Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Human Transportation System (HTS) study, volume 1

This report summarizes work completed under the Human Transportation System Study. This study was conducted by the New Initiatives Office at JSC with the technical support of Boeing, General Dynamics, Lockheed, McDonnell-Douglas, Martin Marietta, and Rockwell. The study was designed to generate information on determining the appropriate path to follow for new system development to meet the Nation's space transportation needs. The study evaluates 18 transportation architecture options using a parametric set of mission requirements. These options include use of current systems (e.g., Shuttle, Titan, etc.) as well as proposed systems (e.g., PLS, Single-Stage-to-Orbit, etc.) to assess the impact of various considerations, such as the cost of alternate access, or the benefit of separating people and cargo. The architecture options are compared to each other with six measurable evaluation criteria or attributes. They are: funding profile, human safety, probability of mission success, architecture cost risk, launch schedule confidence, and environmental impact. Values for these attributes are presented for the architecture options, with pertinent conclusions and recommendations.

Unmanned spacecraft↗

Airspace Technology Demonstration 2 (ATD-2) Phase 2 Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline and Phase 2 Fused demonstrations of the Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration’s (NASA) Airspace Technology Demonstration 2 (ATD-2) project, which has been demonstrated since October of 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA has been developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport operators, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation’s most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research has been demonstrated at the CLT airport since the beginning of October 2017. Phase 1 provided data exchange and integration with the initial demonstration of the integrated system of strategic and tactical scheduling, collaborative tactical surface metering, tactical departure scheduling to an en route meter point and overhead stream insertion, initial integration of a TFDM SWIM prototype feed, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 The Phase 2 Fused IADS system provided substantial updates to baseline IADS Demonstration capability. Improvements were made to the IADS modeler; tactical surface scheduling, and metering; tactical departure scheduling for overhead stream insertion; Electronic Flight Data (EFD) and the integration with the FAA Advanced Electronic Flight Strip (AEFS); RTC/RMTC, and departure trajectories. New capabilities included a TFDM SWIM prototype feed and delivery of IADS data via the TFDM Terminal Publication (TTP) service of the FAA’s SWIM system; strategic surface scheduling and metering as well as fusion with tactical surface metering; integration and ingestion of data from TTP-connected Mobile App and texting industry for General Aviation (GA) flights; and expansion of airspace deployments to include adjacent Center automation, in particular interface with the Atlanta Center (ZTL) arrival metering TBFM system to evaluate pre-scheduling of flights. Improvements in Data Analysis and System Health (DASH) monitoring and updates were completed as well.

Talebi, Ehsan↗

LUX-ZEPLIN (LZ) Conceptual Design Report

The design and performance of the LUX-ZEPLIN (LZ) detector is described as of March 2015 in this Conceptual Design Report. LZ is a second-generation dark-matter detector with the potential for unprecedented sensitivity to weakly interacting massive particles (WIMPs) of masses from a few GeV/c 2 to hundreds of TeV/c 2 . With total liquid xenon mass of about 10 tonnes, LZ will be the most sensitive experiment for WIMPs in this mass region by the end of the decade. This report describes in detail the design of the LZ technical systems. Expected backgrounds are quantified and the performance of the experiment is presented. The LZ detector will be located at the Sanford Underground Research Facility in South Dakota. The organization of the LZ Project and a summary of the expected cost and current schedule are given.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

System Engineering Analysis For Improved Scout Business Information Systems

The project uses system engineering principles to address the need of Boy Scout leaders for an integrated system to facilitate advancement and awards records, leader training and planning for meetings and activities. Existing products to address needs of Scout leaders and relevant stakeholders function to support record keeping and some communication functions but opportunity exists for a better system to fully integrate these functions with training delivery and recording, activity planning along with feedback and information gathering from stakeholders. Key stakeholders for the sytem include Scouts and their families, leaders, training providers, sellers of supplies and awards, content generators and facilities that serve Scout activities. Key performance parameters for the system are protection of personal information, availability of current information, information accuracy and information content that has depth. Implementation concepts considered for the system include (1) owned and operated by Boy Scouts of America, (2) Contracted out to a vendor (3) distributed system that functions with BSA managed interfaces. The selected concept is to contract out to a vendor to maximize the likelihood of successful integration and take advantage of the best technology. Development of requirements considers three key use cases (1) System facilitates planning a hike with training needed satisfied in advance and advancement recording real time (2) Scheduling and documenting in-person training, (3) Family interested in Scouting receives information and can request follow-up. Non-functional requirements are analyzed with the Quality Function Deployment tool. Requirement addressing frequency of backup, compatibility with legacy and new technology, language support, software update are developed to address system reliability and intuitive interface. System functions analyzed include update of activity database, maintenance of advancement status, archive of documents, and monitoring of content that is accessible. The study examines risks associated with information security, technological change and continued popularity of Scouting. Mitigation is based on system functions that are defined. The approach to developing an improved system for facilitating Boy Scout leader functions was iterative with insights into capabilities coming in the course of working through the used cases and sequence diagrams.

