Search NASA⌕ Search

SEARCH · Search NASA

Results for “Optimal Power Flow”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,795 records · Page 100

Synthesis and Characterization of Mixed-Conducting Corrosion Resistant Oxide Supports

An extensive search and evaluation of electrochemically stable catalyst supports (including metal oxides like RuO2-SiO2, RuO2-TiO2, and ITO was perfomed during the 4 years of the project. The suports were also catalyzed by deposition of Pt and tested for its performance and electrochemical stability in RDE and fuel cell experiments. For testing the electrochemical stability and fuel cell performance of the catalysts and supports, we have employed the protocols in use at the Department of Energy and Nissan Technological Center North America (NTCNA). The use of such procedures allows a precise and reproducible estimation of the performance and stability of the materials and permits comparisons among laboratories and DOE funded projects. RuO2-SiO2 catalyst supports showed no loss in surface area during start-stop stability tests that were performed by cycling the electrode potential between 0 V to 1.8 V for 1000 cycles. Catalyzed support (40% Pt/RuO2-SiO2; 1:1 mole ratio) were tested in a PEFC, resulting in a current density of 750 mA/cm2 at 0.6 Volts, and a maximum power density of 570 mW/cm2. Measurements were conducted at 80 ºC with 75% relative humidity of the inlet gases (H2/O2); Pt loadings were 0.4 mg/cm2 at the cathode and 0.2 mg/cm2 at the anode. Start-stop stability tests for support and catalyzed support performed in RDE and PEFC set-ups have confirmed RuO2-TiO2 support stability. The beginning of life performance was exactly equal to end of life performance (in an MEA that has been subjected to severe start-stop cycling for 10,000 start/stop cycles between 1 V to 1.5 V). This result was in sharp contrast to baseline Pt/C catalyst that showed significant performance deterioration after accelerated stability tests. The Pt/TRO showed minimal loss in performance upon exposure to start-stop cycles. The loss in cell voltage at 1 A/cm2 at 100% RH was almost 700 mV for Pt/C whereas it was only ca. 15 mV for Pt/TRO. 40% RH data (of inlet gases) revealed a similar trend in terms of stability – exceptional stability for Pt/TRO as opposed to very poor stability for Pt/HSAC. These observations were attributed to the much higher stability of the TRO support compared to Carbon. The carbon dioxide concentration in the cathode exit stream during the accelerated degradation test with Pt/TRO (start-stop protocol) was extremely low (between 3 to 10 ppm of CO2). In contrast, the CO2 emission levels from a conventional Pt/C catalyst were found to be approx. 200 ppm. This observation was a clear indicator that the main source of carbon being oxidized to carbon dioxide in an MEA was the carbon catalyst support, and not the gas diffusion layer or the graphite flow fields. Indium tin oxide (ITO) was also evaluated as a catalyst support for PEFCs. Pt/ITO was very stable under start-up/shutdown accelerated degradation protocol (RDE tests in perchloric acid). The ECSA change was less than 4% over 10,000 cycles. The load cycling accelerated protocol (from 0.6 to 0.95 V vs. RHE) resulted in a loss of approximately 34% of the initial ECSA after 10,000 cycles. However, fuel cell testing resulted in a very low performing catalyst. XPS spectroscopy was employed to investigate the changes in the catalysts occuring during fuel cell operation. It was observed a shift of In 3d5/2 and In 3d3/2 peaks towards higher binding energies. This can be explained by the formation of hydroxides or oxy-hydroxides in the surface of the catalyst. O1s spectrum for Pt/ITO catalyst after being operated in the fuel cell, also confirmed the formation of significant amounts of surface hydroxides (12 to 16%). The presence of surface hydroxides in the catalyst increased the electrode resistivity affecting fuel cell performance. NTCNA performed a detailed analysis of transport phenomena (reactants and products to/from the Pt active sites) in both commercial catalyst and Pt/RTO (in order to have a better understanding at the basic level). The proton resistance (Rionomer) in Pt/C and Pt/RTO cathode catalyst layers were 150 and 12 mΩ-cm2, respectively. Pt/RTO catalyst layer has about an order or magnitude lower proton transfer resistance than Pt/C catalyst layer. Since the ionomer/support ratio that was used in formulating the ink for both catalysts was the same (0.9), it is expected that the volumetric coverage of ionomer of both catalysts will be significantly different due to the disparity in the surface areas (Pt/C had ~ 800 m2/g, while Pt/RTO had ~ 50 m2/g). The differences in the ionomer volumetric coverage and the ionomer film thickness may explain the significantly higher proton conductivity in the Pt/RTO catalyst layer when compared to Pt/HSAC. It is therefore very important to optimize the ionomer loadings when synthesizing new catalyst supports (and never rely on values for carbon-based commercial catalysts). Finally, NTCNA has elaborated a cost model for non-carbon support materials considering their durability benefits. Material costs for production of Pt/ RuO2-TiO2 electrodes were compared to Pt/C. RuO2-TiO2 support was more expensive than carbon but the total material cost was still dominated by platinum cost. Though ruthenium is considered a precious metal, its cost is far less than platinum. It should also be noted that ruthenium only makes up 38% of the mass of the support, while the rest is inexpensive TiO2. After considering the durability advantages of Pt/RTO, cost model showed that even with almost double the Pt loading (0.35 vs 0.18 mgPt/cm2), Pt/RTO ($22.7/kWnet) is only slightly more expensive than Pt/C ($21.9/kWnet).

