Preloaded space structural coupling joints

A coupling device for tubular members of large truss structures with a locking collar being the only moving part is described. Each tubular member is constructed with an end bell section that has a belled flange with a mating face, and a necked area which is smaller in diameter than the tubular members to be joined. A split ring is affixed to each tubular member and is constructed so that when two tubular members are laterally moved into axial alignment and the collar is rotated over it, the split ring loads the joint with axial forces by pressing the belled flange mating surfaces together, and a preloading force is provided by the collar mating with a taper on the outside of the split rings. All free play is thereby removed by preloaded force. A major object is to provide an ability to remove and replace individual tubular members without disturbing other structural parts of a truss structure. An additional anticipated use of this joint is to couple high pressure fluid lines.

Rhodes, Marvin D.↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

In the future, some spacecraft will be so large that they must be assembled on-orbit. These spacecraft will be used for such tasks as manned missions to Mars or used as orbiting platforms for monitoring the Earth or observing the universe. Some large spacecraft will probably consist of planar truss structures to which will be attached special purpose, self-contained modules. The modules will most likely be taken to orbit fully outfitted and ready for use in heavy-lift launch vehicles. The truss members will also similarly be taken to orbit, but most unassembled. The truss structures will need to be assembled robotically because of the high costs and risks of extra-vehicular activities. Some missions will involve very large loads. To date, very few structures of any kind have been constructed in space. Two relatively simple trusses were assembled in the Space Shuttle bay in late 1985. Here the development of a design of a welded joint for on-orbit, robotic truss assembly is described. Mechanical joints for this application have been considered previously. Welded joints have the advantage of allowing the truss members to carry fluids for active cooling or other purposes. In addition, welded joints can be made more efficient structurally than mechanical joints. Also, welded joints require little maintenance (will not shake loose), and have no slop which would cause the structure to shudder under load reversal. The disadvantages of welded joints are that a more sophisticated assembly robot is required, weld flaws may be difficult to detect on-orbit, the welding process is hazardous, and welding introduces contamination to the environment. In addition, welded joints provide less structural damping than do mechanical joints. Welding on-orbit was first investigated aboard a Soyuz-6 mission in 1969 and then during a Skylab electron beam welding experiment in 1973. A hand held electron beam welding apparatus is currently being prepared for use on the MIR space station. Presently, Marshall Space Flight Center is evaluating processes appropriate for on-orbit welding. A low gravity environment has been found to have very minor effects on the welding processes appropriate for this application. This is based on tests run on-orbit as well as low gravity environments achieved by flying aircraft in parabolic trajectories. It appears that a modified form of gas tungsten arc welding (GTAW) will be most appropriate for welding together structures on-oribt. The process has been modified to work in a vacuum by providing gas to the arc zone by means of a hollow tungsten electrode with special shielding. A commercial tube welding head has been successfully modified for use on-orbit with a gas leakage rate of approximately 2.5 liters/min. To develop as realistic a joint as possible, a specific truss structure was selected on which to base the design. The structure considered was based on the 120 foot diameter aerobrake tetrahedral truss structure. The truss members were assumed to consist of graphite/epoxy tubes. Also, it was assumed that the nodes were constructed of 2219-T87 aluminum alloy. The magnitude of the member load assumed for design purposes was 100 kips.

Rule, William K.↗

Mobile remote manipulator vehicle system

A mobile remote manipulator system is disclosed for assembly, repair and logistics transport on, around and about a space station square bay truss structure. The vehicle is supported by a square track arrangement supported by guide pins integral with the space station truss structure and located at each truss node. Propulsion is provided by a central push-pull drive mechanism that extends out from the vehicle one full structural bay over the truss and locks drive rods into the guide pins. The draw bar is now retracted and the mobile remote manipulator system is pulled onto the next adjacent structural bay. Thus, translation of the vehicle is inchworm style. The drive bar can be locked onto two guide pins while the extendable draw bar is within the vehicle and then push the vehicle away one bay providing bidirectional push-pull drive. The track switches allow the vehicle to travel in two orthogonal directions over the truss structure which coupled with the bidirectional drive, allow movement in four directions on one plane. The top layer of this trilayered vehicle is a logistics platform. This platform is capable of 369 degees of rotation and will have two astronaut foot restraint platforms and a space crane integral.

Bush, Harold G.↗

Lightweight structural columns

Lightweight half-lengths of columns for truss structures are described. The columns are adapted for nestable storage and transport to facilitate fabrication of large area truss structures at a remote site and particularly adaptable for space applications.

