Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Valuing Resilience

There is a variety of work in progress at NREL that is evaluating the value of resiliency. This presentation summarizes of this ongoing work, which including: 1. The development of quantitative resilience metrics for the power system. 2. The implementation of quantitative, performance-based resilience metrics into existing models and tools 3. Methods for valuing resilience, including a time-varying value of lost load. 4. The extent to which accounting for performance-based resilience metrics and/or the value of resilience could impact investment (planning) decisions related to electricity supply. 5. Developing and implementing a consistent valuation methodology for resilience distribution system field validation projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Making the Case for Reusable Booster Systems: The Operations Perspective

Presentation to the Aeronautics Space Engineering Board National Research Council Reusable Booster System: Review and Assessment Committee. Addresses: the criteria and assumptions used in the formulation of current RBS plans; the methodologies used in the current cost estimates for RBS; the modeling methodology used to frame the business case for an RBS capability including: the data used in the analysis, the models' robustness if new data become available, and the impact of unclassified government data that was previously unavailable and which will be supplied by the USAF; the technical maturity of key elements critical to RBS implementation and the ability of current technology development plans to meet technical readiness milestones.

reusable launch vehicle↗

Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools. - Highlights: • We assessed the effectiveness of Environmental Management Plans (EMPs) for major developments, focusing on delivery of mitigation and monitoring. • EIA and Environmental Management Systems (EMS) post-consent are weakly linked. • The use of EMPs varies significantly in practise, partly due to the range of terminology used. • Linkages are hampered by poor communication and follow-up • More detailed guidance on how EMPs can successfully link with EMS is required.

54 ENVIRONMENTAL SCIENCES↗

SU-F-T-351: Establishing a Workflow for IMRT Pre-Treatment Reviews for NRG-GY006 Clinical Trial

Purpose: To establish a workflow for NRG-GY006 IMRT pre-treatment reviews, incorporating advanced radiotherapy technologies being evaluated as part of the clinical trial. Methods: Pre-Treatment reviews are required for every IMRT case as part of NRG-GY006 (a randomized phase II trial of radiation therapy and cisplatin alone or in combination with intravenous triapine in women with newly diagnosed bulky stage I B2, stage II, IIIB, or IVA cancer of the uterine cervix or stage II-IVA vaginal cancer. The pretreatment review process includes structures review and generating an active bone marrow(ABM)- to be used as an avoidance structure during IMRT optimization- and evaluating initial IMRT plan quality using knowledgeengineering based planning (KBP). Institutions will initially submit their simulation CT scan, structures file and PET/CT to IROC QA center for generating ABM. The ABM will be returned to the institution for use in planning. Institutions will then submit an initial IMRT plan for review and will receive information back following implementation of a KBP algorithm, for use in re-optimization, before submitting the final IMRT used for treatment. Results: ABM structure is generated using MIM vista software (Version 6.5, MIM corporation, Inc.). Here, the planning CT and the diagnostic PET/CT are fused and a sub threshold structure is auto segmented above the mean value of the SUV of the bone marrow. The generated ABM were compared with those generated with other software system (e.g. Velocity, Varian) and Dice coefficient (reflects the overlap of structures) ranged between 80 – 90% was achieved. A KBP model was built in Varian Eclipse TPS using the RapidPlan KBP software to perform plan quality assurance. Conclusion: The workflow for IMRT pretreatment reviews has been established. It represents a major improvement of NRG Oncology clinical trial quality assurance and incorporates the latest radiotherapy technologies as part of NCI clinical trials. This project was supported by grants U24CA180803 (IROC), UG1CA189867 (NCORP), U10CA180868 (NRG Oncology Operations), U10CA180822 (NRG Oncology SDMC) from the National Cancer Institute (NCI) and PA CURE grant.

60 APPLIED LIFE SCIENCES↗

Matrix evaluation of science objectives

The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.