08 HYDROGEN↗

DOE-RCT-0003641 Final Technical Report

This program studied novel concepts for an Axial Flux Reluctance Machine to capture energy from marine hydrokinetic sources and compared their attributes to a Radial Flux Reluctance Machine which was designed under a prior Department of Energy program for the same application. Detailed electromagnetic and mechanical analyses were performed to determine the validity of the concept and to provide a direct comparison with the existing conventional Radial Flux Switched Reluctance Machine designed during the Advanced Wave Energy Conversion Project, DE-EE0003641. The alternate design changed the machine topology so that the flux that is switched flows axially rather than radially and the poles themselves are long radially, as opposed to the radial flux machine that has pole pieces that are long axially. It appeared possible to build an axial flux machine that should be considerably more compact than the radial machine. In an “apples to apples” comparison, the same rules with regard to generating magnetic force and the fundamental limitations of flux density hold, so that at the heart of the machine the same torque equations hold. The differences are in the mechanical configuration that limits or enhances the change of permeance with rotor position, in the amount of permeable iron required to channel the flux via the pole pieces to the air-gaps, and in the sizing and complexity of the electrical winding. Accordingly it was anticipated that the magnetic component weight would be similar but that better use of space would result in a shorter machine with accompanying reduction in housing and support structure. For the comparison the pole count was kept the same at 28 though it was also expected that the radial tapering of the slots between pole pieces would permit a higher pole count machine, enabling the generation of greater power at a given speed in some future design. The baseline Radial Flux Machine design was established during the previous DOE program. Its characteristics were tabulated for use in comparing to the Axial Flux Machine. Three basic conceptual designs for the Axial Flux Machine were considered: (1) a machine with a single coil at the inner diameter of the machine, (2) a machine with a single coil at the outside diameter of the machine, and (3) a machine with a coil around each tooth. Slight variations of these basic configurations were considered during the study. Analysis was performed on these configurations to determine the best candidate design to advance to preliminary design, based on size, weight, performance, cost and manufacturability. The configuration selected as the most promising was the multi-pole machine with a coil around each tooth. This configuration provided the least complexity with respect to the mechanical configuration and manufacturing, which would yield the highest reliability and lowest cost machine of the three options. A preliminary design was performed on this selected configuration. For this first ever axial design of the multi rotor configuration the 'apples to apples' comparison was based on using the same length of rotor pole as the axial length of rotor pole in the radial machine and making the mean radius of the rotor in the axial machine the same as the air gap radius in the radial machine. The tooth to slot ratio at the mean radius of the axial machine was the same as the tooth to slot ratio of the radial machine. The comparison between the original radial flux machine and the new axial flux machine indicates that for the same torque, the axial flux machine diameter will be 27% greater, but it will have 30% of the length, and 76% of the weight. Based on these results, it is concluded that an axial flux reluctance machine presents a viable option for large generators to be used for the capture of wave energy. In the analysis of Task 4, below, it is pointed out that our selection of dimensional similarity for the 'apples to apples' comparison did not produce an optimum axial flux design. There is torque capability to spare, implying we could reduce the magnetic structure, but the winding area, constrained by the pole separation at the inner pole radius has a higher resistance than desirable, implying we need more room for copper. The recommendation is to proceed via one cycle of optimization and review to correct this unbalance and then proceed to a detailed design phase to produce manufacturing drawings, followed by the construction of a prototype to test the performance of the machine against predicted results.

16 TIDAL AND WAVE POWER↗

Analysis of HolosGen Sub-Scale Simulator with Plant Dynamics Code

The Subcritical Power Module Sub-scale Simulator (SPM-SS) has been designed and constructed by HolosGen LLC under the ARPA-E MEITNER program to simulate the thermal-hydraulic and heat transfer behavior of the full-scale Holos-Quad Subcritical Power Modules (SPMs). Four coupled SPMs, each rated at 5.5MW, form the Holos-Quad gas-cooled microreactor design. The SPM-SS represents a substantially scaled-down system with a power rating less than 40 kW, equipped with an electrically heated fuel cartridge heat exchanger, an electrically heated compressor heat exchanger, and a valve actuated turbine heat exchanger, in addition to a recuperator and a cooler heat exchanger. The fuel cartridge represents a portion of the full-scale SPM core, the compressor heat exchanger mimics the temperature changes resulting from the compressor’s turbomachinery inefficiencies, the turbine heat exchanger mimics the expansion process normally occurring through the turbine, while the recuperator and cooler heat exchangers complete the subscale simulator loop. The heaters equipping the fuel cartridge and the compressor heat exchangers are electronically controlled to simulate normal and off-normal SPM operating conditions. The full-scale Holos-Quad SPM design eliminates the traditional balance of plant and executes thermal-to-electric energy conversion by means of an intercooled Brayton cycle with decoupled compressor-turbine turbomachinery. The Holos-Quad full-scale design is equipped with a multi-stage axial Low- and High-Pressure compressor, and a multistage axial turbine. The SPM-SS is designed for testing and validation of selected components which are instead coupled by a traditional balance of plant. The SPMSS is not equipped with turbo-machinery (compressor and turbine) as the development of these components were excluded from the scope of work under the ARPA-E MEITNER funding program. The SPM-SS balance of plant enables modifications, replacement and testing of individual components with different working fluids and is designed to include the turbo-machinery components that will be developed in future research . The SPM-SS can be operated with different gases, variable mass-flow-rates, pressures, and temperatures to obtain test data for selected components, whose performance can be scaled to validate the computer model of the full-scale SPM at various conditions (e.g., start-up, transients conditions). The SPM-SS can operate at the maximum Holos-Quad design pressure of 7 MPa, and a maximum temperature limited to 650 °C by the electrical heaters. Several SPM-SS tests have been conducted and analyzed with the Plant Dynamics Code (PDC) developed at the Argonne National Laboratory (ANL). These tests aimed at validating the PDC modeled predictions of the full-scale Holos-Quad design with data from selected SPM-SS components. In order to address SPM-SS specific characteristics, such as components heat losses and absence of turbomachinery components, some modifications to the PDC have been implemented to factor the design differences from the full-scale Holos-Quad SPM to the SPM-SS. As the PDC offers capabilities to analyze systems with different working fluids, air, nitrogen, and helium were utilized as the SPM-SS working fluids. Air was utilized to fine-tune the SPM-SS Systems Structures and Components (SSCs), nitrogen was utilized to pressure test the SPM-SS loop at the SPMs design maximum pressure of 7MPa. Helium was utilized as the working fluid circulating through the SPM-SS SSCs for specific tests to validate the PDC predictions of the fuel cartridge heat exchanger. SPM-SS tests data were also analyzed with both the steady-state and transient analysis capabilities offered by the PDC. This report describes the PDC analysis of the SPM-SS tests data, including the necessary code modifications and comparison of the code results with the experimental data. Based on the results, a discussion is presented on how the analysis supports design and transient calculations of the full-scale Holos-Quad microreactor. Also based on the results of this work, recommendations are made for future optimizations of the SPM-SS components and PDC model development needs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam 2008-2009