Bush, H. G.↗

Joint for Rapid Structural Assembly

Quickly attaching joint used in variety of truss structures. Split ring made in one piece and split radially after final machining. Mating tapers on split ring and endbells small: approximately 7 degrees. Tapers of this range permit high internal preloads to be obtained, yet parts easily separated when collar released. Results from tests on developmental model indicate load-displacement response linear and substantial preloading accomplished. Quickly-erecting truss structures have variety of applications, from Earth to space-station keel beams, antenna masts, and large platforms.

Rhodes, M. D.↗

The Joint Damping Experiment (JDX)

The Joint Damping Experiment (JDX), flown on the Shuttle STS-69 Mission, is designed to measure the influence of gravity on the structural damping of a high precision three bay truss. Principal objectives are: (1) Measure vibration damping of a small-scale, pinjointed truss to determine how pin gaps give rise to gravity-dependent damping rates; (2) Evaluate the applicability of ground and low-g aircraft tests for predicting on-orbit behavior; and (3) Evaluate the ability of current nonlinear finite element codes to model the dynamic behavior of the truss. Damping of the truss was inferred from 'Twang' tests that involve plucking the truss structure and recording the decay of the oscillations. Results are summarized as follows. (1) Damping, rates can change by a factor of 3 to 8 through changing the truss orientation; (2) The addition of a few pinned joints to a truss structure can increase the damping by a factor as high as 30; (3) Damping is amplitude dependent; (4) As gravity induced preloads become large (truss long axis perpendicular to gravity vector) the damping is similar to non-pinjointed truss; (5) Impacting in joints drives higher modes in structure; (6) The torsion mode disappears if gravity induced preloads are low.

Folkman, Steven L.↗

Finite element structural analysis and optimization of space frames and trusses in a massively parallel environment

A set of massively parallel computational procedures are formulated to make finite element method based space frame and truss structural response analyses and stochastic method based structural optimization solution superefficient. Several example frame structural analysis and truss optimization problems are presented for demonstration purposes. All calculations are made on the massively parallel environment of CM-2 computer.

Shieh, Rong C.↗

Vibration control by limiting the maximum axial forces in space trusses

Proposed here is a method of vibration control based on limiting the maximum axial forces in the active members of an adaptive truss. The actuators simulate elastic rigid-plastic behavior and consume the vibrational energy as work. The method is applicable to both statically determinate as well as indeterminate truss structures. However, for energy efficient control of statistically indeterminate trusses extra actuators may be provided on the redundant bars. An energy formulation relating the various control parameters is derived to get an estimate of the control time. Since the simulation of elastic rigid-plastic behavior requires a piecewise linear control law, a general analytical solution is not possible. Numerical simulation by step-by-step integration is performed to simulate the control of an example truss structure. The problems of application to statically indeterminate trusses and optimal actuator placement are identified for future work.

Chawla, Vikas↗

STS-112 Flight Day 3 Highlights

During the third flight day of STS-112 (Commander Jeff Ashby, Pilot Pam Melroy and Mission Specialists Sandy Magnus, Piers Sellers, David Wolf and Fyodor Yurchikhin), the Space Shuttle Atlantis begins its final approach to the International Space Station (ISS) with which it will dock. The Chinese mainland is seen, at night, at a height of 242 statute miles. In one section of video from a camera onboard the ISS, Atlantis can be seen to be almost directly below the station, at a distance of several hundred feet. The orbiter's docking system is shown, as it is slowly guided by Ashby towards the forward docking port on the ISS's Destiny Laboratory Module and its forward docking port. Above the docking port, the S0 truss structure can be seen, to which the S1 truss structure in Atlantis' payload bay will be attached during this mission. Also seen are the Unity airlock and other modules. Following the completion of docking, in which an excellent shot of the docking system in hard dock is visible, the hatches between the two crafts are opened and the members of Atlantis are greeted by the very excited members of Expedition 5, who have been aboard the ISS for several months.

Source record↗

Automated assembly of large space structures

A research program to evaluate telerobotic methods for inspace assembly of large truss structures has been initiated at the NASA Langley Research Center. A commercial robot is mounted on a carriage positioning system and a tetrahedral truss, which is composed of 102 members each 2 m long, is assembled on a rotating motion-base. The facility system is described including details of characterization tests on the truss structure. The current status of the assembly tests is discussed and observations from these tests indicate that no problems have been encountered that would prohibit automated telerobotic assembly from being a viable inspace construction method.

