Search NASA⌕ Search

SEARCH · Search NASA

Results for “traffic signal control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

164 records · Page 10

Situation Awareness Implications of Adaptive Automation of Air Traffic Controller Information Processing Functions

The goal of this research was to define a measure of situation awareness (SA) in an air traffic control (ATC) task and to assess the influence of adaptive automation (AA) of various information processing functions on controller perception, comprehension and projection. The measure was also to serve as a basis for defining and developing an approach to triggering dynamic control allocations, as part of AA, based on controller SA. To achieve these objectives, an enhanced version of an ATC simulation (Multitask (copyright)) was developed for use in two human factors experiments. The simulation captured the basic functions of Terminal Radar Approach Control (TRACON) and was capable of presenting to operators four different modes of control, including information acquisition, information analysis, decision making and action implementation automation, as well as a completely manual control mode. The SA measure that was developed as part of the research was based on the Situation Awareness Global Assessment Technique (SAGAT), previous goal-directed task analyses of enroute control and TRACON, and a separate cognitive task analysis on the ATC simulation. The results of the analysis on Multitask were used as a basis for formulating SA queries as part of the SAGAT-based approach to measuring controller SA, which was used in the experiments. A total of 16 subjects were recruited for both experiments. Half the subjects were used in Experiment #1, which focused on assessing the sensitivity and reliability of the SA measurement approach in the ATC simulation. Comparisons were made of manual versus automated control. The remaining subjects were used in the second experiment, which was intended to more completely describe the SA implications of AA applied to specific controller information processing functions, and to describe how the measure could ultimately serve as a trigger of dynamic function allocations in the application of AA to ATC. Comparisons were made of the sensitivity of the SA measure to automation manipulations impacting both higher-order information processing functions, such as information analysis and decision making, versus lower-order functions, including information acquisition and action implementation. All subjects were exposed to all forms of AA of the ATC task and the manual control condition. The approach to AA used in both experiments was to match operator workload, assessed using a secondary task, to dynamic control allocations in the primary task. In total, the subjects in each experiment participated in 10 trials with each lasting between 45 minutes and 1 hour. In both experiments, ATC performance was measured in terms of aircraft cleared, conflicting, and collided. Secondary task (gauge monitoring) performance was assessed in terms of a hit-to-signal ratio. As part of the SA measure, three simulation freezes were conducted during each trial to administer queries on Level 1, 2, and 3 SA.

Kaber, David B.↗

Antennas Designed for Advanced Communications for Air Traffic Management (AC/ATM) Project

The goal of the Advanced Communications for Air Traffic Management (AC/ATM) Project at the NASA Glenn Research Center at Lewis Field is to enable a communications infrastructure that provides the capacity, efficiency, and flexibility necessary to realize a mature free-flight environment. The technical thrust of the AC/ATM Project is targeted at the design, development, integration, test, and demonstration of enabling technologies for global broadband aeronautical communications. Since Ku-band facilities and equipment are readily available, one of the near-term demonstrations involves a link through a Kuband communications satellite. Two conformally mounted antennas will support the initial AC/ATM communications links. Both of these are steered electronically through monolithic microwave integrated circuit (MMIC) amplifiers and phase shifters. This link will be asymmetrical with the downlink to the aircraft (mobile vehicle) at a throughput rate of greater than 1.5 megabits per second (Mbps), whereas the throughput rate of the uplink from the aircraft will be greater than 100 kilobits per second (kbps). The data on the downlink can be narrow-band, wide-band, or a combination of both, depending on the requirements of the experiment. The AC/ATM project is purchasing a phased-array Ku-band transmitting antenna for the uplink from the test vehicle. Many Ku-band receiving antennas have been built, and one will be borrowed for a short time to perform the initial experiments at the NASA Glenn Research Center at Lewis Field. The Ku-band transmitting antenna is a 254-element MMIC phased-array antenna being built by Boeing Phantom Works. Each element can radiate 100 mW. The antenna is approximately 43-cm high by 24-cm wide by 3.3-cm thick. It can be steered beyond 60 from broadside. The beamwidth varies from 6 at broadside to 12 degrees at 60 degrees, which is typical of phased-array antennas. When the antenna is steered to 60 degrees, the beamwidth will illuminate approximately five satellites on the orbital arc. Spread spectrum techniques will be employed to keep the power impinging on the adjacent satellites below their noise floor so that no interference results. This antenna is power limited. If the antenna elements (currently 254) are increased by a factor of 4 (1024) or 16 (4096), the gain will increase and the beamwidth will decrease in proportion. For the latter two antenna sizes, the power must be "backed off" to prevent interference with the neighboring satellites. The receiving antenna, which is approximately 90-cm high, 60-cm wide, and 3.5-cm thick, is composed of 1500 phased-array elements. The system phased-array controller can control both a 1500-element receiving antenna and a 500-element transmitting antenna. For ground testing, this controller will allow manual beam pointing and polarization alignment. For normal operation, the system can be connected to the receiving antenna and the navigation system for real-time autonomous track operation. This will be accomplished by first pointing both antennas at the satellite using information from the aircraft data bus. Then, the system phased-array controller will electronically adjust the antenna pointing of the receiving antenna to find the peak signal. After the peak signal has been found, the beam of the transmitting antenna will be pointed to the same steering angles as the receiving antenna. For initial ground testing without an aircraft, the ARINC 429 data bus (ARINC Inc., Annapolis, Maryland) will be simulated by a gyro system purchased for the follow-on to the Monolithic Microwave Integrated Circuit (MMIC) Arrays for Satellite Communication on the Move (MASCOM) Project. MASCOM utilized the Advanced Communications Technology Satellite (ACTS) with a pair of Ka-band experimental phased-array antennas.

Zakrajsek, Robert J.↗