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2008 and early spring 2009, respectively. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). Operating the sluiceway reduces the potential for hydropower production. However, this surface flow outlet may be the optimal non-turbine route for fallbacks in late fall after the sluiceway is typically closed for juvenile fish passage and for overwintering summer steelhead and kelt passage in the early spring before the start of the voluntary spill season. The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines, and their movements in front of the sluiceway at TDA to inform fisheries managers’ and engineers’ decision-making relative to sluiceway operations. The study periods were from November 1 to December 15, 2008 (45 days) and from March 1 to April 9, 2009 (40 days). The study objectives were to 1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA during the two study periods, respectively, and 2) assess the behavior of these fish in front of sluice entrances. We obtained fish passage data using fixed-location hydroacoustics and fish behavior data using acoustic imaging. For the overwintering summer steelhead, fallback occurred throughout the 45-day study period. We estimated that a total of 1790 ± 250 (95% confidence interval) summer steelhead targets passed through the powerhouse intakes and operating sluices during November 1 to December 15, 2008. Ninety five percent of these fish passed through the sluiceway. Therefore, without the sluiceway as a route through the dam, a number of steelhead may have fallen back through turbines. Run timing peaked in late November, but fish continued to pass the dam until the end of the study. Horizontal distribution data indicated that sluice 1 is the preferred route for these fish during fallback through the dam. Diel distribution for overwintering steelhead fallbacks was variable with no apparent distinct patterns. Therefore, sluiceway operations should not be based on diel distribution. For the early spring study, overwintering summer steelhead and early out-migrating steelhead kelt downstream passage occurred throughout the 40-day study period. A total of 1766 ± 277 (95% confidence interval) kelt-size targets were estimated to have passed through the powerhouse intakes and operating sluices. Ninety five percent of these fish passed through the sluiceway. Therefore, as with steelhead fallback, not having the sluiceway as a route through the dam, a number of overwintering steelhead and kelts may use the turbines for downstream passage before the start of the spill season. Run timing peaked in late March; however, relatively large numbers of kelt-sized targets passed the dam on March 2 and March 6 (162 and 188 fish, respectively). Horizontal distribution indicated that sluice 1 is the preferred route for these adult salmonids as they migrate downstream through the dam. Again, no clear pattern was seen for diel distribution of overwintering steelhead and early out-migrating kelt passage.

13 HYDRO ENERGY↗

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Coastal Ohio Wind Project

The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack reduced the wake size and enhanced the vortices in the flow downstream of the turbine-tower compared with the tower alone case. Mean and rms velocity distributions from hot wire anemometer data confirmed that in a downwind configuration, the wake of the tower dominates the flow, thus the flow fields of a tower alone and tower-turbine combinations are nearly the same. For the upwind configuration, the mean velocity shows a narrowing of the wake compared with the tower alone case. The downwind configuration wake persisted longer than that of an upwind configuration; however, it was not possible to quantify this difference because of the size limitation of the wind tunnel downstream of the test section. The water tunnel studies demonstrated that the scale model studies could be used to adequately produce accurate motions to model the motions of a wind turbine platform subject to large waves. It was found that the important factors that affect the platform is whether the platform is submerged or surface piercing. In the former, the loads on the platform will be relatively reduced whereas in the latter case, the structure pierces the wave free surface and gains stiffness and stability. The other important element that affects the movement of the platform is depth of the sea in which the wind turbine will be installed. Furthermore, the wildlife biology component evaluated migratory patterns by different monitoring systems consisting of marine radar, thermal IR camera and acoustic recorders. The types of radar used in the project are weather surveillance radar and marine radar. The weather surveillance radar (1988 Doppler), also known as Next Generation Radar (NEXRAD), provides a network of weather stations in the US. Data generated from this network were used to understand general migratory patterns, migratory stopover habitats, and other patterns caused by the effects of weather conditions. At a local scale our marine radar was used to complement the datasets from NEXRAD and to collect additional monitoring parameters such as passage rates, flight paths, flight directions, and flight altitudes of nocturnal migrating species. Our work focused on the design and development of custom built marine radar that used t-bar and parabolic dish antennas. The marine radar used in the project was Furuno (XANK250) which was coupled with a XIR3000B digitizing card from Russell Technologies for collection of the radar data. The radar data was processed by open source radR processing software using different computational techniques and methods. Additional data from thermal IR imaging cameras were collected to detect heat emitted from objects and provide information on movements of birds and bats, data which we used for different animal flight behavior analysis. Lastly, the data from the acoustic recorders were used to provide the number of bird calls for assessing patterns and peak passage rates during migration. The development of the geospatial database included collection of different data sources that are used to support offshore wind turbine development. Many different data sets were collected and organized using initial version of web-based repository software tools that can accommodate distribution of rectified pertinent data sets such as the lake depth, lake bottom engineering parameters, extent of ice, navigation pathways, wind speed, important bird habitats, fish efforts and other layers that are relevant for supporting robust offshore wind turbine developments. Additional geospatial products developed during the project included few different prototypes for offshore wind farm suitability which can involve different stakeholders and participants for solving complex planning problems and building consensus. Some of the prototypes include spatial decision support system (SDSS) for collaborative decision making, a web-based Participatory Geographic Information System (PGIS) framework for evaluating importance of different decision alternatives using different evaluation criteria, and an Android application for collection of field data using mobile and tablet devices . In summary, the simulations of two- and three-blade wind turbines suggested that two-bladed machines could produce comparable annual energy as the three-blade wind turbines but have a lighter tower top weight, which leads to lower cost of energy. In addition, the two-blade rotor configuration potentially costs 20% less than a three blade configuration that produces the same power at the same site. The cost model analysis predicted a potential cost savings of approximately 15% for offshore two-blade wind turbines. The foundation design for a wind turbine in Lake Erie is likely to be driven by ice loads based on the currently available ice data and ice mechanics models. Hence, for Lake Eire, the cost savings will be somewhat smaller than the other lakes in the Great Lakes. Considering the size of cranes and vessels currently available in the Great Lakes, the cost optimal wind turbine size should be 3 MW, not larger. The surveillance data from different monitoring systems suggested that bird and bat passage rates per hour were comparable during heavy migrations in both spring and fall seasons while passage rates were significantly correlated to wind directions and wind speeds. The altitude of migration was higher during heavy migrations and higher over water relative to over land. Notable portions of migration on some spring nights occurred parallel the shoreline, often moving perpendicular to southern winds. The birds approaching the Western basin have a higher propensity to cross than birds approaching the Central basin of Lake Erie and as such offshore turbine development might be a better option further east towards Cleveland than in the Western basin. The high stopover density was more strongly associated with migration volume the following night rather than the preceding night. The processed mean scalar wind speeds with temporal resolutions as fine as 10-minute intervals near turbine height showed that August is the month with the weakest winds while December is the month, which typically has the strongest winds. The ice data suggests that shallow western basin of Lake Erie has higher ice cover duration many times exceeding 90 days during some winters.