Wessen, Randii R.↗

Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UTM UAS Serivce Supplier Development: Sprint 1 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density and large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider(ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the first step in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and the underlying specifications for them, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and proposed specifications for USSs to participate in TCL4. This report describes Sprint One. In this Sprint, the focus was on establishing a baseline for the Application Programming Interfaces (APIs) and their associated data models. In addition, the concept of UAS Volume Reservations (UVR) (areas that impose restrictions on sUAS that are allowed to operate) was tested. NASA provided the specifications and iterated on them with partners while implementers developed to those specifications. NASA then tested each partner's implementation to ensure compatibility with all other implementers. This process helped all stakeholders gain confidence that the foundation for future Sprints was solid.

UAS service supplier↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗

Implementation Strategy

Meeting the identified needs of Earth science requires approaching EOS as an information system and not simply as one or more satellites with instruments. Six elements of strategy are outlined as follows: implementation of the individual discipline missions as currently planned; use of sustained observational capabilities offered by operational satellites without waiting for the launch of new mission; put first priority on the data system; deploy an Advanced Data Collection and Location System; put a substantial new observing capability in a low Earth orbit in such a way as to provide for sustained measurements; and group instruments to exploit their capabilities for synergism; maximize the scientific utility of the mission; and minimize the costs of implementation where possible.

Source record↗

Design and Use of a Large-Scale Liquid Helium Conversion System

A large-scale liquid helium (LHe) to high-pressure (HP) gas conversion system has been implemented at the John F. Kennedy Space Center (KSC). Helium is used by the Space Shuttle, Titan, Atlas, and Delta programs for prelaunch processing, during launch count-down, and for postlaunch securing. The first phase of modifications to the Compressor Converter Facility (CCF), operational in April 1998, allowed the facility to accept bulk liquid helium from tanker containers and to off-load the helium at super-critical pressures. The second phase of modifications, planned to be operational by January 2001, will implement a 227-cubic-meter (m(sup 3)) on-site liquid helium storage system. This paper describes the design and operation of the current system and discusses the design and implementation for the second phase system.

Knudsen, P. N.↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Systems Engineering Approach to the Analysis of a Planetary Mission Ground System in Terms of Science Objectives

The most fundamental objective of all planetary missions is to return data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, a systems engineering approach to determine how the collection of data drives ground system capabilities has received little attention.This paper defines a technique by which science objectives can be quantitatively evaluated. For illustrative purposes, it will be applied to NASA's Cassini Mission. This mission, to be launched in 1997, is an international endeavor designed to orbit Saturn for four years.The results of this systems engineering approach will show which science objectives drive specific ground system capabilities. In addition, this technique can assist system engineers in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during the mission.

systems engineering, ground systems↗

SU-F-T-19: The Consistency Dosimetric Analysis of the Accelerated Breast Brachytherapy

Purpose: To assess the best approach in accept a treatment plan for APBI Savi patients. Should we run a treatment verification test prior to delivering it to the patient? Should we check each CT scan in regards to the initial one in dosimetrical terms? Do we need deformable registration and adaptive planning for each fraction? These are the questions we want to answer running a dosimetric analysis of the dose variances for APBI treatments who receive 10 fractions and no re-planning has been done being considered unnecessary with today’s means of assessment. Methods: A retrospective analysis of 30 patients treated with SAVI applicators were considered for this study. The CT scans taken before each treatment were imported in the treatment planning system and registered with the initial CT scan. The images were fused together with respective to the applicator, using landmark registration. Dosimetric evaluations were performed. Dose received by skin, ribs and PTV on CT images with respect to the initial treatment plan were recorded including maximum, average and minimum dose Results: All the structures displayed changes in volume over the 10 fractions of treatment. The cavities reduction in volume was considerable with a maximum reduction of over 10%. The PTV-eval is covered better due to this fact while the critical organs manifest an increase in the total and maximum dose delivered. Ribs and skin surface that are required by B39 protocol to be monitored can acquire maximum doses of 20% to 30% respectively. Conclusion: A dosimetric evaluation prior to the initial treatment and prior to each of the 10 fractions is proven to be necessary. Deformable registration and adaptive planning have to be studied more and eventually implemented for every patient who received more than one fraction of any type of brachytherapy treatment. Immobilization ad localization methods must be improved and studied further.