97 MATHEMATICS AND COMPUTING↗

Space shuttle with common fuel tank for liquid rocket booster and main engines (supertanker space shuttle)

An operation and schedule enhancement is shown that replaces the four-body cluster (Space Shuttle Orbiter (SSO), external tank, and two solid rocket boosters) with a simpler two-body cluster (SSO and liquid rocket booster/external tank). At staging velocity, the booster unit (liquid-fueled booster engines and vehicle support structure) is jettisoned while the remaining SSO and supertank continues on to orbit. The simpler two-bodied cluster reduces the processing and stack time until SSO mate from 57 days (for the solid rocket booster) to 20 days (for the liquid rocket booster). The areas in which liquid booster systems are superior to solid rocket boosters are discussed. Alternative and future generation vehicles are reviewed to reveal greater performance and operations enhancements with more modifications to the current methods of propulsion design philosophy, e.g., combined cycle engines, and concentric propellant tanks.

Thorpe, Douglas G.↗

F Prime: An Open-Source Framework for Small-Scale Flight Software Systems

Developing flight software for small-scale missions such as CubeSats and SmallSats is challenging. These missions typically have ambitious goals, modest budgets, and tight schedules. To meet these challenges, a good flight software framework is essential. Frameworks can provide an architecture, infrastructure, tools, and reusable software components, all of which can help developers deliver their code on time and on budget. In this paper we present F Prime, a free, open-source flight software framework developed at JPL and tailored to small-scale systems such as CubeSats, SmallSats, and instruments. F Prime comprises several elements: (1) an architecture that decomposes flight software into discrete components with well-defined interfaces; (2) a C++ framework that provides core capabilities such as message queues and threads; (3) tools for specifying components and connections and automatically generating code; (4) a growing collection of ready-to-use components; and (5) tools for testing flight software at the unit and integration levels.We describe the F Prime framework and tools and present our experience using them. We describe several enhancements to the framework currently underway in the areas of software design, software verification, and ground data systems for testing.

Levison, Jeffrey W.↗

GL4U: Bioinformatics training for students and educators using space omics data

NASA’s GeneLab project provides researchers open access to space-relevant experiment multi-omics data that can be mined to understand the effects of spaceflight on biological systems. To maximize the number of scientists who understand and utilize GeneLab data and data processing pipelines, GeneLab has created GeneLab for Colleges and Universities (GL4U). GL4U provides space biology-relevant training in bioinformatics to the next generation of scientists through direct and indirect approaches. The GeneLab team plans to host two annual data processing bootcamps, one for college-level students (direct) and one for college educators (indirect – training of trainers), in which participants learn to analyze GeneLab’s space-relevant omics data. The GL4U direct training pilot program was conducted in June 2021. During the pilot, students participated in a week-long bootcamp consisting of space biology-specific lectures and hands-on instruction using Jupyter Notebooks to analyze RNA sequence data. This pilot demonstrated the capacity of GL4U for training young scientists and encouraging data re-use. During the educator pilot, scheduled for June 2022, educators will receive materials and training to enable them to run the bootcamp at their home institutions or alternatively to adapt the content to implement within existing courses, thereby extending the reach of this initiative.

Amanda Marie Saravia-butler↗

GL4U: Bioinformatics Training for Students and Educators Using Space Omics Data

NASA’s GeneLab project provides researchers open access to space-relevant experiment multi-omics data that can be mined to understand the effects of spaceflight on biological systems. To maximize the number of scientists who understand and utilize GeneLab data and data processing pipelines, GeneLab has created GeneLab for Colleges and Universities (GL4U). GL4U provides space biology-relevant training in bioinformatics to the next generation of scientists through direct and indirect approaches. The GeneLab team plans to host two annual data processing bootcamps, one for college-level students (direct) and one for college educators (indirect – training of trainers), in which participants learn to analyze GeneLab’s space-relevant omics data. The GL4U direct training pilot program was conducted in June 2021. During the pilot, students participated in a week-long bootcamp consisting of space biology-specific lectures and hands-on instruction using Jupyter Notebooks to analyze RNA sequence data. This pilot demonstrated the capacity of GL4U for training young scientists and encouraging data re-use. During the educator pilot, scheduled for June 2022, educators will receive materials and training to enable them to run the bootcamp at their home institutions or alternatively to adapt the content to implement within existing courses, thereby extending the reach of this initiative.