17 WIND ENERGY↗

Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency

The tritium aspects of the DT fuel cycle embody some of the most challenging feasibility and attractiveness issues in the development of fusion systems. The review and analyses in this paper provide important information to understand and quantify these challenges and to define the phase space of plasma physics and fusion technology parameters and features that must guide a serious R&D in the world fusion program. We focus in particular on components, issues and R&D necessary to satisfy three 'principal requirements': (1) achieving tritium self-sufficiency within the fusion system, (2) providing a tritium inventory for the initial start-up of a fusion facility, and (3) managing the safety and biological hazards of tritium. A primary conclusion is that the physics and technology state-of-the-art will not enable DEMO and future power plants to satisfy these principal requirements. We quantify goals and define specific areas and ideas for physics and technology R&D to meet these requirements. A powerful fuel cycle dynamics model was developed to calculate time-dependent tritium inventories and flow rates in all parts and components of the fuel cycle for different ranges of parameters and physics and technology conditions. Dynamics modeling analyses show that the key parameters affecting tritium inventories, tritium start-up inventory, and tritium self-sufficiency are the tritium burn fraction in the plasma (f b ), fueling efficiency (η f ), processing time of plasma exhaust in the inner fuel cycle (t p ), reactor availability factor (AF), reserve time (tr) which determines the reserve tritium inventory needed in the storage system in order to keep the plant operational for time t r in case of any malfunction of any part of the tritium processing system, and the doubling time (t d ). Results show that η f f b > 2% and processing time of 1–4 h are required to achieve tritium self-sufficiency with reasonable confidence. For η f f b = 2% and processing time of 4 h, the tritium start-up inventory required for a 3 GW fusion reactor is ~11 kg, while it is <5 kg if η f f b = 5% and the processing time is 1 h. To achieve these stringent requirements, a serious R&D program in physics and technology is necessary. The EU-DEMO direct internal recycling concept that carries fuel directly from the plasma exhaust gas to the fueling systems without going through the isotope separation system reduces the overall processing time and tritium inventories and has positive effects on the required tritium breeding ratio (TBR R ). A significant finding is the strong dependence of tritium self-sufficiency on the reactor availability factor. Simulations show that tritium self-sufficiency is: impossible if AF < 10% for any η f f b , possible if AF > 30% and 1% ≤ η f f b ≤ 2%, and achievable with reasonable confidence if AF > 50% and η f f b > 2%. These results are of particular concern in light of the low availability factor predicted for the near-term plasma-based experimental facilities (e.g. FNSF, VNS, CTF), and can have repercussions on tritium economy in DEMO reactors as well, unless significant advancements in RAMI are made. There is a linear dependency between the tritium start-up inventory and the fusion power. The required tritium start-up inventory for a fusion facility of 100 MW fusion power is as small as 1 kg. Since fusion power plants will have large powers for better economics, it is important to maintain a 'reserve' tritium inventory in the tritium storage system to continue to fuel the plasma and avoid plant shutdown in case of malfunctions of some parts of the tritium processing lines. But our results show that a reserve time as short as 24 h leads to unacceptable reserve and start-up inventory requirements. Therefore, high reliability and fast maintainability of all components in the fuel cycle are necessary in order to avoid the need for storing reserve tritium inventory sufficient for continued fusion facility operation for more than a few hours. The physics aspects of plasma fueling, tritium burn fraction, and particle and power exhaust are highly interrelated and complex, and predictions for DEMO and power reactors are highly uncertain because of lack of experiments with burning plasma. Fueling by pellet injection on the high field side of tokamak has evolved to be the preferred method to fuel a burning plasma. Extrapolation from the DIII-D penetration scaling shows fueling efficiency expected in DEMO to be <25%, but such extrapolations are highly uncertain. The fueling efficiency of gas in a reactor relevant regime is expected to be extremely poor and not very useful for getting tritium into the core plasma efficiently. Gas fueling will nonetheless be useful for feedback control of the divertor operating parameters. Extensive modeling has been carried out to predict burn fraction, fueling requirements, and fueling efficiency for ITER, DEMO, and beyond. The fueling rate required to operate Q = 10 ITER plasmas in order to provide the required core fueling, helium exhaust and radiative divertor plasma conditions for acceptable divertor power loads was calculated. If this fueling is performed with a 50–50 DT mix, the tritium burn fraction in ITER would be ~0.36%, which is too low to satisfy the self-sufficiency conditions derived from the dynamics modeling for fusion reactors. Extrapolation to DEMO using this approach would also yield similarly low burn fraction. Extensive analysis presented shows that specific features of edge neutral dynamics in ITER and fusion reactors, which are different from present experiments, open possibilities for optimization of tritium fueling and thus to improve the burn fraction. Using only tritium in pellet fueling of the plasma core, and only deuterium for edge density, divertor power load and ELM control results in significant increase of the burn fraction to 1.8–3.6%. These estimates are performed with physics models whose results cannot be fully validated for ITER and DEMO plasma conditions since these cannot be achieved in present tokamak experiments. Thus, several uncertainties remain regarding particle transport and scenario requirements in ITER and DEMO. The safety standard requirements for protection of the public and release guidelines for tritium have been reviewed. General safety approaches including minimizing tritium inventories, reducing tritium permeation through materials, and decontaminating material for waste disposal have been suggested.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Engineering Ralstonia eutropha for Production of Isobutanol (IBT) Motor Fuel from Carbon Dioxide, Hydrogen, and Oxygen Project Final Report

