Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Development of advanced high temperature in-cylinder components and tribological systems for low heat rejection diesel engines, phase 1

Analysis and concept design work completed in Phase 1 have identified a low heat rejection engine configuration with the potential to meet the Heavy Duty Transport Technology program specific fuel consumption goal of 152 g/kW-hr. The proposed engine configuration incorporates low heat rejection, in-cylinder components designed for operation at 24 MPa peak cylinder pressure. Water cooling is eliminated by selective oil cooling of the components. A high temperature lubricant will be required due to increased in-cylinder operating temperatures. A two-stage turbocharger air system with intercooling and aftercooling was selected to meet engine boost and BMEP requirements. A turbocompound turbine stage is incorporated for exhaust energy recovery. The concept engine cost was estimated to be 43 percent higher compared to a Caterpillar 3176 engine. The higher initial engine cost is predicted to be offset by reduced operating costs due the lower fuel consumption.

Kroeger, C. A.↗

Climate and Health Impacts of US Emissions Reductions Consistent with 2 C

An emissions trajectory for the US consistent with 2 C warming would require marked societal changes, making it crucial to understand the associated benefits. Previous studies have examined technological potentials and implementation costs and public health benefits have been quantified for less-aggressive potential emissions-reduction policies, but researchers have not yet fully explored the multiple benefits of reductions consistent with 2 C. We examine the impacts of such highly ambitious scenarios for clean energy and vehicles. US transportation emissions reductions avoid approx.0.03 C global warming in 2030 (0.15 C in 2100), whereas energy emissions reductions avoid approx.0.05-0.07 C 2030 warming (approx.0.25 C in 2100). Nationally, however, clean energy policies produce climate disbenefits including warmer summers (although these would be eliminated by the remote effects of similar policies if they were undertaken elsewhere). The policies also greatly reduce damaging ambient particulate matter and ozone. By 2030, clean energy policies could prevent approx.175,000 premature deaths, with approx.22,000 (11,000-96,000; 95% confidence) fewer annually thereafter, whereas clean transportation could prevent approx.120,000 premature deaths and approx.14,000 (9,000-52,000) annually thereafter. Near-term national benefits are valued at approx.US$250 billion (140 billion to 1,050billion) per year, which is likely to exceed implementation costs. Including longer-term, worldwide climate impacts, benefits roughly quintuple, becoming approx.5-10 times larger than estimated implementation costs. Achieving the benefits, however, would require both larger and broader emissions reductions than those in current legislation or regulations.

policies↗

Cost and Reliability Study for a Large Array of Small Reflector Antennas for JPL/NASA Deep Space Network (DSN)

A study is performed to estimate the cost of an array of small aperture reflector antennas to be used instead or in conjunction with the current large reflector antennas of the JPL/NASA Deep Space Network (DSN), for servicing present and future NASA missions which involve smaller spacecraft with limited power and smaller, lower gain antennas. The advantages of the array configuration in terms of cost and reliability are studied. A probabilistic determination of the reliability and availability of the array as a function of the number of array elements and the availability of individual array elements is made. The impact of additional marginal elements on the operational availability of the array is studied. Parametric cost and reliability plots are presented and directions for further investigation are outlined.

Resch, G.↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Appraising into the Sun: Six-State Solar Home Paired-Sale Analysis