60 APPLIED LIFE SCIENCES↗

Implementing an Information Security Program

The threats to information security have dramatically increased with the proliferation of information systems and the internet. Chemical, biological, radiological, nuclear, and explosives (CBRNe) facilities need to address these threats in order to protect themselves from the loss of intellectual property, theft of valuable or hazardous materials, and sabotage. Project 19 of the European Union CBRN Risk Mitigation Centres of Excellence Initiative is designed to help CBRN security managers, information technology/cybersecurity managers, and other decision-makers deal with these threats through the application of cost-effective information security programs. Project 19 has developed three guidance documents that are publically available to cover information security best practices, planning for an information security management system, and implementing security controls for information security.

blended attack↗

An Overview of NASA's In-Space Cryogenic Propellant Management Technologies

Future mission planning within NASA continues to include cryogenic propellants for in space transportation, with mission durations ranging from days to years. Between 1995 and the present, NASA has pursued a diversified program of ground-based testing to prepare the various technologies associated with in-space cryogenic fluid management (CFM) for implementation. CFM technology areas being addressed include passive insulation, zero gravity pressure control, zero gravity mass gauging, capillary liquid acquisition devices, and zero boiloff storage. NASA CFM technologies are planned, coordinated, and implemented through the Cryogenic Technology Working Group which is comprised of representatives from the various NASA Centers as well as the National Institute of Standards and Technologies (NIST) and, on selected occasions, the Air Force. An overview of the NASA program and Marshall Space Flight Center (MSFC) roles, accomplishments, and near-term activities are presented herein. Basic CFM technology areas being addressed include passive insulation, zero gravity pressure control, zero gravity mass gauging, capillary liquid acquisition devices, and zero boiloff storage. Recent MSFC accomplishments include: the large scale demonstration of a high performance variable density multilayer insulation (MLI) that reduced the boiloff by about half that of standard MLI; utilization of a foam substrate under MLI to eliminate the need for a helium purge bag system; demonstrations of both spray-bar and axial-jet mixer concepts for zero gravity pressure control; and sub-scale testing that verified an optical sensor concept for measuring liquid hydrogen mass in zero gravity. In response to missions requiring cryogenic propellant storage durations on the order of years, a cooperative effort by NASA's Ames Research Center, Glenn Research Center, and MSFC has been implemented to develop and demonstrate zero boiloff concepts for in-space storage of cryogenic propellants. An MSFC contribution to this cooperative effort is a large-scale demonstration of the integrated operation of passive insulation, destratification/pressure control, and cryocooler (commercial unit) subsystems to achieve zero boiloff storage of liquid hydrogen. Testing is expected during the Summer of 2001.