This research project is a collaboration between the Sinskey laboratory at MIT and the Worden laboratory at Michigan State University. The goal of the project is to produce Isobutanol (IBT), a branched-chain alcohol that can serve as a drop-in transportation fuel, through the engineered microbial biosynthesis of Carbon Dioxide, Hydrogen, and Oxygen using a novel bioreactor. This final technical report presents the findings of both the biological engineering work at MIT that extended the native branched-chain amino acid pathway of the wild type Ralstonia eutropha H16 to perform this biosynthesis, as well as the unique design, modeling, and construction of a bioreactor for incompatible gasses at Michigan State that enabled the operational testing of the complete system. This 105 page technical report summarizing the three years of research includes 72 figures and 11 tables of findings. Ralstonia eutropha (also known as Cupriavidus necator) is a Gram-negative, facultatively chemolithoautotrophic bacteria. It has been the principle organism used for the study of polyhydroxybutyrate (PHB) polymer biosynthesis. The wild-type Ralstonia eutropha H16 produces PHB as an intracellular carbon storage material while under nutrient stress in the presence of excess carbon. Under this stress, it can accumulate approximately 80 % of its cell dry weight (CDW) as this intracellular polymer. With the restoration of the required nutrients, the cells are then able to catabolize this polymer. If extracted from the cell, this PHB polymer can be processed into biodegradable and biocompatible plastics, however for this research, it is the efficient metabolic pathway channeling the captured carbon that is of interest. R. eutropha is further unique in that it contains two carbon-fixation Calvin–Benson–Bassham cycle operons, two oxygen-tolerant hydrogenases, and several formate dehydrogenases. It has also been much studied for its ability in the presence of oxygen, to fix carbon dioxide into complex cellular molecules using the energy from hydrogen. In this research project, engineered strains of R. eutropha redirected the excess carbon from PHB storage into the production of isobutanol and 3-methyl-1-butanol (branched-chain higher alcohols). These branched-chain higher alcohols can be used directly as substitutes for fossil-based fuels and are seen as alternative biofuels to ethanol and biodiesel. Importantly, these alcohols have approximately 98 % of the energy content of gasoline, 17 % higher than the current gasoline additive ethanol, without impacting corn market production for feed or food. Unlike ethanol, these branched-chain alcohols have low vapor pressure, hygroscopicity, and water solubility, which make them readily compatible with the existing pipelines, gasoline pumps, and engines in our transportation infrastructure. While the use of alternative energies from solar, wind, geothermal, and hydroelectric has spread for stationary power applications, these energy sources cannot be effectively or efficiently employed in current or future transportation systems. With the ongoing concerns of fossil fuel availability and price stability over the long term, alternative biofuels like branched-chain higher alcohols hold promise as a suitable transportation fuel in the future. We showed in our research that various mutant strains of R. eutropha with isobutyraldehyde dehydrogenase activity, in combination with the overexpression of plasmid-borne, native branched-chain amino acid biosynthesis pathway genes and the overexpression of heterologous ketoisovalerate decarboxylase gene, would produce isobutanol and 3-methyl-1-butanol when initiated during nitrogen or phosphorus limitation. Early on, we isolated one mutant R. eutropha strain which produced over 180 mg/L branched-chain alcohols in flask culture while being more tolerant of isobutanol toxicity. After the targeted elimination of genes encoding several potential carbon sinks (ilvE, bkdAB, and aceE), the production titer of the improved to 270 mg/L isobutanol and 40 mg/L 3-methyl-1-butanol. Semicontinuous flask cultivation supplied the cells with sufficient nutrients while minimizing the toxicity caused by isobutanol. Under this cultivation, the R. eutropha mutant grew and produced more than 14 g/L branched-chain alcohols over the duration of 50 days. These results demonstrate that R. eutropha carbon flux can be redirected from PHB to branched-chain alcohols and that engineered R. eutropha can be cultivated over prolonged periods of time for product biosynthesis. While this bioengineering work was being done at the Sinskey laboratory at MIT, the researchers at the Worden laboratory at Michigan State were working on the design and construction of the required specialty bioreactor for incompatible gasses (BIG) that would allow the safe feeding of microbes on Carbon Dioxide, Hydrogen, and Oxygen without explosive results. The early design and assembly work in year 1 incorporated a novel microbubble generator to maximize the bioavailability of gasses within the system comprised of small scale hollow fiber reactors. The early success of the microbubble generator eliminated the need to investigate potentially toxic surfactants within the system. For operational control, the system design incorporated a Opto22-based control network. The researchers also selected the specific hollow fiber material suitable for the bioreactor application. A variety of commercially available hollow fiber membranes were compared with regard to their pore sizes, cell affinity, and potential interference to cell viability assays. The selected membrane with its spongy layer was then tested for diffusivity of O2 and CO2. The instrumented system was then fully assembled for experimentally measuring the heterotrophic growth rate of immobilized R. eutropha cells. The requisite procedures for inoculation, measurement, and cleaning were established enabling the system performance to be validated under controlled laboratory conditions. In year 2, the researchers completed the Opto22 based cross-platform control network, and the system’s communications across the Sartorius fermentation system and Bruker gas chromatograph was established via open platform communications (OPC) protocol. Using the revised system, measurements were taken of the R.eutropha cell growth rate and substrate mass transfer rate in the hollow fiber membrane. Several IBT recovery strategies were explored and resin adsorption was determined to be optimal solution for lab scale operations. The adsorption capacity of the resin column was then measured and IBT desorption using methanol has been demonstrated. With the growing body of experimental data in hand, mathematical models were constructed to demonstrate and map the cellular kinetics, mass transfer of heterotrophic and autotrophic substrates in the hollow fiber, and the adsorption process in the resin column. A structured kinetic model was constructed to describe the competition between cell mass generation and IBT production. The reactor was then scaled up from single fiber to a membrane area of 180 cm2 and then further to 1 ft2. In Year 3 of the research, the IBT mass transfer across the membrane was characterized within the system with experiments to empirically measure the IBT diffusion coefficient in the BIG spongy layer. Using the refined mathematical models, the researchers are now able to explain the experimental observations and predict bioreactor performance under a wide range of experimental conditions. The Big system is able to demonstrate continuous controlled operations with the integrated IBT recovery system. Both heterotrophic and autotrophic production have been shown during continuous operation with heterotrophic and autotrophic stages. Performance of BIG system has been measured during continuous run with alternating heterotrophic growth on fructose and autotrophic product formation on H2, CO2, and O2. Volumetric productivities of IBT at 325 mg/(L day) and of 3M1B at 50 mg/(L day) were achieved, which were comparable to that achieved under heterotrophic conditions. Using the mathematical model, researchers are able to predict system performance for scaled-up BIG system. The apparent diffusion coefficient of IBT in the spongy layer of XM-50 hollow fiber membranes has been measured at various lumen liquid flow rates. The experiment is simulated in COMSOL to validate the results. The constructed COMSOL model is able to simulate BIG system performance in both batch and continuous mode. Mathematical simulations of the system performance have been run to identify the most crucial operational conditions, identifying the rate-limiting factors in autotrophic production of IBT, and quantitating the rate of IBT catabolism. Investigations of the productivity of the production system have suggested and the modeling of the system has revealed a particular sensitivity to the catabolism of the produced IBT by the engineered R. eutropha. Experiments have been designed and executed to quantify the IBT catabolism of R. eutropha, which open up possibilities for further system improvements through future, targeted bioengineering of the strain. Finally, the researchers at Michigan State performed an economic analysis of the system, based on the collective results, and their findings are presented in full within the report.