Although residential solar photovoltaic (PV) installations have proliferated, PV systems on some U.S. homes still receive no value during an appraisal because comparable home sales are lacking. To value residential PV, some previous studies have employed paired-sales appraisal methods to analyze small PV home samples in depth, while others have used statistical methods to analyze large samples. Our first-of-its-kind study connects the two approaches. It uses appraisal methods to evaluate sales price premiums for owned PV systems on single-unit detached houses that were also evaluated in a large statistical study. Independent appraisers evaluated 43 recent home sales pairs in six states: California, Oregon, Florida, Maryland, North Carolina, and Pennsylvania. We compare these results with contributory-value estimates—based on income (using the PV Value® tool), gross cost, and net cost—as well as hedonic modeling results from the recent statistical study. The results provide strong, appraisal-based evidence of PV premiums in all states. More importantly, the results support the use of cost- and incomebased PV premium estimates when paired-sales analysis is impossible. PV premiums from the paired-sales analysis are most similar to net PV cost estimates. PV Value® income results generally track the appraised premiums, although conservatively. The appraised premiums are in agreement with the hedonic modeling results as well, which bolsters the suitability of both approaches for estimating PV home premiums. Therefore, these results will benefit valuation professionals and mortgage lenders who increasingly are encountering homes equipped with PV and need to understand the factors that can both contribute to and detract from market value.

solar, real estate, home, appraisal, pv, value↗

Techno-economic prospects for producing Fischer-Tropsch jet fuel and electricity from lignite and woody biomass with CO 2 capture for EOR

This work explores the prospective techno-economic performance of facilities that produce low- and net-negative-carbon liquid transportation fuels and electricity with CO 2 capture for enhanced oil recovery. The lignite and biomass-to-jet fuel process is based on KBR’s TRIG gasifier, Rectisol (for sulfur removal and CO 2 capture), fixed-bed low temperature Fischer-Tropsch synthesis of liquid fuels, and Brayton/Rankine combined cycles to convert synthesis/refining off-gases and waste heat to electricity. This work leverages a recent, highly-detailed assessment of a prospective first-of-a-kind (FOAK) demonstration facility to develop highly detailed Aspen Plus process simulations for nine prospective N th -of-a-kind (NOAK) plant equipment configurations. Component-level capital costs from the FOAK study are scaled and adjusted to reflective prospective learning-by-doing to estimate capital costs for the NOAK designs. NOAK plant economic performance is found to be largely insensitive to variations in plant configurations and electricity output fraction, but biomass input fraction significantly affects profitability. Facilities that consume only carbon–neutral biomass, with no lignite co-feed, have significantly net-negative carbon emissions and the most favorable prospective economics when carbon emissions are priced. For these facilities, the crude oil price required for plant economic viability falls rapidly from $\$$100/bbl as carbon emission prices increase above $\$$120/tonne CO 2eq . In general, plants that co-fire lignite with biomass are less profitable (than 100% biomass plants) due to their higher net greenhouse gas emissions.

09 BIOMASS FUELS↗

Civil Uses of Remotely Piloted Aircraft

The technology effort is identified and assessed that is required to bring the civil uses of RPVs to fruition and to determine whether or not the potential market is real and economically practical, the technologies are within reach, the operational problems are manageable, and the benefits are worth the cost. To do so, the economic, technical, and environmental implications are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RPV systems is estimated. Typical cost savings of 25-35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.

Aderhold, J. R.↗

Civil Uses of Remotely Piloted Aircraft

The economic, technical, and environmental implications of remotely piloted vehicles (RVP) are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RVP systems is estimated. Typical cost savings of 25 to 35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.

Aderhold, J. R.↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

CCS is looking more expensive than hoped

According to one estimate, levelized costs of an advanced coal-fired plant with post-combustion CCS entering service in 2016 is estimated at $122.60/MWh, only marginally higher than an advanced coal-fired plant without CCS, which is reckoned around $103.50/MWh. Two things are clear. First, low-carbon options will carry a price premium. Second, the days of spewing carbon into the atmosphere without a penalty are numbered.