Tucker, Stephen↗

Simplifying operations with an uplink/downlink integration toolkit

The Operations Engineering Lab (OEL) at JPL has developed a simple, generic toolkit to integrate the uplink/downlink processes, (often called closing the loop), in JPL's Multimission Ground Data System. This toolkit provides capabilities for integrating telemetry verification points with predicted spacecraft commands and ground events in the Mission Sequence Of Events (SOE) document. In the JPL ground data system, the uplink processing functions and the downlink processing functions are separate subsystems that are not well integrated because of the nature of planetary missions with large one-way light times for spacecraft-to-ground communication. Our new closed-loop monitoring tool allows an analyst or mission controller to view and save uplink commands and ground events with their corresponding downlinked telemetry values regardless of the delay in downlink telemetry and without requiring real-time intervention by the user. An SOE document is a time-ordered list of all the planned ground and spacecraft events, including all commands, sequence loads, ground events, significant mission activities, spacecraft status, and resource allocations. The SOE document is generated by expansion and integration of spacecraft sequence files, ground station allocations, navigation files, and other ground event files. This SOE generation process has been automated within the OEL and includes a graphical, object-oriented SOE editor and real-time viewing tool running under X/Motif. The SOE toolkit was used as the framework for the integrated implementation. The SOE is used by flight engineers to coordinate their operations tasks, serving as a predict data set in ground operations and mission control. The closed-loop SOE toolkit allows simple, automated integration of predicted uplink events with correlated telemetry points in a single SOE document for on-screen viewing and archiving. It automatically interfaces with existing real-time or non real-time sources of information, to display actual values from the telemetry data stream. This toolkit was designed to greatly simplify the user's ability to access and view telemetry data, and also provide a means to view this data in the context of the commands and ground events that are used to interpret it. A closed-loop system can prove especially useful in small missions with limited resources requiring automated monitoring tools. This paper will discuss the toolkit implementation, including design trade-offs and future plans for enhancing the automated capabilities.

Murphy, Susan C.↗

MO-E-BRC-00: Online Adaptive Radiotherapy - Considerations for Practical Clinical Implementation

Online adaptive radiation therapy has the potential to ensure delivery of optimal treatment to the patient by accounting for anatomical and potentially functional changes that occur from one fraction to the next and over the course of treatment. While on-line adaptive RT (ART) has been a topic of many publications, discussions, and research, it has until very recently remained largely a concept and not a practical implementation. However, recent advances in on-table imaging, use of deformable image registration for contour generation and dose tracking, faster and more efficient plan optimization, as well as fast quality assurance method has enabled the implementation of ART in the clinic in the past couple of years. The introduction of these tools into routine clinical use requires many considerations and progressive knowledge to understand how processes that have historically taken hours/days to complete can now be done in less than 30 minutes. This session will discuss considerations to perform real time contouring, planning and patient specific QA, as well as a practical workflow and the required resources. Learning Objectives: To understand the difficulties, challenges and available technologies for online adaptive RT. To understand how to implement online adaptive therapy in a clinical environment and to understand the workflow and resources required. To understand the limitations and sources of uncertainty in the online adaptive process I have research funding from ViewRay Inc. and Philips Medical Systems.; R. Kashani, I have research funding from ViewRay Inc. and Philips Medical Systems.; X. Li, Research supported by Elekta Inc.

60 APPLIED LIFE SCIENCES↗

MO-E-BRC-01: Online Adaptive MR-Guided RT: Workflow and Clinical Implementation

Online adaptive radiation therapy has the potential to ensure delivery of optimal treatment to the patient by accounting for anatomical and potentially functional changes that occur from one fraction to the next and over the course of treatment. While on-line adaptive RT (ART) has been a topic of many publications, discussions, and research, it has until very recently remained largely a concept and not a practical implementation. However, recent advances in on-table imaging, use of deformable image registration for contour generation and dose tracking, faster and more efficient plan optimization, as well as fast quality assurance method has enabled the implementation of ART in the clinic in the past couple of years. The introduction of these tools into routine clinical use requires many considerations and progressive knowledge to understand how processes that have historically taken hours/days to complete can now be done in less than 30 minutes. This session will discuss considerations to perform real time contouring, planning and patient specific QA, as well as a practical workflow and the required resources. Learning Objectives: To understand the difficulties, challenges and available technologies for online adaptive RT. To understand how to implement online adaptive therapy in a clinical environment and to understand the workflow and resources required. To understand the limitations and sources of uncertainty in the online adaptive process I have research funding from ViewRay Inc. and Philips Medical Systems.; R. Kashani, I have research funding from ViewRay Inc. and Philips Medical Systems.; X. Li, Research supported by Elekta Inc.

60 APPLIED LIFE SCIENCES↗

Refine your search to explore more results.