08 HYDROGEN↗

Evaluation of Dry Sorbent Injection Technology for Pre-Combustion CO{sub 2} Capture

This document summarizes the work performed on Cooperative Agreement DE-FE0000465, “Evaluation of Dry Sorbent Technology for Pre-Combustion CO{sub 2} Capture,” during the period of performance of January 1, 2010 through September 30, 2013. This project involves the development of a novel technology that combines a dry sorbent-based carbon capture process with the water-gas-shift reaction for separating CO{sub 2} from syngas. The project objectives were to model, develop, synthesize and screen sorbents for CO{sub 2} capture from gasified coal streams. The project was funded by the DOE National Energy Technology Laboratory with URS as the prime contractor. Illinois Clean Coal Institute and The University of Illinois Urbana-Champaign were project co-funders. The objectives of this project were to identify and evaluate sorbent materials and concepts that were suitable for capturing carbon dioxide (CO{sub 2}) from warm/hot water-gas-shift (WGS) systems under conditions that minimize energy penalties and provide continuous gas flow to advanced synthesis gas combustion and processing systems. Objectives included identifying and evaluating sorbents that efficiently capture CO{sub 2} from a gas stream containing CO{sub 2}, carbon monoxide (CO), and hydrogen (H{sub 2}) at temperatures as high as 650 °C and pressures of 400-600 psi. After capturing the CO{sub 2}, the sorbents would ideally be regenerated using steam, or other condensable purge vapors. Results from the adsorption and regeneration testing were used to determine an optimal design scheme for a sorbent enhanced water gas shift (SEWGS) process and evaluate the technical and economic viability of the dry sorbent approach for CO{sub 2} capture. Project work included computational modeling, which was performed to identify key sorbent properties for the SEWGS process. Thermodynamic modeling was used to identify optimal physical properties for sorbents and helped down-select from the universe of possible sorbent materials to seven that were deemed thermodynamically viable for the process. Molecular modeling was used to guide sorbent synthesis through first principles simulations of adsorption and regeneration. Molecular dynamics simulations also modeled the impact of gas phase impurities common in gasified coal streams (e.g., H{sub 2}S) on the adsorption process. The role of inert dopants added for mechanical durability to active sorbent materials was also investigated through molecular simulations. Process simulations were conducted throughout the project to help determine the overall feasibility of the process and to help guide laboratory operating conditions. A large component of the program was the development of sorbent synthesis methods. Three different approaches were used: mechanical alloying (MA), flame spray pyrolysis (FSP), and ultrasonic spray pyrolysis (USP). Sorbents were characterized by a host of analytical techniques and screened for SEWGS performance using a thermogravimetric analyzer (TGA). A feedback loop from screening efforts to sorbent synthesis was established and used throughout the project lifetime. High temperature, high pressure reactor (HTPR) systems were constructed to test the sorbents at conditions mimicking the SEWGS process as identified through process modeling. These experiments were conducted at the laboratory scale to examine sorbents for their CO{sub 2} capacity, conversion of CO to CO{sub 2}, and impacts of adsorption and regeneration conditions, and syngas composition (including impurities and H2O:CO ratio). Results from the HTPR testing showed sorbents with as high as 0.4 g{sub CO{sub 2}}/g{sub sorbent} capacity with the ability to initially shift the WGS completely towards CO{sub 2}/H{sub 2}. A longer term experiment with a simple syngas matrix and N{sub 2}/steam regeneration stream showed a USP sorbent to be stable through 50 adsorption-regeneration cycles, though the sorbent tested had a somewhat diminished initial capacity. The program culminated in a technoeconomic assessment in which two different approaches were taken; one approach was intended to be technically conservative while the second required several key engineering challenges to be met in order to succeed. The project team is confident that, with the proper support, those challenges could be met. The second approach relies on a slipstream of H{sub 2} from the shifted syngas and O{sub 2} from an air separation unit (ASU) to be combusted in the presence of the sorbent for regeneration; termed a regenerating boiler. The approach also makes use of the heat of adsorption to generate >400 MW of turbine quality steam; total plant gross energy output as high as 1 GW was estimated for an IGCC with an initial gross energy output of 737 MW, without any additional coal usage. The regenerating boiler concept could benefit further from additional heat integration, but the results of this effort show a COE of $97.50 per MWh for a rational combination of operating parameters and sorbent lifetime as well as conservative estimates for steam turbines, gas turbine, and ASU. If the COE of CO{sub 2} transmission, storage and monitoring ($5.60 / MWh) is added to the base case for an IGCC ($81.30 / MWh for Case 5 from the DOE Bituminous Coal Report), the cost of CO{sub 2} capture for the regenerating boiler was only $10.60 / MWh; other regenerating boiler cases are as low $6.90 / MWh. The project met all agreed upon milestones and was completed within budget, more than 25% cost share provided by the project team. Results from the program showed that the SEWGS process has great promise, and with further study and evaluation could become a component of a comprehensive carbon capture program. SEWGS requires a paradigm shift in the traditional approach to carbon capture because the regenerating boiler concept is not a ‘back-end’ solution to CO{sub 2} mitigation. Rather, it is an integral part of the plant operations and is responsible for generating more electricity than the IGCC itself. Schemes could be envisioned where the H{sub 2} production is used exclusively to regenerate the sorbent, with any excess sold as a commodity, and the heat of adsorption serving as the primary driver for power generation. Further work with sorbent evaluation, process modeling and heat integration, and scale-up would be needed to more fully vet SEWGS, but the culmination of this program indicates that additional study is warranted.