20 FOSSIL-FUELED POWER PLANTS↗

Financial Planning as a Tool for Efficient and Timely Decommissioning of Nuclear Research Facilities

It is generally recognized in the technical and economical literature that reliable cost evaluations with adequate estimates also of the errors and uncertainties involved are necessary in order for rational and appropriate management decisions to be made on any major plant investment. Such estimates are required for the selection of technologies to be applied and for selection to be made between alternative technologies and designs as well as for the overall financing issues including the one of whether to go ahead with the project. Inadequacies in the cost calculations typically lead to suboptimal decisions and ultimately substantial overruns and/or needs for retrofits. Actually, a very strict discipline has to be applied with adaptation of the approach used with regard to the stage of the planning. Deviations from the expected tend to raise the estimated cost much more frequently than they lower it. The same rationale applies to planning and cost calculations for decommissioning of nuclear research facilities. There are, however, many reasons why such estimations may be very treacherous to carry out. This will be dealt with in the following. The knowledge base underlying the present paper has been developed and accumulated as a result of the research that the Swedish Nuclear Power Inspectorate (SKI) has carried out in support of its regulatory oversight over the Swedish system of finance. The findings are, however, equally applicable and appropriate for implementers in their planning, decision, monitoring and evaluation activities. In the nineteen fifties and sixties, Sweden had a comprehensive program for utilization of nuclear power including uranium mining, fuel fabrication, reprocessing and domestically developed heavy water reactors. Examples of facilities are presented in Figures 1-5. Eventually, the development work lead to the present nuclear program with ten modern light water reactors in operation at present. According to Swedish law, those who benefit from the use of these plants must pay a fee which is accumulated in a fund so that all future costs for decommissioning and waste management can be covered. Each year, estimates on all future costs are submitted to the SKI for review. The Government then decides on the size of the fee, based on the results of the review. In conclusion: it has been concluded in the SKI work - in spite of the difficulties pointed out above - that cost calculations with the precision needed for a system of finance can be achieved even at early stages provided that the various features of the task are adequately dealt with.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimal adjustment sets for causal query estimation in partially observed biomolecular networks

Abstract Causal query estimation in biomolecular networks commonly selects a ‘valid adjustment set’, i.e. a subset of network variables that eliminates the bias of the estimator. A same query may have multiple valid adjustment sets, each with a different variance. When networks are partially observed, current methods use graph-based criteria to find an adjustment set that minimizes asymptotic variance. Unfortunately, many models that share the same graph topology, and therefore same functional dependencies, may differ in the processes that generate the observational data. In these cases, the topology-based criteria fail to distinguish the variances of the adjustment sets. This deficiency can lead to sub-optimal adjustment sets, and to miss-characterization of the effect of the intervention. We propose an approach for deriving ‘optimal adjustment sets’ that takes into account the nature of the data, bias and finite-sample variance of the estimator, and cost. It empirically learns the data generating processes from historical experimental data, and characterizes the properties of the estimators by simulation. We demonstrate the utility of the proposed approach in four biomolecular Case studies with different topologies and different data generation processes. The implementation and reproducible Case studies are at https://github.com/srtaheri/OptimalAdjustmentSet.

59 BASIC BIOLOGICAL SCIENCES↗

Short-Haul Revitalization Study Final Report

A feasibility study was performed for an advanced commercial short-haul aircraft to evaluate the potential for increased service for short-haul flights that operate out of regional and community airports. An analysis of potential origin-destination markets and trip distances resulted in a seat capacity selection of 48 passengers and a design range of 600 NM. A down-select of advanced technologies resulted in a hybrid-electric propulsion system being chosen as the primary enabling technology. A conceptual design of the advanced aircraft was developed, and a mission and sizing analysis was performed, comparing variants of the advanced aircraft with different levels of electrification. Fairly aggressive levels of electrification and battery specific energy are needed for the hybridelectric architecture to realize any benefit in terms of total energy cost for the 600 NM design mission. The development and operational costs were estimated for the advanced aircraft and compared to the baseline. This analysis demonstrated the negative effect of the cost to develop the hybrid-electric technology on the eventual operating cost. A market analysis was performed to determine possible passenger demand for the advanced shorthaul aircraft. According to the market analysis, there is potential demand for such an aircraft, but not necessarily in many of the smaller regional and community airports that were the intended beneficiaries of this new aircraft concept.