Amanda Marie Saravia-butler↗

Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses (2012 Annual Summary Report)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (RD) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and RD activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and RD results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and RD activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term RD efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of Production and Validation of the SMAP Passive Soil Moisture Product

The Soil Moisture Active Passive (SMAP) mission is an L-band mission scheduled for launch in Jan. 2015. The SMAP instruments consist of a radar and a radiometer to obtain complementary information from space for soil moisture and freeze/thaw state research and applications. By utilizing novel designs in antenna construction, retrieval algorithms, and acquisition hardware, SMAP provides a capability for global mapping of soil moisture and freeze/thaw state with unprecedented accuracy, resolution, and coverage. This improvement in hydrosphere state measurement is expected to advance our understanding of the processes that link the terrestrial water, energy and carbon cycles, improve our capability in flood prediction and drought monitoring, and enhance our skills in weather and climate forecast. For swath-based soil moisture measurement, SMAP generates three operational geophysical data products: (1) the radiometer-only soil moisture product (L2_SM_P) posted at 36-kilometer resolution, (2) the radar-only soil moisture product (L2_SM_A) posted at 3-kilometers resolution, and (3) the radar-radiometer combined soil moisture product (L2_SM_AP) posted at 9-kilometers resolution. Each product draws on the strengths of the underlying sensor(s) and plays a unique role in hydroclimatological and hydrometeorological applications. A full suite of SMAP data products is given in Table 1.

passive microwave↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Scenario Complexity for Unmanned Aircraft System Traffic

This work introduces an approach to estimate the complexity of a low-altitude air traffic scenario involving multiple UASs using mathematical programming. Given a set of multi-point UAS flight trajectories, vehicle dynamics, and a conflict resolution algorithm, an abstract model is developed such that it can be solved quickly using a mathematical programming optimization software without running high-fidelity simulations that can be computationally expensive and may not suit real-time apA quick and accurate assessment of complexity for a given traffic scenario can help plan and schedule flights to alleviate traffic bottleneck and mitigate operation risks, especially for unmanned aerial system traffic management where high traffic density or complexity is expected. This work introduces a traffic scenario complexity metric that was constructed based on the number of potential conflicts weighted by the conflict resolution cost associated. The cost associated with a conflict is calculated based on the corresponding conflict resolution maneuvers. To obtain the conflict resolution maneuvers, a MILP-based optimization was formulated with the vehicle model and conflict management parameters incorporated. To evaluate the complexity metrics, an approach of using measurements from high-fidelity simulations was proposed. The scenario complexity measurements for 920 random-generated scenarios were obtained through high-fidelity simulations and treated as the ground truth. Two statistics methods: Pearson and Alternative Conditional Expectations were applied for analysis. The results showed that the number of flights has low correlation with the scenario complexity according to the correlation coefficients calculated by both methods. The Alternative Conditional Expectations method shows that the proposed scenario complexity metric has better correlation with the ground truth than the number of potential conflicts.plications. In the abstract model, each vehicle is represented by a time-varied vector associated with position, speed, and heading information. The total extra distance that aircraft need to divert from their original routes to avoid collisions is computed and used to setup a quadratic programming formula. The metrics including the number of conflicts and extra distances travelled by all vehicles are then utilized to estimate the complexity of a given UAS flight scenario. Results and verification against high-fidelity simulations will be provided in the final draft.

traffic complexity↗

Towards Scalable Deep Learning via I/O Analysis and Optimization

Deep learning systems have been growing in prominence as a way to automatically characterize objects, trends, and anomalies. Given the importance of deep learning systems, researchers have been investigating techniques to optimize such systems. An area of particular interest has been using large supercomputing systems to quickly generate effective deep learning networks: a phase often referred to as “training” of the deep learning neural network. As we scale existing deep learning frameworks—such as Caffe—on these large supercomputing systems, we notice that the parallelism can help improve the computation tremendously, leaving data I/O as the major bottleneck limiting the overall system scalability. In this paper, we first present a detailed analysis of the performance bottlenecks of Caffe on large supercomputing systems. Our analysis shows that the I/O subsystem of Caffe—LMDB—relies on memory-mapped I/O to access its database, which can be highly inefficient on large-scale systems because of its interaction with the process scheduling system and the network-based parallel filesystem. Based on this analysis, we then present LMDBIO, our optimized I/O plugin for Caffe that takes into account the data access pattern of Caffe in order to vastly improve I/O performance. Our experimental results show that LMDBIO can improve the overall execution time of Caffe by nearly 20-fold in some cases.