20 FOSSIL-FUELED POWER PLANTS↗

Computing for Finance

The finance sector is one of the driving forces for the use of distributed or Grid computing for business purposes. The speakers will review the state-of-the-art of high performance computing in the financial sector, and provide insight into how different types of Grid computing – from local clusters to global networks - are being applied to financial applications. They will also describe the use of software and techniques from physics, such as Monte Carlo simulations, in the financial world. There will be four talks of 20min each. The talk abstracts and speaker bios are listed below. This will be followed by a Q&A; panel session with the speakers. From 19:00 onwards there will be a networking cocktail for audience and speakers. This is an EGEE / CERN openlab event organized in collaboration with the regional business network rezonance.ch. A webcast of the event will be made available for subsequent viewing, along with powerpoint material presented by the speakers. Attendance is free and open to all. Registration is mandatory via www.rezonance.ch, including for CERN staff. 1. Overview of High Performance Computing in the Financial Industry Michael Yoo, Managing Director, Head of the Technical Council, UBS Presentation will describe the key business challenges driving the need for HPC solutions, describe the means in which those challenges are being addressed within UBS (such as GRID) as well as the limitations of some of these solutions, and assess some of the newer HPC technologies which may also play a role in the Financial Industry in the future. Speaker Bio: Michael originally joined the former Swiss Bank Corporation in 1994 in New York as a developer on a large data warehouse project. In 1996 he left SBC and took a role with Fidelity Investments in Boston. Unable to stay away for long, he returned to SBC in 1997 while working for Perot Systems in Singapore. Finally, in 1998 he formally returned to UBS in Stamford following the merger with SBC and has remained with UBS for the past 9 years. During his tenure at UBS, he has had a number of leadership roles within IT in development, support and architecture. In 2006 Michael relocated to Switzerland to take up his current role as head of the UBS IB Technical Council, responsible for the overall technology strategy and vision of the Investment Bank. One of Michael's key responsibilities is to manage the UBS High Performance Computing Research Lab and he has been involved in a number of initiatives in the HPC space. 2. Grid in the Commercial WorldFred Gedling, Chief Technology Officer EMEA and Senior Vice President Global Services, DataSynapse Grid computing gets mentions in the press for community programs starting last decade with Seti@Home. Government, national and supranational initiatives in grid receive some press. One of the IT-industries' best-kept secrets is the use of grid computing by commercial organizations with spectacular results. Grid Computing and its evolution into Application Virtualization is discussed and how this is key to the next generation data center. Speaker Bio: Fred Gedling holds the joint roles of Chief Technology Officer for EMEA and Senior Vice President of Global Services at DataSynapse, a global provider of application virtualisation software. Based in London and working closely with organisations seeking to optimise their IT infrastructures, Fred offers unique insights into the technology of virtualisation as well as the methodology of establishing ROI and rapid deployment to the immediate advantage of the business. Fred has more than fifteen years experience of enterprise middleware and high-performance infrastructures. Prior to DataSynapse he worked in high performance CRM middleware and was the CTO EMEA for New Era of Networks (NEON) during the rapid growth of Enterprise Application Integration. His 25-year career in technology also includes management positions at Goldman Sachs and Stratus Computer. Fred holds a First Class Bsc (Hons) degree in Physics with Astrophysics from the University of Leeds and had the privilege of being a summer student at CERN.3. Opportunities for gLite in finance and related industriesAdam Vile, Head of Grid, HPC and Technical Computing, Excelian Ltd.gLite, the Grid software developed by the EGEE project, has been exceedingly successful as an enabling infrastructure, and has been a massive success in bringing together scientific and technical communities to provide the compute power to address previously incomputable problems. Not so in the finance industry. In its current form gLite would be a business disabler. There are other middleware tools that solve the finance communities compute problems much better. Things are moving on, however. There are moves afoot in the open source community to evolve the technology to address other, more sophisticated needs such as utility and interactive computing. In this talk, I will describe how Excelian is providing Grid consultancy services for the finance community and how, through its relationship to the EGEE project, Excelian is helping to identify and exploit opportunities as the research and business worlds converge. Because of the strong third party presence in the finance industry, such opportunities are few and far between, but they are there, especially as we expand sideways into related verticals such as the smaller hedge funds and energy companies. This talk will give an overview of the barriers to adoption of gLite in the finance industry and highlight some of the opportunities offered in this and related industries as the ideas around Grid mature. Speaker Bio: Dr Adam Vile is a senior consultant and head of the Grid and HPC practice at Excelian, a consultancy that focuses on financial markets professional services. He has spent many years in investment banking, as a developer, project manager and architect in both front and back office. Before joining Excelian he was senior Grid and HPC architect at Barclays Capital. Prior to joining investment banking, Adam spent a number of years lecturing in IT and mathematics at a UK University and maintains links with academia through lectures, research and through validation and steering of postgraduate courses. He is a chartered mathematician and was the conference chair of the Institute of Mathematics and its Applications first conference in computational Finance. 4. From Monte Carlo to Wall Street Daniel Egloff, Head of Financial Engineering Computing Unit, Zürich Cantonal Bank High performance computing techniques provide new means to solve computationally hard problems in the financial service industry. First I consider Monte Carlo simulation and illustrate how it can be used to implement a sophisticated credit risk management and economic capital framework. From a HPC perspective, basic Monte Carlo simulation is embarrassingly parallel and can be implemented efficiently on distributed memory clusters. Additional difficulties arise for adaptive variance reduction schemes, if the information content in a sample is very small, and if the amount of simulated date becomes huge such that incremental processing algorithms are indispensable. We discuss the business value of an advanced credit risk quantification which is particularly compelling in these days. While Monte Carlo simulation is a very versatile tool it is not always the preferred solution for the pricing of complex products like multi asset options, structured products, or credit derivatives. As a second application I show how operator methods can be used to develop a pricing framework. The scalability of operator methods relies heavily on optimized dense matrix-matrix multiplications and requires specialized BLAS level-3 implementations provided by specialized FPGA or GPU boards. Speaker Bio: Daniel Egloff studied mathematics, theoretical physics, and computer science at the University of Zurich and the ETH Zurich. He holds a PhD in Mathematics from University of Fribourg, Switzerland. After his PhD he started to work for a large Swiss insurance company in the area of asset and liability management. He continued his professional career in the consulting industry. At KPMG and Arthur Andersen he consulted international clients and implemented quantitative risk management solutions for financial institutions and insurance companies. In 2002 he joined Zurich Cantonal Bank. He was assigned to develop and implement credit portfolio risk and economic capital methodologies. He built up a competence center for high performance and cluster computing. Currently, Daniel Egloff is heading the Financial Computing unit in the ZKB Financial Engineering division. He and his team is engineering and operating high performance cluster applications for computationally intensive problems in financial risk management.

BUSINESS VALUE↗

Proposed Mars Surveyor Landing Sites in Northern Meridiani Sinus, Southern Elysium Planitia, and Argyre Planitia