Marien, Ty V.↗

Aqueous Bromide Discharges from U.S. Coal-Fired Power Plants: Points of Origin, Concentration Ranges, and Effluent Treatment Costs

Bromide discharges from coal-fired power plants have received increased attention from regulatory bodies due to their contribution to the formation of disinfection byproducts (DBPs) in downstream drinking water treatment plants. Here, this paper characterizes the relative contributions of bromide from coal feedstocks and bromine-based mercury control processes, estimates the distribution of bromide concentrations at 85 active coal-fired power plants across the United States (U.S.) with wet flue gas desulfurization units, and estimates the cost of bromide removal from wastewater discharge using year 2020 data. Bromide discharges are estimated at the plant level using a combination of the reported coal rank and composition combusted, estimates of bromide addition in mercury control techniques under multiple halogen addition scenarios, and the estimated flue gas desulfurization (FGD) wastewater flow rate. The median, simulated plant-level estimation of total FGD wastewater flow is 18.3 gallons/min at a bromide concentration of 319 mg/L, equivalent to ~11.6 tonnes/year of bromide discharges to the environment. Next, we evaluated the expected cost of employing the best available technology (BAT) to control bromide discharges in FGD wastewater to prevent contributions to DBP formation. Treatment would need to remove more than 99.8% of bromide to reach the 0.2 mg/L voluntary incentive program (VIP) limit. The total cost of treatment depends on whether disposal is on- or off-site; the average costs for all plants combined come to an average of $110 million ($95.2/kgal) in 2021 U.S. dollars for on-site disposal, or $134 million ($115/kgal) for off-site disposal.

01 COAL, LIGNITE, AND PEAT↗

Documentation of the analysis of the benefits and costs of aeronautical research and technology models, volume 1

The analysis of the benefits and costs of aeronautical research and technology (ABC-ART) models are documented. These models were developed by NASA for use in analyzing the economic feasibility of applying advanced aeronautical technology to future civil aircraft. The methodology is composed of three major modules: fleet accounting module, airframe manufacturing module, and air carrier module. The fleet accounting module is used to estimate the number of new aircraft required as a function of time to meet demand. This estimation is based primarily upon the expected retirement age of existing aircraft and the expected change in revenue passenger miles demanded. Fuel consumption estimates are also generated by this module. The airframe manufacturer module is used to analyze the feasibility of the manufacturing the new aircraft demanded. The module includes logic for production scheduling and estimating manufacturing costs. For a series of aircraft selling prices, a cash flow analysis is performed and a rate of return on investment is calculated. The air carrier module provides a tool for analyzing the financial feasibility of an airline purchasing and operating the new aircraft. This module includes a methodology for computing the air carrier direct and indirect operating costs, performing a cash flow analysis, and estimating the internal rate of return on investment for a set of aircraft purchase prices.

Bobick, J. C.↗

Estimating basis functions in massive fields under the spatial mixed effects model

Abstract Spatial prediction is commonly achieved under the assumption of a Gaussian random field by obtaining maximum likelihood estimates of parameters, and then using the kriging equations to arrive at predicted values. For massive datasets, fixed rank kriging using the expectation–maximization algorithm for estimation has been proposed as an alternative to the usual but computationally prohibitive kriging method. The method reduces computation cost of estimation by redefining the spatial process as a linear combination of basis functions and spatial random effects. A disadvantage of this method is that it imposes constraints on the relationship between the observed locations and the knots. We develop an alternative method that utilizes the spatial mixed effects model, but allows for additional flexibility by estimating the range of the spatial dependence between the observations and the knots via an alternating expectation conditional maximization algorithm. Experiments show that our methodology improves estimation without sacrificing prediction accuracy while also minimizing the additional computational burden of extra parameter estimation. The methodology is applied to a temperature dataset archived by the United States National Climate Data Center, with improved results over previous methodology.

Pazdernik, Karl↗

Refine your search to explore more results.