Pumma, Sarunya↗

SU-E-T-27: A Tool for Routine Quality Assurance of Radiotherapy Dose Calculation Software

Purpose: Dose calculation software is thoroughly evaluated when it is commissioned; however, evaluation of periodic software updates is typically limited in scope due to staffing constraints and the need to quickly return the treatment planning system to clinical service. We developed a tool for quickly and comprehensively testing and documenting dose calculation software against measured data. Methods: A tool was developed using MatLab (The MathWorks, Natick, MA) for evaluation of dose calculation algorithms against measured data. Inputs to the tool are measured data, reference DICOM RT PLAN files describing the measurements, and dose calculations in DICOM format. The tool consists of a collection of extensible modules that can perform analysis of point dose, depth dose curves, and profiles using dose difference, distance-to-agreement, and the gamma-index. Each module generates a report subsection that is incorporated into a master template, which is converted to final form in portable document format (PDF). Results: After each change to the treatment planning system, a report can be generated in approximately 90 minutes. The tool has been in use for more than 5 years, spanning 5 versions of the eMC and 4 versions of the AAA. We have detected changes to the algorithms that affected clinical practice once during this period. Conclusion: Our tool provides an efficient method for quality assurance of dose calculation software, providing a complete set of tests for an update. Future work includes the addition of plan level tests, allowing incorporation of, for example, the TG-119 test suite for IMRT, and integration with the treatment planning system via an application programming interface. Integration with the planning system will permit fully-automated testing and reporting at scheduled intervals.

07 ISOTOPE AND RADIATION SOURCES↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

The 10 kW power electronics for hydrogen arcjets

A combination of emerging mission considerations such as 'launch on schedule', resource limitations, and the development of higher power spacecraft busses has resulted in renewed interest in high power hydrogen arcjet systems with specific impulses greater than 1000 s for Earth-space orbit transfer and maneuver applications. Solar electric propulsion systems with about 10 kW of power appear to offer payload benefits at acceptable trip times. This work outlines the design and development of 10 kW hydrogen arcjet power electronics and results of arcjet integration testing. The power electronics incorporated a full bridge switching topology similar to that employed in state of the art 5 kW power electronics, and the output filter included an output current averaging inductor with an integral pulse generation winding for arcjet ignition. Phase shifted, pulse width modulation with current mode control was used to regulate the current delivered to arcjet, and a low inductance power stage minimized switching transients. Hybrid power Metal Oxide Semiconductor Field Effect Transistors were used to minimize conduction losses. Switching losses were minimized using a fast response, optically isolated, totem-pole gate drive circuit. The input bus voltage for the unit was 150 V, with a maximum output voltage of 225 V. The switching frequency of 20 kHz was a compromise between mass savings and higher efficiency. Power conversion efficiencies in excess of 0.94 were demonstrated, along with steady state load current regulation of 1 percent. The power electronics were successfully integrated with a 10 kW laboratory hydrogen arcjet, and reliable, nondestructive starts and transitions to steady state operation were demonstrated. The estimated specific mass for a flight packaged unit was 2 kg/kW.

Hamley, John A.↗

LADEE Satellite Modeling and Simulation Development

As human activity on and around the Moon increases, so does the likelihood that our actions will have an impact on its atmosphere. The Lunar Atmosphere and Dust Environment Explorer (LADEE), a NASA satellite scheduled to launch in 2013, will orbit the Moon collecting composition, density, and time variability data to characterize the current state of the lunar atmosphere. LADEE will also test the concept of the "Modular Common Bus" spacecraft architecture, an effort to reduce both development time and cost by designing reusable, modular components for use in multiple missions with similar requirements. An important aspect of this design strategy is to both simulate the spacecraft and develop the flight code in Simulink, a block diagram-style programming language that allows easy algorithm visualization and performance testing. Before flight code can be tested, however, a realistic simulation of the satellite and its dynamics must be generated and validated. This includes all of the satellite control system components such as actuators used for force and torque generation and sensors used for inertial orientation reference. My primary responsibilities have included designing, integrating, and testing models for the LADEE thrusters, reaction wheels, star trackers, and rate gyroscopes.

Adams, Michael↗

Resource Management for Processing Wide Area Data Streams on Supercomputers

Modern scientific instruments generate enormous amount of data. Typically, the data collected from the instruments are stored in one or more files that are then moved to a distant supercomputer for processing. The final results are sent back to the user. In order to make effective use of the time on expensive instruments, experimenters want to process the data as they are generated. They want to stream the data from instruments' memory directly to a supercomputer's memory for analysis. Since the compute nodes in a supercomputer are not connected directly to the wide area network, the data streams need to be passed through intermediate gateway nodes. As opposed to the best effort file transfers, data streaming applications require resources at a specific time for a specific period. In this paper, we present a system model for enabling data streaming through gateway nodes and an algorithm to efficiently allocate gateway node resources along with compute nodes. We evaluate the algorithm using real-world traces on the Chameleon Cloud. The results show that our system can schedule compute and gateway resources efficiently for streaming analysis.

data streaming↗

Refine your search to explore more results.