Our objective is to propose two landing sites that the Mars Surveyor 2001 Lander and Athena Rover could go to on Mars that should meet the safety requirements of the spacecraft landing system and optimize surface operations (chiefly driven by power and communications requirements). An additional site within Argyre Planitia, initially proposed by Parker to the Mars Surveyor Landing Site program, is also proposed for potential consideration for post-2001 missions to Mars, as it is well outside the current latitude limits for the Athena Rover. All three sites are designed to be situated as close to a diversity of geologic units within a few kilometers of the landing site so that diversity can be placed in a geologic context. This objective is very different from the Mars Pathfinder requirement to land at a site with a maximum chance for containing a diversity of rocks within a few tens of meters of the lander. That requirement was driven by the Sojourner mobility limit of a few tens of meters. It can be argued that the Athena project, with its much larger mobility capability, might actually want to avoid such a site, because placing collected samples in geologic context would be difficult. While it has been argued, both before and after the Mars Pathfinder landing, that the provenance for local blocks may be determined by orbiter spectra, primarily from the MGS TES instrument, our ability to do so has yet to be demonstrated. Indeed, several months after conclusion of the Pathfinder mission, we have yet to reach a consensus on the composition of local materials. Our primary data set for selecting a landing site within the latitude and elevation constraints of the 2001 mission is the Viking Orbiter image archive. The site must be selected to place the landing ellipse so as to avoid obvious hazards, such as steep slopes, large or numerous craters, or abundant large knobs. For this purpose, we chose a resolution limit of better than 50 m/pixel. This necessarily excludes from the present study images from current and future orbiter spacecraft, until such data does become readily available. Within each proposed region, it may be possible to identify additional sites once these data become available. Second, the fine-component thermal inertia data, should be greater than about 5 or 6 cgs Units (10(exp -3) cal/sq cm s(exp -0.5)/K). Low thermal inertias imply dusty environments, which could pose a mobility hazard. Similarly, the albedo of the site should not be particularly high, which would also suggest dusty surfaces. Low albedos are preferred, as they often coincide with low Viking red:violet ratios and indicate less dusty surfaces. Next, the Modeled Block Abundance should also not be too high or too low. Based on the Viking Lander and Mars Pathfinder experiences, percentages of blocks should be on the order of 5-25%. Too many blocks could pose a hazard to the landing and mobility. Too few blocks could also indicate a dusty surface. Primary Landing Site: Northern Meridiani Sinus (Proposed by T. J. Parker and K., S. Edgett) Vital Statistics: (1) Latitude, Longitude: 0-3 N, 350-2 W. *Elevation (Viking): about0.5-1.5 Ian. (2) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbits 709A and 410B). Possible stereo coverage in region where two orbits overlap (probably small parallax angle, as these orbits are not listed in NASA Contractor Report 3501) (3) Albedo: about .18 -.26 (4) Block Abundance: 5-26% (5)Fine-Component Thermal Inertia: 5-9 cgs units This region consists of bright deposits similar to those described by Edgett et al, that also lie within a prominent dark albedo region. These deposits are flat-lying, to such a degree that they ramp against topography rather than draping over it. This led Edgett and Parker to suggest that they may be subaqueous sediments, possibly lacustrine or marine evaporites, laid down sometime from the late Noachian to middle Hesperian (age determination pending crater counts). A contact between this material and elevated, dissected highlands to the south was identified , and is described by Edgett et al. Our desire in proposing this landing site is to sample the edge of this deposit where it has been exposed through etching, presumably eolian deflation (the deposit, though in the highlands, is itself only lightly to moderately cratered). This should enable access to in situ stratigraphy. The actual landing site will be selected where slopes are not expected to be steep, such that the rover itself should be able to traverse them and sample layered materials on the way, either up or down the slope. Perhaps due to uncertainties at this time as to the friability or meter-scale roughness of the deposit, it might make sense to place the landing ellipse on the exhumed highland surface adjacent to the deflated margin of the deposit and plan on driving to the deposit rather than landing on it and driving downslope. This should also enable imaging the margin for evidence of layering should it prove too difficult to climb. A target ellipse on the highland surface should also allow Athena access to ancient Noachian highland materials, particularly if placed near crater ejecta or an inlier of knobby material. Secondary Landing Site: Southern Elysium Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 1.5-3.5 S, 195-198 W. (2) Elevation (Viking): -1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbit 725). Possible stereo coverage between images from beginning and end of orbit that overlap (probably small parallax angle) (4) Albedo: about .27-.28 (5) Block Abundance: 4-7% (6) Fine-Component Thermal Inertia: about 3 cgs units This region consists of eroded knobby material, probably of Noachian age, though much of the crater population has been destroyed, that is onlapped at a sharp contact by an extensive plains unit in southern Elysium Planitia that is Amazonian in age. The plains materials have been attributed to unusually low-viscosity flood lavas from fissures south of the Elysium volcanic rise, or to lacustrine materials associated with a large, Amazonian lake at the source of Marte Vallis. Parker and Schenk presented evidence in support of the latter interpretation, though they attributed the putative shore morphology to an embayment of a northern plains ocean into the southern Elysium region. Detailed examination of the margin of the deposit, showing erosion, not simply burial, of small crater rims and fluidized ejecta blankets, also points to lacustrine or marine sedimentation rather than volcanic plains burial. The plains surface exhibits a "crusty" appearance that many researchers have attributed to pressure ridges in lava flows. In a lacustrine context, they also resemble pressure ridges in desiccated evaporite deposits and salt-rimmed pools (now dry) similar in scale and morphology to spectacular, hundred meter-scale pool rims in alkaline Lake Natron, East African Rift. The eroded highland margin surface adjacent to these plains appears to be fairly smooth, even at 15 m/pixel. Isolated knob inliers are scattered from a few kilometers to several tens of "kilometers apart. Heights of the knobs have not been measured yet but, based on experience with similar features in the Pathfinder landing ellipse, are probably typically on the order of several tens of meters high and smaller, though some of the largest knobs in the region are probably up to a few hundred meters high. Two craters larger than a kilometer in diameter, with fluidized deposits, lie nearby the proposed landing site. Very high-resolution images from MOC should help to determine whether a landing site navigable by the Athena rover could be placed in this region. The space between knobs and craters is large enough to enable placement of a target landing ellipse between them but still provide access to one or more of them and to the margin of the Elysium plains material. Post-2001 Mars Surveyor Landing Site: Argyre Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 55-56 S, 41-43 W. (2) Elevation (Viking): 1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 40 m/pixel images (orbits 567B, 568B, and 569B). Excellent stereo coverage with large parallax angles over the entire landing site region, and much of central and southern Argyre. (4) Albedo: about .23-.24 (5) Block Abundance: No data (6) Fine-Component Thermal Inertia: No data The floors of both the Argyre and Hellas basins contain etched layered materials that are probably thick accumulations of channel or lacustrine sediments. The deposits in Hellas are much more eroded than those in Argyre, and Hellas lacks a channel outlet. Argyre is unique in that Uzboi Vallis flowed out of the basin, requiring overflow of a standing body of water within Argyre. This makes it the largest impact basin on Mars with channels both draining into it and flowing out from it. Hellas' channels may be catastrophic flood channels, whereas Argyre was fed by modest-scale valley networks, though the outlet at Uzboi Vallis was a catastrophic flood Highland craters and basins of this kind should be high-priority landing targets for missions intended to focus on the search for either prebiotic organic materials or even simple fossil microorganisms. Basins with internally-draining valley networks should be preferred over flood channels, as they could have provided the long-term influx of water favorable to the origin of life. (Catastrophic floods are not conducive to fossil preservation, due to their very short durations and high transportation energies). They also afford an opportunity to study the evolution of the planet's climate and volatiles during the period of time between the late Noachian and early Hesperian, when a drastic change from a proposed early warm, wet climate to one more closely resembling the modern environment is thought to have occurred. Large basin

Parker, T. J.↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