facility under postulated fault and accident scenarios

Tests were performed on the Natural convection Shutdown heat removal Test Facility (NSTF) to simulate design basis accident and postulated fault scenarios. Residing at Argonne National Laboratory, the NSTF stands nearly 26-m in total height and reflects a ½ scale reactor cavity cooling system (RCCS) for high temperature gas cooled reactors. The following manuscript details three test conditions performed on the experimental test facility. The first simulated the reactor pressure vessel (RPV) boundary condition during depressurized conduction cool down accident with small primary leak, and was repeated during both winter and summer seasons. The second examined a short-circuit break between the inlet and outlet flow paths, and was performed in three incremental stages of nominal flow area break size. The third and final test case studied system behavior with varying amounts of cooling channel blockages, up to and including 50% flow areas. Nominal component temperatures, heat removal performance, and system stability will be presented to characterize the behavior at these conditions.

decay heat removal↗

Heat transfer results and operational characteristics of the NASA Lewis Research Center hot section cascade test facility

The NASA Lewis Research Center gas turbine hot section test facility has been developed to provide a real-engine environment with well known boundary conditions for the aerothermal performance evaluation/verification of computer design codes. The initial aerothermal research data obtained are presented and the operational characteristics of the facility are discussed. This facility is capable of testing at temperatures and pressures up to 1600 K and 18 atm which corresponds to a vane exit Reynolds number range of 0.5 x 1 million to 2.5 x 1 million based on vane chord. The component cooling air temperature can be independently modulated between 330 and 700 K providing gas-to-coolant temperature ratios similar to current engine application. Research instrumentation of the test components provide conventional pressure and temperature measurements as well as metal temperatures measured by IR-photography. The primary data acquisition mode is steady state through a 704 channel multiplexer/digitizer. The test facility was configured as an annular cascade of full coverage film cooled vanes for the initial series of research tests.

Gladden, H. J.↗

Validation of Oregon State University High Temperature Test Facility Experiments Using Pronghorn

The OSU High Temperature Test Facility is a quarter-scale diameter, 1/64 scale volume test facility meant to replicate thermophysical phenomena in the prototypical General Atomics Modular High Temperature Gas Reactor. Tests pertaining to conduction cooldown events were performed from 2016-2019, providing a large database by which computational methods that are applicable to different length scales can be validated. One of these codes is Pronghorn, which is a coarse-meshed, porous-based subchannel thermal hydraulics code based on the MOOSE application, with the intention of better capturing the physics of both conduction and convection heat transfer within the OSU HTTF core. The goal of this summer project is to develop the framework by which Pronghorn can perform validation exercises of the HTTF core for benchmarking, by generating a mesh appropriate to the geometry of the HTTF core, developing input decks that accurately capture the initial and boundary conditions, materials, and relevant equations to the physics seen in the HTTF core, and using a postprocessor to compare simulation results to various experimental data. While validation of codes is a multi-year project, a mesh has been generated and tested in Pronghorn that meets mass conservation and basic heat transfer principles. The next step is to accurate depict the fluid inlet and outlet boundary conditions, which will be performed using computational fluid dynamics software.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Magnet Test Facilities

Highlights of the various Magnet Test Facilities in the Test & Instrumentation Department.

43 PARTICLE ACCELERATORS↗

Remote Handling and Plasma Conditions to Enable Fusion Nuclear Science R&D Using a US Component Testing Facility

The use of a fusion component testing facility to study and establish, during the ITER era, the remaining scientific and technical knowledge needed by fusion Demo is considered and described in this paper. This use aims to lest components in an integrated fusion nuclear environment, for the first time, to discover and understand the underpinning physical properties, and to develop improved components for further testing, in a time-efficient manner. It requires a design with extensive modularization and remote handling of activated components, and flexible hot-cell laboratories. It further requires reliable plasma conditions to avoid disruptions and minimize their impact, and designs to reduce the divertor heat flux to the level of ITER design. As the plasma duration is extended through the planned ITER level (similar to 10(3) s) and beyond, physical properties with increasing time constants, progressively for similar to 10(4) s, similar to 10(5) s, and similar to 10(6) s, would become accessible for testing and R&D. The longest time constants of these are likely to be of the order of a week ( 106 S). Progressive stages of research operation are envisioned in deuterium, deuterium-tritium for the ITER duration, and deuterium-tritium with increasingly longer plasma durations. The fusion neutron fluence and operational duty factor anticipated for this "scientific exploration" phase of a component test facility are estimated to be up to 1 MW-yr/m(2) and up to 10%, respectively.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Activation of the E1 Ultra High Pressure Propulsion Test Facility at Stennis Space Center

After a decade of construction and a year of activation the El Ultra High Pressure Propulsion Test Facility at NASA's Stennis Space Center is fully operational. The El UHP Propulsion Test Facility is a multi-cell, multi-purpose component and engine test facility . The facility is capable of delivering cryogenic propellants at low, high, and ultra high pressures with flow rates ranging from a few pounds per second up to two thousand pounds per second. Facility activation is defined as a series of tasks required to transition between completion of construction and facility operational readiness. Activating the El UHP Propulsion Test Facility involved independent system checkouts, propellant system leak checks, fluid and gas sampling, gaseous system blow downs, pressurization and vent system checkouts, valve stability testing, valve tuning cryogenic cold flows, and functional readiness tests.

Messer, Bradley↗