Rhodes, Marvin D.↗

Topology and layout optimization of discrete and continuum structures

The basic features of the ground structure method for truss structure an continuum problems are described. Problems with a large number of potential structural elements are considered using the compliance of the structure as the objective function. The design problem is the minimization of compliance for a given structural weight, and the design variables for truss problems are the cross-sectional areas of the individual truss members, while for continuum problems they are the variable densities of material in each of the elements of the FEM discretization. It is shown how homogenization theory can be applied to provide a relation between material density and the effective material properties of a periodic medium with a known microstructure of material and voids.

Bendsoe, Martin P.↗

Screening actuator locations for static shape control

Correction of shape distortion due to zero-mean normally distributed errors in structural sizes which are random variables is examined. A bound on the maximum improvement in the expected value of the root-mean-square shape error is obtained. The shape correction associated with the optimal actuators is also characterized. An actuator effectiveness index is developed and shown to be helpful in screening actuator locations in the structure. The results are specialized to a simple form for truss structures composed of nominally identical members. The bound and effectiveness index are tested on a 55-m radiometer antenna truss structure. It is found that previously obtained results for optimum actuators had a performance close to the bound obtained here. Furthermore, the actuators associated with the optimum design are shown to have high effectiveness indices. Since only a small fraction of truss elements tend to have high effectiveness indices, the proposed screening procedure can greatly reduce the number of truss members that need to be considered as actuator sites.

Haftka, Raphael T.↗

Structural Analysis and Testing of an Erectable Truss for Precision Segmented Reflector Application

This paper describes analysis and test results obtained at Langley Research Center (LaRC) on a doubly curved testbed support truss for precision reflector applications. Descriptions of test procedures and experimental results that expand upon previous investigations are presented. A brief description of the truss is given, and finite-element-analysis models are described. Static-load and vibration test procedures are discussed, and experimental results are shown to be repeatable and in generally good agreement with linear finite-element predictions. Truss structural performance (as determined by static deflection and vibration testing) is shown to be predictable and very close to linear. Vibration test results presented herein confirm that an anomalous mode observed during initial testing was due to the flexibility of the truss support system. Photogrammetric surveys with two 131-in. reference scales show that the root-mean-square (rms) truss-surface accuracy is about 0.0025 in. Photogrammetric measurements also indicate that the truss coefficient of thermal expansion (CTE) is in good agreement with that predicted by analysis. A detailed description of the photogrammetric procedures is included as an appendix.

Collins, Timothy J.↗

Two Techniques For Suppressing Vibrations In Structures

Two techniques intended to be used together to suppress vibrations in large, complicated truss structure involve combination of active and passive damping. Based on bridge feedback and criterion for placement of actuators. Research continues to develop system using these and other techniques to suppress vibrations in, and help control shape of, truss structure in outer space that supports precise, segmented reflector of communication antenna. On Earth, developmental techniques applicable to suppression of vibrations in bridges and tall buildings.

Chen, Gun-Shing↗

Buckling tests of structural elements applicable to large erectable space trusses

Detailed data on columns and center a joint for completeness is presented. Buckling data for a tripod arrangement of these columns using a cluster joint is also presented. The objectives of these test are: (1) to gain insight into joint requirements for truss structure; (2) to assess the structural qualities of the column and center joint designs; (3) to investigate the restraint provided by octetruss core members (tripod) to the cluster joints; (4) to provide insight into the level of analysis required to predict buckling behavior of Gr/E nestable columns both as simple columns and in a tripod arrangement; and (5) to provide a data base for Gr/E nestable columns.

Heard, W. L., Jr.↗

Control of resonant frequencies in adaptive structures by prestressing

The natural vibration frequencies of a structure can be affected by inducing stress in the structure. The success of this kind of control of the resonant frequencies of a truss structure depends on the geometry of the structure. It is shown that in adaptive truss structures the method is effective for vibrations in less stiff directions, such as the normal direction of the plane containing all of the bars of a node, suggesting its applicability for cable, membrane, and thin plate and shell structures.

Baycan, Can M.↗

Evaluation of Pactruss design characteristics critical to space station primary structure

Several aspects of the possible application of the Pactruss concept to the primary truss structure of the space station are investigated. Estimates are made of the loads and hinge moments in deploying diagonal members as full deployment is approached. Included are the effects of beam columning and compliance of the surrounding structure. Requirements for joint design are suggested and a two-stage mid-diagonal latching hinge concept is described or analyzed. The problems with providing the experimental and theoretical tools needed for assuring reliable synchronous deployment are discussed and a first attempt at high-fidelity analytical simulation with NASTRAN is described. An alternative construction scenario in which the entire dual-keel truss structure is deployed as a single Shuttle payload is suggested.

Hedgepeth, John M.↗

Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

Heard, W. L., Jr.↗